[{"name":"R6-160172","title":"Miscellaneous corrections","source":"Ericsson Inc.","contact":"John Diachina","contact-id":25840,"tdoctype":"CR","for":"Approval","abstract":"The possibility of inconsistent deployment of eDRX within the set of BSSs comprising a Routing Area can lead to mobile stations becoming unreachable after performing reselection to a new cell within the same Routing Area.\nThe SGSN will only send the BSS a PERFORM-LOCATION-REQUEST PDU when the Ready timer is running (i.e. it will never be sent to the BSS when the Active timer is running) and as such Note 7 of sub-clause 10.5.1 should not refer to the PERFORM-LOCATION-REQUEST PDU being sent when the Active timer is running.\nThe \u201cTime Until Next Paging Opportunity\u201d (TUNPO) IE is incorrectly shown as 3 octets long.","secretary_remarks":"","agenda_item_sort_order":10,"ainumber":"6.1","ainame":"Extended DRX for GSM (WI code: eDRX_GSM)","tdoc_agenda_sort_order":0,"status":"revised","reservation_date":"2016-11-04 19:30:52","uploaded":"2016-11-04 19:37:40","revisionof":"","revisedto":"R6-160218","release":"Rel-13","crspec":48.018,"crspecversion":"13.3.1","workitem":[{"winame":"CIoT_EC_GSM-Core"}],"crnumber":431.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ran\/WG6_legacyRAN\/TSGR6_02\/Docs\/R6-160172.zip","group":"R6","meeting":"R6-2","year":2016,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0}]