[{"name":"R5-201919","title":"Discussion on how to update TS 38.522","source":"China Mobile, Bureau Veritas, Huawei, Hisilicon, TTA, Sporton","contact":"Dan Song","contact-id":75340,"tdoctype":"discussion","for":"Endorsement","abstract":"Proposal 1: To add TDD-TDD PC2 inter-band EN-DC UE RF Baseline implementation Capabilities declaration in TS 38.508-2. To update the \u201cCA\u201d into \u201cCA\/DC\u201d in both Table 4.0-3 and the corresponding column title of Table 4.1.3-1 in TS 38.522.\nProposal 2: To add NOTE at the bottom of Table 4.1.1-1 to indicate how to skip TS 38.521-1 2Rx test cases. To add NOTE at the bottom of Table 4.1.3-1 to indicate how to skip TS 38.521-3 2Rx test cases.\nProposal 3: The test cases addressed by different WIs shall be added into TS 38.522 by different jumbo CRs with corresponding different work Item codes rather just one jumbo.\nProposal 4: To keep the \u201cAdditional Information\u201d for TC 6.5.3.1 as it is in TS 38.522-g30.\nProposal 5: To add NOTE to the \u201cAdditional Information\u201d of TC 6.2.2 (MPR), TC 6.5.2.2 (SEM), TC 6.5.2.4.1 (NR ACLR) as well as to the bottom of Table 4.1.1-1 to indicate all the three test cases need to be implemented under the same optimization status of UE.","secretary_remarks":"","agenda_item_sort_order":89,"ainumber":"5.3.2.17","ainame":"\tDiscussion Papers \/ Work Plan \/ TC lists","tdoc_agenda_sort_order":19190,"status":"revised","reservation_date":"2020-05-07 07:36:21","uploaded":"2020-05-09 05:49:45","revisionof":"","revisedto":"R5-202919","release":"Rel-16","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_87_Electronic\/Docs\/R5-201919.zip","group":"R5","meeting":"R5-ah-38102","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0}]