[{"name":"R1-1810716","title":"Evaluation assumptions and methodology for Rel-16 NR URLLC","source":"Huawei,China Southern Power Grid, HiSilicon","contact":"Brian Classon","contact-id":45750,"tdoctype":"other","for":"","abstract":"","secretary_remarks":"","agenda_item_sort_order":131,"ainumber":"7.2.6.1","ainame":"Remaining details on evaluation methodology","tdoc_agenda_sort_order":7160,"status":"available","reservation_date":"2018-09-26 20:19:47","uploaded":"2018-09-29 04:16:37","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG1_RL1\/TSGR1_94b\/Docs\/R1-1810716.zip","group":"R1","meeting":"R1-94","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0}]