[{"name":"R4-2006946","title":"CR to 38101-3 on switching between 1Tx carrier and 2Tx carrier","source":"Huawei, HiSilicon","contact":"Meng Zhang","contact-id":76433,"tdoctype":"CR","for":"Agreement","abstract":"According to objectives of NR_RF_FR1, UE requirements for switching between 1Tx E-UTRA carrier and 2Tx NR carrier are introduced to TS 38.101-3 for EN-DC.","secretary_remarks":"","agenda_item_sort_order":270,"ainumber":"6.13.1.5","ainame":"Switching period between case 1 and case 2 [NR_RF_FR1]","tdoc_agenda_sort_order":18900,"status":"not pursued","reservation_date":"2020-05-15 08:07:36","uploaded":"2020-05-15 11:52:08","revisionof":"","revisedto":"","release":"Rel-16","crspec":"38.101-3","crspecversion":"16.3.0","workitem":[{"winame":"NR_RF_FR1"}],"crnumber":263.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_95_e\/Docs\/R4-2006946.zip","group":"R4","meeting":"R4-ah-38108","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0}]