[{"name":"S5-251200","title":"Agenda","source":"WG Chair","contact":"Lan Zou","contact-id":35534,"tdoctype":"agenda","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":2,"ainumber":"2","ainame":"Approval of the agenda","tdoc_agenda_sort_order":12000,"status":"approved","reservation_date":"2025-03-24 09:20:22","uploaded":"2025-03-28 13:59:03","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251200.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251201","title":"IPR and legal declaration","source":"WG Chair","contact":"Lan Zou","contact-id":35534,"tdoctype":"other","for":"Information","abstract":"","secretary_remarks":"","agenda_item_sort_order":3,"ainumber":"3","ainame":"IPR and legal declaration","tdoc_agenda_sort_order":12010,"status":"noted","reservation_date":"2025-03-24 09:20:22","uploaded":"2025-03-28 13:59:03","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251201.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251202","title":"Report from last SA5 meeting","source":"MCC","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"report","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":5,"ainumber":"4.1","ainame":"Last SA5 meeting report","tdoc_agenda_sort_order":12020,"status":"approved","reservation_date":"2025-03-24 09:20:22","uploaded":"2025-03-28 14:03:35","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251202.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251203","title":"Time Plan for SA5 Plenary and OAM sessions","source":"WG Chair","contact":"Lan Zou","contact-id":35534,"tdoctype":"agenda","for":"Information","abstract":"","secretary_remarks":"","agenda_item_sort_order":8,"ainumber":"5.1","ainame":"Administrative issues at SA5 level","tdoc_agenda_sort_order":12030,"status":"noted","reservation_date":"2025-03-24 09:20:22","uploaded":"2025-04-06 11:53:46","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251203.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251204","title":"agenda_with_Tdocs_sequence_Plenary&OAM","source":"WG Chair","contact":"Lan Zou","contact-id":35534,"tdoctype":"agenda","for":"Information","abstract":"","secretary_remarks":"","agenda_item_sort_order":8,"ainumber":"5.1","ainame":"Administrative issues at SA5 level","tdoc_agenda_sort_order":12040,"status":"noted","reservation_date":"2025-03-24 09:20:22","uploaded":"2025-04-06 11:55:14","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251204.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251205","title":"SA5 working procedures","source":"WG Chair","contact":"Lan Zou","contact-id":35534,"tdoctype":"other","for":"Information","abstract":"This document describes the working procedures in SA5. This is a complement to the 3GPP working procedures, and in any case of an inconsistency between the two sets of procedures, the 3GPP working procedures always take precedence.\nThroughout this document the following abbreviations are sometimes used: \u201cCH\u201d which stands for \u201cCharging\u201d and \u201cOAM\u201d which stands for \u201cOAM&P (Operations, Administration, Maintenance and Provisioning)\u201d.","secretary_remarks":"","agenda_item_sort_order":8,"ainumber":"5.1","ainame":"Administrative issues at SA5 level","tdoc_agenda_sort_order":12050,"status":"revised","reservation_date":"2025-03-24 09:20:22","uploaded":"2025-03-31 14:49:52","revisionof":"","revisedto":"S5-252112","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251205.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251206","title":"SA5 Meeting facility requirements","source":"WG Chair","contact":"Lan Zou","contact-id":35534,"tdoctype":"other","for":"Information","abstract":"","secretary_remarks":"","agenda_item_sort_order":8,"ainumber":"5.1","ainame":"Administrative issues at SA5 level","tdoc_agenda_sort_order":12060,"status":"noted","reservation_date":"2025-03-24 09:20:22","uploaded":"2025-03-28 13:59:03","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251206.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251207","title":"SA5 meeting calendar","source":"WG Chair","contact":"Lan Zou","contact-id":35534,"tdoctype":"other","for":"Information","abstract":"","secretary_remarks":"","agenda_item_sort_order":11,"ainumber":"5.4","ainame":"SA5 meeting calendar","tdoc_agenda_sort_order":12070,"status":"noted","reservation_date":"2025-03-24 09:20:22","uploaded":"2025-03-28 13:59:03","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251207.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251208","title":"Post meeting email approval status","source":"WG Vice Chair (Ericsson)","contact":"Thomas Tovinger","contact-id":3654,"tdoctype":"other","for":"Information","abstract":"","secretary_remarks":"","agenda_item_sort_order":8,"ainumber":"5.1","ainame":"Administrative issues at SA5 level","tdoc_agenda_sort_order":12080,"status":"noted","reservation_date":"2025-03-24 09:20:22","uploaded":"2025-04-22 12:41:13","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251208.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251209","title":"OAM action list","source":"WG Vice Chair (Nokia)","contact":"Anatoly Andrianov","contact-id":68259,"tdoctype":"other","for":"Information","abstract":"","secretary_remarks":"","agenda_item_sort_order":14,"ainumber":"6.1","ainame":"OAM&P Plenary","tdoc_agenda_sort_order":12090,"status":"noted","reservation_date":"2025-03-24 09:20:22","uploaded":"2025-04-22 10:31:09","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251209.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251210","title":"OAM Exec Report","source":"WG Vice Chair (Nokia)","contact":"Anatoly Andrianov","contact-id":68259,"tdoctype":"report","for":"Information","abstract":"","secretary_remarks":"","agenda_item_sort_order":14,"ainumber":"6.1","ainame":"OAM&P Plenary","tdoc_agenda_sort_order":12100,"status":"noted","reservation_date":"2025-03-24 09:20:22","uploaded":"2025-04-22 10:31:09","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251210.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251211","title":"Plenary and OAM Chair notes and conclusions","source":"WG Chair","contact":"Lan Zou","contact-id":35534,"tdoctype":"report","for":"Information","abstract":"","secretary_remarks":"","agenda_item_sort_order":8,"ainumber":"5.1","ainame":"Administrative issues at SA5 level","tdoc_agenda_sort_order":12110,"status":"noted","reservation_date":"2025-03-24 09:20:22","uploaded":"2025-04-11 14:11:08","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251211.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251212","title":"Collection of useful endorsed documents in OAM","source":"WG Vice Chair (Nokia)","contact":"Anatoly Andrianov","contact-id":68259,"tdoctype":"discussion","for":"Discussion","abstract":"","secretary_remarks":"","agenda_item_sort_order":14,"ainumber":"6.1","ainame":"OAM&P Plenary","tdoc_agenda_sort_order":12120,"status":"noted","reservation_date":"2025-03-24 09:20:22","uploaded":"2025-04-22 10:31:09","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251212.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251213","title":"Collection of external communication documents in OAM","source":"WG Vice Chair (Nokia)","contact":"Anatoly Andrianov","contact-id":68259,"tdoctype":"discussion","for":"Discussion","abstract":"","secretary_remarks":"","agenda_item_sort_order":14,"ainumber":"6.1","ainame":"OAM&P Plenary","tdoc_agenda_sort_order":12130,"status":"noted","reservation_date":"2025-03-24 09:20:22","uploaded":"2025-04-22 10:31:09","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251213.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251214","title":"Rel-19 SA5 work plan TU table","source":"WG Chair","contact":"Lan Zou","contact-id":35534,"tdoctype":"other","for":"Information","abstract":"","secretary_remarks":"","agenda_item_sort_order":8,"ainumber":"5.1","ainame":"Administrative issues at SA5 level","tdoc_agenda_sort_order":12140,"status":"revised","reservation_date":"2025-03-24 09:20:22","uploaded":"2025-03-28 13:59:03","revisionof":"","revisedto":"S5-252122","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251214.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251215","title":"agenda_with_Tdocs_sequence_CH","source":"SWG CH Chair (MATRIXX Software)","contact":"Gerald G\u00f6rmer","contact-id":85500,"tdoctype":"agenda","for":"Information","abstract":"","secretary_remarks":"","agenda_item_sort_order":97,"ainumber":"7.1","ainame":"Charging Plenary","tdoc_agenda_sort_order":12150,"status":"revised","reservation_date":"2025-03-24 09:20:22","uploaded":"2025-04-07 07:04:42","revisionof":"","revisedto":"S5-251800","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251215.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251216","title":"Charging exec report","source":"SWG CH Chair (MATRIXX Software)","contact":"Gerald G\u00f6rmer","contact-id":85500,"tdoctype":"report","for":"Information","abstract":"","secretary_remarks":"","agenda_item_sort_order":97,"ainumber":"7.1","ainame":"Charging Plenary","tdoc_agenda_sort_order":12160,"status":"noted","reservation_date":"2025-03-24 09:20:22","uploaded":"2025-04-11 10:11:36","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251216.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251217","title":"Collection of useful contributions and external communication documents in CH","source":"SWG Vice Chair (Huawei Tech.(UK) Co.. Ltd)","contact":"SHAN CHEN","contact-id":47584,"tdoctype":"other","for":"Information","abstract":"","secretary_remarks":"","agenda_item_sort_order":97,"ainumber":"7.1","ainame":"Charging Plenary","tdoc_agenda_sort_order":12170,"status":"noted","reservation_date":"2025-03-24 09:20:22","uploaded":"2025-04-11 14:11:08","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251217.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251218","title":"Latest SA5 Rel-19 WIs-SIs","source":"WG Chair","contact":"Lan Zou","contact-id":35534,"tdoctype":"other","for":"Information","abstract":"","secretary_remarks":"","agenda_item_sort_order":8,"ainumber":"5.1","ainame":"Administrative issues at SA5 level","tdoc_agenda_sort_order":12180,"status":"noted","reservation_date":"2025-03-24 09:20:22","uploaded":"2025-03-28 13:59:03","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251218.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251219","title":"Rel-19 SA5 work planning","source":"WG Chair","contact":"Lan Zou","contact-id":35534,"tdoctype":"other","for":"Information","abstract":"All Rel-19 work shall be 100% completed no later than SA5#162 (Aug.2025), preferably majority normative work to be completed in SA5#161 (May.2025).\nThe work tasks which need more time for discussion should be postponed, submitted to Rel-20 plan for approval if needed.","secretary_remarks":"","agenda_item_sort_order":8,"ainumber":"5.1","ainame":"Administrative issues at SA5 level","tdoc_agenda_sort_order":12190,"status":"revised","reservation_date":"2025-03-24 09:20:22","uploaded":"2025-03-31 14:49:53","revisionof":"","revisedto":"S5-251766","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251219.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251220","title":"Rel-20 SA5 work planning","source":"WG Chair","contact":"Lan Zou","contact-id":35534,"tdoctype":"other","for":"Information","abstract":"","secretary_remarks":"","agenda_item_sort_order":8,"ainumber":"5.1","ainame":"Administrative issues at SA5 level","tdoc_agenda_sort_order":12200,"status":"revised","reservation_date":"2025-03-24 09:20:22","uploaded":"2025-03-31 14:49:53","revisionof":"","revisedto":"S5-251767","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251220.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251221","title":"OAM breakout notes","source":"WG Chair","contact":"Lan Zou","contact-id":35534,"tdoctype":"report","for":"Discussion","abstract":"","secretary_remarks":"","agenda_item_sort_order":14,"ainumber":"6.1","ainame":"OAM&P Plenary","tdoc_agenda_sort_order":12210,"status":"noted","reservation_date":"2025-03-24 09:20:22","uploaded":"2025-04-11 14:11:08","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251221.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251222","title":"Support Continuous MDT on reply to RAN3 incoming LS (R3-250788)","source":"Ericsson, AT&T, CMCC, Deutsche Telekom","contact":"Qiang Zu","contact-id":42296,"tdoctype":"discussion","for":"Endorsement","abstract":"","secretary_remarks":"","agenda_item_sort_order":14,"ainumber":"6.1","ainame":"OAM&P Plenary","tdoc_agenda_sort_order":12220,"status":"revised","reservation_date":"2025-03-24 13:11:17","uploaded":"2025-03-28 18:01:38","revisionof":"","revisedto":"S5-252050","release":"Rel-19","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251222.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251223","title":"Reply LS to LS on Continuous MDT","source":"SA5","contact":"Qiang Zu","contact-id":42296,"tdoctype":"LS out","for":"Approval","abstract":"(Ericsson LM)\nSA5 would like to thank RAN3 for their LS (R3-250788), on Continuous Management Based MDT. SA5 has been asked to provide guidance on possible solutions for Continuous Management Based MDT.\nSA5 has studied the observations from the incoming LS (R3-250788) and agreed on the general principle of Continuous Management Based MDT activation, that the scope of Continuous Management Based MDT shall be specified by the management system when sending TraceJob to the RAN nodes. The TraceJob includes an assigned TR and MDT configurations, and it is sent to all participating RAN nodes. If the selected UE is handed over to a participating RAN node, the UE will be reselected in the target RAN node for the Continuous Management Based MDT. If the selected UE is handed over to a non-participating RAN node, the normal MDT procedures will be followed. For the details, please see the attachment.\n2\tActions\nTo RAN3\nACTION: \tSA5 kindly asks RAN3 to take the above progress into account and update any related specifications if necessary.","secretary_remarks":"","agenda_item_sort_order":14,"ainumber":"6.1","ainame":"OAM&P Plenary","tdoc_agenda_sort_order":12230,"status":"merged","reservation_date":"2025-03-24 13:14:08","uploaded":"2025-03-28 18:01:38","revisionof":"","revisedto":"","release":"Rel-19","crspec":"","crspecversion":"","workitem":[{"winame":"NR_AIML_NGRAN_enh-Core"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"R3-250788","lsto":"RAN3","Cc":"","lsoriginalls":"R3-250788","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251223.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251224","title":"Rel-19 CR TS 28.532 PM File extension","source":"Ericsson LM","contact":"Qiang Zu","contact-id":42296,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":79,"ainumber":"6.19.12","ainame":"5G performance measurements and KPIs phase 4","tdoc_agenda_sort_order":12240,"status":"withdrawn","reservation_date":"2025-03-24 13:29:25","uploaded":"2025-03-28 17:36:30","revisionof":"","revisedto":"","release":"Rel-19","crspec":28.532,"crspecversion":"19.0.0","workitem":[{"winame":"PM_KPI_5G_Ph4"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251224.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251225","title":"Rel-19 CR 28.558 misaligned 5GC UE level measurement procedure","source":"Ericsson","contact":"Qiang Zu","contact-id":42296,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Title modified on 3\/28\/2025. Original title : Rel-19 CR 28.558 misaligned 5GC UE level measurement procedure <br\/><br\/>Source modified on 3\/28\/2025. Original source : Ericsson LM","agenda_item_sort_order":79,"ainumber":"6.19.12","ainame":"5G performance measurements and KPIs phase 4","tdoc_agenda_sort_order":12250,"status":"revised","reservation_date":"2025-03-24 13:36:57","uploaded":"2025-03-28 17:50:44","revisionof":"","revisedto":"S5-251960","release":"Rel-19","crspec":28.558,"crspecversion":"19.3.0","workitem":[{"winame":"PM_KPI_5G_Ph4"}],"crnumber":33.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251225.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"2, 6.2.2.1.5","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251226","title":"LS on the new NGMN Publication: \u2018MLOps for Highly Autonomous Network\u2019","source":"NGMN Alliance","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"LS in","for":"Information","abstract":"","secretary_remarks":"","agenda_item_sort_order":14,"ainumber":"6.1","ainame":"OAM&P Plenary","tdoc_agenda_sort_order":12260,"status":"noted","reservation_date":"2025-03-24 13:42:18","uploaded":"2025-03-27 09:46:42","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"ITU-T SG13, ITU-T SG2, 3GPP SA5, TMF, O-RAN","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251226.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251227","title":"Rel-19 CR TS 28.552 Cell Unavailable Time performance measurement","source":"Ericsson, AT&T, Samsung","contact":"Qiang Zu","contact-id":42296,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 3\/28\/2025. Original source : Ericsson, AT&T, Samsung","agenda_item_sort_order":79,"ainumber":"6.19.12","ainame":"5G performance measurements and KPIs phase 4","tdoc_agenda_sort_order":12270,"status":"revised","reservation_date":"2025-03-24 13:44:49","uploaded":"2025-03-28 17:49:37","revisionof":"","revisedto":"S5-251961","release":"Rel-19","crspec":28.552,"crspecversion":"19.3.0","workitem":[{"winame":"PM_KPI_5G_Ph4"}],"crnumber":674.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251227.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":false,"clauses_affected":"5.1.4.1.x (new)","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251228","title":"Rel-19 CR TS 32.401 PM Counter Metadata","source":"Ericsson","contact":"Qiang Zu","contact-id":42296,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 3\/28\/2025. Original source : Ericsson LM","agenda_item_sort_order":79,"ainumber":"6.19.12","ainame":"5G performance measurements and KPIs phase 4","tdoc_agenda_sort_order":12280,"status":"revised","reservation_date":"2025-03-24 13:48:18","uploaded":"2025-03-28 17:48:38","revisionof":"","revisedto":"S5-251962","release":"Rel-19","crspec":32.401,"crspecversion":"19.0.0","workitem":[{"winame":"PM_KPI_5G_Ph4"}],"crnumber":44.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251228.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"4.2.2","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251229","title":"Rel-19 CR TS 32.404 PM Counter Metadata","source":"Ericsson","contact":"Qiang Zu","contact-id":42296,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 3\/28\/2025. Original source : Ericsson LM","agenda_item_sort_order":79,"ainumber":"6.19.12","ainame":"5G performance measurements and KPIs phase 4","tdoc_agenda_sort_order":12290,"status":"revised","reservation_date":"2025-03-24 13:54:16","uploaded":"2025-03-28 17:45:51","revisionof":"","revisedto":"S5-251963","release":"Rel-19","crspec":32.404,"crspecversion":"18.2.0","workitem":[{"winame":"PM_KPI_5G_Ph4"}],"crnumber":22.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251229.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"3.3","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251230","title":"Revised WID on 5G performance measurements and KPIs phase 4","source":"Ericsson LM","contact":"Qiang Zu","contact-id":42296,"tdoctype":"WID revised","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":17,"ainumber":"6.2.2","ainame":"Management Architecture and Mechanisms","tdoc_agenda_sort_order":12300,"status":"agreed","reservation_date":"2025-03-24 13:57:11","uploaded":"2025-03-28 17:44:25","revisionof":"","revisedto":"","release":"Rel-19","crspec":"","crspecversion":"","workitem":[{"winame":"PM_KPI_5G_Ph4"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251230.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251231","title":"Rel-19 CR TS 28.405 QoE Reference Uniqueness","source":"Ericsson","contact":"Qiang Zu","contact-id":42296,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 3\/28\/2025. Original source : Ericsson LM","agenda_item_sort_order":78,"ainumber":"6.19.11.1","ainame":"Data management regarding subscriptions and reporting","tdoc_agenda_sort_order":12310,"status":"revised","reservation_date":"2025-03-24 13:59:50","uploaded":"2025-03-28 17:27:37","revisionof":"","revisedto":"S5-251958","release":"Rel-19","crspec":28.405,"crspecversion":"19.2.0","workitem":[{"winame":"Data_SREP"}],"crnumber":40.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251231.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"5.2","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251232","title":"Rel-19 CR TS 32.422 Trace Reference Uniqueness","source":"Ericsson, CATT","contact":"Qiang Zu","contact-id":42296,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 3\/28\/2025. Original source : Ericsson LM","agenda_item_sort_order":78,"ainumber":"6.19.11.1","ainame":"Data management regarding subscriptions and reporting","tdoc_agenda_sort_order":12320,"status":"revised","reservation_date":"2025-03-24 14:02:08","uploaded":"2025-03-28 17:27:37","revisionof":"","revisedto":"S5-251959","release":"Rel-19","crspec":32.422,"crspecversion":"19.2.0","workitem":[{"winame":"Data_SREP"}],"crnumber":511.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251232.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"5.6","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251233","title":"Rel-18 CR TS 32.404 Corrections on measurement name size","source":"Ericsson","contact":"Qiang Zu","contact-id":42296,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 3\/28\/2025. Original source : Ericsson LM","agenda_item_sort_order":58,"ainumber":"6.4.26","ainame":"Rel-18 CAT B\/C SA5 internal alignment and other CAT F CR(s)","tdoc_agenda_sort_order":12330,"status":"not pursued","reservation_date":"2025-03-24 14:13:30","uploaded":"2025-03-28 17:25:15","revisionof":"","revisedto":"S5-252266","release":"Rel-18","crspec":32.404,"crspecversion":"18.2.0","workitem":[{"winame":"TEI18"}],"crnumber":23.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251233.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"3.3","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251234","title":"Rel-18 CR TS 28.552 Corrections of subcounters and filters","source":"Ericsson, Rakuten Mobile, Samsung","contact":"Qiang Zu","contact-id":42296,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 3\/28\/2025. Original source : Ericsson, Rakuten Mobile, Samsung","agenda_item_sort_order":41,"ainumber":"6.4.9","ainame":"5G performance measurements and KPIs phase 3","tdoc_agenda_sort_order":12340,"status":"revised","reservation_date":"2025-03-24 14:17:28","uploaded":"2025-03-28 17:57:28","revisionof":"","revisedto":"S5-252072","release":"Rel-18","crspec":28.552,"crspecversion":"18.10.0","workitem":[{"winame":"PM_KPI_5G_Ph3"}],"crnumber":675.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251234.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"4.1, 4.1a (new), 4.2","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251235","title":"Rel-19 CR TS 28.552 Corrections of subcounters and filters","source":"Ericsson, Rakuten Mobile, Samsung","contact":"Qiang Zu","contact-id":42296,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 3\/28\/2025. Original source : Ericsson, Rakuten Mobile, Samsung","agenda_item_sort_order":41,"ainumber":"6.4.9","ainame":"5G performance measurements and KPIs phase 3","tdoc_agenda_sort_order":12350,"status":"revised","reservation_date":"2025-03-24 14:19:25","uploaded":"2025-03-28 17:57:28","revisionof":"","revisedto":"S5-252073","release":"Rel-19","crspec":28.552,"crspecversion":"19.3.0","workitem":[{"winame":"PM_KPI_5G_Ph3"}],"crnumber":676.0,"crrevision":"","crcategory":"A","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251235.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"4.1, 4.1a (new), 4.2","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251236","title":"Rel-18 CR TS 28.552 Distribution of UE throughput","source":"Ericsson","contact":"Qiang Zu","contact-id":42296,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Title modified on 3\/28\/2025. Original title : Rel-18 CR TS 28.552 Distribution of UE throughput <br\/><br\/>Source modified on 3\/28\/2025. Original source : Ericsson LM","agenda_item_sort_order":41,"ainumber":"6.4.9","ainame":"5G performance measurements and KPIs phase 3","tdoc_agenda_sort_order":12360,"status":"agreed","reservation_date":"2025-03-24 14:21:57","uploaded":"2025-03-28 17:59:06","revisionof":"","revisedto":"","release":"Rel-18","crspec":28.552,"crspecversion":"18.10.0","workitem":[{"winame":"PM_KPI_5G_Ph3"}],"crnumber":677.0,"crrevision":"","crcategory":"F","tsg_crp":"SP-250550","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251236.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":false,"clauses_affected":"5.1.1.3.2, 5.1.1.3.4","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251237","title":"Rel-19 CR TS 28.552 Distribution of UE throughput","source":"Ericsson","contact":"Qiang Zu","contact-id":42296,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Title modified on 3\/28\/2025. Original title : Rel-19 CR TS 28.552 Distribution of UE throughput <br\/><br\/>Source modified on 3\/28\/2025. Original source : Ericsson LM","agenda_item_sort_order":41,"ainumber":"6.4.9","ainame":"5G performance measurements and KPIs phase 3","tdoc_agenda_sort_order":12370,"status":"agreed","reservation_date":"2025-03-24 14:24:02","uploaded":"2025-03-28 17:59:06","revisionof":"","revisedto":"","release":"Rel-19","crspec":28.552,"crspecversion":"19.3.0","workitem":[{"winame":"PM_KPI_5G_Ph3"}],"crnumber":678.0,"crrevision":"","crcategory":"A","tsg_crp":"SP-250550","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251237.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":false,"clauses_affected":"5.1.1.3.2, 5.1.1.3.4","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251238","title":"Rel-19 CR TS 32.423 Corrections on Trace Record Format","source":"Ericsson, AT&T","contact":"Qiang Zu","contact-id":42296,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 3\/28\/2025. Original source : Ericsson, AT&T","agenda_item_sort_order":81,"ainumber":"6.19.14","ainame":"Subscriber and Equipment Trace and QoE collection management","tdoc_agenda_sort_order":12380,"status":"revised","reservation_date":"2025-03-24 14:26:37","uploaded":"2025-03-28 17:53:47","revisionof":"","revisedto":"S5-251984","release":"Rel-19","crspec":32.423,"crspecversion":"19.2.0","workitem":[{"winame":"TraceQoE_OAM"}],"crnumber":198.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251238.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"5.2.1, 5.2.2, 5.2.6, 5.2.x (new), G.1, Annex X (new)","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251239","title":"Rel-19 CR TS 28.560 Corrections on networkInterfaceTypeList","source":"Ericsson, Vodafone","contact":"Qiang Zu","contact-id":42296,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 3\/28\/2025. Original source : Ericsson, Vodafone","agenda_item_sort_order":59,"ainumber":"6.4.27","ainame":"OAM Rel-19 small enhancements","tdoc_agenda_sort_order":12390,"status":"revised","reservation_date":"2025-03-24 14:29:29","uploaded":"2025-03-28 17:23:51","revisionof":"","revisedto":"S5-252085","release":"Rel-19","crspec":28.56,"crspecversion":"19.1.0","workitem":[{"winame":"TEI19"}],"crnumber":2.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251239.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"6.3.1","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251240","title":"Rel-19 CR TS 28.560 Corrections on PCAPNG header","source":"Ericsson, Vodafone","contact":"Qiang Zu","contact-id":42296,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 3\/28\/2025. Original source : Ericsson, Vodafone","agenda_item_sort_order":59,"ainumber":"6.4.27","ainame":"OAM Rel-19 small enhancements","tdoc_agenda_sort_order":12400,"status":"revised","reservation_date":"2025-03-24 14:32:39","uploaded":"2025-03-28 17:23:51","revisionof":"","revisedto":"S5-252086","release":"Rel-19","crspec":28.56,"crspecversion":"19.1.0","workitem":[{"winame":"TEI19"}],"crnumber":3.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251240.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"2, 7.1.2.1","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251241","title":"Enhancing Enablers for Intent Fulfilment","source":"Nokia, Samsung","contact":"Stephen Mwanje","contact-id":83479,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":65,"ainumber":"6.19.3.1","ainame":"Intent driven management services for mobile network phase 3","tdoc_agenda_sort_order":12410,"status":"withdrawn","reservation_date":"2025-03-24 14:33:19","uploaded":"2025-03-28 10:07:18","revisionof":"","revisedto":"","release":"Rel-19","crspec":28.561,"crspecversion":"19.0.0","workitem":[{"winame":"IDMS_MN_Ph3"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251241.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251242","title":"CCL Goal-targets and actions conflicts","source":"Nokia, Samsung","contact":"Stephen Mwanje","contact-id":83479,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":67,"ainumber":"6.19.4.1","ainame":"Closed Control Loop Management","tdoc_agenda_sort_order":12420,"status":"revised","reservation_date":"2025-03-24 14:33:19","uploaded":"2025-03-28 10:07:18","revisionof":"","revisedto":"S5-251906","release":"Rel-19","crspec":28.567,"crspecversion":"0.1.0","workitem":[{"winame":"CCLM"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251242.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251243","title":"CCL network & time scope conflicts","source":"Nokia","contact":"Stephen Mwanje","contact-id":83479,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":67,"ainumber":"6.19.4.1","ainame":"Closed Control Loop Management","tdoc_agenda_sort_order":12430,"status":"revised","reservation_date":"2025-03-24 14:33:19","uploaded":"2025-03-28 10:07:18","revisionof":"","revisedto":"S5-251908","release":"Rel-19","crspec":28.567,"crspecversion":"0.1.0","workitem":[{"winame":"CCLM"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251243.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251244","title":"CCL Trigger conflicts","source":"Nokia, Samsung","contact":"Stephen Mwanje","contact-id":83479,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":67,"ainumber":"6.19.4.1","ainame":"Closed Control Loop Management","tdoc_agenda_sort_order":12440,"status":"revised","reservation_date":"2025-03-24 14:33:19","uploaded":"2025-03-28 10:07:18","revisionof":"","revisedto":"S5-251905","release":"Rel-19","crspec":28.567,"crspecversion":"0.1.0","workitem":[{"winame":"CCLM"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251244.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251245","title":"CCL Indirect target conflicts","source":"Nokia","contact":"Stephen Mwanje","contact-id":83479,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":67,"ainumber":"6.19.4.1","ainame":"Closed Control Loop Management","tdoc_agenda_sort_order":12450,"status":"revised","reservation_date":"2025-03-24 14:33:19","uploaded":"2025-03-28 10:07:18","revisionof":"","revisedto":"S5-251907","release":"Rel-19","crspec":28.567,"crspecversion":"0.1.0","workitem":[{"winame":"CCLM"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251245.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251246","title":"CCL-impact assessment and resolution","source":"Nokia, Samsung","contact":"Stephen Mwanje","contact-id":83479,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":67,"ainumber":"6.19.4.1","ainame":"Closed Control Loop Management","tdoc_agenda_sort_order":12460,"status":"revised","reservation_date":"2025-03-24 14:33:19","uploaded":"2025-03-28 10:07:18","revisionof":"","revisedto":"S5-251910","release":"Rel-19","crspec":28.567,"crspecversion":"0.1.0","workitem":[{"winame":"CCLM"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251246.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251247","title":"CCL decision escalation","source":"Nokia","contact":"Stephen Mwanje","contact-id":83479,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":67,"ainumber":"6.19.4.1","ainame":"Closed Control Loop Management","tdoc_agenda_sort_order":12470,"status":"revised","reservation_date":"2025-03-24 14:33:19","uploaded":"2025-03-28 10:07:18","revisionof":"","revisedto":"S5-251911","release":"Rel-19","crspec":28.567,"crspecversion":"0.1.0","workitem":[{"winame":"CCLM"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251247.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251248","title":"Coordinating CCLs with other functions","source":"Nokia","contact":"Stephen Mwanje","contact-id":83479,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":67,"ainumber":"6.19.4.1","ainame":"Closed Control Loop Management","tdoc_agenda_sort_order":12480,"status":"revised","reservation_date":"2025-03-24 14:33:19","uploaded":"2025-03-28 10:07:18","revisionof":"","revisedto":"S5-252034","release":"Rel-19","crspec":28.567,"crspecversion":"0.1.0","workitem":[{"winame":"CCLM"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251248.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251249","title":"CCL General NRM","source":"Nokia","contact":"Stephen Mwanje","contact-id":83479,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":67,"ainumber":"6.19.4.1","ainame":"Closed Control Loop Management","tdoc_agenda_sort_order":12490,"status":"revised","reservation_date":"2025-03-24 14:33:19","uploaded":"2025-03-28 10:07:18","revisionof":"","revisedto":"S5-252030","release":"Rel-19","crspec":28.567,"crspecversion":"0.1.0","workitem":[{"winame":"CCLM"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251249.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251250","title":"DP on CCL and ACCL modelling relationship","source":"Nokia","contact":"Stephen Mwanje","contact-id":83479,"tdoctype":"discussion","for":"Endorsement","abstract":"","secretary_remarks":"","agenda_item_sort_order":67,"ainumber":"6.19.4.1","ainame":"Closed Control Loop Management","tdoc_agenda_sort_order":12500,"status":"revised","reservation_date":"2025-03-24 14:33:19","uploaded":"2025-03-28 10:07:18","revisionof":"","revisedto":"S5-252029","release":"Rel-19","crspec":28.567,"crspecversion":"","workitem":[{"winame":"CCLM"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251250.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251251","title":"CCL coordination NRM","source":"Nokia","contact":"Stephen Mwanje","contact-id":83479,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":67,"ainumber":"6.19.4.1","ainame":"Closed Control Loop Management","tdoc_agenda_sort_order":12510,"status":"revised","reservation_date":"2025-03-24 14:33:19","uploaded":"2025-03-28 10:07:18","revisionof":"","revisedto":"S5-252035","release":"Rel-19","crspec":28.567,"crspecversion":"0.1.0","workitem":[{"winame":"CCLM"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251251.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251252","title":"Informative Annex on conflict handling approach","source":"Nokia","contact":"Stephen Mwanje","contact-id":83479,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":67,"ainumber":"6.19.4.1","ainame":"Closed Control Loop Management","tdoc_agenda_sort_order":12520,"status":"revised","reservation_date":"2025-03-24 14:33:19","uploaded":"2025-03-28 10:07:18","revisionof":"","revisedto":"S5-251909","release":"Rel-19","crspec":28.567,"crspecversion":"0.1.0","workitem":[{"winame":"CCLM"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251252.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251253","title":"NDT concept and scope","source":"Nokia, Ericsson","contact":"Stephen Mwanje","contact-id":83479,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":69,"ainumber":"6.19.5.1","ainame":"Management aspects of Network Digital Twins","tdoc_agenda_sort_order":12530,"status":"revised","reservation_date":"2025-03-24 14:33:19","uploaded":"2025-03-28 10:07:18","revisionof":"","revisedto":"S5-251896","release":"Rel-19","crspec":28.561,"crspecversion":"0.1.0","workitem":[{"winame":"NDT"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251253.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251254","title":"NDT relation to automation","source":"Nokia, Ericsson","contact":"Stephen Mwanje","contact-id":83479,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":69,"ainumber":"6.19.5.1","ainame":"Management aspects of Network Digital Twins","tdoc_agenda_sort_order":12540,"status":"revised","reservation_date":"2025-03-24 14:33:19","uploaded":"2025-03-28 10:07:18","revisionof":"","revisedto":"S5-251898","release":"Rel-19","crspec":28.561,"crspecversion":"0.1.0","workitem":[{"winame":"NDT"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251254.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251255","title":"NDTs for verification","source":"Nokia, Ericsson","contact":"Stephen Mwanje","contact-id":83479,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":69,"ainumber":"6.19.5.1","ainame":"Management aspects of Network Digital Twins","tdoc_agenda_sort_order":12550,"status":"revised","reservation_date":"2025-03-24 14:33:19","uploaded":"2025-03-28 10:07:18","revisionof":"","revisedto":"S5-251901","release":"Rel-19","crspec":28.561,"crspecversion":"0.1.0","workitem":[{"winame":"NDT"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251255.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251256","title":"NDT support to Automation","source":"Nokia, Ericsson","contact":"Stephen Mwanje","contact-id":83479,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":69,"ainumber":"6.19.5.1","ainame":"Management aspects of Network Digital Twins","tdoc_agenda_sort_order":12560,"status":"merged","reservation_date":"2025-03-24 14:33:19","uploaded":"2025-03-28 10:07:18","revisionof":"","revisedto":"","release":"Rel-19","crspec":28.561,"crspecversion":"0.1.0","workitem":[{"winame":"NDT"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251256.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251257","title":"NDT NRM","source":"Nokia","contact":"Stephen Mwanje","contact-id":83479,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":69,"ainumber":"6.19.5.1","ainame":"Management aspects of Network Digital Twins","tdoc_agenda_sort_order":12570,"status":"merged","reservation_date":"2025-03-24 14:33:19","uploaded":"2025-03-28 10:07:18","revisionof":"","revisedto":"","release":"Rel-19","crspec":28.561,"crspecversion":"0.1.0","workitem":[{"winame":"NDT"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251257.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251258","title":"Input to draftCR TS28.105 Coordination AIML inference","source":"Nokia","contact":"Stephen Mwanje","contact-id":83479,"tdoctype":"other","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":61,"ainumber":"6.19.1.1","ainame":"AI\/ML management phase 2","tdoc_agenda_sort_order":12580,"status":"not treated","reservation_date":"2025-03-24 14:33:19","uploaded":"2025-03-28 10:07:18","revisionof":"","revisedto":"","release":"Rel-19","crspec":28.105,"crspecversion":"","workitem":[{"winame":"AIML_MGT_Ph2"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251258.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251259","title":"Input to draftCR TS28.105 Enhance AIML inference emulation","source":"Nokia","contact":"Stephen Mwanje","contact-id":83479,"tdoctype":"other","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":61,"ainumber":"6.19.1.1","ainame":"AI\/ML management phase 2","tdoc_agenda_sort_order":12590,"status":"not treated","reservation_date":"2025-03-24 14:33:19","uploaded":"2025-03-28 10:07:18","revisionof":"","revisedto":"","release":"Rel-19","crspec":28.105,"crspecversion":"","workitem":[{"winame":"AIML_MGT_Ph2"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251259.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251260","title":"Input to draftCR TS28.105 NRM for AIML emulation environment","source":"Nokia","contact":"Stephen Mwanje","contact-id":83479,"tdoctype":"other","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":61,"ainumber":"6.19.1.1","ainame":"AI\/ML management phase 2","tdoc_agenda_sort_order":12600,"status":"not treated","reservation_date":"2025-03-24 14:33:19","uploaded":"2025-03-28 10:07:18","revisionof":"","revisedto":"","release":"Rel-19","crspec":28.105,"crspecversion":"","workitem":[{"winame":"AIML_MGT_Ph2"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251260.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251261","title":"Input to draftCR TS28.105 NRM for ML-Knowledge-based TL","source":"Nokia","contact":"Stephen Mwanje","contact-id":83479,"tdoctype":"other","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":61,"ainumber":"6.19.1.1","ainame":"AI\/ML management phase 2","tdoc_agenda_sort_order":12610,"status":"revised","reservation_date":"2025-03-24 14:33:19","uploaded":"2025-03-28 10:07:18","revisionof":"","revisedto":"S5-252041","release":"Rel-19","crspec":28.105,"crspecversion":"","workitem":[{"winame":"AIML_MGT_Ph2"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251261.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251262","title":"pCR TR 28.869 Annex example for CRD based deployment","source":"Rakuten Mobile, Inc","contact":"Ravi Chamarty","contact-id":105494,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":70,"ainumber":"6.19.6","ainame":"Study on Cloud Aspects of Management and Orchestration","tdoc_agenda_sort_order":12620,"status":"revised","reservation_date":"2025-03-24 14:47:15","uploaded":"2025-03-28 18:55:43","revisionof":"","revisedto":"S5-251893","release":"Rel-19","crspec":28.869,"crspecversion":"1.3.0","workitem":[{"winame":"FS_Cloud_OAM"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251262.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251263","title":"pCR TR 28.869 LCM changes for declarative descriptor","source":"Rakuten Mobile, Inc","contact":"Ravi Chamarty","contact-id":105494,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":70,"ainumber":"6.19.6","ainame":"Study on Cloud Aspects of Management and Orchestration","tdoc_agenda_sort_order":12630,"status":"revised","reservation_date":"2025-03-24 14:49:09","uploaded":"2025-03-28 18:55:43","revisionof":"","revisedto":"S5-251887","release":"Rel-19","crspec":28.869,"crspecversion":"1.3.0","workitem":[{"winame":"FS_Cloud_OAM"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251263.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251264","title":"Rel-19 CR TS 28.310 Introduce energy supply, carbon emission and renewable energy information elements","source":"Nokia","contact":"Srilakshmi Srinivasaraju","contact-id":95807,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":93,"ainumber":"6.19.20.1","ainame":"Energy efficiency and energy saving aspects of 5G networks and services","tdoc_agenda_sort_order":12640,"status":"revised","reservation_date":"2025-03-25 07:02:58","uploaded":"2025-03-28 15:11:13","revisionof":"","revisedto":"S5-251941","release":"Rel-19","crspec":28.31,"crspecversion":"19.0.0","workitem":[{"winame":"Energy_OAM_Ph3"}],"crnumber":70.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251264.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251265","title":"Rel-19 CR TS 28.622 Add GenericCollection to support grouping of objects for energy related information - Stage 2","source":"Nokia","contact":"Srilakshmi Srinivasaraju","contact-id":95807,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":93,"ainumber":"6.19.20.1","ainame":"Energy efficiency and energy saving aspects of 5G networks and services","tdoc_agenda_sort_order":12650,"status":"not pursued","reservation_date":"2025-03-25 07:03:00","uploaded":"2025-03-28 15:11:13","revisionof":"","revisedto":"","release":"Rel-19","crspec":28.622,"crspecversion":"19.3.0","workitem":[{"winame":"Energy_OAM_Ph3"}],"crnumber":537.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251265.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251266","title":"Rel-19 CR TS 28.623 Add GenericCollection to support grouping of objects for energy related information - Stage 3","source":"Nokia","contact":"Srilakshmi Srinivasaraju","contact-id":95807,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":93,"ainumber":"6.19.20.1","ainame":"Energy efficiency and energy saving aspects of 5G networks and services","tdoc_agenda_sort_order":12660,"status":"revised","reservation_date":"2025-03-25 07:03:01","uploaded":"2025-03-28 15:11:13","revisionof":"","revisedto":"S5-251942","release":"Rel-19","crspec":28.623,"crspecversion":"19.3.0","workitem":[{"winame":"Energy_OAM_Ph3"}],"crnumber":515.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251266.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251267","title":"Rel-19 CR TS 28.532 Introduce energy supply, carbon emission and renewable energy information elements - stage 3 impacts","source":"Nokia","contact":"Srilakshmi Srinivasaraju","contact-id":95807,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":93,"ainumber":"6.19.20.1","ainame":"Energy efficiency and energy saving aspects of 5G networks and services","tdoc_agenda_sort_order":12670,"status":"withdrawn","reservation_date":"2025-03-25 07:03:02","uploaded":null,"revisionof":"","revisedto":"","release":"Rel-19","crspec":28.532,"crspecversion":"19.0.0","workitem":[{"winame":"Energy_OAM_Ph3"}],"crnumber":375.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251268","title":"Rel-19 CR TS 28.310 Multi-carrier RAN energy saving optimization","source":"Nokia","contact":"Srilakshmi Srinivasaraju","contact-id":95807,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":93,"ainumber":"6.19.20.1","ainame":"Energy efficiency and energy saving aspects of 5G networks and services","tdoc_agenda_sort_order":12680,"status":"revised","reservation_date":"2025-03-25 07:03:02","uploaded":"2025-03-28 15:11:13","revisionof":"","revisedto":"S5-251945","release":"Rel-19","crspec":28.31,"crspecversion":"19.0.0","workitem":[{"winame":"Energy_OAM_Ph3"}],"crnumber":71.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251268.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251269","title":"Rel-19 CR TS 28.104 Enhance the MDA assisted Energy Saving use case for handling of power shortages","source":"Nokia","contact":"Srilakshmi Srinivasaraju","contact-id":95807,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":93,"ainumber":"6.19.20.1","ainame":"Energy efficiency and energy saving aspects of 5G networks and services","tdoc_agenda_sort_order":12690,"status":"revised","reservation_date":"2025-03-25 07:03:03","uploaded":"2025-03-28 15:11:13","revisionof":"","revisedto":"S5-251944","release":"Rel-19","crspec":28.104,"crspecversion":"19.1.0","workitem":[{"winame":"Energy_OAM_Ph3"}],"crnumber":190.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251269.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251270","title":"Discussion on modelling of energy-related information","source":"Nokia","contact":"Srilakshmi Srinivasaraju","contact-id":95807,"tdoctype":"discussion","for":"Information","abstract":"","secretary_remarks":"","agenda_item_sort_order":93,"ainumber":"6.19.20.1","ainame":"Energy efficiency and energy saving aspects of 5G networks and services","tdoc_agenda_sort_order":12700,"status":"noted","reservation_date":"2025-03-25 07:03:04","uploaded":"2025-03-28 15:11:13","revisionof":"","revisedto":"","release":"Rel-19","crspec":"","crspecversion":"","workitem":[{"winame":"Energy_OAM_Ph3"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251270.