[{"name":"R5-193090","title":"Update of test case 6.2B.3.3 UE A-MPR for Inter-Band EN-DC within FR1","source":"Ericsson India Private Limited","contact":"Mats Johansson","contact-id":38077,"tdoctype":"CR","for":"Agreement","abstract":"Test point analysis for A-MPR Intra-band contiguous EN-DC; NS_04 in R5-193151\n\n.","secretary_remarks":"","agenda_item_sort_order":19,"ainumber":"4.1.6.1","ainame":"\tTx Requirements (Clause 6)","tdoc_agenda_sort_order":30900,"status":"revised","reservation_date":"2019-04-02 13:47:13","uploaded":"2019-04-03 12:29:58","revisionof":"","revisedto":"R5-193455","release":"Rel-15","crspec":"38.521-3","crspecversion":"15.2.0","workitem":[{"winame":"5GS_NR_LTE-UEConTest"}],"crnumber":273.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_AHs\/2019-04-08_5G-NR_Adhoc_5\/Docs\/R5-193090.zip","group":"R5","meeting":"R5-ah-35450","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0}]