[{"name":"R5-192978","title":"Discussion on the way to introduce CA_DL_n41C_UL_n41A into Rel-16 TS 38.521-1","source":"CMCC","contact":"Dan Song","contact-id":75340,"tdoctype":"discussion","for":"Endorsement","abstract":"The corresponding CR is R5-192979\nCA_n41C has been 100% core part completed and added into RAN4 Rel-16 DRAFT TS 38.101-1 V16.x.x\u00a0(2019-01) [1] by \u201cR4-1815797 Draft CR to add NR intra-band FR1 in TS 38.101-1 [2]\u201d in RAN4#89@Nov-18 together with CA_n41(2A), CA_n66B, CA_n66(2A) and CA_n71B.\nCA_DL_n41C_UL_n41A: contiguous 2CC CA for DL and 1CC for UL \nProposal 1: For adding CA_DL_n41C_UL_n41A into Rel-16 TS 38.521-1, only \u201cband-combos specific changes\u201d will be captured in the CRs for Rel-16 TS 38.521-1, including  Clause 5.2A\/5.2A.1, 5.3\/5.3.5 and 5.5A\/5.5A.1.\nProposal 2: Besides the \u201cCA_DL_n41C_UL_n41A specific changes\u201d, the other intra-band contiguous related necessary changes need to be completed in Rel-15 test specs which will be raised into Rel-16 test specs after RP#84@June as agreed in [5], including Clause 7.5A.0.1, 7.7\/7.7A.0.1, 7.6A.2\/7.6A.2.1, 7.6A.3\/7.6A.3.1, 7.6A.4 and 7.8A.\nProposal 3: Before June-19, for all the Rel-16 band combos, only \u201cband-combos specific changes\u201d need to be captured in RAN5 Rel-16 CRs. The other band-combos related necessary changes need to be completed in Rel-15 test specs which will be raised into Rel-16 test specs after RP#84@June as agreed in [5].\nProposal 4: CA configurations for Intra-band contiguous CA need to be added in \u201cTable 4.1.2-1c: Tested CA Configurations Selection Criteria\u201d of TS 38.522.\nProposal 5: The test frequencies for \u201cCA_DL_n41C_UL_n41A\u201d need to be added in Clause 4.3.1.1.3 of TS 38.508-1.","secretary_remarks":"","agenda_item_sort_order":53,"ainumber":"4.2.6","ainame":"\tDiscussion Papers \/ Work Plan \/ TC lists","tdoc_agenda_sort_order":29780,"status":"noted","reservation_date":"2019-03-31 03:38:28","uploaded":"2019-04-03 04:59:59","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":[{"winame":"NR_CADC_NR_LTE_DC_R16-UEConTest"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_AHs\/2019-04-08_5G-NR_Adhoc_5\/Docs\/R5-192978.zip","group":"R5","meeting":"R5-ah-35450","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0}]