[{"name":"R5-202397","title":"Discussion on SCell activation and deactivation delay","source":"Samsung R&D Institute UK","contact":"Carolyn Taylor","contact-id":81481,"tdoctype":"discussion","for":"Discussion","abstract":"In this contribution, we discussed specific RAN5 test aspects for TCs 7.5.3.1 and 7.5.3.2. Based on the discussion, our observations are summarized as follows:\nObservation 1: Based on analysis the message contents needed for test cases 7.5.3.1 and 7.5.3.2 are provided in Table 2.2-1 and 2.2-2.\nObservation 2: The test parameters and metrics needed for TCs in 7.5.3 includes: DL AWGN absolute power, DL applied SNR, and UL signal transmit timing relative to DL.\nObservation 3:  The SSB Es\/Iot of both NR Cells shall be above -4dB.\nObservation 4: The tightest requirement for Io of NR Cells shall be between -117.5dBm\/15kHz (-89.5dBm \/ 9.36MHz) or -114.5dBm\/30kHz (-83.5dBm \/ 38.16MHz) and -50dBm \/ CBW for band group NR_FDD_FR1_H.\nObservation 5: The tightest requirement for SSB_RP shall be above -121.5dBm \/ 15kHz or -118.5\/30kHz for band groups NR_FDD_FR1_H.","secretary_remarks":"","agenda_item_sort_order":89,"ainumber":"5.3.2.17","ainame":"\tDiscussion Papers \/ Work Plan \/ TC lists","tdoc_agenda_sort_order":23970,"status":"noted","reservation_date":"2020-05-08 16:51:17","uploaded":"2020-05-08 18:19:07","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":[{"winame":"5GS_NR_LTE-UEConTest"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_87_Electronic\/Docs\/R5-202397.zip","group":"R5","meeting":"R5-ah-38102","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0}]