[{"name":"R2-1801521","title":"Clarification for the PLMN selection procedure in the RRC_INACTIVE state","source":"Samsung","contact":"Alexander Sayenko","contact-id":47308,"tdoctype":"draftCR","for":"","abstract":"","secretary_remarks":"","agenda_item_sort_order":23,"ainumber":"10.2.3","ainame":"Stage 2 corrections for non EN-DC","tdoc_agenda_sort_order":11370,"status":"available","reservation_date":"2018-01-15 10:46:43","uploaded":"2018-01-16 10:03:39","revisionof":"","revisedto":"","release":"Rel-15","crspec":38.3,"crspecversion":"15.0.0","workitem":[{"winame":"NR_newRAT-Core"}],"crnumber":"","crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG2_RL2\/TSGR2_AHs\/2018_01_NR\/Docs\/R2-1801521.zip","group":"R2","meeting":"R2-ah-18777","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0}]