[{"name":"S2-2304361","title":"[DRAFT] LS on Overload Control in Support of Discontinuous Network Coverage.","source":"China Mobile","contact":"Dan Wang","contact-id":87155,"tdoctype":"LS out","for":"Approval","abstract":"SA WG2 asks CT WG1 to decide whether the maximum wait time will require a new IE or reuse existing IE used for MINT.","secretary_remarks":"r00 agreed. Revised to S2-2305576, merging S2-2305300","agenda_item_sort_order":76,"ainumber":"9.2.2","ainame":"Satellite access Phase 2 (5GSAT_Ph2)","tdoc_agenda_sort_order":12800,"status":"revised","reservation_date":"2023-06-04 11:22:40","uploaded":"2023-04-07 16:45:12","revisionof":"","revisedto":"S2-2305576","release":"Rel-18","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"CT WG1","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_156E_Electronic_2023-04\/Docs\/S2-2304361.zip","group":"S2","meeting":"S2-156-e","year":2023,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0}]