[{"name":"R3-202060","title":"(TP for NR-IAB BL CR for 38.401) Stage 2 clean-up for IAB integration procedure","source":"Samsung","contact":"Lixiang Xu","contact-id":50973,"tdoctype":"other","for":"","abstract":"","secretary_remarks":"","agenda_item_sort_order":68,"ainumber":"13.2.1.1","ainame":"IAB Node Integration","tdoc_agenda_sort_order":37900,"status":"revised","reservation_date":"2020-04-09 09:18:08","uploaded":"2020-04-10 05:44:52","revisionof":"","revisedto":"R3-202642","release":"Rel-16","crspec":38.401,"crspecversion":"","workitem":[{"winame":"NR_IAB"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG3_Iu\/TSGR3_107bis_e\/Docs\/R3-202060.zip","group":"R3","meeting":"R3-ah-38074","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0}]