[{"name":"R2-1800745","title":"Draft37.340CR Introduction of NR-NR DC","source":"Rapporteur (ZTE Corporation)","contact":"Sergio Parolari","contact-id":26217,"tdoctype":"draftCR","for":"Endorsement","abstract":"Stage 2 for NR-NR DC will be captured in 37.340","secretary_remarks":"","agenda_item_sort_order":19,"ainumber":"10.2.1","ainame":"Stage 2 TSs and running CR","tdoc_agenda_sort_order":7450,"status":"noted","reservation_date":"2018-01-11 09:24:50","uploaded":"2018-01-12 03:05:46","revisionof":"","revisedto":"","release":"Rel-15","crspec":37.34,"crspecversion":"15.0.0","workitem":[{"winame":"NR_newRAT-Core"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG2_RL2\/TSGR2_AHs\/2018_01_NR\/Docs\/R2-1800745.zip","group":"R2","meeting":"R2-ah-18777","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0}]