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251271","title":"DP on TS 28.554 KPIs related to NF Energy Consumption","source":"Nokia","contact":"Srilakshmi Srinivasaraju","contact-id":95807,"tdoctype":"discussion","for":"Endorsement","abstract":"","secretary_remarks":"","agenda_item_sort_order":93,"ainumber":"6.19.20.1","ainame":"Energy efficiency and energy saving aspects of 5G networks and services","tdoc_agenda_sort_order":12710,"status":"withdrawn","reservation_date":"2025-03-25 07:03:04","uploaded":null,"revisionof":"","revisedto":"","release":"Rel-19","crspec":"","crspecversion":"","workitem":[{"winame":"Energy_OAM_Ph3"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251272","title":"Rel-19 CR TS 28.312 Update the solution for Intent capability exposure","source":"Huawei, Deutsche Telekom, Nokia","contact":"Ruiyue Xu","contact-id":61969,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":65,"ainumber":"6.19.3.1","ainame":"Intent driven management services for mobile network phase 3","tdoc_agenda_sort_order":12720,"status":"revised","reservation_date":"2025-03-25 11:54:56","uploaded":"2025-03-28 10:21:28","revisionof":"","revisedto":"S5-251924","release":"Rel-19","crspec":28.312,"crspecversion":"19.1.0","workitem":[{"winame":"IDMS_MN_Ph3"}],"crnumber":307.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251272.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251273","title":"Rel-19 CR TS 28.312 Update the solution for intent negotiation report","source":"Huawei","contact":"Ruiyue Xu","contact-id":61969,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":65,"ainumber":"6.19.3.1","ainame":"Intent driven management services for mobile network phase 3","tdoc_agenda_sort_order":12730,"status":"revised","reservation_date":"2025-03-25 11:57:42","uploaded":"2025-03-28 10:21:28","revisionof":"","revisedto":"S5-251916","release":"Rel-19","crspec":28.312,"crspecversion":"19.1.0","workitem":[{"winame":"IDMS_MN_Ph3"}],"crnumber":308.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251273.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251274","title":"Rel-19 CR TS 28.312 Enhance the use case and solution to support radio network support for UAV pre-flight preparation","source":"Huawei, Deutsche Telekom","contact":"Ruiyue Xu","contact-id":61969,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 3\/28\/2025. Original source : Huawei, Deutsche Telekom","agenda_item_sort_order":65,"ainumber":"6.19.3.1","ainame":"Intent driven management services for mobile network phase 3","tdoc_agenda_sort_order":12740,"status":"revised","reservation_date":"2025-03-25 12:04:36","uploaded":"2025-03-28 10:21:28","revisionof":"S5-250833","revisedto":"S5-251913","release":"Rel-19","crspec":28.312,"crspecversion":"19.1.0","workitem":[{"winame":"IDMS_MN_Ph3"}],"crnumber":288.0,"crrevision":2.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251274.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":false,"clauses_affected":"2, 5.1.5, 6.2.2.1.1.2, 6.2.2.2,Following YAML files normatively defined in the forge are updated: - \/OpenAPI\/TS28312_IntentExpectations.yaml","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251275","title":"Rel-19 CR TS 28.312 Add procedure for intent exploration","source":"Huawei, Deutsche Telekom","contact":"Ruiyue Xu","contact-id":61969,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 3\/28\/2025. Original source : Huawei, Deutsche Telekom","agenda_item_sort_order":65,"ainumber":"6.19.3.1","ainame":"Intent driven management services for mobile network phase 3","tdoc_agenda_sort_order":12750,"status":"revised","reservation_date":"2025-03-25 12:06:47","uploaded":"2025-03-28 10:21:28","revisionof":"","revisedto":"S5-251917","release":"Rel-19","crspec":28.312,"crspecversion":"19.1.0","workitem":[{"winame":"IDMS_MN_Ph3"}],"crnumber":309.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251275.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"6.3.X(new), Annex.1.X(new)","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251276","title":"Rel-19 CR TS 28.312 Update procedures for intent report management to support implicit intent report subscription","source":"Huawei","contact":"Ruiyue Xu","contact-id":61969,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":65,"ainumber":"6.19.3.1","ainame":"Intent driven management services for mobile network phase 3","tdoc_agenda_sort_order":12760,"status":"revised","reservation_date":"2025-03-25 12:18:01","uploaded":"2025-03-28 10:21:28","revisionof":"","revisedto":"S5-251922","release":"Rel-19","crspec":28.312,"crspecversion":"19.1.0","workitem":[{"winame":"IDMS_MN_Ph3"}],"crnumber":310.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251276.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251277","title":"Rel-19 CR TS 28.312 Update 5.3.1 Intent handling capability obtaining","source":"Huawei","contact":"Ruiyue Xu","contact-id":61969,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":65,"ainumber":"6.19.3.1","ainame":"Intent driven management services for mobile network phase 3","tdoc_agenda_sort_order":12770,"status":"revised","reservation_date":"2025-03-25 12:22:06","uploaded":"2025-03-28 10:21:28","revisionof":"","revisedto":"S5-251925","release":"Rel-19","crspec":28.312,"crspecversion":"19.1.0","workitem":[{"winame":"IDMS_MN_Ph3"}],"crnumber":311.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251277.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251278","title":"Rel-19 CR TS 28.312 Add missing abbreviation and definition","source":"Huawei, Deutsche Telekom","contact":"Ruiyue Xu","contact-id":61969,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Title modified on 3\/28\/2025. Original title : Rel-19 CR TS 28.312 Add missing abbreviation and definition <br\/><br\/>Source modified on 3\/28\/2025. Original source : Huawei, Deutsche Telekom","agenda_item_sort_order":65,"ainumber":"6.19.3.1","ainame":"Intent driven management services for mobile network phase 3","tdoc_agenda_sort_order":12780,"status":"revised","reservation_date":"2025-03-25 12:23:59","uploaded":"2025-03-28 10:21:28","revisionof":"","revisedto":"S5-251926","release":"Rel-19","crspec":28.312,"crspecversion":"19.1.0","workitem":[{"winame":"IDMS_MN_Ph3"}],"crnumber":312.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251278.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"3.1, 3.3","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251279","title":"Rel-19 CR TS 28.312 Enhance the definition for intentMgmtPurpose","source":"Huawei, Deutsche Telekom","contact":"Ruiyue Xu","contact-id":61969,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":65,"ainumber":"6.19.3.1","ainame":"Intent driven management services for mobile network phase 3","tdoc_agenda_sort_order":12790,"status":"revised","reservation_date":"2025-03-25 12:25:37","uploaded":"2025-03-28 10:21:28","revisionof":"","revisedto":"S5-251918","release":"Rel-19","crspec":28.312,"crspecversion":"19.1.0","workitem":[{"winame":"IDMS_MN_Ph3"}],"crnumber":313.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251279.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251280","title":"Rel-19 CR TS 28.312 Enhance the solution for RadioServiceExpectation","source":"Huawei, Deutsche Telekom","contact":"Ruiyue Xu","contact-id":61969,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":65,"ainumber":"6.19.3.1","ainame":"Intent driven management services for mobile network phase 3","tdoc_agenda_sort_order":12800,"status":"agreed","reservation_date":"2025-03-25 12:27:00","uploaded":"2025-03-28 10:21:28","revisionof":"","revisedto":"","release":"Rel-19","crspec":28.312,"crspecversion":"19.1.0","workitem":[{"winame":"IDMS_MN_Ph3"}],"crnumber":314.0,"crrevision":"","crcategory":"F","tsg_crp":"SP-250536","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251280.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251281","title":"Rel-19 Address the implementation issue for CR 0277 and CR 0304","source":"Huawei","contact":"Ruiyue Xu","contact-id":61969,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":65,"ainumber":"6.19.3.1","ainame":"Intent driven management services for mobile network phase 3","tdoc_agenda_sort_order":12810,"status":"withdrawn","reservation_date":"2025-03-25 12:31:42","uploaded":null,"revisionof":"","revisedto":"","release":"Rel-19","crspec":28.312,"crspecversion":"19.1.0","workitem":[{"winame":"IDMS_MN_Ph3"}],"crnumber":315.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251282","title":"Rel-18 CR 28.111 YANG stage-3 corrections","source":"Ericsson India Private Limited","contact":"Balazs Lengyel","contact-id":81420,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":58,"ainumber":"6.4.26","ainame":"Rel-18 CAT B\/C SA5 internal alignment and other CAT F CR(s)","tdoc_agenda_sort_order":12820,"status":"revised","reservation_date":"2025-03-25 22:00:45","uploaded":"2025-03-28 20:33:03","revisionof":"","revisedto":"S5-252083","release":"Rel-18","crspec":28.111,"crspecversion":"18.4.0","workitem":[{"winame":"TEI18"}],"crnumber":25.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251282.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251283","title":"Rel-19 CR 28.111 YANG stage-3 corrections","source":"Ericsson India Private Limited","contact":"Balazs Lengyel","contact-id":81420,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":58,"ainumber":"6.4.26","ainame":"Rel-18 CAT B\/C SA5 internal alignment and other CAT F CR(s)","tdoc_agenda_sort_order":12830,"status":"revised","reservation_date":"2025-03-25 22:06:43","uploaded":"2025-03-28 20:58:18","revisionof":"","revisedto":"S5-252084","release":"Rel-19","crspec":28.111,"crspecversion":"19.1.0","workitem":[{"winame":"TEI19"}],"crnumber":26.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251283.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251284","title":"Rel-18 CR 28.623 YANG stage-3 corrections","source":"Ericsson India Private Limited","contact":"Balazs Lengyel","contact-id":81420,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":58,"ainumber":"6.4.26","ainame":"Rel-18 CAT B\/C SA5 internal alignment and other CAT F CR(s)","tdoc_agenda_sort_order":12840,"status":"withdrawn","reservation_date":"2025-03-25 22:47:20","uploaded":null,"revisionof":"","revisedto":"","release":"Rel-18","crspec":28.622,"crspecversion":"18.10.0","workitem":[{"winame":"TEI18"}],"crnumber":538.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251285","title":"Rel-19 CR 28.623 YANG stage-3 corrections","source":"Ericsson India Private Limited","contact":"Balazs Lengyel","contact-id":81420,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":58,"ainumber":"6.4.26","ainame":"Rel-18 CAT B\/C SA5 internal alignment and other CAT F CR(s)","tdoc_agenda_sort_order":12850,"status":"agreed","reservation_date":"2025-03-25 22:49:15","uploaded":"2025-03-28 20:58:18","revisionof":"","revisedto":"","release":"Rel-19","crspec":28.623,"crspecversion":"19.3.0","workitem":[{"winame":"TEI19"}],"crnumber":516.0,"crrevision":"","crcategory":"F","tsg_crp":"SP-250559","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251285.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251286","title":"Rel-18 CR 28.623 YANG stage-3 corrections","source":"Ericsson India Private Limited","contact":"Balazs Lengyel","contact-id":81420,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":58,"ainumber":"6.4.26","ainame":"Rel-18 CAT B\/C SA5 internal alignment and other CAT F CR(s)","tdoc_agenda_sort_order":12860,"status":"agreed","reservation_date":"2025-03-25 22:58:55","uploaded":"2025-03-28 20:33:03","revisionof":"","revisedto":"","release":"Rel-18","crspec":28.623,"crspecversion":"18.10.0","workitem":[{"winame":"TEI18"}],"crnumber":517.0,"crrevision":"","crcategory":"F","tsg_crp":"SP-250557","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251286.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251287","title":"Addressing ENs in TS 28.560","source":"Vodafone, Ericsson","contact":"Susana Sabater","contact-id":31269,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":59,"ainumber":"6.4.27","ainame":"OAM Rel-19 small enhancements","tdoc_agenda_sort_order":12870,"status":"revised","reservation_date":"2025-03-25 22:59:28","uploaded":"2025-03-28 15:16:32","revisionof":"","revisedto":"S5-252087","release":"Rel-19","crspec":28.56,"crspecversion":"19.1.0","workitem":[{"winame":"Monstra-OAM"}],"crnumber":4.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251287.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251288","title":"Removal of already addressed Editor's Note","source":"Vodafone","contact":"Susana Sabater","contact-id":31269,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":59,"ainumber":"6.4.27","ainame":"OAM Rel-19 small enhancements","tdoc_agenda_sort_order":12880,"status":"revised","reservation_date":"2025-03-26 01:04:06","uploaded":"2025-03-28 15:16:32","revisionof":"","revisedto":"S5-252088","release":"Rel-19","crspec":28.56,"crspecversion":"19.1.0","workitem":[{"winame":"Monstra-OAM"}],"crnumber":5.0,"crrevision":"","crcategory":"D","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251288.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251289","title":"Rel-18 CR 28.541 YANG stage-3 corrections","source":"Ericsson India Private Limited","contact":"Balazs Lengyel","contact-id":81420,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":58,"ainumber":"6.4.26","ainame":"Rel-18 CAT B\/C SA5 internal alignment and other CAT F CR(s)","tdoc_agenda_sort_order":12890,"status":"agreed","reservation_date":"2025-03-26 01:11:20","uploaded":"2025-03-28 20:33:03","revisionof":"","revisedto":"","release":"Rel-18","crspec":28.541,"crspecversion":"18.11.0","workitem":[{"winame":"TEI18"}],"crnumber":1488.0,"crrevision":"","crcategory":"F","tsg_crp":"SP-250557","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251289.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251290","title":"Rel-19 CR 28.541 YANG stage-3 corrections","source":"Ericsson India Private Limited","contact":"Balazs Lengyel","contact-id":81420,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":58,"ainumber":"6.4.26","ainame":"Rel-18 CAT B\/C SA5 internal alignment and other CAT F CR(s)","tdoc_agenda_sort_order":12900,"status":"agreed","reservation_date":"2025-03-26 01:13:48","uploaded":"2025-03-28 20:58:18","revisionof":"","revisedto":"","release":"Rel-19","crspec":28.541,"crspecversion":"19.3.0","workitem":[{"winame":"TEI19"}],"crnumber":1489.0,"crrevision":"","crcategory":"F","tsg_crp":"SP-250558","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251290.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251291","title":"Correct bindings information for 5G ProSe Charging","source":"China Telecom","contact":"XIAOQIAN JIA","contact-id":102960,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Title modified on 3\/28\/2025. Original title : Rel-17_ TS 32.291_Correct bindings information for 5G ProSe Charging<br\/><br\/>Source modified on 3\/28\/2025. Original source : China Telecom Corporation Ltd.","agenda_item_sort_order":99,"ainumber":"7.3","ainame":"Charging Maintenance and Rel-19 Charging small enhancements","tdoc_agenda_sort_order":12910,"status":"revised","reservation_date":"2025-03-26 02:49:16","uploaded":"2025-03-28 01:35:24","revisionof":"","revisedto":"S5-251847","release":"Rel-17","crspec":32.291,"crspecversion":"17.12.0","workitem":[{"winame":"TEI17"}],"crnumber":609.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251291.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"7.9","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251292","title":"Rel19 CR TS28.541 NRM enhancements to ManagedNFProfile","source":"Nokia, Nokia Shanghai Bell, ZTE Corporation, Orange","contact":"Sean Sun","contact-id":92711,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":80,"ainumber":"6.19.13","ainame":"5G Advanced NRM features phase 3","tdoc_agenda_sort_order":12920,"status":"revised","reservation_date":"2025-03-26 02:51:48","uploaded":"2025-03-28 16:51:12","revisionof":"","revisedto":"S5-251967","release":"Rel-19","crspec":28.541,"crspecversion":"19.3.0","workitem":[{"winame":"AdNRM_Ph3"}],"crnumber":1490.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251292.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251293","title":"Rel19 CR TS28.541 change the dataType concerning HostAddr","source":"Nokia, Nokia Shanghai Bell","contact":"Sean Sun","contact-id":92711,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":80,"ainumber":"6.19.13","ainame":"5G Advanced NRM features phase 3","tdoc_agenda_sort_order":12930,"status":"revised","reservation_date":"2025-03-26 02:51:48","uploaded":"2025-03-28 16:51:12","revisionof":"","revisedto":"S5-251978","release":"Rel-19","crspec":28.541,"crspecversion":"19.3.0","workitem":[{"winame":"AdNRM_Ph3"}],"crnumber":1491.0,"crrevision":"","crcategory":"C","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251293.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251294","title":"Rel19 CR TS28.538 change the dataType concerning HostAddr","source":"Nokia, Nokia Shanghai Bell","contact":"Sean Sun","contact-id":92711,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":80,"ainumber":"6.19.13","ainame":"5G Advanced NRM features phase 3","tdoc_agenda_sort_order":12940,"status":"revised","reservation_date":"2025-03-26 02:51:49","uploaded":"2025-03-28 16:51:12","revisionof":"","revisedto":"S5-251979","release":"Rel-19","crspec":28.538,"crspecversion":"19.3.0","workitem":[{"winame":"AdNRM_Ph3"}],"crnumber":108.0,"crrevision":"","crcategory":"C","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251294.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251295","title":"Rel19 CR TS28.541 correction to inconsistency between stage 2 and stage 3 concerning SubNetwork and ManagedElement containment","source":"Nokia, Nokia Shanghai Bell","contact":"Sean Sun","contact-id":92711,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":29,"ainumber":"6.3.11","ainame":"General NRM","tdoc_agenda_sort_order":12950,"status":"revised","reservation_date":"2025-03-26 02:51:50","uploaded":"2025-03-28 16:51:12","revisionof":"","revisedto":"S5-252105","release":"Rel-19","crspec":28.541,"crspecversion":"19.3.0","workitem":[{"winame":"TEI18"}],"crnumber":1492.0,"crrevision":"","crcategory":"A","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251295.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251296","title":"Rel18 CR TS28.541 correction to inconsistency between stage 2 and stage 3 concerning SubNetwork and ManagedElement containment","source":"Nokia, Nokia Shanghai Bell","contact":"Sean Sun","contact-id":92711,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":29,"ainumber":"6.3.11","ainame":"General NRM","tdoc_agenda_sort_order":12960,"status":"agreed","reservation_date":"2025-03-26 02:51:51","uploaded":"2025-03-28 16:51:12","revisionof":"","revisedto":"","release":"Rel-18","crspec":28.541,"crspecversion":"18.11.0","workitem":[{"winame":"TEI18"}],"crnumber":1493.0,"crrevision":"","crcategory":"F","tsg_crp":"SP-250557","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251296.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251297","title":"Rel18 CR TS28.541 correction to stage 3 of SatelliteBackhaulInfo","source":"Nokia, Nokia Shanghai Bell","contact":"Sean Sun","contact-id":92711,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":29,"ainumber":"6.3.11","ainame":"General NRM","tdoc_agenda_sort_order":12970,"status":"agreed","reservation_date":"2025-03-26 02:51:51","uploaded":"2025-03-28 16:51:12","revisionof":"","revisedto":"","release":"Rel-18","crspec":28.541,"crspecversion":"18.11.0","workitem":[{"winame":"TEI18"}],"crnumber":1494.0,"crrevision":"","crcategory":"F","tsg_crp":"SP-250557","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251297.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251298","title":"Rel19 CR TS28.541 correction to stage 3 of SatelliteBackhaulInfo","source":"Nokia, Nokia Shanghai Bell","contact":"Sean Sun","contact-id":92711,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":29,"ainumber":"6.3.11","ainame":"General NRM","tdoc_agenda_sort_order":12980,"status":"revised","reservation_date":"2025-03-26 02:51:52","uploaded":"2025-03-28 16:51:12","revisionof":"","revisedto":"S5-252106","release":"Rel-19","crspec":28.541,"crspecversion":"19.3.0","workitem":[{"winame":"TEI18"}],"crnumber":1495.0,"crrevision":"","crcategory":"A","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251298.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251299","title":"Correct bindings information for 5G ProSe Charging","source":"China Telecom","contact":"XIAOQIAN JIA","contact-id":102960,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Title modified on 3\/28\/2025. Original title : Rel-18_ TS 32.291_Correct bindings information for 5G ProSe Charging<br\/><br\/>Source modified on 3\/28\/2025. Original source : China Telecom Corporation Ltd.","agenda_item_sort_order":105,"ainumber":"7.4.5","ainame":"Charging Aspects for 5G ProSe Ph3","tdoc_agenda_sort_order":12990,"status":"revised","reservation_date":"2025-03-26 02:55:10","uploaded":"2025-03-28 01:35:24","revisionof":"","revisedto":"S5-251848","release":"Rel-18","crspec":32.291,"crspecversion":"18.9.0","workitem":[{"winame":"TEI17"}],"crnumber":610.0,"crrevision":"","crcategory":"A","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251299.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"7.9","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251300","title":"Correct bindings information for 5G ProSe Charging","source":"China Telecom","contact":"XIAOQIAN JIA","contact-id":102960,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Title modified on 3\/28\/2025. Original title : Rel-19_ TS 32.291_Correct bindings information for 5G ProSe Charging<br\/><br\/>Source modified on 3\/28\/2025. Original source : China Telecom Corporation Ltd.","agenda_item_sort_order":105,"ainumber":"7.4.5","ainame":"Charging Aspects for 5G ProSe Ph3","tdoc_agenda_sort_order":13000,"status":"revised","reservation_date":"2025-03-26 02:59:04","uploaded":"2025-03-28 01:35:24","revisionof":"","revisedto":"S5-251849","release":"Rel-19","crspec":32.291,"crspecversion":"19.2.0","workitem":[{"winame":"TEI17"}],"crnumber":611.0,"crrevision":"","crcategory":"A","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251300.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"7.9","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251301","title":"Discussion on NSPA charging information correction","source":"Huawei","contact":"Yimeng Deng","contact-id":102879,"tdoctype":"discussion","for":"Discussion","abstract":"","secretary_remarks":"","agenda_item_sort_order":99,"ainumber":"7.3","ainame":"Charging Maintenance and Rel-19 Charging small enhancements","tdoc_agenda_sort_order":13010,"status":"withdrawn","reservation_date":"2025-03-26 03:42:21","uploaded":"2025-03-28 09:59:27","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251301.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251302","title":"Rel-18 CR 28.201 Correction on NSPA charging information","source":"Huawei","contact":"Yimeng Deng","contact-id":102879,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 3\/28\/2025. Original source : Huawei","agenda_item_sort_order":99,"ainumber":"7.3","ainame":"Charging Maintenance and Rel-19 Charging small enhancements","tdoc_agenda_sort_order":13020,"status":"withdrawn","reservation_date":"2025-03-26 03:42:21","uploaded":"2025-03-28 09:59:27","revisionof":"","revisedto":"S5-252497","release":"Rel-18","crspec":28.201,"crspecversion":"18.1.0","workitem":[{"winame":"5GS_NSPACH"},{"winame":" TEI18"}],"crnumber":15.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251302.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"5.2.1.2, 6.1.3.2, 6.2.1.3","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251303","title":"Rel-19 CR 28.201 Correction on NSPA charging information","source":"Huawei","contact":"Yimeng Deng","contact-id":102879,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 3\/28\/2025. Original source : Huawei","agenda_item_sort_order":99,"ainumber":"7.3","ainame":"Charging Maintenance and Rel-19 Charging small enhancements","tdoc_agenda_sort_order":13030,"status":"withdrawn","reservation_date":"2025-03-26 03:42:22","uploaded":"2025-03-28 09:59:27","revisionof":"","revisedto":"S5-252498","release":"Rel-19","crspec":28.201,"crspecversion":"19.0.0","workitem":[{"winame":"5GS_NSPACH"},{"winame":" TEI18"}],"crnumber":16.0,"crrevision":"","crcategory":"A","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251303.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"5.2.1.2, 6.1.3.2, 6.2.1.3","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251304","title":"Rel-18 CR 28.201 Correction on NSPA charging information","source":"Huawei","contact":"Yimeng Deng","contact-id":102879,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Title modified on 3\/28\/2025. Original title : Rel-18 CR 32.291 Correction on NSPA charging information<br\/><br\/>Source modified on 3\/28\/2025. Original source : Huawei","agenda_item_sort_order":99,"ainumber":"7.3","ainame":"Charging Maintenance and Rel-19 Charging small enhancements","tdoc_agenda_sort_order":13040,"status":"withdrawn","reservation_date":"2025-03-26 03:42:23","uploaded":"2025-03-28 09:59:27","revisionof":"","revisedto":"S5-252499","release":"Rel-18","crspec":32.291,"crspecversion":"18.9.0","workitem":[{"winame":"5GS_NSPACH"},{"winame":" TEI18"}],"crnumber":612.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251304.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"6.1.6.2.7.5, 6.1.6.3.4, 7.6, Forge","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251305","title":"Rel-19 CR 28.201 Correction on NSPA charging information","source":"Huawei","contact":"Yimeng Deng","contact-id":102879,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Title modified on 3\/28\/2025. Original title : Rel-19 CR 32.291 Correction on NSPA charging information<br\/><br\/>Source modified on 3\/28\/2025. Original source : Huawei","agenda_item_sort_order":99,"ainumber":"7.3","ainame":"Charging Maintenance and Rel-19 Charging small enhancements","tdoc_agenda_sort_order":13050,"status":"withdrawn","reservation_date":"2025-03-26 03:42:23","uploaded":"2025-03-28 09:59:27","revisionof":"","revisedto":"S5-252500","release":"Rel-19","crspec":32.291,"crspecversion":"19.2.0","workitem":[{"winame":"5GS_NSPACH"},{"winame":" TEI18"}],"crnumber":613.0,"crrevision":"","crcategory":"A","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251305.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"6.1.6.2.7.5, 6.1.6.3.4, 7.6, Forge","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251306","title":"Rel-18 CR 32.298 Correction on NSPA charging information","source":"Huawei","contact":"Yimeng Deng","contact-id":102879,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 3\/28\/2025. Original source : Huawei","agenda_item_sort_order":99,"ainumber":"7.3","ainame":"Charging Maintenance and Rel-19 Charging small enhancements","tdoc_agenda_sort_order":13060,"status":"withdrawn","reservation_date":"2025-03-26 03:42:24","uploaded":"2025-03-28 09:59:27","revisionof":"","revisedto":"S5-252501","release":"Rel-18","crspec":32.298,"crspecversion":"18.8.0","workitem":[{"winame":"5GS_NSPACH"},{"winame":" TEI18"}],"crnumber":1030.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251306.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"5.2.5.2, Forge","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251307","title":"Rel-19 CR 32.298 Correction on NSPA charging information","source":"Huawei","contact":"Yimeng Deng","contact-id":102879,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 3\/28\/2025. Original source : Huawei","agenda_item_sort_order":99,"ainumber":"7.3","ainame":"Charging Maintenance and Rel-19 Charging small enhancements","tdoc_agenda_sort_order":13070,"status":"withdrawn","reservation_date":"2025-03-26 03:42:25","uploaded":"2025-03-28 09:59:27","revisionof":"","revisedto":"S5-252502","release":"Rel-19","crspec":32.298,"crspecversion":"19.1.0","workitem":[{"winame":"5GS_NSPACH"},{"winame":" TEI18"}],"crnumber":1031.0,"crrevision":"","crcategory":"A","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251307.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"Forge","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251308","title":"Rel-19 CR 32.240 Add charging support for AIoT service","source":"Huawei","contact":"Yimeng Deng","contact-id":102879,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":111,"ainumber":"7.4.11","ainame":"Charging for Ambient power-enabled Internet of Things","tdoc_agenda_sort_order":13080,"status":"revised","reservation_date":"2025-03-26 03:42:26","uploaded":"2025-03-28 09:59:27","revisionof":"","revisedto":"S5-251838","release":"Rel-19","crspec":32.24,"crspecversion":"19.2.0","workitem":[{"winame":"AmbientIoT-CH"}],"crnumber":510.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251308.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251309","title":"Rel-19 CR 32.254 Add charging support for AIoT service","source":"Huawei","contact":"Yimeng Deng","contact-id":102879,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":111,"ainumber":"7.4.11","ainame":"Charging for Ambient power-enabled Internet of Things","tdoc_agenda_sort_order":13090,"status":"not pursued","reservation_date":"2025-03-26 03:42:26","uploaded":"2025-03-28 09:59:27","revisionof":"","revisedto":"","release":"Rel-19","crspec":32.254,"crspecversion":"19.0.0","workitem":[{"winame":"AmbientIoT-CH"}],"crnumber":56.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251309.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251310","title":"Rel-19 CR 32.291 Add charging support for AIoT service","source":"Huawei","contact":"Yimeng Deng","contact-id":102879,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":111,"ainumber":"7.4.11","ainame":"Charging for Ambient power-enabled Internet of Things","tdoc_agenda_sort_order":13100,"status":"revised","reservation_date":"2025-03-26 03:42:27","uploaded":"2025-03-28 09:59:27","revisionof":"","revisedto":"S5-251840","release":"Rel-19","crspec":32.291,"crspecversion":"19.2.0","workitem":[{"winame":"AmbientIoT-CH"}],"crnumber":614.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251310.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251311","title":"Rel-19 CR 32.298 Add charging support for AIoT service","source":"Huawei","contact":"Yimeng Deng","contact-id":102879,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":111,"ainumber":"7.4.11","ainame":"Charging for Ambient power-enabled Internet of Things","tdoc_agenda_sort_order":13110,"status":"revised","reservation_date":"2025-03-26 03:42:28","uploaded":"2025-03-28 09:59:27","revisionof":"","revisedto":"S5-251841","release":"Rel-19","crspec":32.298,"crspecversion":"19.1.0","workitem":[{"winame":"AmbientIoT-CH"}],"crnumber":1032.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251311.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251312","title":"Add layer 3 multi-hop ProSe UE-to-Network relay communication related attributes","source":"China Telecom","contact":"XIAOQIAN JIA","contact-id":102960,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 3\/28\/2025. Original source : China Telecom Corporation Ltd.","agenda_item_sort_order":105,"ainumber":"7.4.5","ainame":"Charging Aspects for 5G ProSe Ph3","tdoc_agenda_sort_order":13120,"status":"revised","reservation_date":"2025-03-26 04:26:25","uploaded":"2025-03-28 01:38:29","revisionof":"","revisedto":"S5-251856","release":"Rel-19","crspec":32.291,"crspecversion":"19.2.0","workitem":[{"winame":"5G_ProSe_Ph3_CH"}],"crnumber":615.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251312.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"6.1.6.2.11.8, 6.1.6.2.11.X(new), 7.9, forge","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251313","title":"Add layer 3 multi-hop ProSe UE-to-Network relay communication related CDR parameters","source":"China Telecom","contact":"XIAOQIAN JIA","contact-id":102960,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 3\/28\/2025. Original source : China Telecom Corporation Ltd.","agenda_item_sort_order":105,"ainumber":"7.4.5","ainame":"Charging Aspects for 5G ProSe Ph3","tdoc_agenda_sort_order":13130,"status":"revised","reservation_date":"2025-03-26 07:00:07","uploaded":"2025-03-28 09:46:49","revisionof":"","revisedto":"S5-251804","release":"Rel-19","crspec":32.298,"crspecversion":"19.1.0","workitem":[{"winame":"5G_ProSe_Ph3_CH"}],"crnumber":1033.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251313.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"5.1.4.7.X(new), 5.1.4.7.Y(new), forge","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251314","title":"Reply LS to ITU-T SG2 on methodology coordination","source":"SA5","contact":"Thomas Tovinger","contact-id":3654,"tdoctype":"LS out","for":"Approval","abstract":"WG vice chair (Ericsson)\nResponse to:\tS5-251332 \/ LS\/r on methodology harmonization update (reply to 3GPP TSG SA5-244109 - LS57)","secretary_remarks":"","agenda_item_sort_order":14,"ainumber":"6.1","ainame":"OAM&P Plenary","tdoc_agenda_sort_order":13140,"status":"approved","reservation_date":"2025-03-26 08:34:07","uploaded":"2025-03-27 13:09:46","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"S5-251332","lsto":"ITU-T SG2","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251314.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251315","title":"Add information flows of Layer-3 ProSe UE-to-UE direct communication","source":"China Telecom Corporation Ltd.","contact":"XIAOQIAN JIA","contact-id":102960,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":105,"ainumber":"7.4.5","ainame":"Charging Aspects for 5G ProSe Ph3","tdoc_agenda_sort_order":13150,"status":"withdrawn","reservation_date":"2025-03-26 09:27:44","uploaded":null,"revisionof":"","revisedto":"","release":"Rel-19","crspec":32.277,"crspecversion":"19.0.0","workitem":[{"winame":"5G_ProSe_Ph3_CH"}],"crnumber":57.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251316","title":"New Study on AI\/ML management enhancements","source":"NEC, Intel","contact":"Hassan Al-kanani","contact-id":47274,"tdoctype":"SID new","for":"Agreement","abstract":"AI 6.2.1->5.5","secretary_remarks":"","agenda_item_sort_order":12,"ainumber":"5.5","ainame":"Rel-20 topic preparation","tdoc_agenda_sort_order":13160,"status":"revised","reservation_date":"2025-03-26 09:37:14","uploaded":"2025-03-28 23:41:55","revisionof":"","revisedto":"S5-251772","release":"Rel-20","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251316.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251317","title":"Add the use case and requirements for edge application deployment location analysis","source":"AsiaInfo, ZTE","contact":"Zhanwu Li","contact-id":95185,"tdoctype":"CR","for":"Agreement","abstract":"Add the use case and requirements for edge application deployment location analysis","secretary_remarks":"Title modified on 3\/27\/2025. Original title : Rel-19 CR TS 28.104 Add the use case and requirements for edge application deployment location analysis<br\/><br\/>Source modified on 3\/27\/2025. Original source : AsiaInfo, ZTE","agenda_item_sort_order":63,"ainumber":"6.19.2.1","ainame":"Management Data Analytics phase 3","tdoc_agenda_sort_order":13170,"status":"revised","reservation_date":"2025-03-26 09:42:01","uploaded":"2025-03-27 09:47:00","revisionof":"","revisedto":"S5-251790","release":"Rel-19","crspec":28.104,"crspecversion":"19.1.0","workitem":[{"winame":"eMDAS_Ph3"}],"crnumber":191.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251317.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"7.2.7.Z(new clauses added)","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251318","title":"Add the use case and requirements for edge computing performance analysis","source":"AsiaInfo, ZTE","contact":"Zhanwu Li","contact-id":95185,"tdoctype":"CR","for":"Agreement","abstract":"Add the use case and requirements for edge computing performance analysis","secretary_remarks":"Title modified on 3\/27\/2025. Original title : Rel-19 CR TS 28.104 Add the use case and requirements for edge computing performance analysis<br\/><br\/>Source modified on 3\/27\/2025. Original source : AsiaInfo, ZTE","agenda_item_sort_order":63,"ainumber":"6.19.2.1","ainame":"Management Data Analytics phase 3","tdoc_agenda_sort_order":13180,"status":"revised","reservation_date":"2025-03-26 09:46:04","uploaded":"2025-03-27 09:47:00","revisionof":"","revisedto":"S5-251792","release":"Rel-19","crspec":28.104,"crspecversion":"19.1.0","workitem":[{"winame":"eMDAS_Ph3"}],"crnumber":192.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251318.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"7.2.2.X(new clauses added)","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251319","title":"Add the use case and requirements for traffic congestion prediction analytics based on UE throughput","source":"AsiaInfo, ZTE","contact":"Zhanwu Li","contact-id":95185,"tdoctype":"CR","for":"Agreement","abstract":"Add the use case and requirements for traffic congestion prediction analytics based on UE throughput analysis","secretary_remarks":"Title modified on 3\/27\/2025. Original title : Rel-19 CR TS 28.104 Add the use case and requirements for traffic congestion prediction analytics based on UE throughput analysis<br\/><br\/>Source modified on 3\/27\/2025. Original source : AsiaInfo, ZTE","agenda_item_sort_order":63,"ainumber":"6.19.2.1","ainame":"Management Data Analytics phase 3","tdoc_agenda_sort_order":13190,"status":"revised","reservation_date":"2025-03-26 09:49:41","uploaded":"2025-03-27 09:47:00","revisionof":"","revisedto":"S5-251798","release":"Rel-19","crspec":28.104,"crspecversion":"19.1.0","workitem":[{"winame":"eMDAS_Ph3"}],"crnumber":193.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251319.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"7.2.2.Y(new clauses added)","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251320","title":"Rel-19 CR TS 28.104 Add solution for  edge application deployment location analysis","source":"AsiaInfo, ZTE","contact":"Zhanwu Li","contact-id":95185,"tdoctype":"CR","for":"Approval","abstract":"Add solution for  edge application deployment location analysis","secretary_remarks":"","agenda_item_sort_order":63,"ainumber":"6.19.2.1","ainame":"Management Data Analytics phase 3","tdoc_agenda_sort_order":13200,"status":"revised","reservation_date":"2025-03-26 09:52:06","uploaded":"2025-03-27 09:47:00","revisionof":"","revisedto":"S5-251791","release":"Rel-19","crspec":28.104,"crspecversion":"19.1.0","workitem":[{"winame":"eMDAS_Ph3"}],"crnumber":194.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251320.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251321","title":"Rel-19 CR TS 28.104 add solutions for edge computing performance analysis","source":"AsiaInfo, ZTE","contact":"Zhanwu Li","contact-id":95185,"tdoctype":"CR","for":"Approval","abstract":"Add solution for edge computing performance analysis","secretary_remarks":"Title modified on 3\/27\/2025. Original title : Rel-19 CR TS 28.104 Add solution for edge computing performance analysis<br\/><br\/>Source modified on 3\/27\/2025. Original source : AsiaInfo, ZTE","agenda_item_sort_order":63,"ainumber":"6.19.2.1","ainame":"Management Data Analytics phase 3","tdoc_agenda_sort_order":13210,"status":"revised","reservation_date":"2025-03-26 09:54:43","uploaded":"2025-03-27 09:47:00","revisionof":"","revisedto":"S5-251793","release":"Rel-19","crspec":28.104,"crspecversion":"19.1.0","workitem":[{"winame":"eMDAS_Ph3"}],"crnumber":195.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251321.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":false,"clauses_affected":"8.4.2.X(New), 8.4.2.X.1(New), 8.4.2.X.2(New), 8.4.2.X.3(New), 8.6.1","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251322","title":"LS on 5G Trace to support UE level measurement (SA5#159)","source":"CT4","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"LS in","for":"Information","abstract":"","secretary_remarks":"","agenda_item_sort_order":14,"ainumber":"6.1","ainame":"OAM&P Plenary","tdoc_agenda_sort_order":13220,"status":"replied to","reservation_date":"2025-03-26 15:27:52","uploaded":"2025-03-27 09:46:42","revisionof":"","revisedto":"","release":"Rel-18","crspec":"","crspecversion":"","workitem":[{"winame":"TEI18"},{"winame":" PM_KPI_5G_Ph3"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"SA5","Cc":"CT3","lsoriginalls":"C4-245536","lsreply":"S5-252113","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251322.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251323","title":"LS reply to LS on energy information collection from OAM to EIF","source":"CT","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"LS in","for":"Information","abstract":"","secretary_remarks":"","agenda_item_sort_order":14,"ainumber":"6.1","ainame":"OAM&P Plenary","tdoc_agenda_sort_order":13230,"status":"noted","reservation_date":"2025-03-26 15:27:52","uploaded":"2025-03-27 09:46:42","revisionof":"","revisedto":"","release":"Rel-19","crspec":"","crspecversion":"","workitem":[{"winame":"Energy_OAM_Ph3"},{"winame":" EnergySys"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"SA5","Cc":"SA, SA2, CT3, CT4","lsoriginalls":"CP-250253","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251323.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251324","title":"LS on per-UE UE performance metrics (SA5#159)","source":"RAN3","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"LS in","for":"Information","abstract":"","secretary_remarks":"","agenda_item_sort_order":14,"ainumber":"6.1","ainame":"OAM&P Plenary","tdoc_agenda_sort_order":13240,"status":"replied to","reservation_date":"2025-03-26 15:27:52","uploaded":"2025-03-27 09:46:42","revisionof":"","revisedto":"","release":"Rel-18","crspec":"","crspecversion":"","workitem":[{"winame":"NR_AIML_NGRAN-Core"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"SA5","Cc":"RAN2","lsoriginalls":"R3-247775","lsreply":"S5-252056","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251324.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251325","title":"Reply LS on MBS Communication Service Type","source":"RAN3","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"LS in","for":"Information","abstract":"","secretary_remarks":"","agenda_item_sort_order":14,"ainumber":"6.1","ainame":"OAM&P Plenary","tdoc_agenda_sort_order":13250,"status":"noted","reservation_date":"2025-03-26 15:27:52","uploaded":"2025-03-27 09:46:42","revisionof":"","revisedto":"","release":"Rel-18","crspec":"","crspecversion":"","workitem":[{"winame":"NR_QoE_enh-Core"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"SA4","Cc":"RAN2, SA5","lsoriginalls":"R3-250858","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251325.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251326","title":"LS on Continuous MDT","source":"RAN3","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"LS in","for":"Information","abstract":"","secretary_remarks":"","agenda_item_sort_order":14,"ainumber":"6.1","ainame":"OAM&P Plenary","tdoc_agenda_sort_order":13260,"status":"replied to","reservation_date":"2025-03-26 15:27:52","uploaded":"2025-03-27 09:46:42","revisionof":"","revisedto":"","release":"Rel-19","crspec":"","crspecversion":"","workitem":[{"winame":"NR_AIML_NGRAN_enh-Core"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"SA5","Cc":"","lsoriginalls":"R3-250891","lsreply":"S5-252114","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251326.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251327","title":"Reply LS on OAM requirements to support regenerative payload transport links","source":"RAN3","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"LS in","for":"Information","abstract":"","secretary_remarks":"","agenda_item_sort_order":14,"ainumber":"6.1","ainame":"OAM&P Plenary","tdoc_agenda_sort_order":13270,"status":"postponed","reservation_date":"2025-03-26 15:27:52","uploaded":"2025-03-27 09:46:42","revisionof":"","revisedto":"","release":"Rel-19","crspec":"","crspecversion":"","workitem":[{"winame":"NR_NTN_Ph3-Core"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"SA2, SA5","Cc":"","lsoriginalls":"R3-250895","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251327.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251328","title":"LS on Ambient IoT progress of RAN3","source":"RAN3","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"LS in","for":"Information","abstract":"","secretary_remarks":"","agenda_item_sort_order":10,"ainumber":"5.3","ainame":"Liaison statements at SA5 level","tdoc_agenda_sort_order":13280,"status":"replied to","reservation_date":"2025-03-26 15:27:52","uploaded":"2025-03-27 09:46:42","revisionof":"","revisedto":"","release":"Rel-19","crspec":"","crspecversion":"","workitem":[{"winame":"Ambient_IoT_Solutions-Core"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"SA2, SA5","Cc":"","lsoriginalls":"R3-250905","lsreply":"S5-251771","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251328.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251329","title":"Reply LS on Usage of Charging Characteristics and CHF Group ID","source":"SA2","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"LS in","for":"Information","abstract":"","secretary_remarks":"","agenda_item_sort_order":97,"ainumber":"7.1","ainame":"Charging Plenary","tdoc_agenda_sort_order":13290,"status":"noted","reservation_date":"2025-03-26 15:27:52","uploaded":"2025-03-27 09:46:42","revisionof":"","revisedto":"","release":"Rel-19","crspec":"","crspecversion":"","workitem":[{"winame":"CHFSeg"},{"winame":" TEI19"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"SA5","Cc":"CT4, CT3","lsoriginalls":"S2-2502640","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251329.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251330","title":"Publication of ETSI NFV group report on architectural support for NFV evolution","source":"ETSI ISG NFV","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"LS in","for":"Information","abstract":"The ETSI ISG NFV would like to inform 3GPP that ETSI GR NFV-IFA 054 (Release 6 group report on architectural support for NFV evolution) has been published. \n\nThe publication of ETSI GR NFV-IFA 054 (v6.1.1) is available at the following location:\nhttps:\/\/www.etsi.org\/deliver\/etsi_gr\/NFV-IFA\/001_099\/054\/06.01.01_60\/gr_nfv-ifa054v060101p.pdf\n\nThe study of ETSI GR NFV-IFA 054 investigates the potential future trends in mobile communication networks\/services, cloud infrastructure, platform services as well as advanced automation\/AI technologies. Following a series of architectural goals associated to two categories of \u201csimplification\u201d and \u201cevolution\u201d principles, the report proposes a high-level architectural framework for Telco Cloud, to address the NFV evolution requirements and fulfil the abovementioned future trends.  As understood by the ISG NFV, the outcomes of the report are potentially related to the studies about future architecture of mobile communication network (e.g., in respect to cloud-native network functions) and cloud aspects of Management and Orchestration as in 3GPP TR 28.869. \n\n\nArchitectural view for the Telco Cloud (derived from ETSI GR NFV-IFA 054)\nCorrespondingly, a Release 6 normative work item (stage 2) to update the existing ETSI GS NFV 006 to specify the Telco Cloud architectural framework has been kicked off in early 2025. The work item also targets to resolve the migration procedures from the legacy NFV-MANO to the Telco Cloud architectural framework.