[{"name":"S1-192868","title":"eCAV \u2013 further 5G service requirements for wired to wireless link replacement for smart manufacturing \/ Industry 4.0","source":"Siemens AG","contact":"Alain Sultan","contact-id":10343,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":35,"ainumber":"8.8","ainame":"eCAV: WID on enhancements for CAV (eCAV) [SP-190310]","tdoc_agenda_sort_order":21892,"status":"agreed","reservation_date":"2019-09-02 14:15:26","uploaded":"2019-09-02 14:18:00","revisionof":"S1-192454","revisedto":"","release":"Rel-17","crspec":22.104,"crspecversion":"17.0.0","workitem":[{"winame":"eCAV"}],"crnumber":16.0,"crrevision":2.0,"crcategory":"B","tsg_crp":"SP-190812","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG1_Serv\/TSGS1_87_SophiaAntipolis\/Docs\/S1-192868.zip","group":"S1","meeting":"S1-87","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0}]