[{"name":"R4-2005522","title":"draftCR for 38.141-2: Radiated test requirements clarification of PUSCH BS Type O-2 PT-RS configuration for MCS 2","source":"Nokia, Nokia Shanghai Bell","contact":"Kai-Erik Sunell","contact-id":74524,"tdoctype":"draftCR","for":"Endorsement","abstract":"","secretary_remarks":"","agenda_item_sort_order":59,"ainumber":"4.11.2","ainame":"BS demodulation (38.104)","tdoc_agenda_sort_order":110,"status":"endorsed","reservation_date":"2020-05-04 15:18:49","uploaded":"2020-05-04 17:32:56","revisionof":"R4-2003887","revisedto":"","release":"Rel-15","crspec":"38.141-2","crspecversion":"15.5.0","workitem":[{"winame":"NR_newRAT-Perf"}],"crnumber":"","crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_94_eBis\/Docs\/R4-2005522.zip","group":"R4","meeting":"R4-ah-38107","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0}]