\n\n2. Actions:\nETSI ISG NFV kindly requests your organization to\n\u2022\tTake the above information into account when proceeding future architecture of mobile communication network in the timeline of 3GPP Release 20;\n\u2022\tProvide feedback to the published ETSI GR NFV-IFA 054 document;\n\u2022\tFurthermore, consider to arrange joint workshop during NFV#50 meeting for exchanging information and views on future mobile communication network and telco cloud.","secretary_remarks":"","agenda_item_sort_order":10,"ainumber":"5.3","ainame":"Liaison statements at SA5 level","tdoc_agenda_sort_order":13300,"status":"postponed","reservation_date":"2025-03-26 15:27:52","uploaded":"2025-03-27 09:46:42","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"SA2, SA5","Cc":"SA","lsoriginalls":"","lsreply":"S5-252049","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251330.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251331","title":"LS on the initiation of a new Technical Report ITU-T TR.M.rnscesnr \u201cRequirements of network service consistency evaluation for shared network resources\u201d","source":"ITU-T SG2","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"LS in","for":"Information","abstract":"","secretary_remarks":"","agenda_item_sort_order":14,"ainumber":"6.1","ainame":"OAM&P Plenary","tdoc_agenda_sort_order":13310,"status":"noted","reservation_date":"2025-03-26 15:27:52","uploaded":"2025-03-27 09:46:42","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"ITU-T SG13,  SA5","Cc":"ITU-T SG2","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251331.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251332","title":"LS\/r on methodology harmonization update (reply to 3GPP TSG SA5-244109 - LS57)","source":"ITU-T SG2","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"LS in","for":"Information","abstract":"","secretary_remarks":"","agenda_item_sort_order":14,"ainumber":"6.1","ainame":"OAM&P Plenary","tdoc_agenda_sort_order":13320,"status":"replied to","reservation_date":"2025-03-26 15:27:52","uploaded":"2025-03-27 09:46:42","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"SA5","Cc":"","lsoriginalls":"","lsreply":"S5-251314","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251332.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251333","title":"Rel-19 CR 28.532 Add new notifications for reliability","source":"Ericsson India Private Limited","contact":"Balazs Lengyel","contact-id":81420,"tdoctype":"CR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":73,"ainumber":"6.19.8.1","ainame":"Service Based Management Architecture enhancement phase 3","tdoc_agenda_sort_order":13330,"status":"withdrawn","reservation_date":"2025-03-26 16:36:33","uploaded":null,"revisionof":"","revisedto":"","release":"Rel-19","crspec":28.532,"crspecversion":"19.0.0","workitem":[{"winame":"SBMA_Ph3"}],"crnumber":376.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251334","title":"TS28.536 CR update Assurace CCL model","source":"Nokia Americas","contact":"Stephen Mwanje","contact-id":83479,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":66,"ainumber":"6.19.4","ainame":"Study on closed control loop management (completed)","tdoc_agenda_sort_order":13340,"status":"not treated","reservation_date":"2025-03-26 17:05:50","uploaded":"2025-03-28 10:07:18","revisionof":"","revisedto":"","release":"Rel-19","crspec":28.536,"crspecversion":"19.1.0","workitem":[{"winame":"CCLM"}],"crnumber":123.0,"crrevision":"","crcategory":"C","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251334.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251335","title":"Incorporation of conclusions from TR 28.880","source":"Vodafone","contact":"Flavio Saia","contact-id":110000,"tdoctype":"CR","for":"Agreement","abstract":"Incorporation of conclusions from TR 28.880","secretary_remarks":"","agenda_item_sort_order":93,"ainumber":"6.19.20.1","ainame":"Energy efficiency and energy saving aspects of 5G networks and services","tdoc_agenda_sort_order":13350,"status":"not pursued","reservation_date":"2025-03-26 22:13:28","uploaded":"2025-03-27 14:53:12","revisionof":"","revisedto":"","release":"Rel-19","crspec":28.541,"crspecversion":"19.3.0","workitem":[{"winame":"Energy_OAM_Ph3"}],"crnumber":1496.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251335.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251336","title":"Rel-19 CR 28.552 Add a new measurement related to efficiency of data collection from NFs performed by NWDAF","source":"China Telecom","contact":"Zhen Li","contact-id":99129,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 3\/28\/2025. Original source : China Telecom Corporation Ltd.","agenda_item_sort_order":89,"ainumber":"6.19.18.1","ainame":"Enhancement of Management Aspects related to NWDAF Phase 2","tdoc_agenda_sort_order":13360,"status":"revised","reservation_date":"2025-03-27 02:23:02","uploaded":"2025-03-28 09:43:16","revisionof":"","revisedto":"S5-251998","release":"Rel-19","crspec":28.552,"crspecversion":"19.3.0","workitem":[{"winame":"NWDAF_OAM_Ph2"}],"crnumber":679.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251336.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"5.18.5","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251337","title":"Rel-19 CR 28.552 Add a new measurement related to efficiency of data collection from DCCF or NWDAF hosting DCCF performed by NWDAF","source":"China Telecom","contact":"Zhen Li","contact-id":99129,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 3\/28\/2025. Original source : China Telecom Corporation Ltd.","agenda_item_sort_order":89,"ainumber":"6.19.18.1","ainame":"Enhancement of Management Aspects related to NWDAF Phase 2","tdoc_agenda_sort_order":13370,"status":"revised","reservation_date":"2025-03-27 02:32:06","uploaded":"2025-03-28 09:45:34","revisionof":"","revisedto":"S5-251999","release":"Rel-19","crspec":28.552,"crspecversion":"19.3.0","workitem":[{"winame":"NWDAF_OAM_Ph2"}],"crnumber":680.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251337.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"5.18.5","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251338","title":"Rel-19 CR 28.552 Add a new measurement related to transmission rate related to the data collection from NFs performed by NWDAF","source":"China Telecom","contact":"Zhen Li","contact-id":99129,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 3\/28\/2025. Original source : China Telecom Corporation Ltd.","agenda_item_sort_order":89,"ainumber":"6.19.18.1","ainame":"Enhancement of Management Aspects related to NWDAF Phase 2","tdoc_agenda_sort_order":13380,"status":"revised","reservation_date":"2025-03-27 02:34:28","uploaded":"2025-03-28 09:46:38","revisionof":"","revisedto":"S5-252000","release":"Rel-19","crspec":28.552,"crspecversion":"19.3.0","workitem":[{"winame":"NWDAF_OAM_Ph2"}],"crnumber":681.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251338.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"5.18.5","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251339","title":"Rel-19 CR 28.552 Add a new measurement related to transmission rate related to the data collection from DCCF or NWDAF hosting DCCF performed by NWDAF","source":"China Telecom","contact":"Zhen Li","contact-id":99129,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 3\/28\/2025. Original source : China Telecom Corporation Ltd.","agenda_item_sort_order":89,"ainumber":"6.19.18.1","ainame":"Enhancement of Management Aspects related to NWDAF Phase 2","tdoc_agenda_sort_order":13390,"status":"revised","reservation_date":"2025-03-27 02:37:38","uploaded":"2025-03-28 09:48:28","revisionof":"","revisedto":"S5-252001","release":"Rel-19","crspec":28.552,"crspecversion":"19.3.0","workitem":[{"winame":"NWDAF_OAM_Ph2"}],"crnumber":682.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251339.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"5.18.5","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251340","title":"Rel-19 CR 28.552 Add use case descriptions on monitoring of NWDAF data collection","source":"China Telecom","contact":"Zhen Li","contact-id":99129,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 3\/28\/2025. Original source : China Telecom Corporation Ltd.","agenda_item_sort_order":89,"ainumber":"6.19.18.1","ainame":"Enhancement of Management Aspects related to NWDAF Phase 2","tdoc_agenda_sort_order":13400,"status":"revised","reservation_date":"2025-03-27 02:50:28","uploaded":"2025-03-28 09:50:09","revisionof":"","revisedto":"S5-252002","release":"Rel-19","crspec":28.552,"crspecversion":"19.3.0","workitem":[{"winame":"NWDAF_OAM_Ph2"}],"crnumber":683.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251340.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"Annex A","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251341","title":"Extend the scope and charging architecture to support 5G LCS converged charging","source":"China Telecom","contact":"Zhiwei Mo","contact-id":93813,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Title modified on 3\/28\/2025. Original title : Rel-19 CR TS 32.271 Extend the scope and charging architecture to support 5G LCS converged charging<br\/><br\/>Source modified on 3\/28\/2025. Original source : China Telecommunications Corp.","agenda_item_sort_order":110,"ainumber":"7.4.","ainame":"Charging Aspects of 5GC LoCation Services","tdoc_agenda_sort_order":13410,"status":"revised","reservation_date":"2025-03-27 07:29:39","uploaded":"2025-03-28 03:20:12","revisionof":"","revisedto":"S5-251829","release":"Rel-19","crspec":32.271,"crspecversion":"19.1.0","workitem":[{"winame":"CH_5G_eLCS_Ph3"}],"crnumber":29.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251341.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"1, 4.4","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251342","title":"Extend basic priciples, CDR generation and handling for 5G LCS converged charging","source":"China Telecom","contact":"Zhiwei Mo","contact-id":93813,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Title modified on 3\/28\/2025. Original title : Rel-19 CR TS 32.271 Extend basic priciples, CDR generation and handling for 5G LCS converged charging<br\/><br\/>Source modified on 3\/28\/2025. Original source : China Telecommunications Corp.","agenda_item_sort_order":110,"ainumber":"7.4.","ainame":"Charging Aspects of 5GC LoCation Services","tdoc_agenda_sort_order":13420,"status":"revised","reservation_date":"2025-03-27 07:29:40","uploaded":"2025-03-28 03:20:12","revisionof":"","revisedto":"S5-251830","release":"Rel-19","crspec":32.271,"crspecversion":"19.1.0","workitem":[{"winame":"CH_5G_eLCS_Ph3"}],"crnumber":30.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251342.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"5.4.1, 5.4.3","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251343","title":"Add message flow of converged charging for 5GC-MT-LR","source":"China Telecom","contact":"Zhiwei Mo","contact-id":93813,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Title modified on 3\/28\/2025. Original title : Rel-19 CR TS 32.271 Add message flow of converged charging for 5GC-MT-LR<br\/><br\/>Source modified on 3\/28\/2025. Original source : China Telecommunications Corp.","agenda_item_sort_order":110,"ainumber":"7.4.","ainame":"Charging Aspects of 5GC LoCation Services","tdoc_agenda_sort_order":13430,"status":"revised","reservation_date":"2025-03-27 07:29:41","uploaded":"2025-03-28 03:20:12","revisionof":"","revisedto":"S5-251832","release":"Rel-19","crspec":32.271,"crspecversion":"19.1.0","workitem":[{"winame":"CH_5G_eLCS_Ph3"}],"crnumber":31.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251343.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"5.4.2.x (new)","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251344","title":"Add message flow of converged charging for 5GC-MO-LR","source":"China Telecom","contact":"Zhiwei Mo","contact-id":93813,"tdoctype":"CR","for":"Approval","abstract":"","secretary_remarks":"Title modified on 3\/28\/2025. Original title : Rel-19 CR TS 32.271 Add message flow of converged charging for 5GC-MO-LR<br\/><br\/>Source modified on 3\/28\/2025. Original source : China Telecommunications Corp.","agenda_item_sort_order":110,"ainumber":"7.4.","ainame":"Charging Aspects of 5GC LoCation Services","tdoc_agenda_sort_order":13440,"status":"revised","reservation_date":"2025-03-27 07:29:41","uploaded":"2025-03-28 03:20:12","revisionof":"","revisedto":"S5-251833","release":"Rel-19","crspec":32.271,"crspecversion":"19.1.0","workitem":[{"winame":"CH_5G_eLCS_Ph3"}],"crnumber":32.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251344.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"5.4.2.y (new)","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251345","title":"Extend data description for 5G LCS converged charging","source":"China Telecom","contact":"Zhiwei Mo","contact-id":93813,"tdoctype":"CR","for":"Approval","abstract":"","secretary_remarks":"Title modified on 3\/28\/2025. Original title : Rel-19 CR TS 32.271 Extend data description for 5G LCS converged charging<br\/><br\/>Source modified on 3\/28\/2025. Original source : China Telecommunications Corp.","agenda_item_sort_order":110,"ainumber":"7.4.","ainame":"Charging Aspects of 5GC LoCation Services","tdoc_agenda_sort_order":13450,"status":"revised","reservation_date":"2025-03-27 07:29:42","uploaded":"2025-03-28 03:20:12","revisionof":"","revisedto":"S5-251834","release":"Rel-19","crspec":32.271,"crspecversion":"19.1.0","workitem":[{"winame":"CH_5G_eLCS_Ph3"}],"crnumber":33.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251345.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"6.2a","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251346","title":"Extend charging information and bindings for 5G LCS converged charging","source":"China Telecom","contact":"Zhiwei Mo","contact-id":93813,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Title modified on 3\/28\/2025. Original title : Rel-19 CR TS 32.271 Extend charging information and bindings for 5G LCS converged charging<br\/><br\/>Source modified on 3\/28\/2025. Original source : China Telecommunications Corp.","agenda_item_sort_order":110,"ainumber":"7.4.","ainame":"Charging Aspects of 5GC LoCation Services","tdoc_agenda_sort_order":13460,"status":"revised","reservation_date":"2025-03-27 07:29:43","uploaded":"2025-03-28 03:20:12","revisionof":"","revisedto":"S5-251835","release":"Rel-19","crspec":32.271,"crspecversion":"19.1.0","workitem":[{"winame":"CH_5G_eLCS_Ph3"}],"crnumber":34.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251346.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"6.3, 6.4","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251347","title":"Extend Data Type for 5G LCS converged charging","source":"China Telecom","contact":"Zhiwei Mo","contact-id":93813,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Title modified on 3\/28\/2025. Original title : Rel-19 CR TS 32.291 Extend Data Type for 5G LCS converged charging<br\/><br\/>Source modified on 3\/28\/2025. Original source : China Telecommunications Corp.","agenda_item_sort_order":110,"ainumber":"7.4.","ainame":"Charging Aspects of 5GC LoCation Services","tdoc_agenda_sort_order":13470,"status":"revised","reservation_date":"2025-03-27 07:29:44","uploaded":"2025-03-28 03:20:12","revisionof":"","revisedto":"S5-251836","release":"Rel-19","crspec":32.291,"crspecversion":"19.2.0","workitem":[{"winame":"CH_5G_eLCS_Ph3"}],"crnumber":616.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251347.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"6.1.6.2.19, 6.1.6.3.4, 7.17","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251348","title":"Extend CHF-CDR for 5G LCS converged charging","source":"China Telecom","contact":"Zhiwei Mo","contact-id":93813,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Title modified on 3\/28\/2025. Original title : Rel-19 CR TS 32.298 Extend CHF CDR for 5G LCS converged charging<br\/><br\/>Source modified on 3\/28\/2025. Original source : China Telecommunications Corp.","agenda_item_sort_order":110,"ainumber":"7.4.","ainame":"Charging Aspects of 5GC LoCation Services","tdoc_agenda_sort_order":13480,"status":"revised","reservation_date":"2025-03-27 07:29:45","uploaded":"2025-03-28 03:20:12","revisionof":"","revisedto":"S5-251837","release":"Rel-19","crspec":32.298,"crspecversion":"19.1.0","workitem":[{"winame":"CH_5G_eLCS_Ph3"}],"crnumber":1034.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251348.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"5.1.5.0","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251349","title":"Rel19 CR TS28.104 correction to reference","source":"Nokia, Nokia Shanghai Bell","contact":"Sean Sun","contact-id":92711,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":32,"ainumber":"6.3.14","ainame":"Other","tdoc_agenda_sort_order":13490,"status":"merged","reservation_date":"2025-03-27 07:44:36","uploaded":"2025-03-28 16:51:12","revisionof":"","revisedto":"","release":"Rel-19","crspec":28.104,"crspecversion":"19.1.0","workitem":[{"winame":"TEI19"}],"crnumber":196.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251349.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251350","title":"Rel-18 CR TS 28.541 Typo corrections and missing definitions","source":"ZTE Corporation, Orange","contact":"Pengxiang Xie","contact-id":102614,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 3\/27\/2025. Original source : ZTE Corporation, Orange","agenda_item_sort_order":43,"ainumber":"6.4.11","ainame":"Additional NRM features phase 2","tdoc_agenda_sort_order":13500,"status":"revised","reservation_date":"2025-03-27 08:00:23","uploaded":"2025-03-27 08:28:17","revisionof":"","revisedto":"S5-252078","release":"Rel-18","crspec":28.541,"crspecversion":"18.11.0","workitem":[{"winame":"AdNRM_ph2"}],"crnumber":1497.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251350.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"5.3.140, 5.4.1","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251351","title":"Rel-19 CR TS 28.541 Typo corrections and missing definitions","source":"ZTE Corporation, Orange","contact":"Pengxiang Xie","contact-id":102614,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 3\/27\/2025. Original source : ZTE Corporation, Orange","agenda_item_sort_order":43,"ainumber":"6.4.11","ainame":"Additional NRM features phase 2","tdoc_agenda_sort_order":13510,"status":"revised","reservation_date":"2025-03-27 08:00:24","uploaded":"2025-03-27 08:28:53","revisionof":"","revisedto":"S5-252079","release":"Rel-19","crspec":28.541,"crspecversion":"19.3.0","workitem":[{"winame":"AdNRM_ph2"}],"crnumber":1498.0,"crrevision":"","crcategory":"A","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251351.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"5.3.140, 5.4.1","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251352","title":"Rel-18 CR TS 28.105 Correction on the isWritable propoerty of AIMLInferenceName in the MLTrainingRequest","source":"ZTE Corporation, Intel, Huawei","contact":"Pengxiang Xie","contact-id":102614,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 3\/27\/2025. Original source : ZTE Corporation, Intel, Huawei","agenda_item_sort_order":35,"ainumber":"6.4.3","ainame":"AI\/ML management","tdoc_agenda_sort_order":13520,"status":"not pursued","reservation_date":"2025-03-27 08:00:26","uploaded":"2025-03-27 10:20:16","revisionof":"","revisedto":"","release":"Rel-18","crspec":28.105,"crspecversion":"18.7.0","workitem":[{"winame":"AIML_MGT"}],"crnumber":277.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251352.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"7.3a.1.2.2.2","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251353","title":"Rel-19 CR TS 28.105 Correction on the isWritable propoerty of AIMLInferenceName in the MLTrainingRequest","source":"ZTE Corporation, Intel, Huawei","contact":"Pengxiang Xie","contact-id":102614,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 3\/27\/2025. Original source : ZTE Corporation, Intel, Huawei","agenda_item_sort_order":35,"ainumber":"6.4.3","ainame":"AI\/ML management","tdoc_agenda_sort_order":13530,"status":"not pursued","reservation_date":"2025-03-27 08:00:27","uploaded":"2025-03-27 10:20:43","revisionof":"","revisedto":"","release":"Rel-19","crspec":28.105,"crspecversion":"19.2.0","workitem":[{"winame":"AIML_MGT"}],"crnumber":278.0,"crrevision":"","crcategory":"A","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251353.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"7.3a.1.2.2.2","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251354","title":"Input to DraftCR Rel-19 TS 28.105 Add Management Scenario for RL","source":"ZTE Corporation, NEC, Intel","contact":"Pengxiang Xie","contact-id":102614,"tdoctype":"other","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":61,"ainumber":"6.19.1.1","ainame":"AI\/ML management phase 2","tdoc_agenda_sort_order":13540,"status":"not treated","reservation_date":"2025-03-27 08:00:28","uploaded":"2025-03-27 09:56:18","revisionof":"","revisedto":"","release":"Rel-19","crspec":28.105,"crspecversion":"","workitem":[{"winame":"AIML_MGT_Ph2"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251354.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251355","title":"Input to DraftCR Rel-19 TS 28.105 Add Procedure Diagram for FL Server selection and determination","source":"ZTE Corporation,NEC, Intel","contact":"Pengxiang Xie","contact-id":102614,"tdoctype":"other","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":61,"ainumber":"6.19.1.1","ainame":"AI\/ML management phase 2","tdoc_agenda_sort_order":13550,"status":"revised","reservation_date":"2025-03-27 08:00:28","uploaded":"2025-03-28 01:26:02","revisionof":"","revisedto":"S5-251785","release":"Rel-19","crspec":28.105,"crspecversion":"","workitem":[{"winame":"AIML_MGT_Ph2"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251355.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251356","title":"Input to DraftCR Rel-19 TS 28.105 Add Procedure Diagram for FL Client selection","source":"ZTE Corporation,NEC, Intel","contact":"Pengxiang Xie","contact-id":102614,"tdoctype":"other","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":61,"ainumber":"6.19.1.1","ainame":"AI\/ML management phase 2","tdoc_agenda_sort_order":13560,"status":"merged","reservation_date":"2025-03-27 08:00:28","uploaded":"2025-03-28 01:26:02","revisionof":"","revisedto":"","release":"Rel-19","crspec":28.105,"crspecversion":"","workitem":[{"winame":"AIML_MGT_Ph2"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251356.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251357","title":"Input to DraftCR Rel-19 TS 28.105 Update the UC and Req of Reinforcement Learning","source":"ZTE Corporation","contact":"Pengxiang Xie","contact-id":102614,"tdoctype":"other","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":61,"ainumber":"6.19.1.1","ainame":"AI\/ML management phase 2","tdoc_agenda_sort_order":13570,"status":"revised","reservation_date":"2025-03-27 08:00:28","uploaded":"2025-03-27 09:10:15","revisionof":"","revisedto":"S5-251788","release":"Rel-19","crspec":28.105,"crspecversion":"","workitem":[{"winame":"AIML_MGT_Ph2"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251357.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251358","title":"Input to DraftCR Rel-19 TS 28.105 Add New Use Case and Requirements of Sustainable AIML for ML training","source":"ZTE Corporation","contact":"Pengxiang Xie","contact-id":102614,"tdoctype":"other","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":61,"ainumber":"6.19.1.1","ainame":"AI\/ML management phase 2","tdoc_agenda_sort_order":13580,"status":"revised","reservation_date":"2025-03-27 08:00:28","uploaded":"2025-03-27 09:22:13","revisionof":"","revisedto":"S5-252044","release":"Rel-19","crspec":28.105,"crspecversion":"","workitem":[{"winame":"AIML_MGT_Ph2"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251358.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251359","title":"Input to DraftCR Rel-19 TS 28.105 Add Solution for Sustainable AIML for ML training","source":"ZTE Corporation","contact":"Pengxiang Xie","contact-id":102614,"tdoctype":"other","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":61,"ainumber":"6.19.1.1","ainame":"AI\/ML management phase 2","tdoc_agenda_sort_order":13590,"status":"merged","reservation_date":"2025-03-27 08:00:28","uploaded":"2025-03-27 09:22:34","revisionof":"","revisedto":"","release":"Rel-19","crspec":28.105,"crspecversion":"","workitem":[{"winame":"AIML_MGT_Ph2"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251359.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251360","title":"Input to DraftCR Rel-19 TS 28.105 Enhancement on AIMLSupportedFunction to support inference in LMF","source":"ZTE Corporation","contact":"Pengxiang Xie","contact-id":102614,"tdoctype":"other","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":61,"ainumber":"6.19.1.1","ainame":"AI\/ML management phase 2","tdoc_agenda_sort_order":13600,"status":"not treated","reservation_date":"2025-03-27 08:00:28","uploaded":"2025-03-27 10:18:52","revisionof":"","revisedto":"","release":"Rel-19","crspec":28.105,"crspecversion":"","workitem":[{"winame":"AIML_MGT_Ph2"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251360.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251361","title":"Rel-19 CR TS 28.541 Enhancement on LMF NRM to Support the Inference Functionality in LMF","source":"ZTE Corporation","contact":"Pengxiang Xie","contact-id":102614,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 3\/27\/2025. Original source : ZTE Corporation","agenda_item_sort_order":61,"ainumber":"6.19.1.1","ainame":"AI\/ML management phase 2","tdoc_agenda_sort_order":13610,"status":"not treated","reservation_date":"2025-03-27 08:00:28","uploaded":"2025-03-27 10:19:37","revisionof":"","revisedto":"","release":"Rel-19","crspec":28.541,"crspecversion":"19.3.0","workitem":[{"winame":"AIML_MGT_Ph2"}],"crnumber":1499.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251361.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"5.3.15","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251362","title":"Input to DraftCR Rel-19 TS 28.105 Add New AI\/ML functionalities management scenario for LMF","source":"ZTE Corporation","contact":"Pengxiang Xie","contact-id":102614,"tdoctype":"other","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":61,"ainumber":"6.19.1.1","ainame":"AI\/ML management phase 2","tdoc_agenda_sort_order":13620,"status":"revised","reservation_date":"2025-03-27 08:00:30","uploaded":"2025-03-27 10:22:11","revisionof":"","revisedto":"S5-252048","release":"Rel-19","crspec":28.105,"crspecversion":"","workitem":[{"winame":"AIML_MGT_Ph2"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251362.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251363","title":"Input to DraftCR Rel-19 TS 28.105 Add Solution for Distributed Learning","source":"ZTE Corporation","contact":"Pengxiang Xie","contact-id":102614,"tdoctype":"other","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":61,"ainumber":"6.19.1.1","ainame":"AI\/ML management phase 2","tdoc_agenda_sort_order":13630,"status":"merged","reservation_date":"2025-03-27 08:00:30","uploaded":"2025-03-27 10:23:32","revisionof":"","revisedto":"","release":"Rel-19","crspec":28.105,"crspecversion":"","workitem":[{"winame":"AIML_MGT_Ph2"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251363.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251364","title":"DP on the NRM Design for AIMLInferenceFunction","source":"ZTE Corporation","contact":"Pengxiang Xie","contact-id":102614,"tdoctype":"discussion","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":61,"ainumber":"6.19.1.1","ainame":"AI\/ML management phase 2","tdoc_agenda_sort_order":13640,"status":"not treated","reservation_date":"2025-03-27 08:00:30","uploaded":"2025-03-28 11:47:44","revisionof":"","revisedto":"","release":"Rel-19","crspec":"","crspecversion":"","workitem":[{"winame":"AIML_MGT_Ph2"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251364.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251365","title":"Input to DraftCR Rel-19 CR TS 28.105 Enhancement on AIMLInferenceFunction NRM","source":"ZTE Corporation","contact":"Pengxiang Xie","contact-id":102614,"tdoctype":"other","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":61,"ainumber":"6.19.1.1","ainame":"AI\/ML management phase 2","tdoc_agenda_sort_order":13650,"status":"not treated","reservation_date":"2025-03-27 08:00:30","uploaded":"2025-03-28 11:47:44","revisionof":"","revisedto":"","release":"Rel-19","crspec":28.105,"crspecversion":"","workitem":[{"winame":"AIML_MGT_Ph2"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251365.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251366","title":"New WID on OAM for XR and media services (XRM)","source":"ZTE Corporation","contact":"Pengxiang Xie","contact-id":102614,"tdoctype":"WID new","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":12,"ainumber":"5.5","ainame":"Rel-20 topic preparation","tdoc_agenda_sort_order":13660,"status":"revised","reservation_date":"2025-03-27 08:00:30","uploaded":"2025-03-28 11:48:45","revisionof":"","revisedto":"S5-251773","release":"Rel-20","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251366.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251367","title":"Rel-19 CR TS 28.312 Enhance the use case and solution to support MOCN undifferentiated radio service in a specified area","source":"China Unicom","contact":"Zhen Xing","contact-id":99712,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":65,"ainumber":"6.19.3.1","ainame":"Intent driven management services for mobile network phase 3","tdoc_agenda_sort_order":13670,"status":"revised","reservation_date":"2025-03-27 08:17:17","uploaded":"2025-03-29 12:42:56","revisionof":"","revisedto":"S5-251914","release":"Rel-19","crspec":28.312,"crspecversion":"19.1.0","workitem":[{"winame":"FS_IDMS_MN_Ph3"},{"winame":" IDMS_MN_Ph3"}],"crnumber":316.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251367.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251368","title":"Revised WID on on Charging aspects of next generation real time communication services phase 2","source":"China Mobile","contact":"Ai Chen","contact-id":80296,"tdoctype":"WID revised","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":98,"ainumber":"7.2","ainame":"New Charging Study\/Work Item proposals","tdoc_agenda_sort_order":13680,"status":"revised","reservation_date":"2025-03-27 08:44:35","uploaded":"2025-03-28 06:09:16","revisionof":"","revisedto":"S5-251857","release":"Rel-19","crspec":"","crspecversion":"","workitem":[{"winame":"NG_RTC_Ph2-CH"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251368.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251369","title":"Rel-19 CR 32.255 Support volume-based charging for standalone IMS data channel","source":"China Mobile","contact":"Ai Chen","contact-id":80296,"tdoctype":"CR","for":"Approval","abstract":"","secretary_remarks":"Source modified on 3\/28\/2025. Original source : China Mobile","agenda_item_sort_order":108,"ainumber":"7.4.8","ainame":"Charging aspects of next generation real time communication services phase 2","tdoc_agenda_sort_order":13690,"status":"revised","reservation_date":"2025-03-27 08:51:50","uploaded":"2025-03-28 06:13:08","revisionof":"","revisedto":"S5-251819","release":"Rel-19","crspec":32.255,"crspecversion":"19.1.0","workitem":[{"winame":"NG_RTC_Ph2-CH"}],"crnumber":573.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251369.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"5.1.18","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251370","title":"Rel-19 CR 32.260 Support duration-based charging for standalone IMS data channel","source":"China Mobile","contact":"Ai Chen","contact-id":80296,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 3\/28\/2025. Original source : China Mobile","agenda_item_sort_order":108,"ainumber":"7.4.8","ainame":"Charging aspects of next generation real time communication services phase 2","tdoc_agenda_sort_order":13700,"status":"revised","reservation_date":"2025-03-27 08:56:11","uploaded":"2025-03-28 06:29:59","revisionof":"","revisedto":"S5-251822","release":"Rel-19","crspec":32.26,"crspecversion":"18.3.0","workitem":[{"winame":"NG_RTC_Ph2-CH"}],"crnumber":438.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251370.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"5.1.15, 5.1.15.y (new)","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251371","title":"Rel-19 CR 28.851 Cleanup","source":"China Mobile","contact":"Ai Chen","contact-id":80296,"tdoctype":"CR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":99,"ainumber":"7.3","ainame":"Charging Maintenance and Rel-19 Charging small enhancements","tdoc_agenda_sort_order":13710,"status":"withdrawn","reservation_date":"2025-03-27 09:03:54","uploaded":"2025-03-28 06:37:20","revisionof":"","revisedto":"","release":"Rel-19","crspec":28.851,"crspecversion":"19.0.0","workitem":[{"winame":"FS_NG_RTC_Ph2_CH"}],"crnumber":1.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251371.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251372","title":"LS on the consent of Recommendation ITU-T M. 3042(ex. M.fcnhe): \"Framework of communication network health evaluation\"","source":"ITU-T SG2","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"LS in","for":"Information","abstract":"","secretary_remarks":"","agenda_item_sort_order":14,"ainumber":"6.1","ainame":"OAM&P Plenary","tdoc_agenda_sort_order":13720,"status":"noted","reservation_date":"2025-03-27 09:35:40","uploaded":"2025-03-27 09:46:42","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"ITU-T SG12, ITU-T SG13, TM Forum, SA5","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251372.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251373","title":"Rel-19 pCR TS 28.579 Introduce definition of External MnS consumer","source":"Huawei","contact":"Jean-Michel CORNILY","contact-id":96535,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":95,"ainumber":"6.19.21.1","ainame":"Enhanced OAM for management service exposure to external consumers through CAPIF","tdoc_agenda_sort_order":13730,"status":"revised","reservation_date":"2025-03-27 11:06:56","uploaded":"2025-03-27 11:10:50","revisionof":"","revisedto":"S5-251946","release":"Rel-19","crspec":28.579,"crspecversion":"0.1.0","workitem":[{"winame":"MExpo"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251373.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251374","title":"Rel-19 CR TS 32.130 Enhance the service-based management architecture for MOCN","source":"Huawei, China Unicom","contact":"Jean-Michel CORNILY","contact-id":96535,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 3\/27\/2025. Original source : Huawei, China Unicom","agenda_item_sort_order":91,"ainumber":"6.19.19.1","ainame":"Management of Network Sharing Phase 3","tdoc_agenda_sort_order":13740,"status":"revised","reservation_date":"2025-03-27 11:38:59","uploaded":"2025-03-27 11:41:48","revisionof":"","revisedto":"S5-252003","release":"Rel-19","crspec":32.13,"crspecversion":"19.0.0","workitem":[{"winame":"NetShare_OAM_Ph3"}],"crnumber":44.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251374.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":false,"clauses_affected":"B.2","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251375","title":"Introduction of Sequence Number in Trace Record Header","source":"Jio Platforms Ltd (JPL)","contact":"Amit Kushwaha","contact-id":101969,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":81,"ainumber":"6.19.14","ainame":"Subscriber and Equipment Trace and QoE collection management","tdoc_agenda_sort_order":13750,"status":"withdrawn","reservation_date":"2025-03-27 11:41:21","uploaded":"2025-03-27 11:46:05","revisionof":"","revisedto":"","release":"Rel-19","crspec":32.423,"crspecversion":"19.2.0","workitem":[{"winame":"TraceQoE_OAM"}],"crnumber":199.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251375.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251376","title":"Rel-19 CR TS 32.130 Enhance Indirect Network Sharing scenario description","source":"Huawei, China Unicom","contact":"Jean-Michel CORNILY","contact-id":96535,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 3\/27\/2025. Original source : Huawei, China Unicom","agenda_item_sort_order":91,"ainumber":"6.19.19.1","ainame":"Management of Network Sharing Phase 3","tdoc_agenda_sort_order":13760,"status":"revised","reservation_date":"2025-03-27 11:45:14","uploaded":"2025-03-27 11:47:57","revisionof":"","revisedto":"S5-252004","release":"Rel-19","crspec":32.13,"crspecversion":"19.0.0","workitem":[{"winame":"NetShare_OAM_Ph3"}],"crnumber":45.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251376.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"4.1","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251377","title":"Rel-19 CR TS 32.130 Clarify MOCN and GWCN scenarios description","source":"Huawei, China Unicom","contact":"Jean-Michel CORNILY","contact-id":96535,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 3\/27\/2025. Original source : Huawei, China Unicom","agenda_item_sort_order":91,"ainumber":"6.19.19.1","ainame":"Management of Network Sharing Phase 3","tdoc_agenda_sort_order":13770,"status":"revised","reservation_date":"2025-03-27 11:50:22","uploaded":"2025-03-27 11:52:06","revisionof":"","revisedto":"S5-252005","release":"Rel-19","crspec":32.13,"crspecversion":"19.0.0","workitem":[{"winame":"NetShare_OAM_Ph3"}],"crnumber":46.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251377.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"4.1","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251378","title":"Rel-19 CR TS 32.423 Introduction of Sequence Number in Trace Record Header","source":"Jio Platforms Ltd (JPL)","contact":"Amit Kushwaha","contact-id":101969,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Title modified on 3\/27\/2025. Original title : Introduction of Sequence Number in Trace Record Header <br\/><br\/>Source modified on 3\/27\/2025. Original source : Jio Platforms Ltd (JPL)","agenda_item_sort_order":81,"ainumber":"6.19.14","ainame":"Subscriber and Equipment Trace and QoE collection management","tdoc_agenda_sort_order":13780,"status":"not pursued","reservation_date":"2025-03-27 11:51:17","uploaded":"2025-03-27 11:53:14","revisionof":"","revisedto":"","release":"Rel-19","crspec":32.423,"crspecversion":"19.2.0","workitem":[{"winame":"TraceQoE_OAM"}],"crnumber":200.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251378.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"5.2.2","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251379","title":"Rel-19 CR TS 32.130 Categorize requirements for the management support for Indirect Network Sharing scenario","source":"Huawei, China Unicom","contact":"Jean-Michel CORNILY","contact-id":96535,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 3\/27\/2025. Original source : Huawei, China Unicom","agenda_item_sort_order":91,"ainumber":"6.19.19.1","ainame":"Management of Network Sharing Phase 3","tdoc_agenda_sort_order":13790,"status":"revised","reservation_date":"2025-03-27 11:55:09","uploaded":"2025-03-27 11:56:56","revisionof":"","revisedto":"S5-252006","release":"Rel-19","crspec":32.13,"crspecversion":"19.0.0","workitem":[{"winame":"NetShare_OAM_Ph3"}],"crnumber":47.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251379.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"5.1.7","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251380","title":"Rel-19 CR TS 28.622 Correct misalignment issue for notificationTypes in stage2 and stage3","source":"Huawei","contact":"Ruiyue Xu","contact-id":61969,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":59,"ainumber":"6.4.27","ainame":"OAM Rel-19 small enhancements","tdoc_agenda_sort_order":13800,"status":"agreed","reservation_date":"2025-03-27 11:59:14","uploaded":"2025-03-28 10:22:15","revisionof":"","revisedto":"","release":"Rel-19","crspec":28.622,"crspecversion":"19.3.0","workitem":[{"winame":"TEI19"}],"crnumber":539.0,"crrevision":"","crcategory":"F","tsg_crp":"SP-250559","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251380.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251381","title":"Rel-19 CR TS 32.130 Separate business-level requirements from specification-level requirements","source":"Huawei, China Unicom","contact":"Jean-Michel CORNILY","contact-id":96535,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 3\/27\/2025. Original source : Huawei, China Unicom","agenda_item_sort_order":91,"ainumber":"6.19.19.1","ainame":"Management of Network Sharing Phase 3","tdoc_agenda_sort_order":13810,"status":"agreed","reservation_date":"2025-03-27 11:59:17","uploaded":"2025-03-27 12:02:52","revisionof":"","revisedto":"","release":"Rel-19","crspec":32.13,"crspecversion":"19.0.0","workitem":[{"winame":"NetShare_OAM_Ph3"}],"crnumber":48.0,"crrevision":"","crcategory":"F","tsg_crp":"SP-250541","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251381.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"5.1.6, 6.1","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251382","title":"Rel-19 CR TS 28.623 Update the YANG definition for notificationTypes to align with stage 2 definition","source":"Huawei","contact":"Ruiyue Xu","contact-id":61969,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 3\/28\/2025. Original source : Huawei","agenda_item_sort_order":59,"ainumber":"6.4.27","ainame":"OAM Rel-19 small enhancements","tdoc_agenda_sort_order":13820,"status":"revised","reservation_date":"2025-03-27 12:01:30","uploaded":"2025-03-28 10:22:15","revisionof":"","revisedto":"S5-252092","release":"Rel-19","crspec":28.623,"crspecversion":"19.3.0","workitem":[{"winame":"TEI19"}],"crnumber":518.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251382.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"Following YANG files normatively defined in the forge are updated: - yang-models\/_3gpp-common-subscription-control.yang","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251383","title":"Rel-19 CR TS 28.533 Correct wrong references","source":"Huawei","contact":"Jean-Michel CORNILY","contact-id":96535,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 3\/27\/2025. Original source : Huawei","agenda_item_sort_order":59,"ainumber":"6.4.27","ainame":"OAM Rel-19 small enhancements","tdoc_agenda_sort_order":13830,"status":"merged","reservation_date":"2025-03-27 12:07:36","uploaded":"2025-03-27 12:10:33","revisionof":"","revisedto":"","release":"Rel-19","crspec":28.533,"crspecversion":"19.1.0","workitem":[{"winame":"TEI19"}],"crnumber":152.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251383.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"2","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251384","title":"Rel-19 CR TS 28.533 Fix errors in clause 4.5","source":"Huawei","contact":"Jean-Michel CORNILY","contact-id":96535,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 3\/27\/2025. Original source : Huawei","agenda_item_sort_order":59,"ainumber":"6.4.27","ainame":"OAM Rel-19 small enhancements","tdoc_agenda_sort_order":13840,"status":"merged","reservation_date":"2025-03-27 12:21:42","uploaded":"2025-03-27 12:24:15","revisionof":"","revisedto":"","release":"Rel-19","crspec":28.533,"crspecversion":"19.1.0","workitem":[{"winame":"TEI19"}],"crnumber":153.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251384.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"4.5","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251385","title":"Rel-19 CR TS 28.533 Correct note in clause 3.1","source":"Huawei","contact":"Jean-Michel CORNILY","contact-id":96535,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 3\/27\/2025. Original source : Huawei","agenda_item_sort_order":59,"ainumber":"6.4.27","ainame":"OAM Rel-19 small enhancements","tdoc_agenda_sort_order":13850,"status":"merged","reservation_date":"2025-03-27 12:26:20","uploaded":"2025-03-27 12:28:15","revisionof":"","revisedto":"","release":"Rel-19","crspec":28.533,"crspecversion":"19.1.0","workitem":[{"winame":"TEI19"}],"crnumber":154.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251385.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"3.1","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251386","title":"Rel-19 CR TS 28.310 Add information model definitions for energy related information","source":"Huawei","contact":"Jean-Michel CORNILY","contact-id":96535,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 3\/27\/2025. Original source : Huawei","agenda_item_sort_order":93,"ainumber":"6.19.20.1","ainame":"Energy efficiency and energy saving aspects of 5G networks and services","tdoc_agenda_sort_order":13860,"status":"merged","reservation_date":"2025-03-27 12:31:45","uploaded":"2025-03-27 12:34:14","revisionof":"","revisedto":"","release":"Rel-19","crspec":28.31,"crspecversion":"19.0.0","workitem":[{"winame":"Energy_OAM_Ph3"}],"crnumber":72.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251386.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"2, X (new)","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251387","title":"New SID on energy efficiency and energy saving aspects of 5G Advanced","source":"Huawei","contact":"Jean-Michel CORNILY","contact-id":96535,"tdoctype":"SID new","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":12,"ainumber":"5.5","ainame":"Rel-20 topic preparation","tdoc_agenda_sort_order":13870,"status":"revised","reservation_date":"2025-03-27 12:35:45","uploaded":"2025-03-27 12:38:27","revisionof":"","revisedto":"S5-251774","release":"Rel-20","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251387.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251388","title":"Additional NFs added in Trace Record contents","source":"Jio Platforms Ltd(JPL)","contact":"Gaurav Goel","contact-id":108803,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 3\/27\/2025. Original source : Jio Platforms Ltd(JPL)","agenda_item_sort_order":81,"ainumber":"6.19.14","ainame":"Subscriber and Equipment Trace and QoE collection management","tdoc_agenda_sort_order":13880,"status":"not pursued","reservation_date":"2025-03-27 12:44:54","uploaded":"2025-03-27 12:48:26","revisionof":"","revisedto":"","release":"Rel-19","crspec":32.423,"crspecversion":"19.2.0","workitem":[{"winame":"TraceQoE_OAM"}],"crnumber":201.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251388.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"4, 4.XX","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251389","title":"Rel-19 CR TS 28.623 Implement the writeOnly property for triggerHeartbeatNtf","source":"Huawei","contact":"Ruiyue Xu","contact-id":61969,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 3\/28\/2025. Original source : Huawei","agenda_item_sort_order":59,"ainumber":"6.4.27","ainame":"OAM Rel-19 small enhancements","tdoc_agenda_sort_order":13890,"status":"agreed","reservation_date":"2025-03-27 12:45:08","uploaded":"2025-03-28 10:22:15","revisionof":"","revisedto":"","release":"Rel-19","crspec":28.623,"crspecversion":"19.3.0","workitem":[{"winame":"TEI19"}],"crnumber":519.0,"crrevision":"","crcategory":"F","tsg_crp":"SP-250559","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251389.