[{"name":"R5-164057","title":"Introduction of test case 6.2.3F - Maximum Power Reduction (MPR) for UE category NB1","source":"Nanjing Ericsson Panda Com Ltd","contact":"Mikael Zir\u00e9n","contact-id":35491,"tdoctype":"CR","for":"Agreement","abstract":"Introducing the new test case.\nTest parameter selection: \n-Traditionally MPR test points are aligned with EVM, SEM, ACLR test cases although formally the MPR requirements are only verified inside the ACLR test case. This needs to be considered when sele","secretary_remarks":"","agenda_item_sort_order":10,"ainumber":"4.1.2.2","ainame":"\tTx Requirements (Clause 6)","tdoc_agenda_sort_order":40570,"status":"revised","reservation_date":"2016-06-22 18:29:37","uploaded":"2016-06-22 18:54:18","revisionof":"","revisedto":"R5-164110","release":"Rel-13","crspec":"36.521-1","crspecversion":"13.1.0","workitem":[{"winame":"NB_IOT-UEConTest"}],"crnumber":2765.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_AHs\/2016-06-27_IoT_Adhoc_1\/Docs\/R5-164057.zip","group":"R5","meeting":"R5-ah-18066","year":2016,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0}]