[{"name":"R4-2001689","title":"On NR Rel-16 HST BS demodulation PUSCH and UL TA requirements","source":"Nokia, Nokia Shanghai Bell","contact":"Axel Mueller","contact-id":83425,"tdoctype":"other","for":"Discussion","abstract":"The few remaining open issues mentionned in the last WF are clustered around: PUSCH 1x1, PUSCH 500kph MCS, PUSCH l0 value simulation alignment, and UL TA SRS placement\nOpen issues not yet captured in the meetings are, a possible 350\/500kph conformance tes","secretary_remarks":"","agenda_item_sort_order":447,"ainumber":"8.17.2.2","ainame":"BS demodulation requirements (38.104) [NR_HST-Perf]","tdoc_agenda_sort_order":208,"status":"noted","reservation_date":"2020-02-14 13:43:05","uploaded":"2020-02-14 15:14:53","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":[{"winame":"NR_HST-Perf"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_94_e\/Docs\/R4-2001689.zip","group":"R4","meeting":"R4-ah-37794","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0}]