[{"name":"R4-2006784","title":"CR to 38.101-2: FR2 UE EIRP increase with IBE relaxation","source":"Qualcomm Incorporated","contact":"Sumant Iyer","contact-id":75048,"tdoctype":"CR","for":"Agreement","abstract":"Based on agreements in WF R4-1912975, the UE capability and network configuration parameter are introduced to enable UL power boosting in exchange for suspended IBE requirements","secretary_remarks":"","agenda_item_sort_order":282,"ainumber":"6.14.1.6","ainame":"Improvement of UE MPR [NR_RF_FR2_req_enh]","tdoc_agenda_sort_order":19900,"status":"not pursued","reservation_date":"2020-05-15 03:55:53","uploaded":"2020-05-15 22:41:45","revisionof":"","revisedto":"","release":"Rel-16","crspec":"38.101-2","crspecversion":"16.3.0","workitem":[{"winame":"NR_RF_FR2_req_enh"}],"crnumber":166.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_95_e\/Docs\/R4-2006784.zip","group":"R4","meeting":"R4-ah-38108","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0}]