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"Following YAML files normatively defined in the forge are updated: - OpenAPI\/TS28623_SubscriptionControlNrm.yaml","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251390","title":"Rel-19 CR TS 28.622 Update Attribute constraints for TimeWindow","source":"Huawei","contact":"Ruiyue Xu","contact-id":61969,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":59,"ainumber":"6.4.27","ainame":"OAM Rel-19 small enhancements","tdoc_agenda_sort_order":13900,"status":"revised","reservation_date":"2025-03-27 12:49:14","uploaded":"2025-03-28 10:22:15","revisionof":"","revisedto":"S5-252094","release":"Rel-19","crspec":28.622,"crspecversion":"19.3.0","workitem":[{"winame":"TEI19"}],"crnumber":540.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251390.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251391","title":"Rel-19 CR TS 28.537 Correct procedures for heartbeat","source":"Huawei","contact":"Ruiyue Xu","contact-id":61969,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":59,"ainumber":"6.4.27","ainame":"OAM Rel-19 small enhancements","tdoc_agenda_sort_order":13910,"status":"not pursued","reservation_date":"2025-03-27 12:51:11","uploaded":"2025-03-28 10:22:15","revisionof":"","revisedto":"S5-252305","release":"Rel-19","crspec":28.537,"crspecversion":"19.1.0","workitem":[{"winame":"TEI19"}],"crnumber":35.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251391.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251392","title":"Rel-19 CR TS 28.312 Update clause 6.1 and 7.1 to support intent negotiation","source":"Huawei, Deutsche Telekom","contact":"Ruiyue Xu","contact-id":61969,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 3\/28\/2025. Original source : Huawei, Deutsche Telekom","agenda_item_sort_order":65,"ainumber":"6.19.3.1","ainame":"Intent driven management services for mobile network phase 3","tdoc_agenda_sort_order":13920,"status":"revised","reservation_date":"2025-03-27 12:55:40","uploaded":"2025-03-28 10:22:15","revisionof":"","revisedto":"S5-251919","release":"Rel-19","crspec":28.312,"crspecversion":"19.1.0","workitem":[{"winame":"IDMS_MN_Ph3"}],"crnumber":317.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251392.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"6.1, 7.1","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251393","title":"Rel-19 CR TS 28537 Add requirements for discovering management capabilities of MnS instances based on area of interest","source":"Huawei, Deutsche Telekom","contact":"Ruiyue Xu","contact-id":61969,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":73,"ainumber":"6.19.8.1","ainame":"Service Based Management Architecture enhancement phase 3","tdoc_agenda_sort_order":13930,"status":"revised","reservation_date":"2025-03-27 13:06:16","uploaded":"2025-03-28 10:22:15","revisionof":"S5-250881","revisedto":"S5-251928","release":"Rel-19","crspec":28.537,"crspecversion":"19.1.0","workitem":[{"winame":"SBMA_Ph3"}],"crnumber":31.0,"crrevision":2.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251393.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251394","title":"Rel-19 CR TS 28.622 Extend the MnsScope to support area of interest (Stage2)","source":"Huawei, Deutsche Telekom","contact":"Ruiyue Xu","contact-id":61969,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 3\/28\/2025. Original source : Huawei, Deutsche Telekom","agenda_item_sort_order":73,"ainumber":"6.19.8.1","ainame":"Service Based Management Architecture enhancement phase 3","tdoc_agenda_sort_order":13940,"status":"revised","reservation_date":"2025-03-27 13:09:52","uploaded":"2025-03-28 10:22:15","revisionof":"S5-250882","revisedto":"S5-251929","release":"Rel-19","crspec":28.622,"crspecversion":"19.3.0","workitem":[{"winame":"SBMA_Ph3"}],"crnumber":514.0,"crrevision":2.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251394.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"4.3.42.1, 4.3.X(new), 4.4.1","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251395","title":"Rel-19 CR TS 28.623 Extend the MnsScope to support area of interest (Stage3)","source":"Huawei, Deutsche Telekom","contact":"Ruiyue Xu","contact-id":61969,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 3\/28\/2025. Original source : Huawei, Deutsche Telekom","agenda_item_sort_order":73,"ainumber":"6.19.8.1","ainame":"Service Based Management Architecture enhancement phase 3","tdoc_agenda_sort_order":13950,"status":"revised","reservation_date":"2025-03-27 13:17:54","uploaded":"2025-03-28 10:23:36","revisionof":"S5-250883","revisedto":"S5-251930","release":"Rel-19","crspec":28.623,"crspecversion":"19.3.0","workitem":[{"winame":"SBMA_Ph3"}],"crnumber":494.0,"crrevision":2.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251395.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"Following YAML files normatively defined in the forge are updated: - OpenAPI\/TS28623_MnSRegistryNrm.yaml","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251396","title":"Rel-19 CR TS 28.622 Enhance the MnSInfo to support discovery of management capabilities of MnS supported by a MnS Producer (Stage2)","source":"Huawei, Deutsche Telekom","contact":"Ruiyue Xu","contact-id":61969,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":73,"ainumber":"6.19.8.1","ainame":"Service Based Management Architecture enhancement phase 3","tdoc_agenda_sort_order":13960,"status":"revised","reservation_date":"2025-03-27 13:21:05","uploaded":"2025-03-28 10:23:36","revisionof":"","revisedto":"S5-251931","release":"Rel-19","crspec":28.622,"crspecversion":"19.3.0","workitem":[{"winame":"SBMA_Ph3"}],"crnumber":541.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251396.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251397","title":"Rel-19 CR TS 28.623 Enhance the MnSInfo to support discovery of management capabilities of MnS supported by a MnS Producer (Stage3)","source":"Huawei, Deutsche Telekom","contact":"Ruiyue Xu","contact-id":61969,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 3\/28\/2025. Original source : Huawei","agenda_item_sort_order":73,"ainumber":"6.19.8.1","ainame":"Service Based Management Architecture enhancement phase 3","tdoc_agenda_sort_order":13970,"status":"revised","reservation_date":"2025-03-27 13:23:52","uploaded":"2025-03-28 10:23:36","revisionof":"","revisedto":"S5-251932","release":"Rel-19","crspec":28.623,"crspecversion":"19.3.0","workitem":[{"winame":"SBMA_Ph3"}],"crnumber":520.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251397.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"Following YAML files normatively defined in the forge are updated: - OpenAPI\/TS28623_MnSRegistryNrm.yaml","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251398","title":"Rel-19 CR TS 28.541 update the naming convention in TS28541_NrNrm.yaml to align with stage 2 definition","source":"Huawei","contact":"Ruiyue Xu","contact-id":61969,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Title modified on 3\/28\/2025. Original title :  Rel-19 CR TS 28.541 update the naming convention in TS28541_NrNrm.yaml to align with stage 2 definition<br\/><br\/>Source modified on 3\/28\/2025. Original source : Huawei","agenda_item_sort_order":80,"ainumber":"6.19.13","ainame":"5G Advanced NRM features phase 3","tdoc_agenda_sort_order":13980,"status":"revised","reservation_date":"2025-03-27 13:41:01","uploaded":"2025-03-28 10:23:36","revisionof":"","revisedto":"S5-251972","release":"Rel-19","crspec":28.541,"crspecversion":"19.3.0","workitem":[{"winame":"AdNRM_Ph3"}],"crnumber":1500.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251398.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":false,"clauses_affected":"Following YAML files normatively defined in the forge are updated: - OpenAPI\/TS28541_NrNrm.yaml","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251399","title":"Rel-19 CR TS 28.622 Address the misalignment issues for vnfParametersList and peeParametersList (stage2)","source":"Huawei","contact":"Ruiyue Xu","contact-id":61969,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 3\/28\/2025. Original source : Huawei","agenda_item_sort_order":80,"ainumber":"6.19.13","ainame":"5G Advanced NRM features phase 3","tdoc_agenda_sort_order":13990,"status":"revised","reservation_date":"2025-03-27 13:44:30","uploaded":"2025-03-28 10:23:36","revisionof":"","revisedto":"S5-251976","release":"Rel-19","crspec":28.622,"crspecversion":"19.3.0","workitem":[{"winame":"AdNRM_Ph3"}],"crnumber":542.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251399.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"4.3.X(new), 4.3.Y(new), 4.4.1","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251400","title":"Rel-19 CR TS 28.623 Address the misalignment issues for vnfParametersList and peeParametersList (stage3)","source":"Huawei","contact":"Ruiyue Xu","contact-id":61969,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 3\/28\/2025. Original source : Huawei","agenda_item_sort_order":80,"ainumber":"6.19.13","ainame":"5G Advanced NRM features phase 3","tdoc_agenda_sort_order":14000,"status":"revised","reservation_date":"2025-03-27 13:47:08","uploaded":"2025-03-28 10:23:36","revisionof":"","revisedto":"S5-251977","release":"Rel-19","crspec":28.623,"crspecversion":"19.3.0","workitem":[{"winame":"AdNRM_Ph3"}],"crnumber":521.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251400.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"Following YAML files normatively defined in the forge are updated: - OpenAPI\/TS28623_GenericNrm.yaml","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251401","title":"Rel-19 CR TS 32.422 Introduction of new Trace Depth \u201cMicro\u201d for Optimised Tracing","source":"Jio Platforms Ltd (JPL)","contact":"Amit Kushwaha","contact-id":101969,"tdoctype":"CR","for":"Decision","abstract":"","secretary_remarks":"Title modified on 3\/27\/2025. Original title : Introduction of new Trace Depth \u201cMicro\u201d for Optimised Tracing<br\/><br\/>Source modified on 3\/27\/2025. Original source : Jio Platforms Ltd (JPL)","agenda_item_sort_order":78,"ainumber":"6.19.11.1","ainame":"Data management regarding subscriptions and reporting","tdoc_agenda_sort_order":14010,"status":"withdrawn","reservation_date":"2025-03-27 13:48:48","uploaded":"2025-03-27 14:34:58","revisionof":"","revisedto":"","release":"Rel-19","crspec":32.422,"crspecversion":"19.2.0","workitem":[{"winame":"Data_SREP"}],"crnumber":512.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251401.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"5.3","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251402","title":"Rel-19 CR TS 28.622 Enhance the definition for schedulerStatus and conditionStatus with default values (stage2)","source":"Huawei","contact":"Ruiyue Xu","contact-id":61969,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 3\/28\/2025. Original source : Huawei","agenda_item_sort_order":80,"ainumber":"6.19.13","ainame":"5G Advanced NRM features phase 3","tdoc_agenda_sort_order":14020,"status":"revised","reservation_date":"2025-03-27 13:52:12","uploaded":"2025-03-28 10:23:36","revisionof":"","revisedto":"S5-251974","release":"Rel-19","crspec":28.622,"crspecversion":"19.3.0","workitem":[{"winame":"AdNRM_Ph3"}],"crnumber":543.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251402.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"4.4.1","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251403","title":"Rel-19 CR TS 28.623 Enhance the definition for schedulerStatus and conditionStatus with default values (stage3)","source":"Huawei","contact":"Ruiyue Xu","contact-id":61969,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 3\/28\/2025. Original source : Huawei","agenda_item_sort_order":80,"ainumber":"6.19.13","ainame":"5G Advanced NRM features phase 3","tdoc_agenda_sort_order":14030,"status":"revised","reservation_date":"2025-03-27 13:57:59","uploaded":"2025-03-28 10:23:36","revisionof":"","revisedto":"S5-251975","release":"Rel-19","crspec":28.623,"crspecversion":"19.3.0","workitem":[{"winame":"AdNRM_Ph3"}],"crnumber":522.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251403.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"Following YAML files normatively defined in the forge are updated: - OpenAPI\/TS28623_GenericNrm.yaml","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251404","title":"Rel-19 CR TS 28.540 Enhance the requirement description","source":"Huawei","contact":"Ruiyue Xu","contact-id":61969,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 3\/28\/2025. Original source : Huawei","agenda_item_sort_order":80,"ainumber":"6.19.13","ainame":"5G Advanced NRM features phase 3","tdoc_agenda_sort_order":14040,"status":"revised","reservation_date":"2025-03-27 14:00:35","uploaded":"2025-03-28 10:24:12","revisionof":"","revisedto":"S5-251969","release":"Rel-19","crspec":28.54,"crspecversion":"19.0.0","workitem":[{"winame":"AdNRM_Ph3"}],"crnumber":33.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251404.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"5.1,5.5, 5.3, 5.4, 5.5, 5.6, 5.7, 5.9.1.1, 5.9.1.2, 8.9.2, 5.9.3, 5.9.4, 5.10, 5.11","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251405","title":"Introduction of Summary Code in Trace Record Header for Optimised Tracing","source":"Jio Platforms Ltd (JPL)","contact":"Navas Nk Njarakkadavath","contact-id":110013,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":81,"ainumber":"6.19.14","ainame":"Subscriber and Equipment Trace and QoE collection management","tdoc_agenda_sort_order":14050,"status":"withdrawn","reservation_date":"2025-03-27 14:07:00","uploaded":"2025-03-27 14:31:25","revisionof":"","revisedto":"","release":"Rel-19","crspec":32.423,"crspecversion":"19.2.0","workitem":[{"winame":"TraceQoE_OAM"}],"crnumber":202.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251405.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251406","title":"Rel-18 CR TS 28.111 Correction on Alarm Definition","source":"NTT DOCOMO, Ericsson","contact":"Refik Fatih \u00dcstok","contact-id":105939,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 3\/28\/2025. Original source : NTT DOCOMO, Ericsson","agenda_item_sort_order":58,"ainumber":"6.4.26","ainame":"Rel-18 CAT B\/C SA5 internal alignment and other CAT F CR(s)","tdoc_agenda_sort_order":14060,"status":"not pursued","reservation_date":"2025-03-27 15:24:02","uploaded":"2025-03-28 09:12:02","revisionof":"","revisedto":"","release":"Rel-18","crspec":28.111,"crspecversion":"18.4.0","workitem":[{"winame":"TEI18"}],"crnumber":27.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251406.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"4","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251407","title":"Rel-19 CR TS 28.111 Correction on Alarm Definition","source":"NTT DOCOMO, Ericsson","contact":"Refik Fatih \u00dcstok","contact-id":105939,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 3\/28\/2025. Original source : NTT DOCOMO, Ericsson","agenda_item_sort_order":58,"ainumber":"6.4.26","ainame":"Rel-18 CAT B\/C SA5 internal alignment and other CAT F CR(s)","tdoc_agenda_sort_order":14070,"status":"not pursued","reservation_date":"2025-03-27 15:35:34","uploaded":"2025-03-28 09:12:18","revisionof":"","revisedto":"","release":"Rel-19","crspec":28.111,"crspecversion":"19.1.0","workitem":[{"winame":"TEI18"}],"crnumber":28.0,"crrevision":"","crcategory":"A","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251407.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"4","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251408","title":"Rel-19 CR TS 28.312 Add Stage-3 Solution for intent driven management of network maintenance","source":"NTT DOCOMO","contact":"Refik Fatih \u00dcstok","contact-id":105939,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 3\/28\/2025. Original source : NTT DOCOMO","agenda_item_sort_order":65,"ainumber":"6.19.3.1","ainame":"Intent driven management services for mobile network phase 3","tdoc_agenda_sort_order":14080,"status":"agreed","reservation_date":"2025-03-27 15:55:11","uploaded":"2025-03-28 09:08:13","revisionof":"","revisedto":"","release":"Rel-19","crspec":28.312,"crspecversion":"19.1.0","workitem":[{"winame":"IDMS_MN_Ph3"}],"crnumber":318.0,"crrevision":"","crcategory":"B","tsg_crp":"SP-250536","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251408.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"OpenAPI\/TS28312_IntentExpectations.yamlOpenAPI\/TS28312_IntentNrm.yaml","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251409","title":"Reply LS on per-UE UE performance metrics","source":"SA5","contact":"Hassan Al-kanani","contact-id":47274,"tdoctype":"LS out","for":"Approval","abstract":"(NEC, Intel)","secretary_remarks":"","agenda_item_sort_order":10,"ainumber":"5.3","ainame":"Liaison statements at SA5 level","tdoc_agenda_sort_order":14090,"status":"revised","reservation_date":"2025-03-27 16:10:00","uploaded":"2025-03-28 23:41:55","revisionof":"","revisedto":"S5-252056","release":"Rel-19","crspec":"","crspecversion":"","workitem":[{"winame":"AIML_MGT_Ph2"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"S5-251324\/R3-247775","lsto":"RAN3","Cc":"RAN2","lsoriginalls":"R3-247775","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251409.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251410","title":"Input to draftCR TS 28.105 Add NRMs on LCM for Federated Learning","source":"Intel, NEC, ZTE, Samsung, Nokia","contact":"Yizhi Yao","contact-id":66963,"tdoctype":"other","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":61,"ainumber":"6.19.1.1","ainame":"AI\/ML management phase 2","tdoc_agenda_sort_order":14100,"status":"revised","reservation_date":"2025-03-27 16:24:00","uploaded":"2025-03-28 16:48:32","revisionof":"","revisedto":"S5-251784","release":"Rel-19","crspec":28.105,"crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251410.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251411","title":"Input to draftCR TS 28.105 Add NRMs on LCM for Reinforcement Learning","source":"Intel, ZTE, NEC","contact":"Yizhi Yao","contact-id":66963,"tdoctype":"other","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":61,"ainumber":"6.19.1.1","ainame":"AI\/ML management phase 2","tdoc_agenda_sort_order":14110,"status":"merged","reservation_date":"2025-03-27 16:29:40","uploaded":"2025-03-28 16:48:32","revisionof":"","revisedto":"","release":"Rel-19","crspec":28.105,"crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251411.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251412","title":"Input to draftCR TS 28.105 Enhance UC for management of Reinforcement Learning","source":"Intel, NEC","contact":"Yizhi Yao","contact-id":66963,"tdoctype":"other","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":61,"ainumber":"6.19.1.1","ainame":"AI\/ML management phase 2","tdoc_agenda_sort_order":14120,"status":"not treated","reservation_date":"2025-03-27 16:30:56","uploaded":"2025-03-28 16:48:32","revisionof":"","revisedto":"","release":"Rel-19","crspec":28.105,"crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251412.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251413","title":"Maintenance of TSs in SA5","source":"Ericsson","contact":"Robert Petersen","contact-id":14104,"tdoctype":"discussion","for":"Endorsement","abstract":"3GPP way of working is that errors that are serious (FASMO) shall be corrected in all maintained versions down to the release where the error was introduced.\nRel-99 up to Rel-8 are not maintained any more.\nSA is complaining on the amount of CRs from SA5 which are on old releases.\nFor old releases there are many TSs that are not used by vendors and operators anymore (typically those that are automatically upgraded for many releases and for systems that are not evolving anymore).\nSA5 has 625 TSs and TRs of which 40 TSs and 143 TRs are no longer maintained., which means that 442 TSs and TRs are maintained.\nSo to reduce the amount of CRs on old releases and still comply to the 3GPP ways of working, there are several options:\n1.\tSA changes which releases and systems are not maintained any more.\nor\n2.\tSA5 makes own way of working for maintenance of old releases and systems.\nIf alternative 2 is agreed, then it should be discussed and agreed which releases and systems are maintained for FASMO errors.\nFor instance 2G and 3G systems may not to be maintained any more. For 4G (and 5G) systems up to Rel-15 may not to be maintained any more. \nFor maintained TSs, FASMO is to be applied strictly, just correcting FASMO errors that go down to the release which introduced the error or the lowest release that is maintained.\n4\tDetailed proposal\nOne of the following alternatives is requested to be endorsed.\nAlternative 1.\nRequest SA to restrict which releases and systems that shall not be maintained any more.\n\nAlternative 2\nSA5 to agree which releases and systems that shall not be maintained any more.\nSystem X, Y and Z are not to be maintained any more. Releases up to Rel-A are not to be maintained any more.\nX, Y, Z and A are to be exchanged to the agreed systems and release.","secretary_remarks":"","agenda_item_sort_order":8,"ainumber":"5.1","ainame":"Administrative issues at SA5 level","tdoc_agenda_sort_order":14130,"status":"revised","reservation_date":"2025-03-27 18:23:02","uploaded":"2025-03-27 18:25:31","revisionof":"","revisedto":"S5-251769","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251413.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251414","title":"Addressing EN for supporting type of signalling","source":"Vodafone, Samsung","contact":"Susana Sabater","contact-id":31269,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":59,"ainumber":"6.4.27","ainame":"OAM Rel-19 small enhancements","tdoc_agenda_sort_order":14140,"status":"revised","reservation_date":"2025-03-27 20:24:39","uploaded":"2025-03-28 15:16:32","revisionof":"","revisedto":"S5-252089","release":"Rel-19","crspec":28.56,"crspecversion":"19.1.0","workitem":[{"winame":"Monstra-OAM"}],"crnumber":6.0,"crrevision":"","crcategory":"C","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251414.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251415","title":"Removal of Editor's Note on encoding","source":"Vodafone","contact":"Susana Sabater","contact-id":31269,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":59,"ainumber":"6.4.27","ainame":"OAM Rel-19 small enhancements","tdoc_agenda_sort_order":14150,"status":"revised","reservation_date":"2025-03-27 20:53:59","uploaded":"2025-03-28 15:16:32","revisionof":"","revisedto":"S5-252090","release":"Rel-19","crspec":28.56,"crspecversion":"19.1.0","workitem":[{"winame":"Monstra-OAM"}],"crnumber":7.0,"crrevision":"","crcategory":"C","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251415.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251416","title":"Rel-18 CR 28.111 How to use notifyPotentialFaultyAlarmList","source":"Ericsson India Private Limited","contact":"Balazs Lengyel","contact-id":81420,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":37,"ainumber":"6.4.5","ainame":"Service based management architecture","tdoc_agenda_sort_order":14160,"status":"revised","reservation_date":"2025-03-27 21:02:41","uploaded":"2025-03-27 21:31:54","revisionof":"","revisedto":"S5-252060","release":"Rel-18","crspec":28.111,"crspecversion":"18.4.0","workitem":[{"winame":"eSBMA"}],"crnumber":29.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251416.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251417","title":"Rel-19 CR 28.111 How to use notifyPotentialFaultyAlarmList","source":"Ericsson India Private Limited","contact":"Balazs Lengyel","contact-id":81420,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":37,"ainumber":"6.4.5","ainame":"Service based management architecture","tdoc_agenda_sort_order":14170,"status":"revised","reservation_date":"2025-03-27 21:04:23","uploaded":"2025-03-27 21:31:54","revisionof":"","revisedto":"S5-252061","release":"Rel-19","crspec":28.111,"crspecversion":"19.1.0","workitem":[{"winame":"eSBMA"}],"crnumber":30.0,"crrevision":"","crcategory":"A","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251417.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251418","title":"Rel-17 CR 28.622 Change dnPrefix properties","source":"Ericsson India Private Limited","contact":"Balazs Lengyel","contact-id":81420,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":29,"ainumber":"6.3.11","ainame":"General NRM","tdoc_agenda_sort_order":14180,"status":"withdrawn","reservation_date":"2025-03-27 21:35:19","uploaded":null,"revisionof":"","revisedto":"","release":"Rel-17","crspec":28.62,"crspecversion":"17.2.0","workitem":[{"winame":"TEI17"}],"crnumber":37.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251419","title":"Rel-17 CR 28.622 Change dnPrefix properties","source":"Ericsson India Private Limited","contact":"Balazs Lengyel","contact-id":81420,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":29,"ainumber":"6.3.11","ainame":"General NRM","tdoc_agenda_sort_order":14190,"status":"agreed","reservation_date":"2025-03-27 21:38:53","uploaded":"2025-03-27 21:59:40","revisionof":"","revisedto":"","release":"Rel-17","crspec":28.622,"crspecversion":"17.13.0","workitem":[{"winame":"TEI17"}],"crnumber":544.0,"crrevision":"","crcategory":"F","tsg_crp":"SP-250556","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251419.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251420","title":"Rel-18 CR 28.622 Change dnPrefix properties","source":"Ericsson India Private Limited","contact":"Balazs Lengyel","contact-id":81420,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":29,"ainumber":"6.3.11","ainame":"General NRM","tdoc_agenda_sort_order":14200,"status":"agreed","reservation_date":"2025-03-27 21:40:34","uploaded":"2025-03-27 21:59:40","revisionof":"","revisedto":"","release":"Rel-18","crspec":28.622,"crspecversion":"18.10.0","workitem":[{"winame":"TEI17"}],"crnumber":545.0,"crrevision":"","crcategory":"A","tsg_crp":"SP-250556","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251420.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251421","title":"Rel-19 CR 28.622 Change dnPrefix properties","source":"Ericsson India Private Limited","contact":"Balazs Lengyel","contact-id":81420,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":29,"ainumber":"6.3.11","ainame":"General NRM","tdoc_agenda_sort_order":14210,"status":"agreed","reservation_date":"2025-03-27 21:44:14","uploaded":"2025-03-27 21:59:40","revisionof":"","revisedto":"","release":"Rel-19","crspec":28.622,"crspecversion":"19.3.0","workitem":[{"winame":"TEI17"}],"crnumber":546.0,"crrevision":"","crcategory":"A","tsg_crp":"SP-250556","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251421.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251422","title":"Rel-19 CR 28.312 Add generic utility function support (stage 2)","source":"Ericsson Inc.","contact":"Mark Scott","contact-id":87586,"tdoctype":"CR","for":"Approval","abstract":"","secretary_remarks":"Source modified on 3\/28\/2025. Original source : Ericsson Canada Inc.","agenda_item_sort_order":65,"ainumber":"6.19.3.1","ainame":"Intent driven management services for mobile network phase 3","tdoc_agenda_sort_order":14220,"status":"withdrawn","reservation_date":"2025-03-27 22:10:35","uploaded":"2025-03-28 21:11:03","revisionof":"","revisedto":"","release":"Rel-19","crspec":28.312,"crspecversion":"19.1.0","workitem":[{"winame":"IDMS_MN_Ph3"}],"crnumber":319.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251422.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"6.2.1.1.1, 6.2.1.1.2, 6.2.1.2.1, 6.2.1.2.2, 6.2.1.2.3, 6.2.1.2.x (new), 6.2.1.3.x (new), 6.2.1.3.y (new), 6.2.1.3.z (new), 6.2.1.4, A.2.1, A.2.3, A.2.4, A.X (new), A.x.1 (new), A.x.2 (new), A.x.3 (new), A.x.4 (new), A.x.5 (new), A.x.6 (new)","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251423","title":"Discussion Paper Justification for the Inclusion of Nested NDT Definition in the TS 28.561","source":"FiberCop, Deutsche Telekom, Telecom Italia","contact":"Simone Bizzarri","contact-id":108103,"tdoctype":"discussion","for":"Endorsement","abstract":"Justification for the Inclusion of Nested NDT Definition in the TS 28.561","secretary_remarks":"","agenda_item_sort_order":69,"ainumber":"6.19.5.1","ainame":"Management aspects of Network Digital Twins","tdoc_agenda_sort_order":14230,"status":"revised","reservation_date":"2025-03-27 22:17:14","uploaded":"2025-03-28 13:32:45","revisionof":"","revisedto":"S5-252018","release":"Rel-19","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251423.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251424","title":"Rel-17 CR 28.623 Change dnPrefix properties","source":"Ericsson India Private Limited","contact":"Balazs Lengyel","contact-id":81420,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":29,"ainumber":"6.3.11","ainame":"General NRM","tdoc_agenda_sort_order":14240,"status":"agreed","reservation_date":"2025-03-27 22:19:43","uploaded":"2025-03-27 23:30:38","revisionof":"","revisedto":"","release":"Rel-17","crspec":28.623,"crspecversion":"17.13.0","workitem":[{"winame":"TEI17"}],"crnumber":523.0,"crrevision":"","crcategory":"F","tsg_crp":"SP-250556","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251424.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251425","title":"Rel-18 CR 28.623 Change dnPrefix properties","source":"Ericsson India Private Limited","contact":"Balazs Lengyel","contact-id":81420,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":29,"ainumber":"6.3.11","ainame":"General NRM","tdoc_agenda_sort_order":14250,"status":"agreed","reservation_date":"2025-03-27 22:21:02","uploaded":"2025-03-27 23:46:46","revisionof":"","revisedto":"","release":"Rel-18","crspec":28.623,"crspecversion":"18.10.0","workitem":[{"winame":"TEI17"}],"crnumber":524.0,"crrevision":"","crcategory":"A","tsg_crp":"SP-250556","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251425.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251426","title":"Rel-19 CR 28.623 Change dnPrefix properties","source":"Ericsson India Private Limited","contact":"Balazs Lengyel","contact-id":81420,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":29,"ainumber":"6.3.11","ainame":"General NRM","tdoc_agenda_sort_order":14260,"status":"agreed","reservation_date":"2025-03-27 22:22:17","uploaded":"2025-03-27 23:53:15","revisionof":"","revisedto":"","release":"Rel-19","crspec":28.623,"crspecversion":"19.3.0","workitem":[{"winame":"TEI17"}],"crnumber":525.0,"crrevision":"","crcategory":"A","tsg_crp":"SP-250556","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251426.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251427","title":"Pseudo-CR on TS 28.561 Nested NDT Definition","source":"FiberCop, Deutsche Telekom, Telecom Italia","contact":"Simone Bizzarri","contact-id":108103,"tdoctype":"pCR","for":"Approval","abstract":"Nested NDT Definition proposal","secretary_remarks":"","agenda_item_sort_order":69,"ainumber":"6.19.5.1","ainame":"Management aspects of Network Digital Twins","tdoc_agenda_sort_order":14270,"status":"revised","reservation_date":"2025-03-27 22:24:43","uploaded":"2025-03-28 13:33:48","revisionof":"","revisedto":"S5-251657","release":"Rel-19","crspec":28.561,"crspecversion":"0.1.0","workitem":[{"winame":"NDT"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251427.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251428","title":"CR 32.254 CAPIF Converged charging Architecture","source":"Nokia","contact":"Jo\u00e3o Rodrigues","contact-id":81291,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":107,"ainumber":"7.4.7","ainame":"Charging aspects of CAPIF","tdoc_agenda_sort_order":14280,"status":"merged","reservation_date":"2025-03-27 22:28:04","uploaded":"2025-03-28 21:01:19","revisionof":"","revisedto":"","release":"Rel-19","crspec":32.254,"crspecversion":"19.0.0","workitem":[{"winame":"CH_CAPIF_EXT"}],"crnumber":57.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251428.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251429","title":"Rel-16 CR 28.541 Update for allowed value ueAccProbabilityDist (stage3, yang)","source":"Ericsson Canada Inc.","contact":"Mark Scott","contact-id":87586,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 3\/28\/2025. Original source : Ericsson Canada Inc.","agenda_item_sort_order":25,"ainumber":"6.3.7","ainame":"SON","tdoc_agenda_sort_order":14290,"status":"agreed","reservation_date":"2025-03-27 23:01:42","uploaded":"2025-03-28 21:10:54","revisionof":"","revisedto":"","release":"Rel-16","crspec":28.541,"crspecversion":"16.23.0","workitem":[{"winame":"TEI16"}],"crnumber":1501.0,"crrevision":"","crcategory":"F","tsg_crp":"SP-250555","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251429.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":false,"clauses_affected":"E.5.30","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251430","title":"Rel-17 CR 28.541 Update for allowed value ueAccProbabilityDist (stage3, yang)","source":"Ericsson Canada Inc.","contact":"Mark Scott","contact-id":87586,"tdoctype":"CR","for":"Approval","abstract":"","secretary_remarks":"Source modified on 3\/28\/2025. Original source : Ericsson Canada Inc.","agenda_item_sort_order":25,"ainumber":"6.3.7","ainame":"SON","tdoc_agenda_sort_order":14300,"status":"revised","reservation_date":"2025-03-27 23:03:11","uploaded":"2025-03-28 21:10:46","revisionof":"","revisedto":"S5-252103","release":"Rel-17","crspec":28.541,"crspecversion":"17.18.0","workitem":[{"winame":"TEI16"}],"crnumber":1502.0,"crrevision":"","crcategory":"A","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251430.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":false,"clauses_affected":"E.5.30","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251431","title":"Rel-18 CR 28.541 Update for allowed value ueAccProbabilityDist (stage3, yang)","source":"Ericsson Canada Inc.","contact":"Mark Scott","contact-id":87586,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 3\/28\/2025. Original source : Ericsson Canada Inc.","agenda_item_sort_order":25,"ainumber":"6.3.7","ainame":"SON","tdoc_agenda_sort_order":14310,"status":"agreed","reservation_date":"2025-03-27 23:04:16","uploaded":"2025-03-28 21:10:38","revisionof":"","revisedto":"","release":"Rel-18","crspec":28.541,"crspecversion":"18.11.0","workitem":[{"winame":"TEI16"}],"crnumber":1503.0,"crrevision":"","crcategory":"A","tsg_crp":"SP-250555","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251431.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":false,"clauses_affected":"Forge only","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251432","title":"Rel-19 CR 28.541 Update for allowed value ueAccProbabilityDist (stage3, yang)","source":"Ericsson Canada Inc.","contact":"Mark Scott","contact-id":87586,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 3\/28\/2025. Original source : Ericsson Canada Inc.","agenda_item_sort_order":25,"ainumber":"6.3.7","ainame":"SON","tdoc_agenda_sort_order":14320,"status":"revised","reservation_date":"2025-03-27 23:05:21","uploaded":"2025-03-28 21:10:29","revisionof":"","revisedto":"S5-252104","release":"Rel-19","crspec":28.541,"crspecversion":"19.3.0","workitem":[{"winame":"TEI16"}],"crnumber":1504.0,"crrevision":"","crcategory":"A","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251432.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":false,"clauses_affected":"Forge only","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251433","title":"Rel-20 DP Moderator update on Charging Aspects of CAPIF","source":"Nokia","contact":"Jo\u00e3o Rodrigues","contact-id":81291,"tdoctype":"discussion","for":"Discussion","abstract":"","secretary_remarks":"","agenda_item_sort_order":98,"ainumber":"7.2","ainame":"New Charging Study\/Work Item proposals","tdoc_agenda_sort_order":14330,"status":"noted","reservation_date":"2025-03-27 23:24:44","uploaded":"2025-03-28 21:01:19","revisionof":"","revisedto":"","release":"Rel-20","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251433.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251434","title":"Rel-19 CR 28.849 EditHelp Editorial Changes","source":"Nokia","contact":"Jo\u00e3o Rodrigues","contact-id":81291,"tdoctype":"CR","for":"Approval","abstract":"","secretary_remarks":"Source modified on 3\/28\/2025. Original source : Nokia<br\/><br\/>Source modified on 28\/03\/2025. Original source : Nokia","agenda_item_sort_order":99,"ainumber":"7.3","ainame":"Charging Maintenance and Rel-19 Charging small enhancements","tdoc_agenda_sort_order":14340,"status":"revised","reservation_date":"2025-03-27 23:28:31","uploaded":"2025-03-28 21:01:19","revisionof":"","revisedto":"S5-251850","release":"Rel-19","crspec":28.849,"crspecversion":"19.0.0","workitem":[{"winame":"FS_CAPIF_Ph2_CH"}],"crnumber":1.0,"crrevision":"","crcategory":"D","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251434.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"4, 5.1, 5.3.2, 6.1.2.2, 6.1.2.3, 6.1.5.1.0, 6.1.5.2.3, 6.1.5.3.3, 6.1.5.4.3, 6.1.6.1, 6.1.6.2, 6.1.6.3, 6.2.6.1, 6.3.1, 6.3.5.3.3, 6.4.6.1, 7, 8","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251435","title":"Rel-19 CR 32.240 CAPIF Logical Charging Architecture","source":"Nokia","contact":"Jo\u00e3o Rodrigues","contact-id":81291,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":107,"ainumber":"7.4.7","ainame":"Charging aspects of CAPIF","tdoc_agenda_sort_order":14350,"status":"revised","reservation_date":"2025-03-28 00:09:40","uploaded":"2025-03-28 21:01:19","revisionof":"","revisedto":"S5-251814","release":"Rel-19","crspec":32.24,"crspecversion":"19.2.0","workitem":[{"winame":"CH_CAPIF_EXT"}],"crnumber":511.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251435.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251436","title":"Rel-19 CR 32.240 CAPIF Service Charging","source":"Nokia","contact":"Jo\u00e3o Rodrigues","contact-id":81291,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":107,"ainumber":"7.4.7","ainame":"Charging aspects of CAPIF","tdoc_agenda_sort_order":14360,"status":"revised","reservation_date":"2025-03-28 00:19:10","uploaded":"2025-03-28 21:01:19","revisionof":"","revisedto":"S5-251815","release":"Rel-19","crspec":32.24,"crspecversion":"19.2.0","workitem":[{"winame":"CH_CAPIF_EXT"}],"crnumber":512.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251436.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251437","title":"Rel-19 CR 32.240 CAPIF Reference Point","source":"Nokia","contact":"Jo\u00e3o Rodrigues","contact-id":81291,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":107,"ainumber":"7.4.7","ainame":"Charging aspects of CAPIF","tdoc_agenda_sort_order":14370,"status":"merged","reservation_date":"2025-03-28 00:22:41","uploaded":"2025-03-28 21:01:19","revisionof":"","revisedto":"","release":"Rel-19","crspec":32.24,"crspecversion":"19.2.0","workitem":[{"winame":"CH_CAPIF_EXT"}],"crnumber":513.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251437.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251438","title":"Rel-19 CR 28.622 Remove deprecated notification","source":"Ericsson India Private Limited","contact":"Balazs Lengyel","contact-id":81420,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":37,"ainumber":"6.4.5","ainame":"Service based management architecture","tdoc_agenda_sort_order":14380,"status":"revised","reservation_date":"2025-03-28 00:30:45","uploaded":"2025-03-28 01:02:18","revisionof":"","revisedto":"S5-252062","release":"Rel-19","crspec":28.622,"crspecversion":"19.3.0","workitem":[{"winame":"TEI19"}],"crnumber":547.0,"crrevision":"","crcategory":"C","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251438.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251439","title":"Rel-19 CR 28.541 Remove deprecated notification","source":"Ericsson India Private Limited","contact":"Balazs Lengyel","contact-id":81420,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":37,"ainumber":"6.4.5","ainame":"Service based management architecture","tdoc_agenda_sort_order":14390,"status":"revised","reservation_date":"2025-03-28 00:33:16","uploaded":"2025-03-28 00:55:51","revisionof":"","revisedto":"S5-252063","release":"Rel-19","crspec":28.541,"crspecversion":"19.3.0","workitem":[{"winame":"TEI19"}],"crnumber":1505.0,"crrevision":"","crcategory":"C","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251439.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251440","title":"Rel19 CR TS28.104 add solution on management data correlation analytics","source":"Nokia, Nokia Shanghai Bell","contact":"Sean Sun","contact-id":92711,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":63,"ainumber":"6.19.2.1","ainame":"Management Data Analytics phase 3","tdoc_agenda_sort_order":14400,"status":"revised","reservation_date":"2025-03-28 01:23:19","uploaded":"2025-03-28 16:51:12","revisionof":"","revisedto":"S5-251795","release":"Rel-19","crspec":28.104,"crspecversion":"19.1.0","workitem":[{"winame":"eMDAS_Ph3"}],"crnumber":197.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251440.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251441","title":"Rel19 CR TS28.104 add solution on correlation analytics for NF Scaling and dimensioning","source":"Nokia, Nokia Shanghai Bell","contact":"Sean Sun","contact-id":92711,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":63,"ainumber":"6.19.2.1","ainame":"Management Data Analytics phase 3","tdoc_agenda_sort_order":14410,"status":"revised","reservation_date":"2025-03-28 01:23:19","uploaded":"2025-03-28 16:51:12","revisionof":"","revisedto":"S5-251796","release":"Rel-19","crspec":28.104,"crspecversion":"19.1.0","workitem":[{"winame":"eMDAS_Ph3"}],"crnumber":198.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251441.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251442","title":"Rel19 CR TS28.104 add solution on management data correlation analytics for threshold assessment and adjustment","source":"Nokia, Nokia Shanghai Bell","contact":"Sean Sun","contact-id":92711,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":63,"ainumber":"6.19.2.1","ainame":"Management Data Analytics phase 3","tdoc_agenda_sort_order":14420,"status":"revised","reservation_date":"2025-03-28 01:23:20","uploaded":"2025-03-28 16:51:12","revisionof":"","revisedto":"S5-251797","release":"Rel-19","crspec":28.104,"crspecversion":"19.1.0","workitem":[{"winame":"eMDAS_Ph3"}],"crnumber":199.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251442.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251443","title":"Rel19 CR TS28.104 add solution on management data collection recommendation for predicted failures","source":"Nokia, Nokia Shanghai Bell","contact":"Sean Sun","contact-id":92711,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":63,"ainumber":"6.19.2.1","ainame":"Management Data Analytics phase 3","tdoc_agenda_sort_order":14430,"status":"revised","reservation_date":"2025-03-28 01:23:21","uploaded":"2025-03-28 16:51:12","revisionof":"","revisedto":"S5-251881","release":"Rel-19","crspec":28.104,"crspecversion":"19.1.0","workitem":[{"winame":"eMDAS_Ph3"}],"crnumber":200.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251443.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251444","title":"Rel19 input to DraftCR TS28.105 New use case on Coordination between the ML capabilities","source":"Nokia, Nokia Shanghai Bell, China mobile, TELUS","contact":"Sean Sun","contact-id":92711,"tdoctype":"other","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":61,"ainumber":"6.19.1.1","ainame":"AI\/ML management phase 2","tdoc_agenda_sort_order":14440,"status":"not treated","reservation_date":"2025-03-28 01:23:22","uploaded":"2025-03-28 14:11:03","revisionof":"","revisedto":"","release":"Rel-19","crspec":28.105,"crspecversion":"","workitem":[{"winame":"AIML_MGT_Ph2"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251444.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251445","title":"Rel-19 CR TS 28.312 Add requirements and solutions for refusing to intent negotiation","source":"China Mobile Com. Corporation","contact":"Mengyuan Ma","contact-id":101859,"tdoctype":"CR","for":"","abstract":"","secretary_remarks":"","agenda_item_sort_order":65,"ainumber":"6.19.3.1","ainame":"Intent driven management services for mobile network phase 3","tdoc_agenda_sort_order":14450,"status":"withdrawn","reservation_date":"2025-03-28 03:09:14","uploaded":"2025-03-28 04:01:37","revisionof":"","revisedto":"","release":"Rel-19","crspec":28.312,"crspecversion":"19.1.0","workitem":[{"winame":"IDMS_MN_Ph3"}],"crnumber":320.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251445.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251446","title":"Rel-19 CR TS 28.312 Add description of excavating of implicit intent","source":"China Mobile Com. Corporation","contact":"Mengyuan Ma","contact-id":101859,"tdoctype":"CR","for":"","abstract":"","secretary_remarks":"Source modified on 3\/28\/2025. Original source : China Mobile Com. Corporation","agenda_item_sort_order":65,"ainumber":"6.19.3.1","ainame":"Intent driven management services for mobile network phase 3","tdoc_agenda_sort_order":14460,"status":"withdrawn","reservation_date":"2025-03-28 03:10:49","uploaded":"2025-03-28 04:01:37","revisionof":"","revisedto":"","release":"Rel-19","crspec":28.312,"crspecversion":"19.1.0","workitem":[{"winame":"IDMS_MN_Ph3"}],"crnumber":321.0,"crrevision":"","crcategory":"C","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251446.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"5.3.9, 6.2.1.2","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251447","title":"Rel-19 pCR TS 28.561 Generic NDT NRM","source":"ZTE Corporation","contact":"Pengxiang Xie","contact-id":102614,"tdoctype":"pCR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":69,"ainumber":"6.19.5.1","ainame":"Management aspects of Network Digital Twins","tdoc_agenda_sort_order":14470,"status":"merged","reservation_date":"2025-03-28 03:31:10","uploaded":"2025-03-28 03:34:32","revisionof":"","revisedto":"","release":"Rel-19","crspec":28.561,"crspecversion":"0.1.0","workitem":[{"winame":"NDT"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251447.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251448","title":"Rel-19 pCR TS 28.561 Add Requirements for Network failure and risk prediction","source":"ZTE Corporation","contact":"Pengxiang Xie","contact-id":102614,"tdoctype":"pCR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":69,"ainumber":"6.19.5.1","ainame":"Management aspects of Network Digital Twins","tdoc_agenda_sort_order":14480,"status":"merged","reservation_date":"2025-03-28 03:31:10","uploaded":"2025-03-28 03:34:32","revisionof":"","revisedto":"","release":"Rel-19","crspec":28.561,"crspecversion":"0.1.0","workitem":[{"winame":"NDT"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251448.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251449","title":"Rel-19 CR TS 28.312 Update on Intent Negotiation Use Case","source":"ZTE Corporation","contact":"Pengxiang Xie","contact-id":102614,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 3\/28\/2025. Original source : ZTE Corporation","agenda_item_sort_order":65,"ainumber":"6.19.3.1","ainame":"Intent driven management services for mobile network phase 3","tdoc_agenda_sort_order":14490,"status":"merged","reservation_date":"2025-03-28 03:31:10","uploaded":"2025-03-28 11:52:31","revisionof":"","revisedto":"","release":"Rel-19","crspec":28.312,"crspecversion":"19.1.0","workitem":[{"winame":"IDMS_MN_Ph3"}],"crnumber":322.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251449.