[{"name":"S1-153061","title":"Introduction and Scope for eMBB TR","source":"LG Electronics France","contact":"Ki-Dong Lee","contact-id":45906,"tdoctype":"draft TR","for":"Decision","abstract":"Proposal for initial input for the eMBB Building Block TR based on the SMARTER phase-1 TR","secretary_remarks":"","agenda_item_sort_order":5,"ainumber":"3.3","ainame":"Outline \/ structure for the new Building Block TRs","tdoc_agenda_sort_order":0,"status":"revised","reservation_date":"2015-10-08 00:04:38","uploaded":"2015-10-09 20:31:36","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG1_Serv\/TSGS1_71bis_adhoc_5G_Vancouver\/docs\/S1-153061.zip","group":"S1","meeting":"S1-ah-31901","year":2015,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0}]