[{"name":"R1-1801273","title":"TP on power control for LTE-NR NSA operation","source":"Huawei, HiSilicon","contact":"Patrick Merias","contact-id":52292,"tdoctype":"discussion","for":"Decision","abstract":"","secretary_remarks":"","agenda_item_sort_order":80,"ainumber":"7.6.1","ainame":"NR UL power control - non-CA aspects","tdoc_agenda_sort_order":117103,"status":"noted","reservation_date":"2018-01-27 17:20:34","uploaded":"2018-01-27 17:20:34","revisionof":"R1-1801227","revisedto":"","release":"Rel-15","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG1_RL1\/TSGR1_AH\/NR_AH_1801\/Docs\/R1-1801273.zip","group":"R1","meeting":"R1-ah-18776","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0}]