[{"name":"R4-2004875","title":"dCR to 38.101-2: FR2 UE EIRP increase with IBE relaxation","source":"Qualcomm Incorporated","contact":"Sumant Iyer","contact-id":75048,"tdoctype":"draftCR","for":"Endorsement","abstract":"For Rel-16 [1], it was identified that an FR2 UE\u2019s transmit power capability could be increased if IBE requirements were relaxed. In this contribution we present a proposal for how power boost (IBE) can be incorporated into the standard.","secretary_remarks":"","agenda_item_sort_order":280,"ainumber":"6.14.1.6","ainame":"Improvement of UE MPR","tdoc_agenda_sort_order":40,"status":"revised","reservation_date":"2020-04-08 02:52:03","uploaded":"2020-04-10 23:03:01","revisionof":"","revisedto":"R4-2005631","release":"Rel-16","crspec":"38.101-2","crspecversion":"16.3.0","workitem":[{"winame":"NR_RF_FR2_req_enh"}],"crnumber":"","crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_94_eBis\/Docs\/R4-2004875.zip","group":"R4","meeting":"R4-ah-38107","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0}]