[{"name":"R3-213363","title":"RRC Re-establishment and inter-vendor CU operation CR 38.401","source":"Ericsson, Verizon Wireless","contact":"Nianshan Shi","contact-id":45408,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":32,"ainumber":"9.3.4.2","ainame":"Pure Stage-2 Corrections","tdoc_agenda_sort_order":38100,"status":"noted","reservation_date":"2021-08-04 10:15:41","uploaded":"2021-08-05 20:09:59","revisionof":"R3-212045","revisedto":"","release":"Rel-15","crspec":38.401,"crspecversion":"15.9.0","workitem":[{"winame":"NR_newRAT-Core"}],"crnumber":163.0,"crrevision":5.0,"crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG3_Iu\/TSGR3_113-e\/Docs\/R3-213363.zip","group":"R3","meeting":"R3-113-e","year":2021,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0}]