[{"name":"R5-190007","title":"LS on Measurement Grids","source":"TSG WG RAN4","contact":"Ingbert Sigovich","contact-id":28887,"tdoctype":"LS in","for":"Information","abstract":"RAN4 made significant progress with measurement grids in the last two meetings for Power Class 3 (PC3) UEs [1-4]. The work will be summarized in the RAN4 Testability TR [5] with two CRs in [2, 4] attached to this LS. \nThe work on measurement grids comple","secretary_remarks":"","agenda_item_sort_order":4,"ainumber":"3","ainame":"\tIncoming Liaison Statements","tdoc_agenda_sort_order":70,"status":"noted","reservation_date":"2018-12-19 18:58:46","uploaded":"2018-12-20 13:55:58","revisionof":"","revisedto":"","release":"Rel-16","crspec":"","crspecversion":"","workitem":[{"winame":"FS_NR_test_methods"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"R4-1816744","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_AHs\/2019-01-21_5G-NR_Adhoc_4\/Docs\/R5-190007.zip","group":"R5","meeting":"R5-ah-18806","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0}]