[{"name":"R5-190111","title":"Updates to EN-DC test case 6.2B.2.1, UE Maximum Output Power reduction for Intra-Band Contiguous EN-DC","source":"Ericsson","contact":"Petter Karlsson","contact-id":76182,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":25,"ainumber":"5.1.4.1","ainame":"\tTx Requirements (Clause 6)","tdoc_agenda_sort_order":1110,"status":"revised","reservation_date":"2019-01-09 13:39:23","uploaded":"2019-01-15 14:18:18","revisionof":"","revisedto":"R5-190829","release":"Rel-15","crspec":"38.521-3","crspecversion":"15.1.0","workitem":[{"winame":"5GS_NR_LTE-UEConTest"}],"crnumber":99.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_AHs\/2019-01-21_5G-NR_Adhoc_4\/Docs\/R5-190111.zip","group":"R5","meeting":"R5-ah-18806","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0}]