[{"name":"R3-205238","title":"E1 Setup Request for virtualized CU-UPs","source":"Ericsson, Deutsche Telekom, Vodafone, BT, Orange","contact":"Julien Muller","contact-id":78585,"tdoctype":"discussion","for":"","abstract":"","secretary_remarks":"","agenda_item_sort_order":111,"ainumber":"31.3.7.1","ainame":"Other Rel-16 Corrections","tdoc_agenda_sort_order":76200,"status":"available","reservation_date":"2020-08-06 23:15:24","uploaded":"2020-08-06 23:19:27","revisionof":"","revisedto":"","release":"Rel-16","crspec":"","crspecversion":"","workitem":[{"winame":"NR_CPUP_Split-Core"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG3_Iu\/TSGR3_109-e\/Docs\/R3-205238.zip","group":"R3","meeting":"R3-109-e","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0}]