[{"name":"R4-2001848","title":"Analysis of BWP switching requirement due to consistent UL failure","source":"Ericsson","contact":"Muhammad Kazmi","contact-id":31117,"tdoctype":"other","for":"Discussion","abstract":"This paper provides analysis of requirements for BWP switching in NR-U under consistent LBT failures","secretary_remarks":"","agenda_item_sort_order":265,"ainumber":"8.1.4.8","ainame":"Active BWP switching [NR_unlic-Core]","tdoc_agenda_sort_order":104,"status":"noted","reservation_date":"2020-02-14 16:03:25","uploaded":"2020-02-14 19:18:40","revisionof":"","revisedto":"","release":"Rel-16","crspec":"","crspecversion":"","workitem":[{"winame":"NR_unlic-Core"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_94_e\/Docs\/R4-2001848.zip","group":"R4","meeting":"R4-ah-37794","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0}]