[{"name":"R5-190005","title":"LS on NR ATF to include per branch relative phase UE measurement","source":"TSG WG RAN4","contact":"Ingbert Sigovich","contact-id":28887,"tdoctype":"LS in","for":"Action","abstract":"The approved test method in [1] for Rel-15 NR UE demodulation requirements at FR2 uses a subset of the Radiated Two Stage over-the-air (OTA) test method. The RTS method is enabled by measurement made by the UE which are generally referred to as the Antenn","secretary_remarks":"","agenda_item_sort_order":4,"ainumber":"3","ainame":"\tIncoming Liaison Statements","tdoc_agenda_sort_order":50,"status":"noted","reservation_date":"2018-12-19 18:58:46","uploaded":"2018-12-20 13:55:57","revisionof":"","revisedto":"","release":"Rel-16","crspec":"","crspecversion":"","workitem":[{"winame":"FS_NR_MIMO_OTA_test"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"R4-1816655","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_AHs\/2019-01-21_5G-NR_Adhoc_4\/Docs\/R5-190005.zip","group":"R5","meeting":"R5-ah-18806","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0}]