[{"name":"R5-185970","title":"Updating Test Tolerances of test cases 6.3.4.2 and  6.3.4.4","source":"Intel Deutschland GmbH","contact":"Jan Zaleski","contact-id":58990,"tdoctype":"CR","for":"Agreement","abstract":"Adopted same TT as 6.2.4 Configured transmitted power, which uses similar power levels and measurement periods. Only exception is SCS60 TDD, where measurement period is 0.25ms VS 1ms in 6.2.4, which would require increased TT. Left [TBD] for that case.","secretary_remarks":"","agenda_item_sort_order":20,"ainumber":"5.1.2.3","ainame":"\tOther Clauses (i.e. Clauses 1-5 \/ Annexes)","tdoc_agenda_sort_order":59700,"status":"revised","reservation_date":"2018-10-02 16:09:32","uploaded":"2018-10-02 16:12:33","revisionof":"","revisedto":"R5-186333","release":"Rel-15","crspec":"38.521-1","crspecversion":"15.0.0","workitem":[{"winame":"5GS_NR_LTE-UEConTest"}],"crnumber":56.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ran\/WG5_Test_ex-T1\/TSGR5_AHs\/2018-10-09_5G-NR_Adhoc_3\/Docs\/R5-185970.zip","group":"R5","meeting":"R5-ah-33362","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0}]