[{"name":"C4-163111","title":"Addressing the LS response from SA5","source":"Nokia, Alcatel-Lucent Shanghai Bell","contact":"Ulrich Wiehe","contact-id":73600,"tdoctype":"pCR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":45,"ainumber":"7.1.19","ainame":"Feasibility Study on the Diameter Base Protocol Update [FS_DBPU]","tdoc_agenda_sort_order":0,"status":"withdrawn","reservation_date":"2016-05-11 14:42:47","uploaded":"2016-05-13 12:59:06","revisionof":"","revisedto":"","release":"","crspec":29.819,"crspecversion":"1.1.0","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG4_protocollars_ex-CN4\/TSGCT4_73_Osaka\/Docs\/C4-163111.zip","group":"C4","meeting":"C4-73","year":2016,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0}]