[{"name":"R4-2001833","title":"CR to TS 38.113: direct field strength measurements for the EMC RE, Rel-15","source":"Huawei","contact":"Michal Szydelko","contact-id":65553,"tdoctype":"CR","for":"Agreement","abstract":"CR for the direct field strength measurement method to measure the EMC radiated emissions from the enclosure port of BS equipped with the antenna connectors \/ TAB connectors, as an alternative method to the substitution approach.","secretary_remarks":"","agenda_item_sort_order":71,"ainumber":"6.9.3","ainame":"Performance requirements [NR_newRAT-Perf]","tdoc_agenda_sort_order":364,"status":"not pursued","reservation_date":"2020-02-14 15:55:19","uploaded":"2020-02-14 19:52:15","revisionof":"","revisedto":"","release":"Rel-15","crspec":"38.113","crspecversion":"15.8.0","workitem":[{"winame":"NR_newRAT-Perf"}],"crnumber":18.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_94_e\/Docs\/R4-2001833.zip","group":"R4","meeting":"R4-ah-37794","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0}]