[{"name":"R2-2000982","title":"Report of [108#19] when to resume DRBs in UP optimization for 5GC","source":"Ericsson","contact":"Tuomas Tirronen","contact-id":73195,"tdoctype":"discussion","for":"Decision","abstract":"","secretary_remarks":"","agenda_item_sort_order":187,"ainumber":"7.1.12.2","ainame":"DRB resume in UP optimization","tdoc_agenda_sort_order":9820,"status":"available","reservation_date":"2020-02-13 13:34:52","uploaded":"2020-02-14 07:40:21","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":[{"winame":"NB_IOTenh3-Core"},{"winame":"LTE_eMTC5-Core"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG2_RL2\/TSGR2_109_e\/Docs\/R2-2000982.zip","group":"R2","meeting":"R2-ah-37793","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0}]