[{"name":"R5-185729","title":"Updates to EN-DC test case 6.2B.2.1, UE Maximum Output Power reduction for Intra-Band Contiguous EN-DC","source":"Ericsson","contact":"Petter Karlsson","contact-id":76182,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":26,"ainumber":"5.1.4.1","ainame":"\tTx Requirements (Clause 6)","tdoc_agenda_sort_order":57290,"status":"revised","reservation_date":"2018-09-28 12:26:29","uploaded":"2018-10-02 12:04:34","revisionof":"","revisedto":"R5-186234","release":"Rel-15","crspec":"38.521-3","crspecversion":"15.0.0","workitem":[{"winame":"5GS_NR_LTE-UEConTest"}],"crnumber":7.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ran\/WG5_Test_ex-T1\/TSGR5_AHs\/2018-10-09_5G-NR_Adhoc_3\/Docs\/R5-185729.zip","group":"R5","meeting":"R5-ah-33362","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0}]