[{"name":"R4-1800543","title":"MPR Analysis for New Channel Bandwidths","source":"Skyworks Solutions Inc.","contact":"dominique brunel","contact-id":75756,"tdoctype":"discussion","for":"Discussion","abstract":"In this contribution MPR measurements are performed to confirm that 30MHz, 70MHz and 90MHz SU are in line with the MPR anticipated for the already agreed channel bandwidths. These are conducted for PC2 and PC3","secretary_remarks":"","agenda_item_sort_order":45,"ainumber":"4.3.2.3.1","ainame":"[FR1] MPR evaluation [NR_newRAT]","tdoc_agenda_sort_order":57000,"status":"noted","reservation_date":"2018-01-15 08:53:22","uploaded":"2018-01-15 20:26:36","revisionof":"","revisedto":"","release":"Rel-15","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_AHs\/TSGR4_AH-1801\/Docs\/R4-1800543.zip","group":"R4","meeting":"R4-ah-18779","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0}]