[{"name":"R5-172848","title":"Addition of ACKs in step 5 of test procedures","source":"NextNav, AT&T, Broadcom","contact":"Ingbert Sigovich","contact-id":28887,"tdoctype":"CR","for":"Agreement","abstract":"ACK was missing from step 5 of the test procedure for TC 11.1, 11.2, 11.3, 11.4, 11.5. Also some editorial corrections for references","secretary_remarks":"","agenda_item_sort_order":268,"ainumber":"5.5.9","ainame":"\tTS 37.571-1","tdoc_agenda_sort_order":284800,"status":"revised","reservation_date":"2017-06-05 17:28:15","uploaded":"2017-06-05 17:37:55","revisionof":"","revisedto":"R5-173414","release":"Rel-14","crspec":"37.571-1","crspecversion":"14.1.0","workitem":[{"winame":"TEI13_Test"},{"winame":"UTRA_LTE_iPos_enh-UEConTest"}],"crnumber":"0201","crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_75_Hangzhou\/Docs\/R5-172848.zip","group":"R5","meeting":"R5-75","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0}]