[{"name":"R4-2001692","title":"NR Rel-16 performance requirement enhancement BS demodulation simulation results and general discussion","source":"Nokia, Nokia Shanghai Bell","contact":"Axel Mueller","contact-id":83425,"tdoctype":"other","for":"Discussion","abstract":"In this contribution we deliver our simulation results and discuss the remaining open points (PT-RS and DM-RS configuration) for 30% TPUT test points.","secretary_remarks":"","agenda_item_sort_order":458,"ainumber":"8.18.2.1","ainame":"30% TP test point [NR_perf_enh-Perf]","tdoc_agenda_sort_order":769,"status":"noted","reservation_date":"2020-02-14 13:43:09","uploaded":"2020-02-14 15:14:53","revisionof":"","revisedto":"","release":"Rel-16","crspec":"","crspecversion":"","workitem":[{"winame":"NR_perf_enh-Perf"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_94_e\/Docs\/R4-2001692.zip","group":"R4","meeting":"R4-ah-37794","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0}]