[{"name":"R4-2001218","title":"TP on revised MPR simulation assumptions and update NR requirements to cover open issue","source":"LG Electronics France","contact":"Suhwan Lim","contact-id":46654,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":296,"ainumber":"8.4.4.1","ainame":"Transmitter characteristics [5G_V2X_NRSL-Core ]","tdoc_agenda_sort_order":768,"status":"revised","reservation_date":"2020-02-14 10:04:13","uploaded":"2020-02-14 11:42:15","revisionof":"","revisedto":"R4-2002761","release":"Rel-16","crspec":"38.886","crspecversion":"0.4.0","workitem":[{"winame":"5G_V2X_NRSL-Core"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_94_e\/Docs\/R4-2001218.zip","group":"R4","meeting":"R4-ah-37794","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0}]