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"5.3.9","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251450","title":"Rel-19 CR TS 28.312 Update on Intent Negotiation NRM","source":"ZTE Corporation","contact":"Pengxiang Xie","contact-id":102614,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 3\/28\/2025. Original source : ZTE Corporation","agenda_item_sort_order":65,"ainumber":"6.19.3.1","ainame":"Intent driven management services for mobile network phase 3","tdoc_agenda_sort_order":14500,"status":"merged","reservation_date":"2025-03-28 03:31:10","uploaded":"2025-03-28 12:18:20","revisionof":"","revisedto":"","release":"Rel-19","crspec":28.312,"crspecversion":"19.1.0","workitem":[{"winame":"IDMS_MN_Ph3"}],"crnumber":323.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251450.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"6.2.1.2.1.1, 6.2.1.3.19, 6.2.1.3.22.2, 6.2.1.4","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251451","title":"Rel-18 CR 28.623 Modify YANG mapping of Subnetwork","source":"Ericsson India Private Limited","contact":"Balazs Lengyel","contact-id":81420,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":37,"ainumber":"6.4.5","ainame":"Service based management architecture","tdoc_agenda_sort_order":14510,"status":"agreed","reservation_date":"2025-03-28 04:12:09","uploaded":"2025-03-28 18:24:21","revisionof":"","revisedto":"","release":"Rel-18","crspec":28.623,"crspecversion":"18.10.0","workitem":[{"winame":"TEI18"}],"crnumber":526.0,"crrevision":"","crcategory":"F","tsg_crp":"SP-250557","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251451.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251452","title":"Rel-19 CR 28.623 Modify YANG mapping of Subnetwork","source":"Ericsson India Private Limited","contact":"Balazs Lengyel","contact-id":81420,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":37,"ainumber":"6.4.5","ainame":"Service based management architecture","tdoc_agenda_sort_order":14520,"status":"agreed","reservation_date":"2025-03-28 04:15:35","uploaded":"2025-03-28 18:24:21","revisionof":"","revisedto":"","release":"Rel-19","crspec":28.623,"crspecversion":"19.3.0","workitem":[{"winame":"TEI18"}],"crnumber":527.0,"crrevision":"","crcategory":"A","tsg_crp":"SP-250557","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251452.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251453","title":"SA5 Rel-20 5GA 25Q1 moderated discussion \u2013 ISAC management","source":"ZTE Corporation","contact":"Bangqiu Ruan","contact-id":96106,"tdoctype":"other","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":12,"ainumber":"5.5","ainame":"Rel-20 topic preparation","tdoc_agenda_sort_order":14530,"status":"noted","reservation_date":"2025-03-28 04:16:55","uploaded":"2025-03-28 19:23:08","revisionof":"","revisedto":"","release":"Rel-20","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251453.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251454","title":"Rel-19 CR TS 28.541 Add attributes to support MEC deployment on board the NTN","source":"ZTE Corporation","contact":"Bangqiu Ruan","contact-id":96106,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 3\/28\/2025. Original source : ZTE Corporation","agenda_item_sort_order":83,"ainumber":"6.19.15.1","ainame":"Management Aspects of NTN Phase 2","tdoc_agenda_sort_order":14540,"status":"revised","reservation_date":"2025-03-28 04:16:55","uploaded":"2025-03-28 19:23:08","revisionof":"","revisedto":"S5-251985","release":"Rel-19","crspec":28.541,"crspecversion":"19.3.0","workitem":[{"winame":"NTN_OAM_Ph2"}],"crnumber":1506.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251454.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"5.3.113.2","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251455","title":"Rel-19 CR TS28.552 Enhance RRC connection resuming related measurements for RedCap UEs","source":"ZTE Corporation","contact":"Bangqiu Ruan","contact-id":96106,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 3\/28\/2025. Original source : ZTE Corporation","agenda_item_sort_order":87,"ainumber":"6.19.17.1","ainame":"Management Aspects of RedCap features","tdoc_agenda_sort_order":14550,"status":"revised","reservation_date":"2025-03-28 04:16:56","uploaded":"2025-03-28 20:43:43","revisionof":"","revisedto":"S5-251994","release":"Rel-19","crspec":28.552,"crspecversion":"19.3.0","workitem":[{"winame":"NR_RedCap_OAM"}],"crnumber":684.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251455.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":false,"clauses_affected":"5.1.1.18.1, 5.1.1.18.2","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251456","title":"Rel-19 CR TS28.552 Enhance PRB Usage related measurements for RedCap UEs","source":"ZTE Corporation","contact":"Bangqiu Ruan","contact-id":96106,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 3\/28\/2025. Original source : ZTE Corporation","agenda_item_sort_order":87,"ainumber":"6.19.17.1","ainame":"Management Aspects of RedCap features","tdoc_agenda_sort_order":14560,"status":"revised","reservation_date":"2025-03-28 04:16:57","uploaded":"2025-03-28 20:43:43","revisionof":"","revisedto":"S5-251995","release":"Rel-19","crspec":28.552,"crspecversion":"19.3.0","workitem":[{"winame":"NR_RedCap_OAM"}],"crnumber":685.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251456.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":false,"clauses_affected":"5.1.1.2.1,5.1.1.2.2, 5.1.1.2.15,5.1.1.2.16","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251457","title":"Rel-19 CR TS28.552 Enhance Number of Active UEs related measurements for RedCap UEs","source":"ZTE Corporation","contact":"Bangqiu Ruan","contact-id":96106,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":87,"ainumber":"6.19.17.1","ainame":"Management Aspects of RedCap features","tdoc_agenda_sort_order":14570,"status":"revised","reservation_date":"2025-03-28 04:16:58","uploaded":"2025-03-28 20:43:43","revisionof":"","revisedto":"S5-251996","release":"Rel-19","crspec":28.552,"crspecversion":"19.3.0","workitem":[{"winame":"NR_RedCap_OAM"}],"crnumber":686.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251457.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251458","title":"Rel-19 CR TS 28.312 Add requirements and solutions for triggering intent negotiation","source":"China Mobile Com. Corporation","contact":"Mengyuan Ma","contact-id":101859,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 3\/28\/2025. Original source : China Mobile Com. Corporation","agenda_item_sort_order":65,"ainumber":"6.19.3.1","ainame":"Intent driven management services for mobile network phase 3","tdoc_agenda_sort_order":14580,"status":"merged","reservation_date":"2025-03-28 04:18:10","uploaded":"2025-03-28 04:24:17","revisionof":"","revisedto":"","release":"Rel-19","crspec":28.312,"crspecversion":"19.1.0","workitem":[{"winame":"IDMS_MN_Ph3"}],"crnumber":324.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251458.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251459","title":"Rel-18 CR 28.541 Modify YANG mapping of Subnetwork","source":"Ericsson India Private Limited","contact":"Balazs Lengyel","contact-id":81420,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":37,"ainumber":"6.4.5","ainame":"Service based management architecture","tdoc_agenda_sort_order":14590,"status":"withdrawn","reservation_date":"2025-03-28 04:19:00","uploaded":null,"revisionof":"","revisedto":"","release":"Rel-18","crspec":28.541,"crspecversion":"18.11.0","workitem":[{"winame":"TEI18"}],"crnumber":1507.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251460","title":"Rel-19 CR TS 28.312 Add description of excavating of implicit intent","source":"China Mobile Com. Corporation","contact":"Mengyuan Ma","contact-id":101859,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 3\/28\/2025. Original source : China Mobile Com. Corporation","agenda_item_sort_order":65,"ainumber":"6.19.3.1","ainame":"Intent driven management services for mobile network phase 3","tdoc_agenda_sort_order":14600,"status":"revised","reservation_date":"2025-03-28 04:21:08","uploaded":"2025-03-28 04:24:17","revisionof":"","revisedto":"S5-252054","release":"Rel-19","crspec":28.312,"crspecversion":"19.1.0","workitem":[{"winame":"IDMS_MN_Ph3"}],"crnumber":325.0,"crrevision":"","crcategory":"C","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251460.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"5.3.9, 6.2.1.2","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251461","title":"Rel-19 CR 28.541 Modify YANG mapping of Subnetwork","source":"Ericsson India Private Limited","contact":"Balazs Lengyel","contact-id":81420,"tdoctype":"CR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":37,"ainumber":"6.4.5","ainame":"Service based management architecture","tdoc_agenda_sort_order":14610,"status":"withdrawn","reservation_date":"2025-03-28 04:21:09","uploaded":null,"revisionof":"","revisedto":"","release":"Rel-19","crspec":28.541,"crspecversion":"19.3.0","workitem":[{"winame":"TEI18"}],"crnumber":1508.0,"crrevision":"","crcategory":"A","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251462","title":"Rel-19 CR TS 28.104 Add solutions for traffic congestion prediction analysis based on UE throughput","source":"AsiaInfo, ZTE","contact":"Zhanwu Li","contact-id":95185,"tdoctype":"CR","for":"Approval","abstract":"Add solution for traffic congestion prediction analysis based on UE throughput","secretary_remarks":"","agenda_item_sort_order":63,"ainumber":"6.19.2.1","ainame":"Management Data Analytics phase 3","tdoc_agenda_sort_order":14620,"status":"revised","reservation_date":"2025-03-28 05:47:08","uploaded":"2025-03-28 05:51:25","revisionof":"","revisedto":"S5-251799","release":"Rel-19","crspec":28.104,"crspecversion":"19.1.0","workitem":[{"winame":"eMDAS_Ph3"}],"crnumber":201.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251462.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251463","title":"Moderated R20 topic discussion on use cases for charging reliability enhancement","source":"Huawei","contact":"Yimeng Deng","contact-id":102879,"tdoctype":"discussion","for":"Discussion","abstract":"","secretary_remarks":"","agenda_item_sort_order":98,"ainumber":"7.2","ainame":"New Charging Study\/Work Item proposals","tdoc_agenda_sort_order":14630,"status":"withdrawn","reservation_date":"2025-03-28 05:54:32","uploaded":"2025-03-28 09:58:54","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251463.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251464","title":"Discussion on the charging domain for NRF registration and discovery","source":"Huawei","contact":"Yimeng Deng","contact-id":102879,"tdoctype":"discussion","for":"Discussion","abstract":"","secretary_remarks":"","agenda_item_sort_order":101,"ainumber":"7.4.1","ainame":"CHF Segmentation","tdoc_agenda_sort_order":14640,"status":"noted","reservation_date":"2025-03-28 05:54:32","uploaded":"2025-03-28 09:58:53","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251464.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251465","title":"Rel-19 CR 32.291 Add charging domain for NRF registration and discovery","source":"Huawei","contact":"Yimeng Deng","contact-id":102879,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 3\/28\/2025. Original source : Huawei","agenda_item_sort_order":101,"ainumber":"7.4.1","ainame":"CHF Segmentation","tdoc_agenda_sort_order":14650,"status":"merged","reservation_date":"2025-03-28 05:54:32","uploaded":"2025-03-28 09:58:53","revisionof":"","revisedto":"","release":"Rel-19","crspec":32.291,"crspecversion":"19.2.0","workitem":[{"winame":"CHFSeg"}],"crnumber":617.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251465.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"6.1.8","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251466","title":"Rel-19 CR 32.255 Addition of the Satellite Roaming Charging Principle","source":"Huawei","contact":"Yimeng Deng","contact-id":102879,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 3\/28\/2025. Original source : Huawei","agenda_item_sort_order":106,"ainumber":"7.4.6","ainame":"Charging aspects of satellite access Phase 3","tdoc_agenda_sort_order":14660,"status":"revised","reservation_date":"2025-03-28 05:54:33","uploaded":"2025-03-28 09:58:53","revisionof":"","revisedto":"S5-251807","release":"Rel-19","crspec":32.255,"crspecversion":"19.1.0","workitem":[{"winame":"5GSAT_Ph3-CH"}],"crnumber":574.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251466.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"5.1.9.X (New)","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251467","title":"Rel-19 CR 32.254 Addition of the CAPIF Charging Architecture","source":"Huawei","contact":"Yimeng Deng","contact-id":102879,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 3\/28\/2025. Original source : Huawei","agenda_item_sort_order":107,"ainumber":"7.4.7","ainame":"Charging aspects of CAPIF","tdoc_agenda_sort_order":14670,"status":"merged","reservation_date":"2025-03-28 05:54:34","uploaded":"2025-03-28 09:58:53","revisionof":"","revisedto":"","release":"Rel-19","crspec":32.254,"crspecversion":"19.0.0","workitem":[{"winame":"CH_CAPIF_EXT"}],"crnumber":58.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251467.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"2, 3.3, 4.1, 4.X(New)","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251468","title":"Rel-19 CR 32.254 Addition of the CAPIF Charging Principle and Scenarios","source":"Huawei","contact":"Yimeng Deng","contact-id":102879,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 3\/28\/2025. Original source : Huawei","agenda_item_sort_order":107,"ainumber":"7.4.7","ainame":"Charging aspects of CAPIF","tdoc_agenda_sort_order":14680,"status":"merged","reservation_date":"2025-03-28 05:54:34","uploaded":"2025-03-28 09:58:53","revisionof":"","revisedto":"","release":"Rel-19","crspec":32.254,"crspecversion":"19.0.0","workitem":[{"winame":"CH_CAPIF_EXT"}],"crnumber":59.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251468.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"5.1.0, 5.1.1, 5.4.2.1, 5.X(New), ","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251469","title":"Rel-19 CR 32.254 Addition of CAPIF charging support","source":"Huawei","contact":"Yimeng Deng","contact-id":102879,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Title modified on 3\/28\/2025. Original title : Rel-19 CR 32.254 Addition of the CAPIF Charging Message Content<br\/><br\/>Source modified on 3\/28\/2025. Original source : Huawei","agenda_item_sort_order":107,"ainumber":"7.4.7","ainame":"Charging aspects of CAPIF","tdoc_agenda_sort_order":14690,"status":"revised","reservation_date":"2025-03-28 05:54:35","uploaded":"2025-03-28 09:58:53","revisionof":"","revisedto":"S5-251818","release":"Rel-19","crspec":32.254,"crspecversion":"19.0.0","workitem":[{"winame":"CH_CAPIF_EXT"}],"crnumber":60.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251469.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"6.2B(New)","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251470","title":"Rel-19 CR 32.260 Charging architecture for IMS DC application download charging charging","source":"Huawei","contact":"Yimeng Deng","contact-id":102879,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Title modified on 3\/28\/2025. Original title : Rel-19 CR 32.260 Charging architecture for IMS DC application download charging<br\/><br\/>Source modified on 3\/28\/2025. Original source : Huawei","agenda_item_sort_order":108,"ainumber":"7.4.8","ainame":"Charging aspects of next generation real time communication services phase 2","tdoc_agenda_sort_order":14700,"status":"revised","reservation_date":"2025-03-28 05:54:36","uploaded":"2025-03-28 09:58:09","revisionof":"","revisedto":"S5-251823","release":"Rel-19","crspec":32.26,"crspecversion":"18.3.0","workitem":[{"winame":"NG_RTC_Ph2-CH"}],"crnumber":439.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251470.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"3.3, 4.1, 4.4","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251471","title":"Rel-19 CR 32.260 Charging principle for IMS DC application download charging","source":"Huawei","contact":"Yimeng Deng","contact-id":102879,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 3\/28\/2025. Original source : Huawei","agenda_item_sort_order":108,"ainumber":"7.4.8","ainame":"Charging aspects of next generation real time communication services phase 2","tdoc_agenda_sort_order":14710,"status":"revised","reservation_date":"2025-03-28 05:54:36","uploaded":"2025-03-28 09:58:09","revisionof":"","revisedto":"S5-251824","release":"Rel-19","crspec":32.26,"crspecversion":"18.3.0","workitem":[{"winame":"NG_RTC_Ph2-CH"}],"crnumber":440.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251471.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"Annex X (new)","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251472","title":"Rel-19 CR 32.260 Charging information for IMS DC application download charging","source":"Huawei","contact":"Yimeng Deng","contact-id":102879,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 3\/28\/2025. Original source : Huawei","agenda_item_sort_order":108,"ainumber":"7.4.8","ainame":"Charging aspects of next generation real time communication services phase 2","tdoc_agenda_sort_order":14720,"status":"revised","reservation_date":"2025-03-28 05:54:37","uploaded":"2025-03-28 09:58:09","revisionof":"","revisedto":"S5-251825","release":"Rel-19","crspec":32.26,"crspecversion":"18.3.0","workitem":[{"winame":"NG_RTC_Ph2-CH"}],"crnumber":441.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251472.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"6.4.1.2.1, 6.4.1b.1, 6.4.1b.2, 6.4.2.2, 6.4.2.3","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251473","title":"Rel-19 CR 32.291 Charging information for IMS DC application download charging","source":"Huawei","contact":"Yimeng Deng","contact-id":102879,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 3\/28\/2025. Original source : Huawei","agenda_item_sort_order":108,"ainumber":"7.4.8","ainame":"Charging aspects of next generation real time communication services phase 2","tdoc_agenda_sort_order":14730,"status":"revised","reservation_date":"2025-03-28 05:54:38","uploaded":"2025-03-28 09:58:09","revisionof":"","revisedto":"S5-251826","release":"Rel-19","crspec":32.291,"crspecversion":"19.2.0","workitem":[{"winame":"NG_RTC_Ph2-CH"}],"crnumber":618.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251473.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"3.3, 6.1.6.1, 6.1.6.2.8.3, 6.1.6.2.8.x (new), 6.1.6.3.4, 6.1.6.3.35, 6.1.8, 7.8, Forge","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251474","title":"Rel-19 CR 32.298 Charging information for IMS DC application download charging","source":"Huawei","contact":"Yimeng Deng","contact-id":102879,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 3\/28\/2025. Original source : Huawei","agenda_item_sort_order":108,"ainumber":"7.4.8","ainame":"Charging aspects of next generation real time communication services phase 2","tdoc_agenda_sort_order":14740,"status":"revised","reservation_date":"2025-03-28 05:54:39","uploaded":"2025-03-28 09:58:09","revisionof":"","revisedto":"S5-251827","release":"Rel-19","crspec":32.298,"crspecversion":"19.1.0","workitem":[{"winame":"NG_RTC_Ph2-CH"}],"crnumber":1035.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251474.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"3.3, Forge","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251475","title":"Rel-19 CR 32.260 Add duration based charging principle for DC application usage","source":"Huawei","contact":"Yimeng Deng","contact-id":102879,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 3\/28\/2025. Original source : Huawei","agenda_item_sort_order":108,"ainumber":"7.4.8","ainame":"Charging aspects of next generation real time communication services phase 2","tdoc_agenda_sort_order":14750,"status":"merged","reservation_date":"2025-03-28 05:54:39","uploaded":"2025-03-28 09:58:09","revisionof":"","revisedto":"","release":"Rel-19","crspec":32.26,"crspecversion":"18.3.0","workitem":[{"winame":"NG_RTC_Ph2-CH"}],"crnumber":442.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251475.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"5.1.15","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251476","title":"Rel-19 CR 32.255 Add volume based charging principle for DC application download and usage","source":"Huawei","contact":"Yimeng Deng","contact-id":102879,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 3\/28\/2025. Original source : Huawei","agenda_item_sort_order":108,"ainumber":"7.4.8","ainame":"Charging aspects of next generation real time communication services phase 2","tdoc_agenda_sort_order":14760,"status":"revised","reservation_date":"2025-03-28 05:54:40","uploaded":"2025-03-28 09:58:09","revisionof":"","revisedto":"S5-251820","release":"Rel-19","crspec":32.255,"crspecversion":"19.1.0","workitem":[{"winame":"NG_RTC_Ph2-CH"}],"crnumber":575.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251476.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"5.1.18","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251477","title":"Rel-19 CR 32.255 Add volume based charging principle to support IMS DC as a PS Data Off Exempt Service","source":"Huawei","contact":"Yimeng Deng","contact-id":102879,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 3\/28\/2025. Original source : Huawei","agenda_item_sort_order":108,"ainumber":"7.4.8","ainame":"Charging aspects of next generation real time communication services phase 2","tdoc_agenda_sort_order":14770,"status":"revised","reservation_date":"2025-03-28 05:54:40","uploaded":"2025-03-28 09:58:09","revisionof":"","revisedto":"S5-251821","release":"Rel-19","crspec":32.255,"crspecversion":"19.1.0","workitem":[{"winame":"NG_RTC_Ph2-CH"}],"crnumber":576.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251477.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"5.1.18, 6.2.1.2","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251478","title":"Rel-19 CR 32.254 Add charging principle for IMS network capabilities exposure","source":"Huawei","contact":"Yimeng Deng","contact-id":102879,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 3\/28\/2025. Original source : Huawei","agenda_item_sort_order":108,"ainumber":"7.4.8","ainame":"Charging aspects of next generation real time communication services phase 2","tdoc_agenda_sort_order":14780,"status":"revised","reservation_date":"2025-03-28 05:54:41","uploaded":"2025-03-28 09:58:09","revisionof":"","revisedto":"S5-251828","release":"Rel-19","crspec":32.254,"crspecversion":"19.0.0","workitem":[{"winame":"NG_RTC_Ph2-CH"}],"crnumber":61.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251478.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"2, 5.1.X (new), 6.3.1.4.1","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251479","title":"Rel-18 CR TS 28.111 Add missing solution components","source":"Huawei","contact":"Kai Zhang","contact-id":37005,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 3\/28\/2025. Original source : Huawei","agenda_item_sort_order":37,"ainumber":"6.4.5","ainame":"Service based management architecture","tdoc_agenda_sort_order":14790,"status":"not pursued","reservation_date":"2025-03-28 06:28:56","uploaded":"2025-03-28 10:10:59","revisionof":"","revisedto":"","release":"Rel-18","crspec":28.111,"crspecversion":"18.4.0","workitem":[{"winame":"eSBMA"}],"crnumber":31.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251479.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"6.1, 6.2","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251480","title":"Rel-19 CR TS 28.111 Add missing solution components","source":"Huawei","contact":"Kai Zhang","contact-id":37005,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 3\/28\/2025. Original source : Huawei","agenda_item_sort_order":37,"ainumber":"6.4.5","ainame":"Service based management architecture","tdoc_agenda_sort_order":14800,"status":"not pursued","reservation_date":"2025-03-28 06:28:57","uploaded":"2025-03-28 10:10:59","revisionof":"","revisedto":"","release":"Rel-19","crspec":28.111,"crspecversion":"19.1.0","workitem":[{"winame":"eSBMA"}],"crnumber":32.0,"crrevision":"","crcategory":"A","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251480.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"6.1, 6.2","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251481","title":"Rel-18 CR TS 28.111 Correction on reliability of alarm lists","source":"Huawei","contact":"Kai Zhang","contact-id":37005,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 3\/28\/2025. Original source : Huawei","agenda_item_sort_order":37,"ainumber":"6.4.5","ainame":"Service based management architecture","tdoc_agenda_sort_order":14810,"status":"not pursued","reservation_date":"2025-03-28 06:28:58","uploaded":"2025-03-28 10:10:59","revisionof":"","revisedto":"","release":"Rel-18","crspec":28.111,"crspecversion":"18.4.0","workitem":[{"winame":"eSBMA"}],"crnumber":33.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251481.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"6.11","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251482","title":"Rel-19 CR TS 28.111 Correction on reliability of alarm lists","source":"Huawei","contact":"Kai Zhang","contact-id":37005,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 3\/28\/2025. Original source : Huawei","agenda_item_sort_order":37,"ainumber":"6.4.5","ainame":"Service based management architecture","tdoc_agenda_sort_order":14820,"status":"not pursued","reservation_date":"2025-03-28 06:28:58","uploaded":"2025-03-28 10:10:59","revisionof":"","revisedto":"","release":"Rel-19","crspec":28.111,"crspecversion":"19.1.0","workitem":[{"winame":"eSBMA"}],"crnumber":34.0,"crrevision":"","crcategory":"A","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251482.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"6.11","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251483","title":"pCR TS 28.579 Add concepts content","source":"Huawei, Nokia, Samsung","contact":"Kai Zhang","contact-id":37005,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":95,"ainumber":"6.19.21.1","ainame":"Enhanced OAM for management service exposure to external consumers through CAPIF","tdoc_agenda_sort_order":14830,"status":"revised","reservation_date":"2025-03-28 06:28:59","uploaded":"2025-03-28 10:10:59","revisionof":"","revisedto":"S5-251947","release":"Rel-19","crspec":28.579,"crspecversion":"0.1.0","workitem":[{"winame":"MExpo"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251483.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251484","title":"DP on management services exposure","source":"Huawei","contact":"Kai Zhang","contact-id":37005,"tdoctype":"discussion","for":"Endorsement","abstract":"","secretary_remarks":"","agenda_item_sort_order":95,"ainumber":"6.19.21.1","ainame":"Enhanced OAM for management service exposure to external consumers through CAPIF","tdoc_agenda_sort_order":14840,"status":"merged","reservation_date":"2025-03-28 06:28:59","uploaded":"2025-03-28 10:10:59","revisionof":"","revisedto":"","release":"Rel-19","crspec":"","crspecversion":"","workitem":[{"winame":"MExpo"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251484.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251485","title":"pCR TS 28.579 Introduce MSEDF","source":"Huawei","contact":"Kai Zhang","contact-id":37005,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":95,"ainumber":"6.19.21.1","ainame":"Enhanced OAM for management service exposure to external consumers through CAPIF","tdoc_agenda_sort_order":14850,"status":"not pursued","reservation_date":"2025-03-28 06:28:59","uploaded":"2025-03-28 10:10:59","revisionof":"","revisedto":"","release":"Rel-19","crspec":28.579,"crspecversion":"0.1.0","workitem":[{"winame":"MExpo"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251485.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251486","title":"Rel-19 CR TS 28.111 Update terms and concepts overview","source":"Huawei","contact":"Kai Zhang","contact-id":37005,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 3\/28\/2025. Original source : Huawei","agenda_item_sort_order":73,"ainumber":"6.19.8.1","ainame":"Service Based Management Architecture enhancement phase 3","tdoc_agenda_sort_order":14860,"status":"revised","reservation_date":"2025-03-28 06:28:59","uploaded":"2025-03-28 10:10:59","revisionof":"","revisedto":"S5-251933","release":"Rel-19","crspec":28.111,"crspecversion":"19.1.0","workitem":[{"winame":"SBMA_Ph3"}],"crnumber":35.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251486.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"3.1, 4","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251487","title":"Rel-19 CR TS 28.111 Update references and abbreviations","source":"Huawei","contact":"Kai Zhang","contact-id":37005,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 3\/28\/2025. Original source : Huawei","agenda_item_sort_order":73,"ainumber":"6.19.8.1","ainame":"Service Based Management Architecture enhancement phase 3","tdoc_agenda_sort_order":14870,"status":"agreed","reservation_date":"2025-03-28 06:29:02","uploaded":"2025-03-28 10:10:59","revisionof":"","revisedto":"","release":"Rel-19","crspec":28.111,"crspecversion":"19.1.0","workitem":[{"winame":"SBMA_Ph3"}],"crnumber":36.0,"crrevision":"","crcategory":"F","tsg_crp":"SP-250553","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251487.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"2, 3.3","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251488","title":"Rel-19 CR TS 28.111 Update scope","source":"Huawei","contact":"Kai Zhang","contact-id":37005,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 3\/28\/2025. Original source : Huawei","agenda_item_sort_order":73,"ainumber":"6.19.8.1","ainame":"Service Based Management Architecture enhancement phase 3","tdoc_agenda_sort_order":14880,"status":"agreed","reservation_date":"2025-03-28 06:29:02","uploaded":"2025-03-28 10:10:59","revisionof":"","revisedto":"","release":"Rel-19","crspec":28.111,"crspecversion":"19.1.0","workitem":[{"winame":"SBMA_Ph3"}],"crnumber":37.0,"crrevision":"","crcategory":"D","tsg_crp":"SP-250553","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251488.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"1","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251489","title":"New SID on SBMA enhancement phase 4","source":"Moderator (Huawei)","contact":"Kai Zhang","contact-id":37005,"tdoctype":"SID new","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":12,"ainumber":"5.5","ainame":"Rel-20 topic preparation","tdoc_agenda_sort_order":14890,"status":"revised","reservation_date":"2025-03-28 06:29:03","uploaded":"2025-03-28 10:10:59","revisionof":"","revisedto":"S5-251775","release":"Rel-20","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251489.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251490","title":"TS28.561 Add the NDT concept and scope","source":"China Mobile","contact":"Yushuang Hu","contact-id":96973,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":69,"ainumber":"6.19.5.1","ainame":"Management aspects of Network Digital Twins","tdoc_agenda_sort_order":14900,"status":"withdrawn","reservation_date":"2025-03-28 06:35:32","uploaded":"2025-03-28 10:02:17","revisionof":"","revisedto":"","release":"Rel-19","crspec":28.561,"crspecversion":"0.1.0","workitem":[{"winame":"NDT"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251490.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251491","title":"TS28.561 NDT support for network automation","source":"China Mobile, Huawei","contact":"Yushuang Hu","contact-id":96973,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":69,"ainumber":"6.19.5.1","ainame":"Management aspects of Network Digital Twins","tdoc_agenda_sort_order":14910,"status":"withdrawn","reservation_date":"2025-03-28 06:35:32","uploaded":"2025-03-28 12:01:23","revisionof":"","revisedto":"","release":"Rel-19","crspec":28.561,"crspecversion":"0.1.0","workitem":[{"winame":"NDT"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251491.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251492","title":"pCR Add UC and requirements of using NDT to generate customer experience data for TS 28.561","source":"China Mobile, Huawei","contact":"Yushuang Hu","contact-id":96973,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":69,"ainumber":"6.19.5.1","ainame":"Management aspects of Network Digital Twins","tdoc_agenda_sort_order":14920,"status":"merged","reservation_date":"2025-03-28 06:35:32","uploaded":"2025-03-28 12:01:23","revisionof":"","revisedto":"","release":"Rel-19","crspec":28.561,"crspecversion":"0.1.0","workitem":[{"winame":"NDT"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251492.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251493","title":"pCR Add solution of Using NDT to generate ML training data for TS 28.561","source":"China Mobile","contact":"Yushuang Hu","contact-id":96973,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":69,"ainumber":"6.19.5.1","ainame":"Management aspects of Network Digital Twins","tdoc_agenda_sort_order":14930,"status":"merged","reservation_date":"2025-03-28 06:35:32","uploaded":"2025-03-28 10:02:17","revisionof":"","revisedto":"","release":"Rel-19","crspec":28.561,"crspecversion":"0.1.0","workitem":[{"winame":"NDT"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251493.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251494","title":"Rel-19 CR TS 28.312 Modify the Generic Information model definition","source":"China Mobile, Huawei","contact":"Yushuang Hu","contact-id":96973,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 3\/28\/2025. Original source : China Mobile, Huawei<br\/><br\/>Source modified on 28\/03\/2025. Original source : China Mobile, Huawei","agenda_item_sort_order":65,"ainumber":"6.19.3.1","ainame":"Intent driven management services for mobile network phase 3","tdoc_agenda_sort_order":14940,"status":"agreed","reservation_date":"2025-03-28 06:35:32","uploaded":"2025-03-28 10:01:16","revisionof":"","revisedto":"","release":"Rel-19","crspec":28.312,"crspecversion":"19.1.0","workitem":[{"winame":"IDMS_MN_Ph3"}],"crnumber":326.0,"crrevision":"","crcategory":"F","tsg_crp":"SP-250536","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251494.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"2, 6.2.1.0","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251495","title":"Rel-19 CR TS 28.312 Update solution for intent exploration","source":"China Mobile, Huawei","contact":"Yushuang Hu","contact-id":96973,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 3\/28\/2025. Original source : China Mobile, Huawei<br\/><br\/>Source modified on 28\/03\/2025. Original source : China Mobile, Huawei","agenda_item_sort_order":65,"ainumber":"6.19.3.1","ainame":"Intent driven management services for mobile network phase 3","tdoc_agenda_sort_order":14950,"status":"merged","reservation_date":"2025-03-28 06:35:33","uploaded":"2025-03-28 10:01:16","revisionof":"","revisedto":"","release":"Rel-19","crspec":28.312,"crspecversion":"19.1.0","workitem":[{"winame":"IDMS_MN_Ph3"}],"crnumber":327.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251495.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"6.2.1.2.2","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251496","title":"Input to DraftCR Rel-19 TS 28.105 Add UC for prediction latency","source":"China Mobile","contact":"Yushuang Hu","contact-id":96973,"tdoctype":"other","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":61,"ainumber":"6.19.1.1","ainame":"AI\/ML management phase 2","tdoc_agenda_sort_order":14960,"status":"merged","reservation_date":"2025-03-28 06:35:33","uploaded":"2025-03-28 10:01:16","revisionof":"","revisedto":"","release":"Rel-19","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251496.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251497","title":"Input to DraftCR Rel-19 TS 28.105 Add UC for AIML explainability","source":"China Mobile","contact":"Yushuang Hu","contact-id":96973,"tdoctype":"other","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":61,"ainumber":"6.19.1.1","ainame":"AI\/ML management phase 2","tdoc_agenda_sort_order":14970,"status":"merged","reservation_date":"2025-03-28 06:35:33","uploaded":"2025-03-28 10:01:16","revisionof":"","revisedto":"","release":"Rel-19","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251497.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251498","title":"New SID on Management aspect of Network Digital Twins phase 2","source":"China Mobile","contact":"Yushuang Hu","contact-id":96973,"tdoctype":"SID new","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":12,"ainumber":"5.5","ainame":"Rel-20 topic preparation","tdoc_agenda_sort_order":14980,"status":"revised","reservation_date":"2025-03-28 06:35:33","uploaded":"2025-03-28 12:01:23","revisionof":"","revisedto":"S5-251776","release":"Rel-20","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251498.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251499","title":"Input to Draft CR 28.622 External Management Data","source":"Nokia","contact":"Christiane Allwang","contact-id":90208,"tdoctype":"other","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":76,"ainumber":"6.19.","ainame":"Data management phase 2","tdoc_agenda_sort_order":14990,"status":"revised","reservation_date":"2025-03-28 06:35:59","uploaded":"2025-03-28 16:12:11","revisionof":"","revisedto":"S5-251955","release":"Rel-19","crspec":28.622,"crspecversion":"","workitem":[{"winame":"MADCOL_Ph2"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251499.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251500","title":"Rel-19 CR TS 28.622 Corrections of Trace Reference Notifications","source":"Nokia","contact":"Christiane Allwang","contact-id":90208,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Title modified on 3\/28\/2025. Original title : Rel-19 CR 28.622 Rel-19 CR TS 28.622 Corrections of Trace Reference Notifications<br\/><br\/>Source modified on 3\/28\/2025. Original source : Nokia","agenda_item_sort_order":59,"ainumber":"6.4.27","ainame":"OAM Rel-19 small enhancements","tdoc_agenda_sort_order":15000,"status":"agreed","reservation_date":"2025-03-28 06:35:59","uploaded":"2025-03-28 07:46:41","revisionof":"","revisedto":"","release":"Rel-19","crspec":28.622,"crspecversion":"19.3.0","workitem":[{"winame":"TEI19"}],"crnumber":548.0,"crrevision":"","crcategory":"F","tsg_crp":"SP-250559","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251500.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"4.3.35.4","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251501","title":"Rel-19 CR TS 32.421 Enhancement to Trace Reference","source":"Nokia","contact":"Christiane Allwang","contact-id":90208,"tdoctype":"CR","for":"Approval","abstract":"","secretary_remarks":"Source modified on 3\/28\/2025. Original source : Nokia","agenda_item_sort_order":78,"ainumber":"6.19.11.1","ainame":"Data management regarding subscriptions and reporting","tdoc_agenda_sort_order":15010,"status":"not pursued","reservation_date":"2025-03-28 06:36:00","uploaded":"2025-03-28 07:46:41","revisionof":"","revisedto":"","release":"Rel-19","crspec":32.421,"crspecversion":"19.2.0","workitem":[{"winame":"Data_SREP"}],"crnumber":146.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251501.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"5.3.1","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251502","title":"Rel-19 CR TS 32.422 Enhancement to Trace Reference","source":"Nokia","contact":"Christiane Allwang","contact-id":90208,"tdoctype":"CR","for":"Approval","abstract":"","secretary_remarks":"Source modified on 3\/28\/2025. Original source : Nokia","agenda_item_sort_order":78,"ainumber":"6.19.11.1","ainame":"Data management regarding subscriptions and reporting","tdoc_agenda_sort_order":15020,"status":"not pursued","reservation_date":"2025-03-28 06:36:01","uploaded":"2025-03-28 07:46:41","revisionof":"","revisedto":"","release":"Rel-19","crspec":32.422,"crspecversion":"19.2.0","workitem":[{"winame":"Data_SREP"}],"crnumber":513.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251502.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"4.1.1.9.2, 5.6","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251503","title":"Rel-19 CR TS 32.423 Enhancement to Trace Reference","source":"Nokia","contact":"Christiane Allwang","contact-id":90208,"tdoctype":"CR","for":"Approval","abstract":"","secretary_remarks":"Source modified on 3\/28\/2025. Original source : Nokia","agenda_item_sort_order":78,"ainumber":"6.19.11.1","ainame":"Data management regarding subscriptions and reporting","tdoc_agenda_sort_order":15030,"status":"not pursued","reservation_date":"2025-03-28 06:36:02","uploaded":"2025-03-28 07:46:41","revisionof":"","revisedto":"","release":"Rel-19","crspec":32.423,"crspecversion":"19.2.0","workitem":[{"winame":"Data_SREP"}],"crnumber":203.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251503.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"5.2.2, A.1, B.1","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251504","title":"Rel-19 CR TS 28.622 Enhancement to Trace Reference","source":"Nokia","contact":"Christiane Allwang","contact-id":90208,"tdoctype":"CR","for":"Approval","abstract":"","secretary_remarks":"Source modified on 3\/28\/2025. Original source : Nokia","agenda_item_sort_order":78,"ainumber":"6.19.11.1","ainame":"Data management regarding subscriptions and reporting","tdoc_agenda_sort_order":15040,"status":"not pursued","reservation_date":"2025-03-28 06:36:02","uploaded":"2025-03-28 07:46:41","revisionof":"","revisedto":"","release":"Rel-19","crspec":28.622,"crspecversion":"19.3.0","workitem":[{"winame":"Data_SREP"}],"crnumber":549.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251504.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"4.3.35.1, 4.3.35.2, 4.4.1","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251505","title":"Rel-19 CR TS 28.623 Enhancement to Trace Reference","source":"Nokia","contact":"Christiane Allwang","contact-id":90208,"tdoctype":"CR","for":"Approval","abstract":"","secretary_remarks":"Source modified on 3\/28\/2025. Original source : Nokia","agenda_item_sort_order":78,"ainumber":"6.19.11.1","ainame":"Data management regarding subscriptions and reporting","tdoc_agenda_sort_order":15050,"status":"not pursued","reservation_date":"2025-03-28 06:36:03","uploaded":"2025-03-28 07:46:41","revisionof":"","revisedto":"","release":"Rel-19","crspec":28.623,"crspecversion":"19.3.0","workitem":[{"winame":"Data_SREP"}],"crnumber":528.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251505.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"FORGE","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251506","title":"Input to draftCR TS 28.105 Pre-specialized training and Fine-tuning","source":"China Mobile, ZTE","contact":"Sheng GAO","contact-id":102722,"tdoctype":"other","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":61,"ainumber":"6.19.1.1","ainame":"AI\/ML management phase 2","tdoc_agenda_sort_order":15060,"status":"merged","reservation_date":"2025-03-28 06:51:53","uploaded":"2025-03-28 08:27:25","revisionof":"","revisedto":"","release":"Rel-19","crspec":28.105,"crspecversion":"","workitem":[{"winame":"AIML_MGT_Ph2"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251506.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251507","title":"Input to Draft CR Rel-19 CR TS 28.105 Add solution for Pre-specialized training and fine-tuning","source":"China Mobile, ZTE","contact":"Sheng GAO","contact-id":102722,"tdoctype":"other","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":61,"ainumber":"6.19.1.1","ainame":"AI\/ML management phase 2","tdoc_agenda_sort_order":15070,"status":"merged","reservation_date":"2025-03-28 06:53:29","uploaded":"2025-03-28 08:27:25","revisionof":"","revisedto":"","release":"Rel-19","crspec":28.105,"crspecversion":"","workitem":[{"winame":"AIML_MGT_Ph2"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251507.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251508","title":"Rel-19 DP Handling of un-reported usage information after failure","source":"Ericsson","contact":"Robert T\u00f6rnkvist","contact-id":35172,"tdoctype":"discussion","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":99,"ainumber":"7.3","ainame":"Charging Maintenance and Rel-19 Charging small enhancements","tdoc_agenda_sort_order":15080,"status":"noted","reservation_date":"2025-03-28 07:07:18","uploaded":"2025-03-28 17:09:21","revisionof":"","revisedto":"","release":"Rel-19","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251508.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251509","title":"Rel-19 CR 32.291 Addition of domain features","source":"Ericsson","contact":"Robert T\u00f6rnkvist","contact-id":35172,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 3\/28\/2025. Original source : Ericsson","agenda_item_sort_order":101,"ainumber":"7.4.1","ainame":"CHF Segmentation","tdoc_agenda_sort_order":15090,"status":"revised","reservation_date":"2025-03-28 07:07:18","uploaded":"2025-03-28 17:09:21","revisionof":"","revisedto":"S5-251802","release":"Rel-19","crspec":32.291,"crspecversion":"19.2.0","workitem":[{"winame":"CHFSeg"}],"crnumber":619.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251509.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"6.1.8","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251510","title":"Rel-19 CR 32.274 Addition of charging characteristics","source":"Ericsson","contact":"Robert T\u00f6rnkvist","contact-id":35172,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":101,"ainumber":"7.4.1","ainame":"CHF Segmentation","tdoc_agenda_sort_order":15100,"status":"revised","reservation_date":"2025-03-28 07:07:19","uploaded":"2025-03-28 17:09:21","revisionof":"","revisedto":"S5-251803","release":"Rel-19","crspec":32.274,"crspecversion":"18.1.0","workitem":[{"winame":"CHFSeg"}],"crnumber":91.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251510.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251511","title":"Rel-19 DP Charging architecture considerations for CAPIF","source":"Ericsson","contact":"Robert T\u00f6rnkvist","contact-id":35172,"tdoctype":"discussion","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":107,"ainumber":"7.4.7","ainame":"Charging aspects of CAPIF","tdoc_agenda_sort_order":15110,"status":"noted","reservation_date":"2025-03-28 07:07:20","uploaded":"2025-03-28 17:09:21","revisionof":"","revisedto":"","release":"Rel-19","crspec":"","crspecversion":"","workitem":[{"winame":"CH_CAPIF_EXT"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251511.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251512","title":"Rel-19 CR 32.254 Addition of charging architecture for CAPIF","source":"Ericsson","contact":"Robert T\u00f6rnkvist","contact-id":35172,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 3\/28\/2025. Original source : Ericsson","agenda_item_sort_order":107,"ainumber":"7.4.7","ainame":"Charging aspects of CAPIF","tdoc_agenda_sort_order":15120,"status":"revised","reservation_date":"2025-03-28 07:07:20","uploaded":"2025-03-28 17:09:21","revisionof":"","revisedto":"S5-251816","release":"Rel-19","crspec":32.254,"crspecversion":"19.0.0","workitem":[{"winame":"CH_CAPIF_EXT"}],"crnumber":62.