[{"name":"R4-1709695","title":"Impact of beam switching time on DL performance","source":"Ericsson","contact":"Esther Sienkiewicz","contact-id":59234,"tdoctype":"other","for":"Discussion","abstract":"This contribution presents results on the impact of beam switching delay to downlink performance. Two aspects of downlink performance are considered; the potential impact of beam switching time to SS detection performance and the link level impact of beam","secretary_remarks":"","agenda_item_sort_order":95,"ainumber":"3.4.2.1","ainame":"Beam switching speed [NR_newRAT]","tdoc_agenda_sort_order":96520,"status":"noted","reservation_date":"2017-09-11 12:43:33","uploaded":"2017-09-11 16:19:38","revisionof":"","revisedto":"","release":"Rel-15","crspec":"","crspecversion":"","workitem":[{"winame":"NR_newRAT"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_AHs\/TSGR4_NR_Sep2017\/Docs\/R4-1709695.zip","group":"R4","meeting":"R4-ah-19871","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0}]