[{"name":"R3-200816","title":"(TP for NR-IAB BL CR for TS 38.425): Downlink End-to-End Flow Control in IAB Networks","source":"Ericsson","contact":"Filip Barac","contact-id":76369,"tdoctype":"other","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":76,"ainumber":"13.2.2.1","ainame":"Flow Control","tdoc_agenda_sort_order":52000,"status":"available","reservation_date":"2020-02-14 15:16:08","uploaded":"2020-02-14 21:57:05","revisionof":"","revisedto":"","release":"Rel-16","crspec":38.425,"crspecversion":"","workitem":[{"winame":"NR_IAB"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG3_Iu\/TSGR3_107_e\/Docs\/R3-200816.zip","group":"R3","meeting":"R3-ah-37819","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0}]