[{"name":"R5-193154","title":"Update to EN-DC FR1 RLM IS DRX test with SSB-based RLM RS","source":"Qualcomm UK Ltd","contact":"Ashwin Mohan","contact-id":79648,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":29,"ainumber":"4.1.9.1","ainame":"\tEN-DC with all NR cells in FR1 (Clause 4)","tdoc_agenda_sort_order":31540,"status":"revised","reservation_date":"2019-04-03 07:35:49","uploaded":"2019-04-03 11:06:59","revisionof":"","revisedto":"R5-193358","release":"Rel-15","crspec":"38.533","crspecversion":"15.0.0","workitem":[{"winame":"5GS_NR_LTE-UEConTest"}],"crnumber":62.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_AHs\/2019-04-08_5G-NR_Adhoc_5\/Docs\/R5-193154.zip","group":"R5","meeting":"R5-ah-35450","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0}]