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251512.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"3.3 and 4.4","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251513","title":"Rel-19 CR 32.254 Addition of charging principles for CAPIF","source":"Ericsson","contact":"Robert T\u00f6rnkvist","contact-id":35172,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 3\/28\/2025. Original source : Ericsson","agenda_item_sort_order":107,"ainumber":"7.4.7","ainame":"Charging aspects of CAPIF","tdoc_agenda_sort_order":15130,"status":"revised","reservation_date":"2025-03-28 07:07:21","uploaded":"2025-03-28 17:09:21","revisionof":"","revisedto":"S5-251817","release":"Rel-19","crspec":32.254,"crspecversion":"19.0.0","workitem":[{"winame":"CH_CAPIF_EXT"}],"crnumber":63.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251513.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"2, 5.1.0, and 5.x.1 (new)","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251514","title":"Rel-19 DP Format of user identity","source":"Ericsson","contact":"Robert T\u00f6rnkvist","contact-id":35172,"tdoctype":"discussion","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":109,"ainumber":"7.4.9","ainame":"Charging for Uncrewed Aerial Systems Phase 2","tdoc_agenda_sort_order":15140,"status":"noted","reservation_date":"2025-03-28 07:07:21","uploaded":"2025-03-28 17:09:21","revisionof":"","revisedto":"","release":"Rel-19","crspec":"","crspecversion":"","workitem":[{"winame":"UAS_Ph3-CH"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251514.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251515","title":"Rel-19 CR 32.255 Addition of user identifiers","source":"Ericsson","contact":"Robert T\u00f6rnkvist","contact-id":35172,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 3\/28\/2025. Original source : Ericsson","agenda_item_sort_order":109,"ainumber":"7.4.9","ainame":"Charging for Uncrewed Aerial Systems Phase 2","tdoc_agenda_sort_order":15150,"status":"not pursued","reservation_date":"2025-03-28 07:07:21","uploaded":"2025-03-28 17:09:21","revisionof":"","revisedto":"","release":"Rel-19","crspec":32.255,"crspecversion":"19.1.0","workitem":[{"winame":"UAS_Ph3-CH"}],"crnumber":577.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251515.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"6.2.1.2","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251516","title":"Rel-19 CR 32.271 Addition of LCS architecture","source":"Ericsson","contact":"Robert T\u00f6rnkvist","contact-id":35172,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 3\/28\/2025. Original source : Ericsson","agenda_item_sort_order":110,"ainumber":"7.4.","ainame":"Charging Aspects of 5GC LoCation Services","tdoc_agenda_sort_order":15160,"status":"revised","reservation_date":"2025-03-28 07:07:22","uploaded":"2025-03-28 17:09:21","revisionof":"","revisedto":"S5-251831","release":"Rel-19","crspec":32.271,"crspecversion":"19.1.0","workitem":[{"winame":"CH_5G_eLCS_Ph3"}],"crnumber":35.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251516.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"4.1.2 and 4.1.x (new)","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251517","title":"Rel-19 CR 32.271 Addition of charging architecture for LCS","source":"Ericsson","contact":"Robert T\u00f6rnkvist","contact-id":35172,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 3\/28\/2025. Original source : Ericsson","agenda_item_sort_order":110,"ainumber":"7.4.","ainame":"Charging Aspects of 5GC LoCation Services","tdoc_agenda_sort_order":15170,"status":"merged","reservation_date":"2025-03-28 07:07:23","uploaded":"2025-03-28 17:09:21","revisionof":"","revisedto":"","release":"Rel-19","crspec":32.271,"crspecversion":"19.1.0","workitem":[{"winame":"CH_5G_eLCS_Ph3"}],"crnumber":36.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251517.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"4.4","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251518","title":"Rel-19 CR 32.271 Addition of charging principles for LCS","source":"Ericsson","contact":"Robert T\u00f6rnkvist","contact-id":35172,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 3\/28\/2025. Original source : Ericsson","agenda_item_sort_order":110,"ainumber":"7.4.","ainame":"Charging Aspects of 5GC LoCation Services","tdoc_agenda_sort_order":15180,"status":"merged","reservation_date":"2025-03-28 07:07:24","uploaded":"2025-03-28 17:09:21","revisionof":"","revisedto":"","release":"Rel-19","crspec":32.271,"crspecversion":"19.1.0","workitem":[{"winame":"CH_5G_eLCS_Ph3"}],"crnumber":37.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251518.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"5.1, 5.4.1.1, and 5.4.1.2.1","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251519","title":"Rel-19 CR 32.240 Addition of MOCN network sharing","source":"Ericsson","contact":"Robert T\u00f6rnkvist","contact-id":35172,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 3\/28\/2025. Original source : Ericsson","agenda_item_sort_order":112,"ainumber":"7.4.12","ainame":"Charging aspects for Multi-Operator Core Network (MOCN) network sharing","tdoc_agenda_sort_order":15190,"status":"revised","reservation_date":"2025-03-28 07:07:25","uploaded":"2025-03-28 17:09:21","revisionof":"","revisedto":"S5-251842","release":"Rel-19","crspec":32.24,"crspecversion":"19.2.0","workitem":[{"winame":"CH_MOCN_NetShare"}],"crnumber":514.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251519.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"2 and 6.7.1","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251520","title":"Rel-19 CR 32.255 Addition of architecture for MOCN","source":"Ericsson","contact":"Robert T\u00f6rnkvist","contact-id":35172,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 3\/28\/2025. Original source : Ericsson","agenda_item_sort_order":112,"ainumber":"7.4.12","ainame":"Charging aspects for Multi-Operator Core Network (MOCN) network sharing","tdoc_agenda_sort_order":15200,"status":"revised","reservation_date":"2025-03-28 07:07:25","uploaded":"2025-03-28 17:09:21","revisionof":"","revisedto":"S5-251843","release":"Rel-19","crspec":32.255,"crspecversion":"19.1.0","workitem":[{"winame":"CH_MOCN_NetShare"},{"winame":" NetShare_CH"}],"crnumber":578.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251520.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"2 and 4.1.x","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251521","title":"Rel-19 CR 32.256 Addition of architecture for network sharing","source":"Ericsson","contact":"Robert T\u00f6rnkvist","contact-id":35172,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 3\/28\/2025. Original source : Ericsson","agenda_item_sort_order":112,"ainumber":"7.4.12","ainame":"Charging aspects for Multi-Operator Core Network (MOCN) network sharing","tdoc_agenda_sort_order":15210,"status":"revised","reservation_date":"2025-03-28 07:07:26","uploaded":"2025-03-28 17:09:21","revisionof":"","revisedto":"S5-251846","release":"Rel-19","crspec":32.256,"crspecversion":"19.1.0","workitem":[{"winame":"CH_MOCN_NetShare"},{"winame":" NetShare_CH"}],"crnumber":48.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251521.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"4.1.x (new)","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251522","title":"Rel-19 CR 32.255 Addition of charging architecture for MOCN","source":"Ericsson","contact":"Robert T\u00f6rnkvist","contact-id":35172,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 3\/28\/2025. Original source : Ericsson","agenda_item_sort_order":112,"ainumber":"7.4.12","ainame":"Charging aspects for Multi-Operator Core Network (MOCN) network sharing","tdoc_agenda_sort_order":15220,"status":"revised","reservation_date":"2025-03-28 07:07:27","uploaded":"2025-03-28 17:09:21","revisionof":"","revisedto":"S5-251844","release":"Rel-19","crspec":32.255,"crspecversion":"19.1.0","workitem":[{"winame":"CH_MOCN_NetShare"}],"crnumber":579.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251522.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"4.x (new)","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251523","title":"Rel-19 CR 32.255 Addition of charging requirements for MOCN","source":"Ericsson","contact":"Robert T\u00f6rnkvist","contact-id":35172,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Title modified on 3\/28\/2025. Original title : Rel-19 CR 32.255 Addition of charging requirement for MOCN<br\/><br\/>Source modified on 3\/28\/2025. Original source : Ericsson","agenda_item_sort_order":112,"ainumber":"7.4.12","ainame":"Charging aspects for Multi-Operator Core Network (MOCN) network sharing","tdoc_agenda_sort_order":15230,"status":"revised","reservation_date":"2025-03-28 07:07:28","uploaded":"2025-03-28 17:09:21","revisionof":"","revisedto":"S5-251845","release":"Rel-19","crspec":32.255,"crspecversion":"19.1.0","workitem":[{"winame":"CH_MOCN_NetShare"}],"crnumber":580.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251523.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"2, 5.1.1, and 5.1.2","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251524","title":"Rel-19 CR TS 32.422 Introduction of new Trace Depth \u201cMicro\u201d for Optimised Tracing","source":"Jio Platforms Ltd (JPL)","contact":"Amit Kushwaha","contact-id":101969,"tdoctype":"CR","for":"Approval","abstract":"","secretary_remarks":"Title modified on 3\/28\/2025. Original title : Introduction of new Trace Depth \u201cMicro\u201d for Optimised Tracing<br\/><br\/>Source modified on 3\/28\/2025. Original source : Jio Platforms Ltd (JPL)<br\/><br\/>Source modified on 28\/03\/2025. Original source : Jio Plat","agenda_item_sort_order":78,"ainumber":"6.19.11.1","ainame":"Data management regarding subscriptions and reporting","tdoc_agenda_sort_order":15240,"status":"not pursued","reservation_date":"2025-03-28 07:12:35","uploaded":"2025-03-28 07:21:18","revisionof":"","revisedto":"","release":"Rel-19","crspec":32.422,"crspecversion":"19.2.0","workitem":[{"winame":"Data_SREP"}],"crnumber":514.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251524.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"5.3, 5.5","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251525","title":"Rel-19 CR TS 32.423 Introduction of Summary Code in Trace Record Header for Optimised Tracing","source":"Jio Platforms Ltd (JPL)","contact":"Navas Nk Njarakkadavath","contact-id":110013,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Title modified on 3\/28\/2025. Original title : Introduction of Summary Code in Trace Record Header for Optimised Tracing<br\/><br\/>Source modified on 3\/28\/2025. Original source : Jio Platforms Ltd (JPL)","agenda_item_sort_order":81,"ainumber":"6.19.14","ainame":"Subscriber and Equipment Trace and QoE collection management","tdoc_agenda_sort_order":15250,"status":"not pursued","reservation_date":"2025-03-28 07:12:52","uploaded":"2025-03-28 07:24:36","revisionof":"","revisedto":"","release":"Rel-19","crspec":32.423,"crspecversion":"19.2.0","workitem":[{"winame":"TraceQoE_OAM"}],"crnumber":204.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251525.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"5.2.2","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251526","title":"Rel-19 CR 28.851 Addressing editHelp comments","source":"China Mobile","contact":"Ai Chen","contact-id":80296,"tdoctype":"CR","for":"Approval","abstract":"","secretary_remarks":"Source modified on 3\/28\/2025. Original source : China Mobile","agenda_item_sort_order":99,"ainumber":"7.3","ainame":"Charging Maintenance and Rel-19 Charging small enhancements","tdoc_agenda_sort_order":15260,"status":"revised","reservation_date":"2025-03-28 07:21:30","uploaded":"2025-03-28 07:29:30","revisionof":"","revisedto":"S5-251851","release":"Rel-19","crspec":28.851,"crspecversion":"19.0.0","workitem":[{"winame":"TEI19"}],"crnumber":2.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251526.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251527","title":"Rel-19 pCR 28.567 Triggered CCL UC and Requirements","source":"Samsung R&D Institute UK","contact":"Deepanshu Gautam","contact-id":81664,"tdoctype":"pCR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":67,"ainumber":"6.19.4.1","ainame":"Closed Control Loop Management","tdoc_agenda_sort_order":15270,"status":"revised","reservation_date":"2025-03-28 07:28:31","uploaded":"2025-03-28 19:20:20","revisionof":"","revisedto":"S5-251904","release":"Rel-19","crspec":28.567,"crspecversion":"0.1.0","workitem":[{"winame":"CCLM"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251527.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251528","title":"CR 28.657 Add requirements for SnF support","source":"Samsung R&D Institute UK","contact":"Deepanshu Gautam","contact-id":81664,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 3\/28\/2025. Original source : Samsung R&D Institute UK","agenda_item_sort_order":83,"ainumber":"6.19.15.1","ainame":"Management Aspects of NTN Phase 2","tdoc_agenda_sort_order":15280,"status":"revised","reservation_date":"2025-03-28 07:32:37","uploaded":"2025-03-28 19:20:20","revisionof":"","revisedto":"S5-251986","release":"Rel-19","crspec":28.657,"crspecversion":"18.0.0","workitem":[{"winame":"NTN_OAM_Ph2"}],"crnumber":10.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251528.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"4.2","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251529","title":"Revised WID on Management Aspects of NTN Phase 2","source":"Samsung R&D Institute UK","contact":"Deepanshu Gautam","contact-id":81664,"tdoctype":"WID revised","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":18,"ainumber":"6.2.3","ainame":"Support of New Services","tdoc_agenda_sort_order":15290,"status":"merged","reservation_date":"2025-03-28 07:40:52","uploaded":"2025-03-28 19:20:20","revisionof":"","revisedto":"","release":"Rel-19","crspec":"","crspecversion":"","workitem":[{"winame":"NTN_OAM_Ph2"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251529.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251530","title":"Rel-19 InputToDraftCR 28.105 solution for Impact management","source":"Samsung R&D Institute UK","contact":"Deepanshu Gautam","contact-id":81664,"tdoctype":"other","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":61,"ainumber":"6.19.1.1","ainame":"AI\/ML management phase 2","tdoc_agenda_sort_order":15300,"status":"revised","reservation_date":"2025-03-28 07:46:44","uploaded":"2025-03-28 19:20:20","revisionof":"","revisedto":"S5-252108","release":"Rel-19","crspec":28.105,"crspecversion":"","workitem":[{"winame":"AIML_MGT_Ph2"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251530.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251531","title":"Correction of reference","source":"China Mobile Com. Corporation","contact":"Jia Dong","contact-id":76893,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Title modified on 3\/28\/2025. Original title : Rel-19 CR 28.853 Correction of reference<br\/><br\/>Source modified on 3\/28\/2025. Original source : China Mobile Com. Corporation","agenda_item_sort_order":99,"ainumber":"7.3","ainame":"Charging Maintenance and Rel-19 Charging small enhancements","tdoc_agenda_sort_order":15310,"status":"revised","reservation_date":"2025-03-28 07:47:07","uploaded":"2025-03-28 10:23:29","revisionof":"","revisedto":"S5-251852","release":"Rel-19","crspec":28.853,"crspecversion":"19.0.0","workitem":[{"winame":"TEI19"}],"crnumber":1.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251531.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"2,5.1.4.3.1","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251532","title":"Rel-19 CR TS 28.312 Add use case and requirement for intent related intents","source":"NTT DOCOMO","contact":"Hiroaki Ishii","contact-id":106439,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 3\/28\/2025. Original source : NTT DOCOMO","agenda_item_sort_order":65,"ainumber":"6.19.3.1","ainame":"Intent driven management services for mobile network phase 3","tdoc_agenda_sort_order":15320,"status":"not pursued","reservation_date":"2025-03-28 07:47:42","uploaded":"2025-03-28 07:57:50","revisionof":"","revisedto":"","release":"Rel-19","crspec":28.312,"crspecversion":"19.1.0","workitem":[{"winame":"IDMS_MN_Ph3"}],"crnumber":328.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251532.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"5.1","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251533","title":"Revised WID on Charging for Uncrewed Aerial Systems Phase 3","source":"China Mobile Com. Corporation","contact":"Jia Dong","contact-id":76893,"tdoctype":"WID revised","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":98,"ainumber":"7.2","ainame":"New Charging Study\/Work Item proposals","tdoc_agenda_sort_order":15330,"status":"revised","reservation_date":"2025-03-28 07:52:03","uploaded":"2025-03-28 10:23:29","revisionof":"","revisedto":"S5-251801","release":"Rel-19","crspec":"","crspecversion":"","workitem":[{"winame":"UAS_Ph3-CH"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251533.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251534","title":"Rel-19 CR TS 28.312 Add an example to support intent report based on condition","source":"Huawei","contact":"Ruiyue Xu","contact-id":61969,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 3\/28\/2025. Original source : Huawei","agenda_item_sort_order":65,"ainumber":"6.19.3.1","ainame":"Intent driven management services for mobile network phase 3","tdoc_agenda_sort_order":15340,"status":"revised","reservation_date":"2025-03-28 07:54:37","uploaded":"2025-03-28 10:24:12","revisionof":"","revisedto":"S5-251923","release":"Rel-19","crspec":28.312,"crspecversion":"19.1.0","workitem":[{"winame":"IDMS_MN_Ph3"}],"crnumber":329.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251534.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":false,"clauses_affected":"5.3.2.1","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251535","title":"Discussion paper on objective for UAS_Ph3-CH","source":"China Mobile Com. Corporation","contact":"Jia Dong","contact-id":76893,"tdoctype":"discussion","for":"Discussion","abstract":"","secretary_remarks":"","agenda_item_sort_order":98,"ainumber":"7.2","ainame":"New Charging Study\/Work Item proposals","tdoc_agenda_sort_order":15350,"status":"noted","reservation_date":"2025-03-28 07:54:47","uploaded":"2025-03-28 10:23:29","revisionof":"","revisedto":"","release":"Rel-19","crspec":"","crspecversion":"","workitem":[{"winame":"UAS_Ph3-CH"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251535.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251536","title":"pCR TS 28.567 Add use case and requirements for network performance problem recovery","source":"Huawei, Deutsche Telekom","contact":"Ruiyue Xu","contact-id":61969,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":67,"ainumber":"6.19.4.1","ainame":"Closed Control Loop Management","tdoc_agenda_sort_order":15360,"status":"revised","reservation_date":"2025-03-28 07:57:30","uploaded":"2025-03-28 10:24:12","revisionof":"","revisedto":"S5-251912","release":"Rel-19","crspec":28.567,"crspecversion":"0.1.0","workitem":[{"winame":"CCLM"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251536.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251537","title":"pCR TR 28.869 Add potential solution for VNF configuration management","source":"Huawei, Deutsche Telekom, Ericsson, Nokia","contact":"Ruiyue Xu","contact-id":61969,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":70,"ainumber":"6.19.6","ainame":"Study on Cloud Aspects of Management and Orchestration","tdoc_agenda_sort_order":15370,"status":"revised","reservation_date":"2025-03-28 08:00:41","uploaded":"2025-03-28 10:24:12","revisionof":"","revisedto":"S5-251889","release":"Rel-19","crspec":28.869,"crspecversion":"1.3.0","workitem":[{"winame":"FS_Cloud_OAM"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251537.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251538","title":"Rel-19 pCR 28.561 adding requirement of network issue inducement capability","source":"NTT DOCOMO, SK Telecom","contact":"Ryoji Tamura","contact-id":102838,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":69,"ainumber":"6.19.5.1","ainame":"Management aspects of Network Digital Twins","tdoc_agenda_sort_order":15380,"status":"merged","reservation_date":"2025-03-28 08:04:57","uploaded":"2025-03-28 08:14:23","revisionof":"","revisedto":"","release":"Rel-19","crspec":28.561,"crspecversion":"0.1.0","workitem":[{"winame":"NDT"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251538.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251539","title":"Rel-19 CR 28.104 software upgrade validation","source":"Samsung R&D Institute UK","contact":"Deepanshu Gautam","contact-id":81664,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 3\/28\/2025. Original source : Samsung R&D Institute UK","agenda_item_sort_order":63,"ainumber":"6.19.2.1","ainame":"Management Data Analytics phase 3","tdoc_agenda_sort_order":15390,"status":"revised","reservation_date":"2025-03-28 08:05:15","uploaded":"2025-03-28 19:20:20","revisionof":"","revisedto":"S5-251885","release":"Rel-19","crspec":28.104,"crspecversion":"19.1.0","workitem":[{"winame":"eMDAS_Ph3"}],"crnumber":202.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251539.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":false,"clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251540","title":"Rel-19 pCR 28.561 NDT overview","source":"NTT DOCOMO, SK Telecom","contact":"Ryoji Tamura","contact-id":102838,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":69,"ainumber":"6.19.5.1","ainame":"Management aspects of Network Digital Twins","tdoc_agenda_sort_order":15400,"status":"merged","reservation_date":"2025-03-28 08:06:25","uploaded":"2025-03-28 08:14:23","revisionof":"","revisedto":"","release":"Rel-19","crspec":28.561,"crspecversion":"0.1.0","workitem":[{"winame":"NDT"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251540.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251541","title":"Rel-19 InputToDraftCR 28.105 RL UC and Requirements","source":"Samsung R&D Institute UK","contact":"Deepanshu Gautam","contact-id":81664,"tdoctype":"other","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":61,"ainumber":"6.19.1.1","ainame":"AI\/ML management phase 2","tdoc_agenda_sort_order":15410,"status":"revised","reservation_date":"2025-03-28 08:10:26","uploaded":"2025-03-28 19:20:20","revisionof":"","revisedto":"S5-251787","release":"Rel-19","crspec":28.105,"crspecversion":"","workitem":[{"winame":"AIML_MGT_Ph2"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251541.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251542","title":"Rel-19 CR 28.561 NDT Inducement Requirements","source":"Samsung R&D Institute UK","contact":"Deepanshu Gautam","contact-id":81664,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":69,"ainumber":"6.19.5.1","ainame":"Management aspects of Network Digital Twins","tdoc_agenda_sort_order":15420,"status":"merged","reservation_date":"2025-03-28 08:14:58","uploaded":"2025-03-28 19:20:20","revisionof":"","revisedto":"","release":"Rel-19","crspec":28.561,"crspecversion":"0.1.0","workitem":[{"winame":"NDT"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251542.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251543","title":"Rel 18 CR TS 28.532 correct the format of scope parameter to align with stage3","source":"HUAWEI","contact":"xiaoli Shi","contact-id":84838,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Title modified on 3\/28\/2025. Original title : Rel 18 CR TS 28.532 correct the scope operation parameter in stage 3<br\/><br\/>Source modified on 3\/28\/2025. Original source : Huawei","agenda_item_sort_order":37,"ainumber":"6.4.5","ainame":"Service based management architecture","tdoc_agenda_sort_order":15430,"status":"revised","reservation_date":"2025-03-28 08:26:53","uploaded":"2025-03-28 09:23:11","revisionof":"","revisedto":"S5-252066","release":"Rel-18","crspec":28.532,"crspecversion":"18.6.0","workitem":[{"winame":"eSBMA"}],"crnumber":377.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251543.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"11.1.1.2.2, 11.1.1.3.2, 11.1.1.4.2, 11.1.1.4.3, 12.1.3.1.3, 12.1.3.1.4, 12.1.3.1.5","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251544","title":"Rel 19 CR TS 28.532 correct the scope operation parameter in stage 3","source":"Huawei","contact":"xiaoli Shi","contact-id":84838,"tdoctype":"CR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":37,"ainumber":"6.4.5","ainame":"Service based management architecture","tdoc_agenda_sort_order":15440,"status":"revised","reservation_date":"2025-03-28 08:27:04","uploaded":"2025-03-28 09:23:11","revisionof":"","revisedto":"S5-252067","release":"Rel-19","crspec":28.532,"crspecversion":"19.0.0","workitem":[{"winame":"eSBMA"}],"crnumber":378.0,"crrevision":"","crcategory":"A","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251544.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251545","title":"Rel-19 InputToDraftCR TS 28.105 enhance the description for managing AIML based capabilities","source":"Huawei","contact":"xiaoli Shi","contact-id":84838,"tdoctype":"other","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":61,"ainumber":"6.19.1.1","ainame":"AI\/ML management phase 2","tdoc_agenda_sort_order":15450,"status":"not treated","reservation_date":"2025-03-28 08:27:05","uploaded":"2025-03-28 09:23:11","revisionof":"","revisedto":"","release":"Rel-19","crspec":28.105,"crspecversion":"","workitem":[{"winame":"AIML_MGT_Ph2"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251545.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251546","title":"Rel-19 InputToDraftCR TS 28.105 add procedure of management of AIML capabilities for NG-RAN and MDA","source":"Huawei","contact":"xiaoli Shi","contact-id":84838,"tdoctype":"other","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":61,"ainumber":"6.19.1.1","ainame":"AI\/ML management phase 2","tdoc_agenda_sort_order":15460,"status":"not treated","reservation_date":"2025-03-28 08:27:05","uploaded":"2025-03-28 09:23:11","revisionof":"","revisedto":"","release":"Rel-19","crspec":28.105,"crspecversion":"","workitem":[{"winame":"AIML_MGT_Ph2"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251546.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251547","title":"Rel-19 InputToDraftCR TS 28.105 Update the description for managing ML models in use in a live network","source":"Huawei","contact":"xiaoli Shi","contact-id":84838,"tdoctype":"other","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":61,"ainumber":"6.19.1.1","ainame":"AI\/ML management phase 2","tdoc_agenda_sort_order":15470,"status":"revised","reservation_date":"2025-03-28 08:27:05","uploaded":"2025-03-28 09:23:11","revisionof":"","revisedto":"S5-252046","release":"Rel-19","crspec":28.105,"crspecversion":"","workitem":[{"winame":"AIML_MGT_Ph2"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251547.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251548","title":"Rel-19 InputToDraftCR TS 28.105 add solution for exploration in reinforcement learning","source":"Huawei","contact":"xiaoli Shi","contact-id":84838,"tdoctype":"other","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":61,"ainumber":"6.19.1.1","ainame":"AI\/ML management phase 2","tdoc_agenda_sort_order":15480,"status":"revised","reservation_date":"2025-03-28 08:27:05","uploaded":"2025-03-28 09:23:11","revisionof":"","revisedto":"S5-252040","release":"Rel-19","crspec":28.105,"crspecversion":"","workitem":[{"winame":"AIML_MGT_Ph2"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251548.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251549","title":"Rel-19 InputToDraftCR TS 28.105 Add use case and requirements for reinforcement learning conflict management","source":"Huawei","contact":"xiaoli Shi","contact-id":84838,"tdoctype":"other","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":61,"ainumber":"6.19.1.1","ainame":"AI\/ML management phase 2","tdoc_agenda_sort_order":15490,"status":"revised","reservation_date":"2025-03-28 08:27:05","uploaded":"2025-03-28 09:23:11","revisionof":"","revisedto":"S5-251786","release":"Rel-19","crspec":28.105,"crspecversion":"","workitem":[{"winame":"AIML_MGT_Ph2"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251549.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251550","title":"Rel-19 InputToDraftCR TS 28.105 Add solutions of training conflict management for reinforcement learning","source":"Huawei","contact":"xiaoli Shi","contact-id":84838,"tdoctype":"other","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":61,"ainumber":"6.19.1.1","ainame":"AI\/ML management phase 2","tdoc_agenda_sort_order":15500,"status":"not treated","reservation_date":"2025-03-28 08:27:05","uploaded":"2025-03-28 09:23:11","revisionof":"","revisedto":"","release":"Rel-19","crspec":28.105,"crspecversion":"","workitem":[{"winame":"AIML_MGT_Ph2"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251550.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251551","title":"Rel-19 InputToDraftCR TS 28.105 add use case for Management of Local explanation in AIML inference","source":"Huawei","contact":"xiaoli Shi","contact-id":84838,"tdoctype":"other","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":61,"ainumber":"6.19.1.1","ainame":"AI\/ML management phase 2","tdoc_agenda_sort_order":15510,"status":"revised","reservation_date":"2025-03-28 08:27:05","uploaded":"2025-03-28 09:23:11","revisionof":"","revisedto":"S5-252047","release":"Rel-19","crspec":28.105,"crspecversion":"","workitem":[{"winame":"AIML_MGT_Ph2"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251551.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251552","title":"Rel-19 InputToDraftCR TS 28.105 add solution for Management of Local explanation in AIML inference","source":"Huawei","contact":"xiaoli Shi","contact-id":84838,"tdoctype":"other","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":61,"ainumber":"6.19.1.1","ainame":"AI\/ML management phase 2","tdoc_agenda_sort_order":15520,"status":"not treated","reservation_date":"2025-03-28 08:27:05","uploaded":"2025-03-28 09:23:11","revisionof":"","revisedto":"","release":"Rel-19","crspec":28.105,"crspecversion":"","workitem":[{"winame":"AIML_MGT_Ph2"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251552.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251553","title":"Rel-19 InputToDraftCR TS 28.105 update the ML model lifecycle management capabilities","source":"Huawei","contact":"xiaoli Shi","contact-id":84838,"tdoctype":"other","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":61,"ainumber":"6.19.1.1","ainame":"AI\/ML management phase 2","tdoc_agenda_sort_order":15530,"status":"not treated","reservation_date":"2025-03-28 08:27:05","uploaded":"2025-03-28 09:23:11","revisionof":"","revisedto":"","release":"Rel-19","crspec":28.105,"crspecversion":"","workitem":[{"winame":"AIML_MGT_Ph2"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251553.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251554","title":"Rel-19 CR TS 28.104 update MDA type for UE throughput anlaysis","source":"Huawei","contact":"xiaoli Shi","contact-id":84838,"tdoctype":"CR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":63,"ainumber":"6.19.2.1","ainame":"Management Data Analytics phase 3","tdoc_agenda_sort_order":15540,"status":"revised","reservation_date":"2025-03-28 08:27:05","uploaded":"2025-03-28 09:23:11","revisionof":"","revisedto":"S5-251880","release":"Rel-19","crspec":28.104,"crspecversion":"19.1.0","workitem":[{"winame":"eMDAS_Ph3"}],"crnumber":203.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251554.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251555","title":"Rel-19 CR TS 28.104 add stage3 solution for mobility performance analysis","source":"Huawei, Samsung","contact":"xiaoli Shi","contact-id":84838,"tdoctype":"CR","for":"Approval","abstract":"","secretary_remarks":"Source modified on 3\/28\/2025. Original source : Huawei, Samsung","agenda_item_sort_order":63,"ainumber":"6.19.2.1","ainame":"Management Data Analytics phase 3","tdoc_agenda_sort_order":15550,"status":"not pursued","reservation_date":"2025-03-28 08:27:06","uploaded":"2025-03-28 09:23:11","revisionof":"","revisedto":"","release":"Rel-19","crspec":28.104,"crspecversion":"19.1.0","workitem":[{"winame":"eMDAS_Ph3"}],"crnumber":204.0,"crrevision":"","crcategory":"C","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251555.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"MdaReport.yaml","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251556","title":"Rel-19 CR TS 28.540 Add new requirements for management of NTN","source":"China Unicom","contact":"Mingrui Sun","contact-id":89325,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Title modified on 3\/28\/2025. Original title : Rel-19 CR TS 28.540 Add new requirements for NTN management<br\/><br\/>Source modified on 3\/28\/2025. Original source : China Unicom","agenda_item_sort_order":83,"ainumber":"6.19.15.1","ainame":"Management Aspects of NTN Phase 2","tdoc_agenda_sort_order":15560,"status":"not pursued","reservation_date":"2025-03-28 08:52:17","uploaded":"2025-03-28 12:55:13","revisionof":"","revisedto":"","release":"Rel-19","crspec":28.54,"crspecversion":"19.0.0","workitem":[{"winame":"NTN_OAM_Ph2"}],"crnumber":34.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251556.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"5.9.x","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251557","title":"Rel-19 CR 28.541 Add control attribute for LTM cell switch","source":"Ericsson","contact":"Per Elmdahl","contact-id":82789,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 3\/28\/2025. Original source : Ericsson France S.A.S","agenda_item_sort_order":59,"ainumber":"6.4.27","ainame":"OAM Rel-19 small enhancements","tdoc_agenda_sort_order":15570,"status":"revised","reservation_date":"2025-03-28 08:58:49","uploaded":"2025-03-28 11:57:04","revisionof":"","revisedto":"S5-252095","release":"Rel-19","crspec":28.541,"crspecversion":"19.3.0","workitem":[{"winame":"TEI19"}],"crnumber":1509.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251557.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":false,"clauses_affected":"3.3, 4.3.2.2, 4.3.2.3, 4.4.1, Forge","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251558","title":"New SID Study on intent driven management services for mobile network phase 4","source":"Moderator (Huawei, Ericsson)","contact":"Ruiyue Xu","contact-id":61969,"tdoctype":"SID new","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":12,"ainumber":"5.5","ainame":"Rel-20 topic preparation","tdoc_agenda_sort_order":15580,"status":"revised","reservation_date":"2025-03-28 09:20:19","uploaded":"2025-03-28 14:15:38","revisionof":"","revisedto":"S5-251777","release":"Rel-20","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251558.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251559","title":"Rel-19 CR TS 28.312 Correction on introduction in clause 5.1.9.1","source":"NTT DOCOMO","contact":"Refik Fatih \u00dcstok","contact-id":105939,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 3\/28\/2025. Original source : NTT DOCOMO","agenda_item_sort_order":65,"ainumber":"6.19.3.1","ainame":"Intent driven management services for mobile network phase 3","tdoc_agenda_sort_order":15590,"status":"agreed","reservation_date":"2025-03-28 09:21:16","uploaded":"2025-03-28 09:26:08","revisionof":"","revisedto":"","release":"Rel-19","crspec":28.312,"crspecversion":"19.1.0","workitem":[{"winame":"IDMS_MN_Ph3"}],"crnumber":330.0,"crrevision":"","crcategory":"F","tsg_crp":"SP-250536","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251559.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"5.1.9.1","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251560","title":"R19 pCR TR 28.869 enhance observability requirements (Use case 7)","source":"Orange, AT&T","contact":"Frederic Desnoes","contact-id":107698,"tdoctype":"pCR","for":"Approval","abstract":"The objective of this pCR is to adapt the management functions to the cloud native evolution.\nThis pCR proposes to enhance the requirements for the use case \u201cObservability for Cloud Native Network functions\u201d in TR 28.869 (Study on cloud aspects of managem","secretary_remarks":"","agenda_item_sort_order":70,"ainumber":"6.19.6","ainame":"Study on Cloud Aspects of Management and Orchestration","tdoc_agenda_sort_order":15600,"status":"revised","reservation_date":"2025-03-28 09:36:07","uploaded":"2025-03-28 09:44:46","revisionof":"","revisedto":"S5-251891","release":"Rel-19","crspec":28.869,"crspecversion":"1.3.0","workitem":[{"winame":"FS_Cloud_OAM"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251560.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251561","title":"Rel-18 CR TS 28.557 Update procedure of management of tenant to align with access control solution","source":"Huawei","contact":"Xian Zhao","contact-id":95721,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 3\/28\/2025. Original source : Huawei","agenda_item_sort_order":55,"ainumber":"6.4.23","ainame":"Management of non-public networks phase 2","tdoc_agenda_sort_order":15610,"status":"revised","reservation_date":"2025-03-28 09:59:23","uploaded":"2025-03-28 10:53:13","revisionof":"","revisedto":"S5-252081","release":"Rel-18","crspec":28.557,"crspecversion":"18.3.0","workitem":[{"winame":"OAM_NPN_Ph2"}],"crnumber":16.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251561.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"2, 6.1.3, B.5","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251562","title":"Rel-18 CR TS 28.111 Clarify notifyChangedAlarmGeneral","source":"Huawei, Ericsson","contact":"Xian Zhao","contact-id":95721,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 3\/28\/2025. Original source : Huawei, Ericsson","agenda_item_sort_order":37,"ainumber":"6.4.5","ainame":"Service based management architecture","tdoc_agenda_sort_order":15620,"status":"agreed","reservation_date":"2025-03-28 09:59:24","uploaded":"2025-03-28 10:53:13","revisionof":"","revisedto":"","release":"Rel-18","crspec":28.111,"crspecversion":"18.4.0","workitem":[{"winame":"eSBMA"}],"crnumber":38.0,"crrevision":"","crcategory":"F","tsg_crp":"SP-250531","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251562.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"6.11, 8.4","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251563","title":"Rel-19 CR TS 28.111 Clarify notifyChangedAlarmGeneral","source":"Huawei, Ericsson","contact":"Xian Zhao","contact-id":95721,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 3\/28\/2025. Original source : Huawei, Ericsson","agenda_item_sort_order":37,"ainumber":"6.4.5","ainame":"Service based management architecture","tdoc_agenda_sort_order":15630,"status":"agreed","reservation_date":"2025-03-28 09:59:25","uploaded":"2025-03-28 10:53:13","revisionof":"","revisedto":"","release":"Rel-19","crspec":28.111,"crspecversion":"19.1.0","workitem":[{"winame":"eSBMA"}],"crnumber":39.0,"crrevision":"","crcategory":"A","tsg_crp":"SP-250531","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251563.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"6.11, 8.4","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251564","title":"Rel-18 CR TS 28.111 Add missing ThresholdInfo dataType and related definition","source":"Huawei","contact":"Xian Zhao","contact-id":95721,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 3\/28\/2025. Original source : Huawei","agenda_item_sort_order":37,"ainumber":"6.4.5","ainame":"Service based management architecture","tdoc_agenda_sort_order":15640,"status":"revised","reservation_date":"2025-03-28 09:59:26","uploaded":"2025-03-28 10:53:13","revisionof":"","revisedto":"S5-252068","release":"Rel-18","crspec":28.111,"crspecversion":"18.4.0","workitem":[{"winame":"eSBMA"}],"crnumber":40.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251564.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"7.1, 7.3.X(new), 7.3.Y(new), 7.3.Z(new), 7.4.1","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251565","title":"Rel-19 CR TS 28.111 Add missing ThresholdInfo dataType and related definition","source":"Huawei","contact":"Xian Zhao","contact-id":95721,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 3\/28\/2025. Original source : Huawei","agenda_item_sort_order":37,"ainumber":"6.4.5","ainame":"Service based management architecture","tdoc_agenda_sort_order":15650,"status":"revised","reservation_date":"2025-03-28 09:59:27","uploaded":"2025-03-28 10:53:13","revisionof":"","revisedto":"S5-252069","release":"Rel-19","crspec":28.111,"crspecversion":"19.1.0","workitem":[{"winame":"eSBMA"}],"crnumber":41.0,"crrevision":"","crcategory":"A","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251565.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"7.1, 7.3.X(new), 7.3.Y(new), 7.3.Z(new), 7.4.1","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251566","title":"Pseudo-CR on TS 28.561 Use case of RAN energy saving policy verification","source":"Huawei","contact":"Xian Zhao","contact-id":95721,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":69,"ainumber":"6.19.5.1","ainame":"Management aspects of Network Digital Twins","tdoc_agenda_sort_order":15660,"status":"merged","reservation_date":"2025-03-28 09:59:28","uploaded":"2025-03-28 10:53:13","revisionof":"","revisedto":"","release":"Rel-19","crspec":28.561,"crspecversion":"0.1.0","workitem":[{"winame":"NDT"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251566.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251567","title":"Pseudo-CR on TS 28.561 NDT NRMs","source":"Huawei","contact":"Xian Zhao","contact-id":95721,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":69,"ainumber":"6.19.5.1","ainame":"Management aspects of Network Digital Twins","tdoc_agenda_sort_order":15670,"status":"revised","reservation_date":"2025-03-28 09:59:28","uploaded":"2025-03-28 10:53:13","revisionof":"","revisedto":"S5-252020","release":"Rel-19","crspec":28.561,"crspecversion":"0.1.0","workitem":[{"winame":"NDT"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251567.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251568","title":"Pseudo-CR on TS 28.561 Remove abbreviations in clause 5.1","source":"Huawei","contact":"Xian Zhao","contact-id":95721,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":69,"ainumber":"6.19.5.1","ainame":"Management aspects of Network Digital Twins","tdoc_agenda_sort_order":15680,"status":"noted","reservation_date":"2025-03-28 09:59:28","uploaded":"2025-03-28 10:53:13","revisionof":"","revisedto":"","release":"Rel-19","crspec":28.561,"crspecversion":"0.1.0","workitem":[{"winame":"NDT"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251568.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251569","title":"Pseudo-CR on TS 28.561 Add requirements for NDT supporting data generation","source":"Huawei","contact":"Xian Zhao","contact-id":95721,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":69,"ainumber":"6.19.5.1","ainame":"Management aspects of Network Digital Twins","tdoc_agenda_sort_order":15690,"status":"revised","reservation_date":"2025-03-28 09:59:29","uploaded":"2025-03-28 10:53:13","revisionof":"","revisedto":"S5-251903","release":"Rel-19","crspec":28.561,"crspecversion":"0.1.0","workitem":[{"winame":"NDT"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251569.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251570","title":"Pseudo-CR on TS 28.561 Procedure for consuming NDT capability","source":"Huawei","contact":"Xian Zhao","contact-id":95721,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":69,"ainumber":"6.19.5.1","ainame":"Management aspects of Network Digital Twins","tdoc_agenda_sort_order":15700,"status":"revised","reservation_date":"2025-03-28 09:59:29","uploaded":"2025-03-28 10:53:13","revisionof":"","revisedto":"S5-252021","release":"Rel-19","crspec":28.561,"crspecversion":"0.1.0","workitem":[{"winame":"NDT"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251570.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251571","title":"Pseudo-CR on TR 28.869 Add an example in Annex B","source":"Huawei","contact":"Xian Zhao","contact-id":95721,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":70,"ainumber":"6.19.6","ainame":"Study on Cloud Aspects of Management and Orchestration","tdoc_agenda_sort_order":15710,"status":"revised","reservation_date":"2025-03-28 09:59:29","uploaded":"2025-03-28 10:53:13","revisionof":"","revisedto":"S5-252010","release":"Rel-19","crspec":28.869,"crspecversion":"1.3.0","workitem":[{"winame":"FS_Cloud_OAM"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251571.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251572","title":"Pseudo-CR on TR 28.869 Add conclusion for management data streaming solution based on message bus","source":"Huawei","contact":"Xian Zhao","contact-id":95721,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":70,"ainumber":"6.19.6","ainame":"Study on Cloud Aspects of Management and Orchestration","tdoc_agenda_sort_order":15720,"status":"revised","reservation_date":"2025-03-28 09:59:29","uploaded":"2025-03-28 10:53:13","revisionof":"","revisedto":"S5-252013","release":"Rel-19","crspec":28.869,"crspecversion":"1.3.0","workitem":[{"winame":"FS_Cloud_OAM"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251572.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251573","title":"Rel-19 CR TS 28.540 Add requirements for management of Ambient IoT","source":"Huawei","contact":"Xian Zhao","contact-id":95721,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 3\/28\/2025. Original source : Huawei","agenda_item_sort_order":80,"ainumber":"6.19.13","ainame":"5G Advanced NRM features phase 3","tdoc_agenda_sort_order":15730,"status":"revised","reservation_date":"2025-03-28 09:59:29","uploaded":"2025-03-28 10:53:13","revisionof":"","revisedto":"S5-251970","release":"Rel-19","crspec":28.54,"crspecversion":"19.0.0","workitem":[{"winame":"AdNRM_Ph3"}],"crnumber":35.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251573.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"2, 3.1, 3.2, 5.X (new)","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251574","title":"Rel-19 CR TS 28.541 Add AIOTF and ADM IOC to support management of Ambient IoT","source":"Huawei, China Unicom","contact":"Xian Zhao","contact-id":95721,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 3\/28\/2025. Original source : Huawei","agenda_item_sort_order":80,"ainumber":"6.19.13","ainame":"5G Advanced NRM features phase 3","tdoc_agenda_sort_order":15740,"status":"revised","reservation_date":"2025-03-28 09:59:30","uploaded":"2025-03-28 10:53:13","revisionof":"","revisedto":"S5-251971","release":"Rel-19","crspec":28.541,"crspecversion":"19.3.0","workitem":[{"winame":"AdNRM_Ph3"}],"crnumber":1510.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251574.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"2, 5.2.1.1, 5.2.1.2, 5.3.a (new), 5.3.b (new), Q.1.1, Q.2.1","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251575","title":"Rel-19 CR TS 28.538 Update the procedure 5GC NF Provisioning","source":"Huawei","contact":"Xian Zhao","contact-id":95721,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 3\/28\/2025. Original source : Huawei","agenda_item_sort_order":80,"ainumber":"6.19.13","ainame":"5G Advanced NRM features phase 3","tdoc_agenda_sort_order":15750,"status":"revised","reservation_date":"2025-03-28 09:59:31","uploaded":"2025-03-28 10:53:13","revisionof":"","revisedto":"S5-251968","release":"Rel-19","crspec":28.538,"crspecversion":"19.3.0","workitem":[{"winame":"AdNRM_Ph3"}],"crnumber":109.