[{"name":"R4-1800847","title":"Work plan for the Study on alternative test methods for UE New Radio RF","source":"MVG Industries","contact":"Alessandro Scannavini","contact-id":52688,"tdoctype":"Work Plan","for":"Approval","abstract":"During the RAN4 #82-bis meeting a work plan on the study on the baseline test method was approved [1]. The outcome of the study item on 5G NR testability is captured in TR38.803 [2]. It was agreed to not preclude any test methods and hence an equivalence","secretary_remarks":"","agenda_item_sort_order":202,"ainumber":"4.7.1","ainame":"General (Ad-hoc MoM, TR) [FS_NR_test_methods]","tdoc_agenda_sort_order":733000,"status":"revised","reservation_date":"2018-01-15 15:34:17","uploaded":"2018-01-15 16:09:23","revisionof":"","revisedto":"R4-1801259","release":"Rel-15","crspec":"","crspecversion":"","workitem":[{"winame":"FS_NR_test_methods"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_AHs\/TSGR4_AH-1801\/Docs\/R4-1800847.zip","group":"R4","meeting":"R4-ah-18779","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0}]