[{"name":"R4-2206133","title":"TP to TR38.837 on MPR evaluation for 2Tx PC2 and PC1.5 operation","source":"Skyworks Solutions Inc.","contact":"Dominique Brunel","contact-id":75756,"tdoctype":"pCR","for":"Approval","abstract":"in this contribution we provide TP to add the inputs on the TxD MPR studies. Note that due to lack of time before deadline this TP is incomplete, a revision will be provided to the group consideration before the beginning of the meeting.","secretary_remarks":"[102-e][128] NR_TxD","agenda_item_sort_order":324,"ainumber":"10.7.2","ainame":"UE RF requirements for phase 1 (38.101-1)","tdoc_agenda_sort_order":0,"status":"noted","reservation_date":"2022-02-14 23:38:12","uploaded":"2022-02-14 23:51:55","revisionof":"","revisedto":"","release":"Rel-17","crspec":"38.837","crspecversion":"0.3.0","workitem":[{"winame":"NR_RF_TxD-Core"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_102-e\/Docs\/R4-2206133.zip","group":"R4","meeting":"R4-102-e","year":2022,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0}]