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251575.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"7.4.3, 7.4.4","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251576","title":"Rel-19 CR TS 28.541 add YAML stage 3 for NTN time based solution","source":"Huawei","contact":"Xian Zhao","contact-id":95721,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 3\/28\/2025. Original source : Huawei","agenda_item_sort_order":83,"ainumber":"6.19.15.1","ainame":"Management Aspects of NTN Phase 2","tdoc_agenda_sort_order":15760,"status":"revised","reservation_date":"2025-03-28 09:59:32","uploaded":"2025-03-28 10:53:13","revisionof":"","revisedto":"S5-252110","release":"Rel-19","crspec":28.541,"crspecversion":"19.3.0","workitem":[{"winame":"NTN_OAM_Ph2"}],"crnumber":1511.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251576.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"4.3.94, 4.3.95Following YAML file normatively defined in the forge are updated- \/OpenAPI\/TS28541_NrNrm.yaml","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251577","title":"Rel-19 CR TS 28.312 Correction on introduction for intent fulfilment feasibility check","source":"NTT DOCOMO","contact":"Refik Fatih \u00dcstok","contact-id":105939,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 3\/28\/2025. Original source : NTT DOCOMO","agenda_item_sort_order":65,"ainumber":"6.19.3.1","ainame":"Intent driven management services for mobile network phase 3","tdoc_agenda_sort_order":15770,"status":"revised","reservation_date":"2025-03-28 10:01:05","uploaded":"2025-03-28 10:04:17","revisionof":"","revisedto":"S5-251920","release":"Rel-19","crspec":28.312,"crspecversion":"19.1.0","workitem":[{"winame":"IDMS_MN_Ph3"}],"crnumber":331.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251577.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"5.3.3.1","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251578","title":"pCR Add evaluation for solutions in clause 5.2.1.3","source":"China Mobile,NTT DOCOMO","contact":"guangjing cao","contact-id":92523,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":70,"ainumber":"6.19.6","ainame":"Study on Cloud Aspects of Management and Orchestration","tdoc_agenda_sort_order":15780,"status":"revised","reservation_date":"2025-03-28 10:29:15","uploaded":"2025-03-28 14:21:44","revisionof":"","revisedto":"S5-251892","release":"Rel-19","crspec":28.869,"crspecversion":"1.3.0","workitem":[{"winame":"FS_Cloud_OAM"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251578.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251579","title":"pCR Add solution and evaluation statement for usecase Placement of cloud native NFs","source":"China Mobile","contact":"guangjing cao","contact-id":92523,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":70,"ainumber":"6.19.6","ainame":"Study on Cloud Aspects of Management and Orchestration","tdoc_agenda_sort_order":15790,"status":"approved","reservation_date":"2025-03-28 10:31:17","uploaded":"2025-03-28 14:21:44","revisionof":"","revisedto":"","release":"Rel-19","crspec":28.869,"crspecversion":"1.3.0","workitem":[{"winame":"FS_Cloud_OAM"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251579.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251580","title":"Update Business roles for Support of Satellite charging","source":"CSCN, CATT","contact":"Hong Xiao","contact-id":104085,"tdoctype":"CR","for":"Agreement","abstract":"Update Business roles for Support of Satellite charging","secretary_remarks":"Title modified on 3\/28\/2025. Original title : Rel-19 CR 32.255 Update Business roles for Support of Satellite charging<br\/><br\/>Source modified on 3\/28\/2025. Original source : CSCN, CATT","agenda_item_sort_order":106,"ainumber":"7.4.6","ainame":"Charging aspects of satellite access Phase 3","tdoc_agenda_sort_order":15800,"status":"agreed","reservation_date":"2025-03-28 10:32:07","uploaded":"2025-03-28 12:36:50","revisionof":"","revisedto":"","release":"Rel-19","crspec":32.255,"crspecversion":"19.1.0","workitem":[{"winame":"5GSAT_Ph3-CH"}],"crnumber":581.0,"crrevision":"","crcategory":"F","tsg_crp":"SP-250518","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251580.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"E.2","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251581","title":"Rel-19 CR 32.158 Add details for MnS API versioning","source":"Ericsson Canada Inc.","contact":"Mark Scott","contact-id":87586,"tdoctype":"CR","for":"Approval","abstract":"","secretary_remarks":"Source modified on 3\/28\/2025. Original source : Ericsson Canada Inc.","agenda_item_sort_order":73,"ainumber":"6.19.8.1","ainame":"Service Based Management Architecture enhancement phase 3","tdoc_agenda_sort_order":15810,"status":"not pursued","reservation_date":"2025-03-28 10:49:44","uploaded":"2025-03-28 21:10:21","revisionof":"","revisedto":"","release":"Rel-19","crspec":32.158,"crspecversion":"18.2.0","workitem":[{"winame":"eSBMA"}],"crnumber":145.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251581.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":false,"clauses_affected":"4.4, 4.4.1, 4.4.2, 4.4.3, A.x (new), A.x.1 (new), A.x.1.1 (new), A.x.1.2 (new)","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251582","title":"Rel-19 CR 28.537 Add details for MnS API versioning","source":"Ericsson Canada Inc.","contact":"Mark Scott","contact-id":87586,"tdoctype":"CR","for":"Approval","abstract":"","secretary_remarks":"Source modified on 3\/28\/2025. Original source : Ericsson Canada Inc.","agenda_item_sort_order":73,"ainumber":"6.19.8.1","ainame":"Service Based Management Architecture enhancement phase 3","tdoc_agenda_sort_order":15820,"status":"not pursued","reservation_date":"2025-03-28 10:51:06","uploaded":"2025-03-28 21:10:12","revisionof":"","revisedto":"","release":"Rel-19","crspec":28.537,"crspecversion":"19.1.0","workitem":[{"winame":"eSBMA"}],"crnumber":36.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251582.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":false,"clauses_affected":"5.x (new), 5.x.1 (new), 5.x.2 (new), 5.x.2.1 (new), 5.x.2.2 (new), 5.x.2.3 (new), 5.x.3 (new)","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251583","title":"pCR TR 28.869 Cloud-native VNF policy management evaluation","source":"NTT DOCOMO","contact":"Kostas Katsalis","contact-id":91395,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":70,"ainumber":"6.19.6","ainame":"Study on Cloud Aspects of Management and Orchestration","tdoc_agenda_sort_order":15830,"status":"revised","reservation_date":"2025-03-28 11:00:30","uploaded":"2025-03-28 15:11:01","revisionof":"","revisedto":"S5-251890","release":"Rel-19","crspec":28.869,"crspecversion":"1.3.0","workitem":[{"winame":"FS_Cloud_OAM"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251583.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251584","title":"pCR TR 28.869  3GPP management architecture evolution based on PaaS","source":"NTT DOCOMO, China Mobile","contact":"Kostas Katsalis","contact-id":91395,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":70,"ainumber":"6.19.6","ainame":"Study on Cloud Aspects of Management and Orchestration","tdoc_agenda_sort_order":15840,"status":"revised","reservation_date":"2025-03-28 11:03:06","uploaded":"2025-03-28 15:11:01","revisionof":"","revisedto":"S5-251895","release":"Rel-19","crspec":28.869,"crspecversion":"1.3.0","workitem":[{"winame":"FS_Cloud_OAM"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251584.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251585","title":"Rel-19 CR 28.540 Add secure backhaul requirements for NTN","source":"Ericsson Canada Inc.","contact":"Mark Scott","contact-id":87586,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 3\/28\/2025. Original source : Ericsson Canada Inc.","agenda_item_sort_order":83,"ainumber":"6.19.15.1","ainame":"Management Aspects of NTN Phase 2","tdoc_agenda_sort_order":15850,"status":"revised","reservation_date":"2025-03-28 11:09:30","uploaded":"2025-03-28 21:10:04","revisionof":"","revisedto":"S5-251987","release":"Rel-19","crspec":28.54,"crspecversion":"19.0.0","workitem":[{"winame":"NTN_OAM_Ph2"}],"crnumber":36.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251585.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"2, 3.1, 3.2, 5.9.x (new)","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251586","title":"Rel-19 CR 28.541 Add solution for NTN time-based IP configuration","source":"Ericsson Canada Inc.","contact":"Mark Scott","contact-id":87586,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 3\/28\/2025. Original source : Ericsson Canada Inc.","agenda_item_sort_order":83,"ainumber":"6.19.15.1","ainame":"Management Aspects of NTN Phase 2","tdoc_agenda_sort_order":15860,"status":"revised","reservation_date":"2025-03-28 11:10:36","uploaded":"2025-03-28 21:09:52","revisionof":"","revisedto":"S5-251991","release":"Rel-19","crspec":28.541,"crspecversion":"19.3.0","workitem":[{"winame":"NTN_OAM_Ph2"}],"crnumber":1512.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251586.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"2, 4.3.77, 4.4.1, 5.2.1, 5.3.1.1, 5.4.1, Q.1.x (new) ","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251587","title":"Rel-19 CR 28.532 Enhance notifyFilePreparationError definition","source":"Ericsson Canada Inc.","contact":"Mark Scott","contact-id":87586,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 3\/28\/2025. Original source : Ericsson Canada Inc.","agenda_item_sort_order":41,"ainumber":"6.4.9","ainame":"5G performance measurements and KPIs phase 3","tdoc_agenda_sort_order":15870,"status":"revised","reservation_date":"2025-03-28 11:14:51","uploaded":"2025-03-28 21:09:43","revisionof":"","revisedto":"S5-252074","release":"Rel-19","crspec":28.532,"crspecversion":"19.0.0","workitem":[{"winame":"PM_KPI_5G_Ph3"}],"crnumber":379.0,"crrevision":"","crcategory":"C","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251587.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"11.6.1.2.1, 11.6.1.2.2 ","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251588","title":"Rel-19 CR 28.540 Add NTN regenerative concepts and requirements","source":"Ericsson","contact":"Thomas Tovinger","contact-id":3654,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 3\/28\/2025. Original source : Ericsson LM","agenda_item_sort_order":83,"ainumber":"6.19.15.1","ainame":"Management Aspects of NTN Phase 2","tdoc_agenda_sort_order":15880,"status":"revised","reservation_date":"2025-03-28 11:15:43","uploaded":"2025-03-28 14:23:33","revisionof":"","revisedto":"S5-252024","release":"Rel-19","crspec":28.54,"crspecversion":"19.0.0","workitem":[{"winame":"NTN_OAM_Ph2"}],"crnumber":37.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251588.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"4.10.X (new), 5.9.4","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251589","title":"Rel-19 CR 28.662 Update sector equipment and antenna function definitions","source":"Ericsson Canada Inc.","contact":"Mark Scott","contact-id":87586,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":80,"ainumber":"6.19.13","ainame":"5G Advanced NRM features phase 3","tdoc_agenda_sort_order":15890,"status":"revised","reservation_date":"2025-03-28 11:19:40","uploaded":"2025-03-28 21:09:36","revisionof":"","revisedto":"S5-251980","release":"Rel-19","crspec":28.662,"crspecversion":"18.0.0","workitem":[{"winame":"AdNRM_Ph3"}],"crnumber":15.0,"crrevision":"","crcategory":"C","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251589.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251590","title":"Rel-19 CR 28.541 Update sector equipment and antenna function definitions","source":"Ericsson Canada Inc.","contact":"Mark Scott","contact-id":87586,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":80,"ainumber":"6.19.13","ainame":"5G Advanced NRM features phase 3","tdoc_agenda_sort_order":15900,"status":"revised","reservation_date":"2025-03-28 11:20:52","uploaded":"2025-03-28 21:09:27","revisionof":"","revisedto":"S5-251981","release":"Rel-19","crspec":28.541,"crspecversion":"19.3.0","workitem":[{"winame":"AdNRM_Ph3"}],"crnumber":1513.0,"crrevision":"","crcategory":"C","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251590.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251591","title":"Rel-18 CR 28541 Correct support qualifier condition for ephemerisInfoSetRef","source":"Ericsson","contact":"Thomas Tovinger","contact-id":3654,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 3\/28\/2025. Original source : Ericsson LM","agenda_item_sort_order":47,"ainumber":"6.4.15","ainame":"Management Aspects of NTN","tdoc_agenda_sort_order":15910,"status":"agreed","reservation_date":"2025-03-28 11:23:52","uploaded":"2025-03-28 11:29:19","revisionof":"","revisedto":"","release":"Rel-18","crspec":28.541,"crspecversion":"18.11.0","workitem":[{"winame":"OAM_NTN"}],"crnumber":1514.0,"crrevision":"","crcategory":"F","tsg_crp":"SP-250549","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251591.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":false,"clauses_affected":"4.3.2.3, 4.4.1.","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251592","title":"Update Charging principles and architecture references for MVNOs charging","source":"CSCN","contact":"Hong Xiao","contact-id":104085,"tdoctype":"CR","for":"Agreement","abstract":"Update Charging principles and architecture references for MVNOs charging","secretary_remarks":"Title modified on 3\/28\/2025. Original title : Rel-19 CR 32.240 Update Charging principles and architecture references for MVNOs charging<br\/><br\/>Source modified on 3\/28\/2025. Original source : CSCN","agenda_item_sort_order":106,"ainumber":"7.4.6","ainame":"Charging aspects of satellite access Phase 3","tdoc_agenda_sort_order":15920,"status":"revised","reservation_date":"2025-03-28 11:31:40","uploaded":"2025-03-28 12:36:50","revisionof":"","revisedto":"S5-251805","release":"Rel-19","crspec":32.24,"crspecversion":"19.2.0","workitem":[{"winame":"5GSAT_Ph3-CH"}],"crnumber":515.0,"crrevision":"","crcategory":"C","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251592.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"5.5.3.10, G.2.4","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251593","title":"WID on Study on Management Data Analytics (MDA) \u2013 Phase 4","source":"Huawei Tech. Japan, K.K.","contact":"Brendan Hassett","contact-id":43306,"tdoctype":"SID new","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":12,"ainumber":"5.5","ainame":"Rel-20 topic preparation","tdoc_agenda_sort_order":15930,"status":"revised","reservation_date":"2025-03-28 11:43:45","uploaded":"2025-03-28 12:37:41","revisionof":"","revisedto":"S5-251778","release":"Rel-20","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251593.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251594","title":"pCR Add evaluation for some LCM solutions and update the clause 5.2.6","source":"China Mobile","contact":"guangjing cao","contact-id":92523,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":70,"ainumber":"6.19.6","ainame":"Study on Cloud Aspects of Management and Orchestration","tdoc_agenda_sort_order":15940,"status":"revised","reservation_date":"2025-03-28 11:45:53","uploaded":"2025-03-28 14:21:44","revisionof":"","revisedto":"S5-252011","release":"Rel-19","crspec":28.869,"crspecversion":"1.3.0","workitem":[{"winame":"FS_Cloud_OAM"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251594.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251595","title":"Rel-17 CR TS 28.541 Fix invalid reference","source":"Huawei","contact":"Brendan Hassett","contact-id":43306,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Title modified on 3\/28\/2025. Original title : Rel-19 CR TS 28.541 Fix invalid reference<br\/><br\/>Source modified on 3\/28\/2025. Original source : Huawei Tech. Japan, K.K.","agenda_item_sort_order":29,"ainumber":"6.3.11","ainame":"General NRM","tdoc_agenda_sort_order":15950,"status":"revised","reservation_date":"2025-03-28 11:46:58","uploaded":"2025-03-28 12:37:41","revisionof":"","revisedto":"S5-252096","release":"Rel-19","crspec":28.541,"crspecversion":"19.3.0","workitem":[{"winame":"TEI19"}],"crnumber":1515.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251595.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"5.1","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251596","title":"Rel-19 CR TS 28.104 Improvements to failure prediction","source":"Huawei","contact":"Brendan Hassett","contact-id":43306,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 3\/28\/2025. Original source : Huawei Tech. Japan, K.K.","agenda_item_sort_order":63,"ainumber":"6.19.2.1","ainame":"Management Data Analytics phase 3","tdoc_agenda_sort_order":15960,"status":"agreed","reservation_date":"2025-03-28 11:49:32","uploaded":"2025-03-28 12:37:41","revisionof":"","revisedto":"","release":"Rel-19","crspec":28.104,"crspecversion":"19.1.0","workitem":[{"winame":"eMDAS_Ph3"}],"crnumber":205.0,"crrevision":"","crcategory":"C","tsg_crp":"SP-250528","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251596.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"2, 8.4.3.1.3","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251597","title":"Rel-18 CR TS 28.552 PLMN name inconsistency","source":"Ericsson","contact":"Qiang Zu","contact-id":42296,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 3\/28\/2025. Original source : Ericsson LM","agenda_item_sort_order":41,"ainumber":"6.4.9","ainame":"5G performance measurements and KPIs phase 3","tdoc_agenda_sort_order":15970,"status":"revised","reservation_date":"2025-03-28 11:49:40","uploaded":"2025-03-28 18:00:39","revisionof":"","revisedto":"S5-252075","release":"Rel-18","crspec":28.552,"crspecversion":"18.10.0","workitem":[{"winame":"PM_KPI_5G_Ph3"}],"crnumber":687.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251597.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":false,"clauses_affected":"5.1.1.23, 5.1.2.1, 5.1.3.3, 5.1.3.6.2","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251598","title":"Rel-19 CR TS 28.552 PLMN name inconsistency","source":"Ericsson","contact":"Qiang Zu","contact-id":42296,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 3\/28\/2025. Original source : Ericsson LM","agenda_item_sort_order":41,"ainumber":"6.4.9","ainame":"5G performance measurements and KPIs phase 3","tdoc_agenda_sort_order":15980,"status":"revised","reservation_date":"2025-03-28 11:50:58","uploaded":"2025-03-28 18:00:39","revisionof":"","revisedto":"S5-252076","release":"Rel-19","crspec":28.552,"crspecversion":"19.3.0","workitem":[{"winame":"PM_KPI_5G_Ph3"}],"crnumber":688.0,"crrevision":"","crcategory":"A","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251598.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":false,"clauses_affected":"5.1.1.23, 5.1.2.1, 5.1.3.3, 5.1.3.6.2","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251599","title":"Rel-19 pCR TS 28.561 General improvements to use cases and requirements","source":"Huawei Tech. Japan, K.K.","contact":"Brendan Hassett","contact-id":43306,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":69,"ainumber":"6.19.5.1","ainame":"Management aspects of Network Digital Twins","tdoc_agenda_sort_order":15990,"status":"revised","reservation_date":"2025-03-28 11:51:23","uploaded":"2025-03-28 12:37:41","revisionof":"","revisedto":"S5-252019","release":"Rel-19","crspec":28.561,"crspecversion":"0.1.0","workitem":[{"winame":"NDT"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251599.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251600","title":"pCR Add general conclusion and some recommendations","source":"China Mobile","contact":"guangjing cao","contact-id":92523,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":70,"ainumber":"6.19.6","ainame":"Study on Cloud Aspects of Management and Orchestration","tdoc_agenda_sort_order":16000,"status":"revised","reservation_date":"2025-03-28 12:02:19","uploaded":"2025-03-28 14:21:44","revisionof":"","revisedto":"S5-252014","release":"Rel-19","crspec":28.869,"crspecversion":"1.3.0","workitem":[{"winame":"FS_Cloud_OAM"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251600.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251601","title":"TS28.561 Add the NDT concept and scope","source":"China Mobile, FiberCop","contact":"Yushuang Hu","contact-id":96973,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":69,"ainumber":"6.19.5.1","ainame":"Management aspects of Network Digital Twins","tdoc_agenda_sort_order":16010,"status":"revised","reservation_date":"2025-03-28 12:30:01","uploaded":"2025-03-28 12:32:05","revisionof":"","revisedto":"S5-251897","release":"Rel-19","crspec":28.561,"crspecversion":"0.1.0","workitem":[{"winame":"NDT"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251601.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251602","title":"TS28.561 NDT support for network automation","source":"China Mobile, Huawei, FiberCop","contact":"Yushuang Hu","contact-id":96973,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":69,"ainumber":"6.19.5.1","ainame":"Management aspects of Network Digital Twins","tdoc_agenda_sort_order":16020,"status":"revised","reservation_date":"2025-03-28 12:30:21","uploaded":"2025-03-28 12:32:05","revisionof":"","revisedto":"S5-251899","release":"Rel-19","crspec":28.561,"crspecversion":"0.1.0","workitem":[{"winame":"NDT"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251602.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251603","title":"Rel-19 CR 28.312 Clarifications on negotiation of intent fulfillment","source":"Ericsson Canada Inc.","contact":"Mark Scott","contact-id":87586,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":65,"ainumber":"6.19.3.1","ainame":"Intent driven management services for mobile network phase 3","tdoc_agenda_sort_order":16030,"status":"revised","reservation_date":"2025-03-28 12:31:29","uploaded":"2025-03-28 21:09:16","revisionof":"","revisedto":"S5-251915","release":"Rel-19","crspec":28.312,"crspecversion":"19.1.0","workitem":[{"winame":"IDMS_MN_Ph3"}],"crnumber":332.0,"crrevision":"","crcategory":"C","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251603.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251604","title":"Rel-18 CR 32.298 Correction of API Information","source":"Amdocs","contact":"Monika Gupta","contact-id":96725,"tdoctype":"CR","for":"Approval","abstract":"","secretary_remarks":"Source modified on 3\/28\/2025. Original source : Amdocs Software Systems Ltd","agenda_item_sort_order":99,"ainumber":"7.3","ainame":"Charging Maintenance and Rel-19 Charging small enhancements","tdoc_agenda_sort_order":16040,"status":"revised","reservation_date":"2025-03-28 12:46:37","uploaded":"2025-03-28 15:32:58","revisionof":"","revisedto":"S5-251853","release":"Rel-18","crspec":32.298,"crspecversion":"18.8.0","workitem":[{"winame":"TEI18"}],"crnumber":1036.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251604.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"5.2.5.2, Forge","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251605","title":"Rel-19 CR 32.298 Correction of API Information","source":"Amdocs Software Systems Ltd","contact":"Monika Gupta","contact-id":96725,"tdoctype":"CR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":99,"ainumber":"7.3","ainame":"Charging Maintenance and Rel-19 Charging small enhancements","tdoc_agenda_sort_order":16050,"status":"revised","reservation_date":"2025-03-28 12:50:17","uploaded":"2025-03-28 15:33:57","revisionof":"","revisedto":"S5-251854","release":"Rel-19","crspec":32.298,"crspecversion":"19.1.0","workitem":[{"winame":"TEI18"}],"crnumber":1037.0,"crrevision":"","crcategory":"A","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251605.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251606","title":"Input to draftCR Rel-19 TS 28.105 Use case on AIML prediction latency in inference","source":"Nokia, Nokia Shanghai Bell","contact":"Sean Sun","contact-id":92711,"tdoctype":"other","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":61,"ainumber":"6.19.1.1","ainame":"AI\/ML management phase 2","tdoc_agenda_sort_order":16060,"status":"withdrawn","reservation_date":"2025-03-28 12:51:11","uploaded":"2025-03-28 14:11:03","revisionof":"","revisedto":"","release":"Rel-19","crspec":28.105,"crspecversion":"","workitem":[{"winame":"AIML_MGT_Ph2"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251606.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251607","title":"Input to draftCR Rel-19 TS 28.105 Use case on AIML prediction latency in training","source":"Nokia, Nokia Shanghai Bell","contact":"Sean Sun","contact-id":92711,"tdoctype":"other","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":61,"ainumber":"6.19.1.1","ainame":"AI\/ML management phase 2","tdoc_agenda_sort_order":16070,"status":"noted","reservation_date":"2025-03-28 12:51:11","uploaded":"2025-03-28 14:11:03","revisionof":"","revisedto":"","release":"Rel-19","crspec":28.105,"crspecversion":"","workitem":[{"winame":"AIML_MGT_Ph2"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251607.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251608","title":"Input to draftCR Rel-19 TS 28.105 Use case on ML explainability for inference","source":"Nokia, Nokia Shanghai Bell","contact":"Sean Sun","contact-id":92711,"tdoctype":"other","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":61,"ainumber":"6.19.1.1","ainame":"AI\/ML management phase 2","tdoc_agenda_sort_order":16080,"status":"merged","reservation_date":"2025-03-28 12:51:11","uploaded":"2025-03-28 14:11:03","revisionof":"","revisedto":"","release":"Rel-19","crspec":28.105,"crspecversion":"","workitem":[{"winame":"AIML_MGT_Ph2"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251608.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251609","title":"Input to draftCR Rel-19 TS 28.105 Use case on ML explainability for training","source":"Nokia, Nokia Shanghai Bell","contact":"Sean Sun","contact-id":92711,"tdoctype":"other","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":61,"ainumber":"6.19.1.1","ainame":"AI\/ML management phase 2","tdoc_agenda_sort_order":16090,"status":"merged","reservation_date":"2025-03-28 12:51:11","uploaded":"2025-03-28 14:11:03","revisionof":"","revisedto":"","release":"Rel-19","crspec":28.105,"crspecversion":"","workitem":[{"winame":"AIML_MGT_Ph2"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251609.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251610","title":"Input to draftCR Rel-19 TS 28.105 Solution on model confidence requirement","source":"Nokia, Nokia Shanghai Bell","contact":"Sean Sun","contact-id":92711,"tdoctype":"other","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":61,"ainumber":"6.19.1.1","ainame":"AI\/ML management phase 2","tdoc_agenda_sort_order":16100,"status":"withdrawn","reservation_date":"2025-03-28 12:51:11","uploaded":"2025-03-28 14:11:03","revisionof":"","revisedto":"","release":"Rel-19","crspec":28.105,"crspecversion":"","workitem":[{"winame":"AIML_MGT_Ph2"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251610.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251611","title":"Input to draftCR Rel-19 TS 28.105 Solution on sustainable AIML training","source":"Nokia, Nokia Shanghai Bell","contact":"Sean Sun","contact-id":92711,"tdoctype":"other","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":61,"ainumber":"6.19.1.1","ainame":"AI\/ML management phase 2","tdoc_agenda_sort_order":16110,"status":"noted","reservation_date":"2025-03-28 12:51:11","uploaded":"2025-03-28 14:11:03","revisionof":"","revisedto":"","release":"Rel-19","crspec":28.105,"crspecversion":"","workitem":[{"winame":"AIML_MGT_Ph2"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251611.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251612","title":"Input to draftCR Rel-19 TS 28.105 Use case on model confidence requirement","source":"Nokia, Nokia Shanghai Bell","contact":"Sean Sun","contact-id":92711,"tdoctype":"other","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":61,"ainumber":"6.19.1.1","ainame":"AI\/ML management phase 2","tdoc_agenda_sort_order":16120,"status":"revised","reservation_date":"2025-03-28 12:51:11","uploaded":"2025-03-28 14:11:03","revisionof":"","revisedto":"S5-252042","release":"Rel-19","crspec":28.105,"crspecversion":"","workitem":[{"winame":"AIML_MGT_Ph2"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251612.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251613","title":"Input to draftCR Rel-19 TS 28.105 Use case on sustainable AIML training","source":"Nokia, Nokia Shanghai Bell","contact":"Sean Sun","contact-id":92711,"tdoctype":"other","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":61,"ainumber":"6.19.1.1","ainame":"AI\/ML management phase 2","tdoc_agenda_sort_order":16130,"status":"merged","reservation_date":"2025-03-28 12:51:11","uploaded":"2025-03-28 14:11:03","revisionof":"","revisedto":"","release":"Rel-19","crspec":28.105,"crspecversion":"","workitem":[{"winame":"AIML_MGT_Ph2"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251613.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251614","title":"Input to draftCR Rel-19 TS 28.105 Add RL NRMs","source":"Nokia, Nokia Shanghai Bell","contact":"Sean Sun","contact-id":92711,"tdoctype":"other","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":61,"ainumber":"6.19.1.1","ainame":"AI\/ML management phase 2","tdoc_agenda_sort_order":16140,"status":"merged","reservation_date":"2025-03-28 12:51:11","uploaded":"2025-03-28 14:11:03","revisionof":"","revisedto":"","release":"Rel-19","crspec":28.105,"crspecversion":"","workitem":[{"winame":"AIML_MGT_Ph2"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251614.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251615","title":"LS reply to LS on 5G Trace to support UE level measurement","source":"SA5","contact":"Shitao Li","contact-id":39112,"tdoctype":"LS out","for":"Approval","abstract":"Huawei","secretary_remarks":"","agenda_item_sort_order":14,"ainumber":"6.1","ainame":"OAM&P Plenary","tdoc_agenda_sort_order":16150,"status":"revised","reservation_date":"2025-03-28 13:08:48","uploaded":"2025-03-28 14:30:21","revisionof":"","revisedto":"S5-252055","release":"Rel-18","crspec":"","crspecversion":"","workitem":[{"winame":"TEI18"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"SA5-250280","lsto":"3GPP CT4","Cc":"3GPP CT3","lsoriginalls":"C4-245536","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251615.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251616","title":"Rel-18 CR 32.422 Clarification on SMF obtaining Trace control and measurement parameters from UDM","source":"Huawei","contact":"Shitao Li","contact-id":39112,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Title modified on 3\/28\/2025. Original title : Rel-18 CR 32.422 Clarification on SMF obtaining trace control and configuration parameters from UDM<br\/><br\/>Source modified on 3\/28\/2025. Original source : Huawei","agenda_item_sort_order":40,"ainumber":"6.4.8","ainame":"Management of Trace\/MDT phase 2","tdoc_agenda_sort_order":16160,"status":"revised","reservation_date":"2025-03-28 13:08:48","uploaded":"2025-03-28 14:30:32","revisionof":"","revisedto":"S5-252070","release":"Rel-18","crspec":32.422,"crspecversion":"18.5.0","workitem":[{"winame":"5GMDT_Ph2"}],"crnumber":515.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251616.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"2, 4.1.2.15.1 and 4.1.2.18.2","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251617","title":"Rel-18 CR 32.422 Clarification on SMF obtaining trace control and configuration parameters from UDM","source":"Huawei","contact":"Shitao Li","contact-id":39112,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Title modified on 3\/28\/2025. Original title : Rel-19 CR 32.422 Clarification on SMF obtaining trace control and configuration parameters from UDM<br\/><br\/>Source modified on 3\/28\/2025. Original source : Huawei","agenda_item_sort_order":40,"ainumber":"6.4.8","ainame":"Management of Trace\/MDT phase 2","tdoc_agenda_sort_order":16170,"status":"revised","reservation_date":"2025-03-28 13:08:49","uploaded":"2025-03-28 14:30:47","revisionof":"","revisedto":"S5-252071","release":"Rel-19","crspec":32.422,"crspecversion":"19.2.0","workitem":[{"winame":"5GMDT_Ph2"}],"crnumber":516.0,"crrevision":"","crcategory":"A","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251617.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"2, 4.1.2.15.1 and 4.1.2.18.2","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251618","title":"Rel-19 CR 28.104 adding statics information in failure prediction output","source":"Huawei","contact":"Shitao Li","contact-id":39112,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Title modified on 3\/28\/2025. Original title : Rel-19 CR 28.104 adding  statistics information in failure prediction output<br\/><br\/>Source modified on 3\/28\/2025. Original source : Huawei","agenda_item_sort_order":63,"ainumber":"6.19.2.1","ainame":"Management Data Analytics phase 3","tdoc_agenda_sort_order":16180,"status":"revised","reservation_date":"2025-03-28 13:08:50","uploaded":"2025-03-28 14:30:57","revisionof":"","revisedto":"S5-251883","release":"Rel-19","crspec":28.104,"crspecversion":"19.1.0","workitem":[{"winame":"eMDAS_Ph3"}],"crnumber":206.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251618.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"8.4.3.1.3","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251619","title":"Rel-19 CR 28.104 clarification on resource management","source":"Huawei","contact":"Shitao Li","contact-id":39112,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 3\/28\/2025. Original source : Huawei<br\/><br\/>Source modified on 28\/03\/2025. Original source : Huawei","agenda_item_sort_order":63,"ainumber":"6.19.2.1","ainame":"Management Data Analytics phase 3","tdoc_agenda_sort_order":16190,"status":"not pursued","reservation_date":"2025-03-28 13:08:51","uploaded":"2025-03-28 14:31:14","revisionof":"","revisedto":"","release":"Rel-19","crspec":28.104,"crspecversion":"19.1.0","workitem":[{"winame":"eMDAS_Ph3"}],"crnumber":207.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251619.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"2 and 8.4.7.1.1.2 ","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251620","title":"Rel-19 CR 28.104 topology information as enabling data is missing","source":"Huawei","contact":"Shitao Li","contact-id":39112,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Title modified on 3\/28\/2025. Original title : Rel-19 CR 28.104 topology infomation as enabling data is missing<br\/><br\/>Source modified on 3\/28\/2025. Original source : Huawei","agenda_item_sort_order":63,"ainumber":"6.19.2.1","ainame":"Management Data Analytics phase 3","tdoc_agenda_sort_order":16200,"status":"revised","reservation_date":"2025-03-28 13:08:52","uploaded":"2025-03-28 14:31:30","revisionof":"","revisedto":"S5-251884","release":"Rel-19","crspec":28.104,"crspecversion":"19.1.0","workitem":[{"winame":"eMDAS_Ph3"}],"crnumber":208.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251620.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251621","title":"Rel 19 CR TS 28.541 Remove support qualifier from attribute constraints for NR NRM","source":"Ericsson","contact":"Eoin McDonnell","contact-id":95325,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 3\/28\/2025. Original source : Ericsson Japan K.K.","agenda_item_sort_order":59,"ainumber":"6.4.27","ainame":"OAM Rel-19 small enhancements","tdoc_agenda_sort_order":16210,"status":"revised","reservation_date":"2025-03-28 13:26:17","uploaded":"2025-03-28 13:47:13","revisionof":"","revisedto":"S5-252097","release":"Rel-19","crspec":28.541,"crspecversion":"19.3.0","workitem":[{"winame":"TEI19"}],"crnumber":1516.0,"crrevision":"","crcategory":"C","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251621.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"4.3.1.3, 4.3.3.3, 4.3.5.3, 4.3.40.3, 4.3.41.3, 4.3.42.3, 4.3.58.3, 4.3.63.3, 4.3.68.3, 4.3.79.3","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251622","title":"Rel 19 CR TS 28.541 Remove support qualifier from attribute constraints for Network Slice NRM","source":"Ericsson","contact":"Eoin McDonnell","contact-id":95325,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 3\/28\/2025. Original source : Ericsson Japan K.K.","agenda_item_sort_order":59,"ainumber":"6.4.27","ainame":"OAM Rel-19 small enhancements","tdoc_agenda_sort_order":16220,"status":"revised","reservation_date":"2025-03-28 13:28:13","uploaded":"2025-03-28 13:47:13","revisionof":"","revisedto":"S5-252098","release":"Rel-19","crspec":28.541,"crspecversion":"19.3.0","workitem":[{"winame":"TEI19"}],"crnumber":1517.0,"crrevision":"","crcategory":"C","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251622.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"6.3.1.3, 6.3.2.3, 6.3.4.3, 6.3.6.3, 6.3.7.3, 6.3.8.3, 6.3.9.3, 6.3.11.3, 6.3.12.3, 6.3.14.3, 6.3.15.3, 6.3.16.3, 6.3.17.3, 6.3.20.3, 6.3.26.3, 6.3.27.3, 6.3.30.3, 6.3.31.3, 6.3.32.2, 6.3.34.3, 6.3.37.3, 6.3.38.3, 6.3.42.3, 6.3.43.3, 6.3.45.3, 6.3.46.3","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251623","title":"Rel 19 CR TS 28.541 Remove support qualifier from attribute constraints for 5GC NRM","source":"Ericsson","contact":"Eoin McDonnell","contact-id":95325,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 3\/28\/2025. Original source : Ericsson Japan K.K.","agenda_item_sort_order":59,"ainumber":"6.4.27","ainame":"OAM Rel-19 small enhancements","tdoc_agenda_sort_order":16230,"status":"revised","reservation_date":"2025-03-28 13:29:36","uploaded":"2025-03-28 13:47:13","revisionof":"","revisedto":"S5-252099","release":"Rel-19","crspec":28.541,"crspecversion":"19.3.0","workitem":[{"winame":"TEI19"}],"crnumber":1518.0,"crrevision":"","crcategory":"C","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251623.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"5.3.1.3, 5.3.2.3, 5.3.3.3, 5.3.10.3, 5.3.16.3, 5.3.51.3, 5.3.52.3, 5.3.65.3, 5.3.70.3, 5.3.72.3, 5.3.81.3, 5.3.83.3, 5.3.88.3, 5.3.89.3, 5.3.91.3, 5.3.98.3, 5.3.115.3, 5.3.118.3, 5.3.119.3, 5.3.126.3, 5.3.140.3, 5.3.142c.3, 5.3.142e.3, 5.3.143.3, 5.3.143a.3, 5.3.143b.3, 5.3.144a.3, 5.3.151.3, 5.3.161.3, 5.3.162.3, 5.3.163.3, 5.3.164.3, 5.3.166.3, 5.3.189.3, 5.3.190.3, 5.3.195.3, 5.3.204.3, 5.3.212.3, 5.3.231.3, 5.3.232.3","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251624","title":"Rel 18 CR TS 28.104 Correct References for MDA reporting","source":"Ericsson","contact":"Eoin McDonnell","contact-id":95325,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 3\/28\/2025. Original source : Ericsson Japan K.K.","agenda_item_sort_order":34,"ainumber":"6.4.2","ainame":"Management Data Analytics phase 2","tdoc_agenda_sort_order":16240,"status":"not pursued","reservation_date":"2025-03-28 13:31:18","uploaded":"2025-03-28 13:47:13","revisionof":"","revisedto":"","release":"Rel-18","crspec":28.104,"crspecversion":"18.7.0","workitem":[{"winame":"eMDAS_Ph2"}],"crnumber":209.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251624.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"10.1.3.1","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251625","title":"Rel 19 CR TS 28.104 Correct References for MDA reporting","source":"Ericsson","contact":"Eoin McDonnell","contact-id":95325,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 3\/28\/2025. Original source : Ericsson Japan K.K.","agenda_item_sort_order":34,"ainumber":"6.4.2","ainame":"Management Data Analytics phase 2","tdoc_agenda_sort_order":16250,"status":"revised","reservation_date":"2025-03-28 13:32:43","uploaded":"2025-03-28 13:47:13","revisionof":"","revisedto":"S5-252057","release":"Rel-19","crspec":28.104,"crspecversion":"19.1.0","workitem":[{"winame":"eMDAS_Ph2"}],"crnumber":210.0,"crrevision":"","crcategory":"A","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251625.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"10.1.3.1","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251626","title":"Rel 19 CR TS 28.104 Clarify definition of confidenceDegree attribute","source":"Ericsson","contact":"Eoin McDonnell","contact-id":95325,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 3\/28\/2025. Original source : Ericsson Japan K.K.","agenda_item_sort_order":63,"ainumber":"6.19.2.1","ainame":"Management Data Analytics phase 3","tdoc_agenda_sort_order":16260,"status":"revised","reservation_date":"2025-03-28 13:34:11","uploaded":"2025-03-28 13:47:13","revisionof":"","revisedto":"S5-251886","release":"Rel-19","crspec":28.104,"crspecversion":"19.1.0","workitem":[{"winame":"eMDAS_Ph3"}],"crnumber":211.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251626.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"9.5.1","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251627","title":"Rel-19 Revised WID on Management Aspects of NTN Phase 2","source":"CATT, China Unicom","contact":"Min Shu","contact-id":83568,"tdoctype":"WID revised","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":17,"ainumber":"6.2.2","ainame":"Management Architecture and Mechanisms","tdoc_agenda_sort_order":16270,"status":"revised","reservation_date":"2025-03-28 13:40:55","uploaded":"2025-03-28 15:49:54","revisionof":"","revisedto":"S5-252022","release":"Rel-19","crspec":"","crspecversion":"","workitem":[{"winame":"NTN_OAM_Ph2"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251627.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251628","title":"Rel-19 CR TS 28.541 Correction on wrong attribute property definition.docx","source":"CATT","contact":"Min Shu","contact-id":83568,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":59,"ainumber":"6.4.27","ainame":"OAM Rel-19 small enhancements","tdoc_agenda_sort_order":16280,"status":"revised","reservation_date":"2025-03-28 13:40:55","uploaded":"2025-03-28 15:49:54","revisionof":"S5-250932","revisedto":"S5-252100","release":"Rel-19","crspec":28.541,"crspecversion":"19.3.0","workitem":[{"winame":"TEI19"}],"crnumber":1470.0,"crrevision":2.0,"crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251628.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251629","title":"Rel-19 CR TS 28.658 Add attributes to support Store and Forward Satellite operation for eNB","source":"CATT","contact":"Min Shu","contact-id":83568,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 3\/28\/2025. Original source : CATT","agenda_item_sort_order":83,"ainumber":"6.19.15.1","ainame":"Management Aspects of NTN Phase 2","tdoc_agenda_sort_order":16290,"status":"revised","reservation_date":"2025-03-28 13:41:00","uploaded":"2025-03-28 15:49:54","revisionof":"","revisedto":"S5-252025","release":"Rel-19","crspec":28.658,"crspecversion":"18.1.0","workitem":[{"winame":"NTN_OAM_Ph2"}],"crnumber":68.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251629.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251630","title":"Rel-19 CR TS 28.658 Add attributes to support Store and Forward Satellite operation for eNB stage3","source":"CATT, Samsung","contact":"Min Shu","contact-id":83568,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Title modified on 3\/28\/2025. Original title : Rel-19 CR TS 28.659 Add attributes to support Store and Forward Satellite operation for eNB stage3<br\/><br\/>Source modified on 3\/28\/2025. Original source : CATT","agenda_item_sort_order":83,"ainumber":"6.19.15.1","ainame":"Management Aspects of NTN Phase 2","tdoc_agenda_sort_order":16300,"status":"agreed","reservation_date":"2025-03-28 13:41:01","uploaded":"2025-03-28 15:49:54","revisionof":"","revisedto":"","release":"Rel-19","crspec":28.659,"crspecversion":"18.1.0","workitem":[{"winame":"NTN_OAM_Ph2"}],"crnumber":44.0,"crrevision":"","crcategory":"B","tsg_crp":"SP-250546","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251630.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"A.2.2.1, A.3.2","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251631","title":"Rel-19 CR TS 28.708 Add attributes to support Store and Forward Satellite operation for EPC","source":"CATT","contact":"Min Shu","contact-id":83568,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 3\/28\/2025. Original source : CATT","agenda_item_sort_order":83,"ainumber":"6.19.15.1","ainame":"Management Aspects of NTN Phase 2","tdoc_agenda_sort_order":16310,"status":"revised","reservation_date":"2025-03-28 13:41:01","uploaded":"2025-03-28 15:49:54","revisionof":"","revisedto":"S5-252027","release":"Rel-19","crspec":28.708,"crspecversion":"18.1.0","workitem":[{"winame":"NTN_OAM_Ph2"}],"crnumber":11.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251631.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"4.3.2.2, 4.3.22.2, 4.4.1","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251632","title":"Rel-19 CR TS 28.709 Add attributes to support Store and Forward Satellite operation for EPC stage3","source":"CATT","contact":"Min Shu","contact-id":83568,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":83,"ainumber":"6.19.15.1","ainame":"Management Aspects of NTN Phase 2","tdoc_agenda_sort_order":16320,"status":"revised","reservation_date":"2025-03-28 13:41:02","uploaded":"2025-03-28 15:49:54","revisionof":"","revisedto":"S5-252028","release":"Rel-19","crspec":28.709,"crspecversion":"18.1.0","workitem":[{"winame":"NTN_OAM_Ph2"}],"crnumber":16.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251632.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251633","title":"Rel-19 Input to draftCR TS 28.105 Add NRMs on distributed training","source":"CATT","contact":"Min Shu","contact-id":83568,"tdoctype":"other","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":61,"ainumber":"6.19.1.1","ainame":"AI\/ML management phase 2","tdoc_agenda_sort_order":16330,"status":"revised","reservation_date":"2025-03-28 13:41:03","uploaded":"2025-03-28 15:49:54","revisionof":"","revisedto":"S5-251789","release":"Rel-19","crspec":28.105,"crspecversion":"","workitem":[{"winame":"AIML_MGT_Ph2"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251633.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251634","title":"New SID on cloud aspects of management and orchestration phase 2","source":"China Mobile","contact":"guangjing cao","contact-id":92523,"tdoctype":"SID new","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":12,"ainumber":"5.5","ainame":"Rel-20 topic preparation","tdoc_agenda_sort_order":16340,"status":"revised","reservation_date":"2025-03-28 13:50:18","uploaded":"2025-03-28 14:21:44","revisionof":"","revisedto":"S5-251779","release":"Rel-20","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251634.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251635","title":"Rel-19 pCR TS 28.572 Improve clauses on Planned configuration concepts","source":"Nokia","contact":"Olaf Pollakowski","contact-id":68423,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":75,"ainumber":"6.19.9.1","ainame":"Management of planned configurations","tdoc_agenda_sort_order":16350,"status":"revised","reservation_date":"2025-03-28 13:57:12","uploaded":"2025-03-28 17:41:45","revisionof":"","revisedto":"S5-251950","release":"Rel-19","crspec":28.572,"crspecversion":"0.3.0","workitem":[{"winame":"PlanM"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251635.