[{"name":"R4-2003886","title":"draftCR for 38.104: Performance requirements clarification of PUSCH BS Type O-2 PT-RS configuration for MCS 2","source":"Nokia, Nokia Shanghai Bell","contact":"Axel Mueller","contact-id":83425,"tdoctype":"draftCR","for":"Endorsement","abstract":"Table 11.2.2.1.1-1: Test parameters for testing PUSCH, does not properly capture the options for PT-RS configuration in FR2.\nIn particualr, it was agreed in [R4-1907241] that no PT-RS is configured in FR2 for MCS 2.\nThis draftCR adds the PT-RS configurati","secretary_remarks":"","agenda_item_sort_order":59,"ainumber":"4.11.2","ainame":"BS demodulation (38.104)","tdoc_agenda_sort_order":80,"status":"revised","reservation_date":"2020-04-10 09:38:47","uploaded":"2020-04-10 12:59:11","revisionof":"","revisedto":"R4-2005521","release":"Rel-15","crspec":"38.104","crspecversion":"15.9.0","workitem":[{"winame":"NR_newRAT-Perf"}],"crnumber":"","crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_94_eBis\/Docs\/R4-2003886.zip","group":"R4","meeting":"R4-ah-38107","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0}]