[{"name":"R4-2006850","title":"CR for Semi-persistent or aperiodic SSB based L1-RSRP reporting on PUSCH in FR2","source":"MediaTek inc.","contact":"Hsuanli Lin","contact-id":63134,"tdoctype":"CR","for":"Agreement","abstract":"For a semi-persistent or aperiodic SSB based L1-RSRP report on PUSCH in FR2, the offset between the CSI report request and PUSCH specified in TS 38.214 is shorter than the measurement period specified in TS 38.133. In other words, measurement time is insufficient.","secretary_remarks":"","agenda_item_sort_order":56,"ainumber":"4.9.8","ainame":"Beam management based on SSB and\/or CSI-RS (38.133) [NR_newRAT-Core]","tdoc_agenda_sort_order":6010,"status":"merged","reservation_date":"2020-05-15 06:42:36","uploaded":"2020-05-15 08:23:26","revisionof":"","revisedto":"","release":"Rel-15","crspec":"38.133","crspecversion":"15.9.0","workitem":[{"winame":"NR_newRAT-Core"}],"crnumber":693.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_95_e\/Docs\/R4-2006850.zip","group":"R4","meeting":"R4-ah-38108","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0}]