[{"name":"S2-2311978","title":"LS from RAN WG2: Reply LS on the resource selection window for Scheme 2 in a dedicated resource pool for positioning","source":"RAN WG2","contact":"Sven Fischer","contact-id":20628,"tdoctype":"LS in","for":"Action","abstract":"RAN WG2 thanks RAN WG1 for their LS on the resource selection window for scheme 2 in a dedicated SL-PRS resource pool and informing RAN WG2 about RAN WG1's Working Assumption: Working assumption For Scheme 2, in a dedicated resource pool, using Rel-16 resource (re)-selection procedure as the starting point, support the following modification: Modification 2: For the resource selection window: o Option 1: for the derivation of the window, using the legacy approach as a starting point, substitute the Packet Delay Budget (PDB) with a Delay Budget for SL-PRS RAN WG1 request: RAN WG1 respectfully asks RAN WG2 whether they can confirm RAN WG1 s working assumption, and if not, RAN WG1 requests RAN WG2 to decide an alternative solution and inform RAN WG1. RAN WG2 response: RAN WG2 confirms the RAN WG1 working assumption above. Action: RAN WG2 respectfully asks RAN WG1 and SA WG2 to take the above information into account.","secretary_remarks":"Response drafted in S2-2312909. Noted in parallel session","agenda_item_sort_order":77,"ainumber":"9.5.2","ainame":"Ranging based services and sidelink positioning (Ranging_SL)","tdoc_agenda_sort_order":12950,"status":"noted","reservation_date":"2023-10-18 16:41:40","uploaded":"2023-10-19 12:19:16","revisionof":"","revisedto":"","release":"Rel-18","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"RAN WG1, SA WG2","Cc":"","lsoriginalls":"R2-2311389","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_160_Chicago_2023-11\/Docs\/S2-2311978.zip","group":"S2","meeting":"S2-160","year":2023,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0}]