[{"name":"R5-201839","title":"On RRM inter-frequency tests in narrow NR bands","source":"ROHDE & SCHWARZ","contact":"Adrian Cardalda Garcia","contact-id":66591,"tdoctype":"discussion","for":"Endorsement","abstract":"RRM inter-frequency test cases need multiple (for NR, maximum two) cells to be allocated in the same band. Considering the current NR FR1 test configurations for RRM, we have two possibilities:\n\u2022\tFor 10 MHz BW, inter-frequency tests need 10+10 = 20 MHz available BW in the band.\n\u2022\tFor 40 MHz BW (only TDD), inter-frequency tests need 40+40 = 80 MHz available BW in the band.\nNot all the NR bands are wide enough to allocate two inter-frequency cells. According to [1], the following NR bands do not have the necessary BW to support inter-frequency tests with the current test configuration: [..]\nProposal 1: Define the auxiliary bands for each of the narrow bands identified above and use the auxiliary band for the serving cell for NR SA tests.\nProposal 2: Send an LS to RAN4 informing them of the potential issue for EN-DC tests for the bands identified above and ask them whether they are planning to enable inter-frequency testing for these bands with 5 MHz test configurations.","secretary_remarks":"","agenda_item_sort_order":89,"ainumber":"5.3.2.17","ainame":"\tDiscussion Papers \/ Work Plan \/ TC lists","tdoc_agenda_sort_order":18390,"status":"noted","reservation_date":"2020-05-07 06:14:19","uploaded":"2020-05-08 07:47:13","revisionof":"","revisedto":"","release":"Rel-16","crspec":"38.533","crspecversion":"","workitem":[{"winame":"5GS_NR_LTE-UEConTest"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_87_Electronic\/Docs\/R5-201839.zip","group":"R5","meeting":"R5-ah-38102","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0}]