[{"name":"R4-2006945","title":"CR to 38101-1 on switching between 1Tx carrier and 2Tx carrier","source":"Huawei, HiSilicon","contact":"Meng Zhang","contact-id":76433,"tdoctype":"CR","for":"Agreement","abstract":"According to objectives of NR_RF_FR1, UE requirements for switching between NR SUL\/UL carrier 1 with 1Tx chain and NR UL carrier 2 with 2Tx chains are introduced to TS 38.101-1 for UEs configured with SUL or UL-CA.","secretary_remarks":"","agenda_item_sort_order":270,"ainumber":"6.13.1.5","ainame":"Switching period between case 1 and case 2 [NR_RF_FR1]","tdoc_agenda_sort_order":18890,"status":"not pursued","reservation_date":"2020-05-15 08:07:35","uploaded":"2020-05-15 11:52:08","revisionof":"","revisedto":"","release":"Rel-16","crspec":"38.101-1","crspecversion":"16.3.0","workitem":[{"winame":"NR_RF_FR1"}],"crnumber":328.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_95_e\/Docs\/R4-2006945.zip","group":"R4","meeting":"R4-ah-38108","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0}]