[{"name":"R5-202163","title":"Discussion about power configuration for spurious emission for inter-band EN-DC","source":"Guangdong OPPO Mobile Telecom.","contact":"Wenhao Zhan","contact-id":86118,"tdoctype":"discussion","for":"Endorsement","abstract":"CR is R5-202207 and R5-202208\nCurrently power configurations for spurious emission for inter-band EN-DC within FR1 are not accurate enough. This paper introduces the unreasonable configuration and propose a new power configuration.\nObservation 1: The second and third intermodulation products which occurred by NR and E-UTRA transmission might be very weak or even inexistence with currently power configurations so that the test case of spurious emission for inter-band EN-DC within FR1 might not meet the requirement.\nProposal 1: For test cases 6.5B.3.3.1 and 6.5B.3.3.2, both NR and E-UTRA transmit power configuration are set to 20 for PC3 UE no matter it supports pc_dynamicPowerSharing or not.","secretary_remarks":"","agenda_item_sort_order":89,"ainumber":"5.3.2.17","ainame":"\tDiscussion Papers \/ Work Plan \/ TC lists","tdoc_agenda_sort_order":21630,"status":"noted","reservation_date":"2020-05-08 02:46:17","uploaded":"2020-05-08 12:41:23","revisionof":"","revisedto":"","release":"Rel-16","crspec":"38.521-3","crspecversion":"","workitem":[{"winame":"5GS_NR_LTE-UEConTest"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_87_Electronic\/Docs\/R5-202163.zip","group":"R5","meeting":"R5-ah-38102","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0}]