[{"name":"R1-1814187","title":"Draft CR on overlapping PUCCH multiplexing procedure","source":"Huawei, HiSilicon","contact":"Patrick Merias","contact-id":52292,"tdoctype":"draftCR","for":"Decision","abstract":"","secretary_remarks":"","agenda_item_sort_order":60,"ainumber":"7.1.3.2","ainame":"Maintenance for physical uplink control channel","tdoc_agenda_sort_order":418700,"status":"endorsed","reservation_date":"2018-11-16 18:20:06","uploaded":"2018-11-16 18:20:06","revisionof":"","revisedto":"","release":"Rel-15","crspec":38.213,"crspecversion":"15.3.0","workitem":[{"winame":"NR_newRAT-Core"}],"crnumber":"","crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG1_RL1\/TSGR1_95\/Docs\/R1-1814187.zip","group":"R1","meeting":"R1-95","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0}]