[{"name":"R4-1700155","title":"On feasible BS ACLR level","source":"Sumitomo Elec. Industries, Ltd","contact":"Li Yue","contact-id":58006,"tdoctype":"other","for":"","abstract":"This contribution studies the feasible BS ACLR level for WP5D and has the following observations and proposals\nObservation 1 It is not feasible to consider DPD as prerequisite when studying the feasibility of BS ACLR \nObservation 2 Advanced power amplifie","secretary_remarks":"","agenda_item_sort_order":9,"ainumber":"3.1.2.1","ainame":"ACLR\/SEM\/ACS [FS_NR_newRAT]","tdoc_agenda_sort_order":1550,"status":"noted","reservation_date":"2017-01-06 07:30:57","uploaded":"2017-01-06 08:23:35","revisionof":"","revisedto":"","release":"Rel-14","crspec":"","crspecversion":"","workitem":[{"winame":"FS_NR_newRAT"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_AHs\/TSGR4_NR_Jan2017\/Docs\/R4-1700155.zip","group":"R4","meeting":"R4-ah-18517","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0}]