[{"name":"R3-172044","title":"Stage 2 TP for SN change procedure","source":"LG Electronics Inc.","contact":"Jian (James) XU","contact-id":49608,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":29.0,"ainumber":"10.8.1","ainame":"E-UTRA-NR DC via EPC where the E-UTRA is the master","tdoc_agenda_sort_order":0,"status":"revised","reservation_date":"2017-06-14 11:02:40","uploaded":"2017-06-20 02:33:05","revisionof":"","revisedto":"R3-172627","release":"Rel-15","crspec":37.34,"crspecversion":"0.1.2","workitem":[{"winame":"NR_newRAT-Core"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG3_Iu\/TSGR3_AHGs\/R3_AH_NR_1706\/Docs\/R3-172044.zip","group":"R3","meeting":"R3-ah-18516","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0}]