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251636","title":"Rel-19 pCR TS 28.572 Improve clauses on Managing planned configurations","source":"Nokia","contact":"Olaf Pollakowski","contact-id":68423,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":75,"ainumber":"6.19.9.1","ainame":"Management of planned configurations","tdoc_agenda_sort_order":16360,"status":"revised","reservation_date":"2025-03-28 13:58:14","uploaded":"2025-03-28 17:41:45","revisionof":"","revisedto":"S5-251951","release":"Rel-19","crspec":28.572,"crspecversion":"0.3.0","workitem":[{"winame":"PlanM"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251636.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251637","title":"Rel-19 pCR TS 28.572 Improve clause Information model","source":"Nokia","contact":"Olaf Pollakowski","contact-id":68423,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":75,"ainumber":"6.19.9.1","ainame":"Management of planned configurations","tdoc_agenda_sort_order":16370,"status":"revised","reservation_date":"2025-03-28 13:59:18","uploaded":"2025-03-28 17:41:45","revisionof":"","revisedto":"S5-251952","release":"Rel-19","crspec":28.572,"crspecversion":"0.3.0","workitem":[{"winame":"PlanM"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251637.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251638","title":"Rel-19 pCR TS 28.572 Improve clause RESTful HTTP-based solution set","source":"Nokia","contact":"Olaf Pollakowski","contact-id":68423,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":75,"ainumber":"6.19.9.1","ainame":"Management of planned configurations","tdoc_agenda_sort_order":16380,"status":"revised","reservation_date":"2025-03-28 14:00:27","uploaded":"2025-03-28 17:41:45","revisionof":"","revisedto":"S5-251953","release":"Rel-19","crspec":28.572,"crspecversion":"0.3.0","workitem":[{"winame":"PlanM"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251638.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251639","title":"pCR Add terminology","source":"China Mobile","contact":"guangjing cao","contact-id":92523,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":70,"ainumber":"6.19.6","ainame":"Study on Cloud Aspects of Management and Orchestration","tdoc_agenda_sort_order":16390,"status":"revised","reservation_date":"2025-03-28 14:12:05","uploaded":"2025-03-28 14:21:44","revisionof":"","revisedto":"S5-252015","release":"Rel-19","crspec":28.869,"crspecversion":"1.3.0","workitem":[{"winame":"FS_Cloud_OAM"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251639.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251640","title":"Introduce the support of store and forward satellite operation and UE-satellite-UE communication","source":"CATT","contact":"Yingying Liu","contact-id":94862,"tdoctype":"CR","for":"Approval","abstract":"Add the introduction of store and forward satellite operation charging.\nAdd the introduction of UE-satellite-UE communication charging.","secretary_remarks":"Title modified on 3\/28\/2025. Original title : 32.240 Introduce the support of store and forward satellite operation and UE-satellite-UE communication<br\/><br\/>Source modified on 3\/28\/2025. Original source : CATT","agenda_item_sort_order":106,"ainumber":"7.4.6","ainame":"Charging aspects of satellite access Phase 3","tdoc_agenda_sort_order":16400,"status":"revised","reservation_date":"2025-03-28 14:12:12","uploaded":"2025-03-28 14:32:27","revisionof":"","revisedto":"S5-251806","release":"Rel-19","crspec":32.24,"crspecversion":"19.2.0","workitem":[{"winame":"5GSAT_Ph3-CH"}],"crnumber":516.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251640.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"2, 6.5","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251641","title":"Add charging principle for store and forward satellite operation","source":"CATT","contact":"Yingying Liu","contact-id":94862,"tdoctype":"CR","for":"Approval","abstract":"Add charging principle for store and forward satellite operation","secretary_remarks":"Title modified on 3\/28\/2025. Original title : 32.251 Add charging principle for store and forward satellite operation<br\/><br\/>Source modified on 3\/28\/2025. Original source : CATT","agenda_item_sort_order":106,"ainumber":"7.4.6","ainame":"Charging aspects of satellite access Phase 3","tdoc_agenda_sort_order":16410,"status":"revised","reservation_date":"2025-03-28 14:12:13","uploaded":"2025-03-28 14:32:27","revisionof":"","revisedto":"S5-251808","release":"Rel-19","crspec":32.251,"crspecversion":"18.0.0","workitem":[{"winame":"5GSAT_Ph3-CH"}],"crnumber":520.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251641.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"3.3, 5.2.1.x","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251642","title":"Add charging information for store and forward satellite operation of SMS service","source":"CATT","contact":"Yingying Liu","contact-id":94862,"tdoctype":"CR","for":"Approval","abstract":"Add charging information for S&F in the CDR","secretary_remarks":"Title modified on 3\/28\/2025. Original title : 32.251 Add charging information for store and forward satellite operation of SMS service<br\/><br\/>Source modified on 3\/28\/2025. Original source : CATT","agenda_item_sort_order":106,"ainumber":"7.4.6","ainame":"Charging aspects of satellite access Phase 3","tdoc_agenda_sort_order":16420,"status":"revised","reservation_date":"2025-03-28 14:12:13","uploaded":"2025-03-28 14:32:27","revisionof":"","revisedto":"S5-251809","release":"Rel-19","crspec":32.251,"crspecversion":"18.0.0","workitem":[{"winame":"5GSAT_Ph3-CH"}],"crnumber":521.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251642.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"6.1.5, 6.1.6, 6.3.2","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251643","title":"Add charging trigger for store and forward satellite operation with UP CIoT","source":"CATT","contact":"Yingying Liu","contact-id":94862,"tdoctype":"CR","for":"Approval","abstract":"Add charging triggers for store and forward satellite operation charging with UP CIoT","secretary_remarks":"Title modified on 3\/28\/2025. Original title : 32.251 Add charging trigger for store and forward satellite operation with UP CIoT<br\/><br\/>Source modified on 3\/28\/2025. Original source : CATT","agenda_item_sort_order":106,"ainumber":"7.4.6","ainame":"Charging aspects of satellite access Phase 3","tdoc_agenda_sort_order":16430,"status":"revised","reservation_date":"2025-03-28 14:12:14","uploaded":"2025-03-28 14:32:27","revisionof":"","revisedto":"S5-251810","release":"Rel-19","crspec":32.251,"crspecversion":"18.0.0","workitem":[{"winame":"5GSAT_Ph3-CH"}],"crnumber":522.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251643.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"5.2.2.4, 5.2.3.x","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251644","title":"Add charging information for store and forward satellite operation with UP CIoT","source":"CATT","contact":"Yingying Liu","contact-id":94862,"tdoctype":"CR","for":"Approval","abstract":"Add charging information for store and forward satellite operation charging with UP CIoT","secretary_remarks":"Title modified on 3\/28\/2025. Original title : 32.251 Add charging information for store and forward satellite operation with UP CIoT<br\/><br\/>Source modified on 3\/28\/2025. Original source : CATT","agenda_item_sort_order":106,"ainumber":"7.4.6","ainame":"Charging aspects of satellite access Phase 3","tdoc_agenda_sort_order":16440,"status":"revised","reservation_date":"2025-03-28 14:12:15","uploaded":"2025-03-28 14:32:27","revisionof":"","revisedto":"S5-251811","release":"Rel-19","crspec":32.251,"crspecversion":"18.0.0","workitem":[{"winame":"5GSAT_Ph3-CH"}],"crnumber":523.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251644.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"6.1.x","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251645","title":"Add charging principle for UE-satellite-UE communication","source":"CATT","contact":"Yingying Liu","contact-id":94862,"tdoctype":"CR","for":"Approval","abstract":"Add charging principle for UE-satellite-UE communication","secretary_remarks":"Title modified on 3\/28\/2025. Original title : 32.260 Add charging principle for UE-satellite-UE communication<br\/><br\/>Source modified on 3\/28\/2025. Original source : CATT","agenda_item_sort_order":106,"ainumber":"7.4.6","ainame":"Charging aspects of satellite access Phase 3","tdoc_agenda_sort_order":16450,"status":"revised","reservation_date":"2025-03-28 14:12:16","uploaded":"2025-03-28 14:32:27","revisionof":"","revisedto":"S5-251812","release":"Rel-19","crspec":32.26,"crspecversion":"18.3.0","workitem":[{"winame":"5GSAT_Ph3-CH"}],"crnumber":443.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251645.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"5.1.x","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251646","title":"Add charging trigger and charging information for UE-satellite-UE communication","source":"CATT","contact":"Yingying Liu","contact-id":94862,"tdoctype":"CR","for":"Approval","abstract":"Add charging triggers and charging information for UE-satellite-UE communication","secretary_remarks":"Title modified on 3\/28\/2025. Original title : 32.260 Add charging trigger and charging information for UE-satellite-UE communication<br\/><br\/>Source modified on 3\/28\/2025. Original source : CATT","agenda_item_sort_order":106,"ainumber":"7.4.6","ainame":"Charging aspects of satellite access Phase 3","tdoc_agenda_sort_order":16460,"status":"revised","reservation_date":"2025-03-28 14:12:17","uploaded":"2025-03-28 14:32:27","revisionof":"","revisedto":"S5-251813","release":"Rel-19","crspec":32.26,"crspecversion":"18.3.0","workitem":[{"winame":"5GSAT_Ph3-CH"}],"crnumber":444.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251646.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"5.4.3, 6.4.2.2, 6.4.2.3","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251647","title":"Update reference for the TR","source":"CATT","contact":"Yingying Liu","contact-id":94862,"tdoctype":"CR","for":"Approval","abstract":"Add TS 23.503 to reference","secretary_remarks":"Title modified on 3\/28\/2025. Original title : 28.846 Update reference for the TR<br\/><br\/>Source modified on 3\/28\/2025. Original source : CATT","agenda_item_sort_order":106,"ainumber":"7.4.6","ainame":"Charging aspects of satellite access Phase 3","tdoc_agenda_sort_order":16470,"status":"revised","reservation_date":"2025-03-28 14:12:17","uploaded":"2025-03-28 14:32:27","revisionof":"","revisedto":"S5-251855","release":"Rel-19","crspec":28.846,"crspecversion":"19.0.0","workitem":[{"winame":"5GSAT_Ph3-CH"}],"crnumber":1.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251647.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"2, 6.4.4","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251648","title":"Pseudo-CR on TS 28.561 Update use case for NDT support analysis of failure events including signaling storm","source":"Huawei","contact":"Zhuoyuan Tian","contact-id":98112,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":69,"ainumber":"6.19.5.1","ainame":"Management aspects of Network Digital Twins","tdoc_agenda_sort_order":16480,"status":"merged","reservation_date":"2025-03-28 14:16:17","uploaded":"2025-03-28 14:23:50","revisionof":"","revisedto":"","release":"Rel-19","crspec":28.561,"crspecversion":"0.1.0","workitem":[{"winame":"NDT"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251648.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251649","title":"Correct the description of maximum number of PDU sessions of network slice","source":"Huawei","contact":"Zhuoyuan Tian","contact-id":98112,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Title modified on 3\/28\/2025. Original title : Rel-19 CR TS 28.554 Correct the description of maximum number of PDU sessions of network slice<br\/><br\/>Source modified on 3\/28\/2025. Original source : Huawei","agenda_item_sort_order":59,"ainumber":"6.4.27","ainame":"OAM Rel-19 small enhancements","tdoc_agenda_sort_order":16490,"status":"revised","reservation_date":"2025-03-28 14:16:17","uploaded":"2025-03-28 14:23:50","revisionof":"","revisedto":"S5-252101","release":"Rel-19","crspec":28.554,"crspecversion":"19.3.0","workitem":[{"winame":"TEI19"}],"crnumber":217.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251649.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"6.4.5","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251650","title":"Rel-19 CR TS 28.541 Add support of RAN configurations for Indirect Network Sharing","source":"China Unicom","contact":"Zhaoning Wang","contact-id":91259,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":91,"ainumber":"6.19.19.1","ainame":"Management of Network Sharing Phase 3","tdoc_agenda_sort_order":16500,"status":"withdrawn","reservation_date":"2025-03-28 14:17:49","uploaded":null,"revisionof":"","revisedto":"","release":"Rel-19","crspec":32.13,"crspecversion":"19.0.0","workitem":[{"winame":"NetShare_OAM_Ph3"}],"crnumber":49.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251651","title":"Rel-19 CR TS 32.130 Update abbreviations for Indirect Network Sharing","source":"China Unicom, China Telecom","contact":"Zhaoning Wang","contact-id":91259,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 3\/31\/2025. Original source : China Unicom, China Telecom","agenda_item_sort_order":91,"ainumber":"6.19.19.1","ainame":"Management of Network Sharing Phase 3","tdoc_agenda_sort_order":16510,"status":"revised","reservation_date":"2025-03-28 14:23:29","uploaded":"2025-03-31 06:57:29","revisionof":"","revisedto":"S5-252007","release":"Rel-19","crspec":32.13,"crspecversion":"19.0.0","workitem":[{"winame":"NetShare_OAM_Ph3"}],"crnumber":50.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251651.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"3.2, 4.1","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251652","title":"New SID on Semantic-based Network Management","source":"Moderator(China Unicom, Samsung)","contact":"Zhaoning Wang","contact-id":91259,"tdoctype":"SID new","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":12,"ainumber":"5.5","ainame":"Rel-20 topic preparation","tdoc_agenda_sort_order":16520,"status":"revised","reservation_date":"2025-03-28 14:27:55","uploaded":"2025-03-28 17:02:35","revisionof":"","revisedto":"S5-251780","release":"Rel-20","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251652.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251653","title":"Rel-19 CR TS 28.552 Correction of Distribution of time interval","source":"Esurfing IoT","contact":"Lixin Liang","contact-id":95162,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 3\/28\/2025. Original source : Esurfing IoT","agenda_item_sort_order":79,"ainumber":"6.19.12","ainame":"5G performance measurements and KPIs phase 4","tdoc_agenda_sort_order":16530,"status":"revised","reservation_date":"2025-03-28 14:32:26","uploaded":"2025-03-28 15:18:24","revisionof":"","revisedto":"S5-251964","release":"Rel-19","crspec":28.552,"crspecversion":"19.3.0","workitem":[{"winame":"PM_KPI_5G_Ph4"}],"crnumber":689.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251653.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":false,"clauses_affected":"5.1.1.6.12","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251654","title":"Rel-19 CR TS 28.552 Add Multicast Group Paging records for MBS measurement","source":"Esurfing IoT","contact":"Lixin Liang","contact-id":95162,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":79,"ainumber":"6.19.12","ainame":"5G performance measurements and KPIs phase 4","tdoc_agenda_sort_order":16540,"status":"revised","reservation_date":"2025-03-28 14:43:05","uploaded":"2025-03-28 15:54:24","revisionof":"","revisedto":"S5-251965","release":"Rel-19","crspec":28.552,"crspecversion":"19.3.0","workitem":[{"winame":"PM_KPI_5G_Ph4"}],"crnumber":690.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251654.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251655","title":"Rel-19 CR TS 28.541 Add solution to support RAN configurations for Indirect Network Sharing","source":"China Unicom, China Telecom","contact":"Zhaoning Wang","contact-id":91259,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":91,"ainumber":"6.19.19.1","ainame":"Management of Network Sharing Phase 3","tdoc_agenda_sort_order":16550,"status":"agreed","reservation_date":"2025-03-28 14:55:46","uploaded":"2025-03-28 17:02:35","revisionof":"","revisedto":"","release":"Rel-19","crspec":28.541,"crspecversion":"19.3.0","workitem":[{"winame":"NetShare_OAM_Ph3"}],"crnumber":1519.0,"crrevision":"","crcategory":"B","tsg_crp":"SP-250541","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251655.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251656","title":"Requirements for IAB-node connects to management system","source":"Ericsson","contact":"Junfeng Wang","contact-id":91147,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Title modified on 3\/28\/2025. Original title : Rel-19 CR TS 28.314 Requirements for IAB-node connects to management system<br\/><br\/>Source modified on 3\/28\/2025. Original source : Ericsson Telecomunicazioni SpA<br\/><br\/>Source modified on 28\/03\/2025. Origi","agenda_item_sort_order":85,"ainumber":"6.19.16.1","ainame":"Management of IAB nodes","tdoc_agenda_sort_order":16560,"status":"revised","reservation_date":"2025-03-28 15:04:12","uploaded":"2025-03-28 16:11:16","revisionof":"","revisedto":"S5-251992","release":"Rel-19","crspec":28.314,"crspecversion":"18.0.0","workitem":[{"winame":"NR_MOBILE_IAB_OAM"}],"crnumber":2.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251656.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":false,"clauses_affected":"6.2, 6.2.x(new)","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251657","title":"Pseudo-CR on TS 28.561 Nested NDT Definition","source":"FiberCop, Deutsche Telekom, Telecom Italia, Orange","contact":"Simone Bizzarri","contact-id":108103,"tdoctype":"pCR","for":"Approval","abstract":"Pseudo-CR on TS 28.561 Nested NDT Definition","secretary_remarks":"","agenda_item_sort_order":69,"ainumber":"6.19.5.1","ainame":"Management aspects of Network Digital Twins","tdoc_agenda_sort_order":16570,"status":"revised","reservation_date":"2025-03-28 15:05:44","uploaded":"2025-03-28 15:08:59","revisionof":"S5-251427","revisedto":"S5-252017","release":"Rel-19","crspec":28.561,"crspecversion":"0.1.0","workitem":[{"winame":"NDT"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251657.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251658","title":"Rel-19 CR TS 28.552 add measurement of coverage satisfaction ratio","source":"CMCC, Huawei, ZTE, CATT","contact":"Bin Wang","contact-id":102472,"tdoctype":"CR","for":"Approval","abstract":"","secretary_remarks":"Source modified on 3\/28\/2025. Original source : CMCC, Huawei, ZTE, CATT","agenda_item_sort_order":79,"ainumber":"6.19.12","ainame":"5G performance measurements and KPIs phase 4","tdoc_agenda_sort_order":16580,"status":"withdrawn","reservation_date":"2025-03-28 15:11:28","uploaded":"2025-03-28 15:22:41","revisionof":"","revisedto":"","release":"Rel-19","crspec":28.552,"crspecversion":"19.3.0","workitem":[{"winame":"PM_KPI_5G_Ph4"}],"crnumber":691.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251658.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":false,"clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251659","title":"Rel-19 CR 28.541 Align predefinedPccRuleSet attributes with the definitions in TS 29.512","source":"Ericsson, Deutsche Telekom","contact":"Jan Groenendijk","contact-id":49147,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Title modified on 3\/28\/2025. Original title : Rel-19 CR TS 28.541 Align predefinedPccRuleSet attributes with the definitions in TS 29.512<br\/><br\/>Source modified on 3\/28\/2025. Original source : Ericsson, Deutsche Telekom","agenda_item_sort_order":43,"ainumber":"6.4.11","ainame":"Additional NRM features phase 2","tdoc_agenda_sort_order":16590,"status":"revised","reservation_date":"2025-03-28 15:12:07","uploaded":"2025-03-28 20:52:14","revisionof":"","revisedto":"S5-252080","release":"Rel-19","crspec":28.541,"crspecversion":"19.3.0","workitem":[{"winame":"TEI19"}],"crnumber":1520.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251659.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"5.3.81.2, 5.4.1, Forge","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251660","title":"Rel-19 CR TS 28.312 Introduce mapping table","source":"Ericsson, Deutsche Telekom","contact":"Jan Groenendijk","contact-id":49147,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":65,"ainumber":"6.19.3.1","ainame":"Intent driven management services for mobile network phase 3","tdoc_agenda_sort_order":16600,"status":"revised","reservation_date":"2025-03-28 15:12:07","uploaded":"2025-03-28 20:52:14","revisionof":"","revisedto":"S5-251927","release":"Rel-19","crspec":28.312,"crspecversion":"19.1.0","workitem":[{"winame":"IDMS_MN_Ph3"}],"crnumber":333.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251660.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251661","title":"Rel-19 CR TS 28.312 Update UML diagram for intent","source":"Ericsson, ZTE","contact":"Jan Groenendijk","contact-id":49147,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 3\/28\/2025. Original source : Ericsson, ZTE","agenda_item_sort_order":65,"ainumber":"6.19.3.1","ainame":"Intent driven management services for mobile network phase 3","tdoc_agenda_sort_order":16610,"status":"endorsed","reservation_date":"2025-03-28 15:12:08","uploaded":"2025-03-28 20:52:14","revisionof":"","revisedto":"S5-252534","release":"Rel-19","crspec":28.312,"crspecversion":"19.1.0","workitem":[{"winame":"IDMS_MN_Ph3"}],"crnumber":334.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251661.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"6.2.1.1.1","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251662","title":"Rel-19 CR TS 28.536 Clarify generic use of closed control loop","source":"Ericsson, Deutsche Telekom","contact":"Jan Groenendijk","contact-id":49147,"tdoctype":"CR","for":"Approval","abstract":"","secretary_remarks":"Source modified on 3\/28\/2025. Original source : Ericsson, Deutsche Telekom","agenda_item_sort_order":67,"ainumber":"6.19.4.1","ainame":"Closed Control Loop Management","tdoc_agenda_sort_order":16620,"status":"not pursued","reservation_date":"2025-03-28 15:12:09","uploaded":"2025-03-28 20:52:14","revisionof":"","revisedto":"","release":"Rel-19","crspec":28.536,"crspecversion":"19.1.0","workitem":[{"winame":"CCLM"}],"crnumber":124.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251662.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"4.1.2.3.1.1","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251663","title":"pCR on TS 28.567 introduce imported information elements","source":"Ericsson, Deutsche Telekom","contact":"Jan Groenendijk","contact-id":49147,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":67,"ainumber":"6.19.4.1","ainame":"Closed Control Loop Management","tdoc_agenda_sort_order":16630,"status":"not pursued","reservation_date":"2025-03-28 15:12:09","uploaded":"2025-03-28 20:52:14","revisionof":"","revisedto":"","release":"Rel-19","crspec":28.567,"crspecversion":"0.1.0","workitem":[{"winame":"CCLM"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251663.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251664","title":"Rel-17 CR TS 28.310 Clarify information of service","source":"Ericsson, Deutsche Telekom","contact":"Jan Groenendijk","contact-id":49147,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":23,"ainumber":"6.3.5","ainame":"Energy efficiency","tdoc_agenda_sort_order":16640,"status":"not pursued","reservation_date":"2025-03-28 15:12:09","uploaded":"2025-03-28 20:52:14","revisionof":"","revisedto":"","release":"Rel-17","crspec":28.31,"crspecversion":"17.10.0","workitem":[{"winame":"TEI17"}],"crnumber":73.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251664.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251665","title":"Rel-18 CR TS 28.310 Clarify information of service","source":"Ericsson, Deutsche Telekom","contact":"Jan Groenendijk","contact-id":49147,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":23,"ainumber":"6.3.5","ainame":"Energy efficiency","tdoc_agenda_sort_order":16650,"status":"not pursued","reservation_date":"2025-03-28 15:12:10","uploaded":"2025-03-28 20:52:15","revisionof":"","revisedto":"","release":"Rel-18","crspec":28.31,"crspecversion":"18.8.0","workitem":[{"winame":"TEI17"}],"crnumber":74.0,"crrevision":"","crcategory":"A","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251665.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251666","title":"Rel-19 CR TS 28.310 Clarify information of service","source":"Ericsson, Deutsche Telekom","contact":"Jan Groenendijk","contact-id":49147,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":23,"ainumber":"6.3.5","ainame":"Energy efficiency","tdoc_agenda_sort_order":16660,"status":"not pursued","reservation_date":"2025-03-28 15:12:11","uploaded":"2025-03-28 20:52:14","revisionof":"","revisedto":"","release":"Rel-19","crspec":28.31,"crspecversion":"19.0.0","workitem":[{"winame":"TEI17"}],"crnumber":75.0,"crrevision":"","crcategory":"A","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251666.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251667","title":"Rel-16 CR TS 28.530 Clarify tenant information concept","source":"Ericsson, Deutsche Telekom","contact":"Jan Groenendijk","contact-id":49147,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Title modified on 3\/28\/2025. Original title : Rel-16 CR TS 28.530 clarify tenant information concept<br\/><br\/>Source modified on 3\/28\/2025. Original source : Ericsson, Deutsche Telekom","agenda_item_sort_order":27,"ainumber":"6.3.9","ainame":"Network slicing management","tdoc_agenda_sort_order":16670,"status":"not pursued","reservation_date":"2025-03-28 15:12:11","uploaded":"2025-03-28 20:52:14","revisionof":"","revisedto":"","release":"Rel-16","crspec":28.53,"crspecversion":"16.7.0","workitem":[{"winame":"TEI16"}],"crnumber":74.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251667.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"4.1.9, 4.8","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251668","title":"Rel-17 CR TS 28.530 Clarify tenant information concept","source":"Ericsson, Deutsche Telekom","contact":"Jan Groenendijk","contact-id":49147,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Title modified on 3\/28\/2025. Original title : Rel-17 CR TS 28.530 clarify tenant information concept<br\/><br\/>Source modified on 3\/28\/2025. Original source : Ericsson, Deutsche Telekom","agenda_item_sort_order":27,"ainumber":"6.3.9","ainame":"Network slicing management","tdoc_agenda_sort_order":16680,"status":"not pursued","reservation_date":"2025-03-28 15:12:12","uploaded":"2025-03-28 20:52:14","revisionof":"","revisedto":"","release":"Rel-17","crspec":28.53,"crspecversion":"17.6.0","workitem":[{"winame":"TEI16"}],"crnumber":75.0,"crrevision":"","crcategory":"A","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251668.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"4.1.9, 4.8","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251669","title":"Rel-18 CR TS 28.530 Clarify tenant information concept","source":"Ericsson, Deutsche Telekom","contact":"Jan Groenendijk","contact-id":49147,"tdoctype":"CR","for":"Approval","abstract":"","secretary_remarks":"Title modified on 3\/28\/2025. Original title : Rel-18 CR TS 28.530 clarify tenant information concept<br\/><br\/>Source modified on 3\/28\/2025. Original source : Ericsson, Deutsche Telekom","agenda_item_sort_order":27,"ainumber":"6.3.9","ainame":"Network slicing management","tdoc_agenda_sort_order":16690,"status":"not pursued","reservation_date":"2025-03-28 15:12:13","uploaded":"2025-03-28 20:52:14","revisionof":"","revisedto":"","release":"Rel-18","crspec":28.53,"crspecversion":"18.2.0","workitem":[{"winame":"TEI16"}],"crnumber":76.0,"crrevision":"","crcategory":"A","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251669.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"4.1.9, 4.8","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251670","title":"Rel-19 CR TS 28.530 Clarify tenant information concept","source":"Ericsson, Deutsche Telekom","contact":"Jan Groenendijk","contact-id":49147,"tdoctype":"CR","for":"Approval","abstract":"","secretary_remarks":"Title modified on 3\/28\/2025. Original title : Rel-19 CR TS 28.530 clarify tenant information concept<br\/><br\/>Source modified on 3\/28\/2025. Original source : Ericsson, Deutsche Telekom","agenda_item_sort_order":27,"ainumber":"6.3.9","ainame":"Network slicing management","tdoc_agenda_sort_order":16700,"status":"not pursued","reservation_date":"2025-03-28 15:12:14","uploaded":"2025-03-28 20:52:14","revisionof":"","revisedto":"","release":"Rel-19","crspec":28.53,"crspecversion":"19.0.0","workitem":[{"winame":"TEI16"}],"crnumber":77.0,"crrevision":"","crcategory":"A","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251670.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"4.1.9, 4.8","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251671","title":"Rel-18 CR TS 28.312 Correct import table","source":"Ericsson, Deutsche Telekom","contact":"Jan Groenendijk","contact-id":49147,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":36,"ainumber":"6.4.4","ainame":"Intent driven Management Service for mobile network phase 2","tdoc_agenda_sort_order":16710,"status":"revised","reservation_date":"2025-03-28 15:12:14","uploaded":"2025-03-28 20:52:14","revisionof":"","revisedto":"S5-252058","release":"Rel-18","crspec":28.312,"crspecversion":"18.7.0","workitem":[{"winame":"IDMS_MN_ph2"}],"crnumber":335.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251671.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251672","title":"Rel-19 CR TS 28.312 Correct import table","source":"Ericsson, Deutsche Telekom","contact":"Jan Groenendijk","contact-id":49147,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":36,"ainumber":"6.4.4","ainame":"Intent driven Management Service for mobile network phase 2","tdoc_agenda_sort_order":16720,"status":"revised","reservation_date":"2025-03-28 15:12:15","uploaded":"2025-03-28 20:52:14","revisionof":"","revisedto":"S5-252059","release":"Rel-19","crspec":28.312,"crspecversion":"19.1.0","workitem":[{"winame":"IDMS_MN_ph2"}],"crnumber":336.0,"crrevision":"","crcategory":"A","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251672.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251673","title":"Rel-18 CR TS 28.317 Correct import table","source":"Ericsson, Deutsche Telekom","contact":"Jan Groenendijk","contact-id":49147,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 3\/28\/2025. Original source : Ericsson, Deutsche Telekom","agenda_item_sort_order":33,"ainumber":"6.4.1","ainame":"Self-Configuration of RAN NEs","tdoc_agenda_sort_order":16730,"status":"agreed","reservation_date":"2025-03-28 15:12:16","uploaded":"2025-03-28 20:52:14","revisionof":"","revisedto":"","release":"Rel-18","crspec":28.317,"crspecversion":"18.2.0","workitem":[{"winame":"RANSC"}],"crnumber":13.0,"crrevision":"","crcategory":"F","tsg_crp":"SP-250552","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251673.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"6.2.1","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251674","title":"Rel-19 CR TS 28.317 Correct import table","source":"Ericsson, Deutsche Telekom","contact":"Jan Groenendijk","contact-id":49147,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 3\/28\/2025. Original source : Ericsson, Deutsche Telekom","agenda_item_sort_order":33,"ainumber":"6.4.1","ainame":"Self-Configuration of RAN NEs","tdoc_agenda_sort_order":16740,"status":"agreed","reservation_date":"2025-03-28 15:12:17","uploaded":"2025-03-28 20:52:14","revisionof":"","revisedto":"","release":"Rel-19","crspec":28.317,"crspecversion":"19.0.0","workitem":[{"winame":"RANSC"}],"crnumber":14.0,"crrevision":"","crcategory":"A","tsg_crp":"SP-250552","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251674.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"6.2.1","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251675","title":"Discussion paper on adding information in entry point specifications","source":"Ericsson, Huawei, Deutsche Telekom","contact":"Jan Groenendijk","contact-id":49147,"tdoctype":"discussion","for":"Information","abstract":"","secretary_remarks":"","agenda_item_sort_order":73,"ainumber":"6.19.8.1","ainame":"Service Based Management Architecture enhancement phase 3","tdoc_agenda_sort_order":16750,"status":"noted","reservation_date":"2025-03-28 15:12:17","uploaded":"2025-03-28 20:52:14","revisionof":"","revisedto":"","release":"Rel-19","crspec":"","crspecversion":"","workitem":[{"winame":"SBMA_Ph3"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251675.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251676","title":"Rel-19 CR TS 28.310 Add entry point information","source":"Ericsson, Huawei, Deutsche Telekom","contact":"Jan Groenendijk","contact-id":49147,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 3\/28\/2025. Original source : Ericsson, Huawei, Deutsche Telekom","agenda_item_sort_order":73,"ainumber":"6.19.8.1","ainame":"Service Based Management Architecture enhancement phase 3","tdoc_agenda_sort_order":16760,"status":"not pursued","reservation_date":"2025-03-28 15:12:17","uploaded":"2025-03-28 20:52:14","revisionof":"","revisedto":"","release":"Rel-19","crspec":28.31,"crspecversion":"19.0.0","workitem":[{"winame":"SBMA_Ph3"}],"crnumber":76.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251676.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"1, 2","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251677","title":"Rel-19 CR TS 28.313 Add entry point information","source":"Ericsson, Huawei, Deutsche Telekom","contact":"Jan Groenendijk","contact-id":49147,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 3\/28\/2025. Original source : Ericsson, Huawei, Deutsche Telekom","agenda_item_sort_order":73,"ainumber":"6.19.8.1","ainame":"Service Based Management Architecture enhancement phase 3","tdoc_agenda_sort_order":16770,"status":"not pursued","reservation_date":"2025-03-28 15:12:18","uploaded":"2025-03-28 20:52:14","revisionof":"","revisedto":"","release":"Rel-19","crspec":28.313,"crspecversion":"19.2.0","workitem":[{"winame":"SBMA_Ph3"}],"crnumber":76.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251677.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"1, 2","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251678","title":"Rel-19 CR TS 28.314 Add entry point information","source":"Ericsson, Huawei, Deutsche Telekom","contact":"Jan Groenendijk","contact-id":49147,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 3\/28\/2025. Original source : Ericsson, Huawei, Deutsche Telekom","agenda_item_sort_order":73,"ainumber":"6.19.8.1","ainame":"Service Based Management Architecture enhancement phase 3","tdoc_agenda_sort_order":16780,"status":"not pursued","reservation_date":"2025-03-28 15:12:19","uploaded":"2025-03-28 20:52:14","revisionof":"","revisedto":"","release":"Rel-19","crspec":28.314,"crspecversion":"18.0.0","workitem":[{"winame":"SBMA_Ph3"}],"crnumber":3.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251678.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"1, 2","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251679","title":"Rel-19 CR TS 28.404 Add entry point information","source":"Ericsson, Huawei, Deutsche Telekom","contact":"Jan Groenendijk","contact-id":49147,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 3\/28\/2025. Original source : Ericsson, Huawei, Deutsche Telekom","agenda_item_sort_order":73,"ainumber":"6.19.8.1","ainame":"Service Based Management Architecture enhancement phase 3","tdoc_agenda_sort_order":16790,"status":"not pursued","reservation_date":"2025-03-28 15:12:20","uploaded":"2025-03-28 20:52:14","revisionof":"","revisedto":"","release":"Rel-19","crspec":28.404,"crspecversion":"18.0.0","workitem":[{"winame":"SBMA_Ph3"}],"crnumber":13.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251679.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"1, 2","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251680","title":"Rel-19 CR TS 28.531 Add entry point information","source":"Ericsson, Huawei, Deutsche Telekom","contact":"Jan Groenendijk","contact-id":49147,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 3\/28\/2025. Original source : Ericsson, Huawei, Deutsche Telekom","agenda_item_sort_order":73,"ainumber":"6.19.8.1","ainame":"Service Based Management Architecture enhancement phase 3","tdoc_agenda_sort_order":16800,"status":"not pursued","reservation_date":"2025-03-28 15:12:21","uploaded":"2025-03-28 20:52:14","revisionof":"","revisedto":"","release":"Rel-19","crspec":28.531,"crspecversion":"19.0.0","workitem":[{"winame":"SBMA_Ph3"}],"crnumber":243.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251680.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"1, 2","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251681","title":"Rel-19 CR TS 28.532 Add entry point information","source":"Ericsson, Huawei, Deutsche Telekom","contact":"Jan Groenendijk","contact-id":49147,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 3\/28\/2025. Original source : Ericsson, Huawei, Deutsche Telekom","agenda_item_sort_order":73,"ainumber":"6.19.8.1","ainame":"Service Based Management Architecture enhancement phase 3","tdoc_agenda_sort_order":16810,"status":"not pursued","reservation_date":"2025-03-28 15:12:21","uploaded":"2025-03-28 20:52:14","revisionof":"","revisedto":"","release":"Rel-19","crspec":28.532,"crspecversion":"19.0.0","workitem":[{"winame":"SBMA_Ph3"}],"crnumber":380.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251681.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"1","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251682","title":"Rel-19 CR TS 28.535 Add entry point information","source":"Ericsson, Huawei, Deutsche Telekom","contact":"Jan Groenendijk","contact-id":49147,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 3\/28\/2025. Original source : Ericsson, Huawei, Deutsche Telekom","agenda_item_sort_order":73,"ainumber":"6.19.8.1","ainame":"Service Based Management Architecture enhancement phase 3","tdoc_agenda_sort_order":16820,"status":"not pursued","reservation_date":"2025-03-28 15:12:22","uploaded":"2025-03-28 20:52:14","revisionof":"","revisedto":"","release":"Rel-19","crspec":28.535,"crspecversion":"18.2.0","workitem":[{"winame":"SBMA_Ph3"}],"crnumber":81.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251682.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"1, 2","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251683","title":"Rel-19 CR TS 28.537 Add entry point information","source":"Ericsson, Huawei, Deutsche Telekom","contact":"Jan Groenendijk","contact-id":49147,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 3\/28\/2025. Original source : Ericsson, Huawei, Deutsche Telekom","agenda_item_sort_order":73,"ainumber":"6.19.8.1","ainame":"Service Based Management Architecture enhancement phase 3","tdoc_agenda_sort_order":16830,"status":"not pursued","reservation_date":"2025-03-28 15:12:24","uploaded":"2025-03-28 20:52:14","revisionof":"","revisedto":"","release":"Rel-19","crspec":28.537,"crspecversion":"19.1.0","workitem":[{"winame":"SBMA_Ph3"}],"crnumber":37.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251683.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"1","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251684","title":"Rel-19 CR TS 28.540 Add entry point information","source":"Ericsson, Huawei, Deutsche Telekom","contact":"Jan Groenendijk","contact-id":49147,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 3\/28\/2025. Original source : Ericsson, Huawei, Deutsche Telekom","agenda_item_sort_order":73,"ainumber":"6.19.8.1","ainame":"Service Based Management Architecture enhancement phase 3","tdoc_agenda_sort_order":16840,"status":"not pursued","reservation_date":"2025-03-28 15:12:25","uploaded":"2025-03-28 20:52:14","revisionof":"","revisedto":"","release":"Rel-19","crspec":28.54,"crspecversion":"19.0.0","workitem":[{"winame":"SBMA_Ph3"}],"crnumber":38.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251684.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"1","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251685","title":"Rel-19 CR TS 28.555 Add entry point information","source":"Ericsson, Huawei, Deutsche Telekom","contact":"Jan Groenendijk","contact-id":49147,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 3\/28\/2025. Original source : Ericsson, Huawei, Deutsche Telekom","agenda_item_sort_order":73,"ainumber":"6.19.8.1","ainame":"Service Based Management Architecture enhancement phase 3","tdoc_agenda_sort_order":16850,"status":"not pursued","reservation_date":"2025-03-28 15:12:26","uploaded":"2025-03-28 20:52:14","revisionof":"","revisedto":"","release":"Rel-19","crspec":28.555,"crspecversion":"18.0.0","workitem":[{"winame":"SBMA_Ph3"}],"crnumber":1.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251685.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"1, 2","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251686","title":"Rel-19 CR TS 28.622 Add entry point information","source":"Ericsson, Huawei, Deutsche Telekom","contact":"Jan Groenendijk","contact-id":49147,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 3\/28\/2025. Original source : Ericsson, Huawei, Deutsche Telekom","agenda_item_sort_order":73,"ainumber":"6.19.8.1","ainame":"Service Based Management Architecture enhancement phase 3","tdoc_agenda_sort_order":16860,"status":"not pursued","reservation_date":"2025-03-28 15:12:26","uploaded":"2025-03-28 20:52:14","revisionof":"","revisedto":"","release":"Rel-19","crspec":28.622,"crspecversion":"19.3.0","workitem":[{"winame":"SBMA_Ph3"}],"crnumber":550.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251686.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"1","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251687","title":"Rel-19 CR TS 28.130 Add entry point information","source":"Ericsson, Huawei, Deutsche Telekom","contact":"Jan Groenendijk","contact-id":49147,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Title modified on 3\/28\/2025. Original title : Rel-19 CR TS 32.130 Add entry point information<br\/><br\/>Source modified on 3\/28\/2025. Original source : Ericsson, Huawei, Deutsche Telekom","agenda_item_sort_order":73,"ainumber":"6.19.8.1","ainame":"Service Based Management Architecture enhancement phase 3","tdoc_agenda_sort_order":16870,"status":"not pursued","reservation_date":"2025-03-28 15:12:27","uploaded":"2025-03-28 20:52:14","revisionof":"","revisedto":"","release":"Rel-19","crspec":32.13,"crspecversion":"19.0.0","workitem":[{"winame":"SBMA_Ph3"}],"crnumber":51.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251687.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"1, 2","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251688","title":"Rel-19 CR TS 32.421 Add entry point information","source":"Ericsson, Huawei, Deutsche Telekom","contact":"Jan Groenendijk","contact-id":49147,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 3\/28\/2025. Original source : Ericsson, Huawei, Deutsche Telekom","agenda_item_sort_order":73,"ainumber":"6.19.8.1","ainame":"Service Based Management Architecture enhancement phase 3","tdoc_agenda_sort_order":16880,"status":"not pursued","reservation_date":"2025-03-28 15:12:28","uploaded":"2025-03-28 20:52:14","revisionof":"","revisedto":"","release":"Rel-19","crspec":32.421,"crspecversion":"19.2.0","workitem":[{"winame":"SBMA_Ph3"}],"crnumber":147.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251688.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"1","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251689","title":"Rel-19 CR TS28.541 Fix isOrdered and isUnique Attribute properties","source":"ZTE Corporation","contact":"Bangqiu Ruan","contact-id":96106,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 3\/28\/2025. Original source : ZTE Corporation","agenda_item_sort_order":43,"ainumber":"6.4.11","ainame":"Additional NRM features phase 2","tdoc_agenda_sort_order":16890,"status":"merged","reservation_date":"2025-03-28 15:12:57","uploaded":"2025-03-28 19:23:08","revisionof":"","revisedto":"","release":"Rel-19","crspec":28.541,"crspecversion":"19.3.0","workitem":[{"winame":"AdNRM_ph2"}],"crnumber":1521.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251689.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"5.4.1,6.4.1","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251690","title":"Rel-18 CR TS28.541 Fix nTNTAClist for stage 3 OpenAPI","source":"ZTE Corporation","contact":"Bangqiu Ruan","contact-id":96106,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 3\/28\/2025. Original source : ZTE Corporation","agenda_item_sort_order":47,"ainumber":"6.4.15","ainame":"Management Aspects of NTN","tdoc_agenda_sort_order":16900,"status":"agreed","reservation_date":"2025-03-28 15:12:58","uploaded":"2025-03-28 19:23:08","revisionof":"","revisedto":"","release":"Rel-18","crspec":28.541,"crspecversion":"18.11.0","workitem":[{"winame":"OAM_NTN"}],"crnumber":1522.0,"crrevision":"","crcategory":"F","tsg_crp":"SP-250549","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251690.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":false,"clauses_affected":"Only stage3 changed","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251691","title":"Rel-19 CR TS28.541 Fix nTNTAClist for stage 3 OpenAPI","source":"ZTE Corporation","contact":"Bangqiu Ruan","contact-id":96106,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 3\/28\/2025. Original source : ZTE Corporation","agenda_item_sort_order":47,"ainumber":"6.4.15","ainame":"Management Aspects of NTN","tdoc_agenda_sort_order":16910,"status":"agreed","reservation_date":"2025-03-28 15:12:58","uploaded":"2025-03-28 19:23:08","revisionof":"","revisedto":"","release":"Rel-19","crspec":28.541,"crspecversion":"19.3.0","workitem":[{"winame":"OAM_NTN"}],"crnumber":1523.0,"crrevision":"","crcategory":"A","tsg_crp":"SP-250549","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251691.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":false,"clauses_affected":"Only stage3 changed","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251692","title":"Rel-18 CR TS28.552 Add missing  EP_N9 for GTP capacity related measurements","source":"ZTE Corporation","contact":"Bangqiu Ruan","contact-id":96106,"tdoctype":"CR","for":"Approval","abstract":"","secretary_remarks":"Source modified on 3\/28\/2025. Original source : ZTE Corporation","agenda_item_sort_order":41,"ainumber":"6.4.9","ainame":"5G performance measurements and KPIs phase 3","tdoc_agenda_sort_order":16920,"status":"agreed","reservation_date":"2025-03-28 15:12:59","uploaded":"2025-03-28 19:23:07","revisionof":"","revisedto":"","release":"Rel-18","crspec":28.552,"crspecversion":"18.10.0","workitem":[{"winame":"PM_KPI_5G_Ph3"}],"crnumber":692.0,"crrevision":"","crcategory":"F","tsg_crp":"SP-250550","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251692.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"5.1.1.44.1, 5.4.12.1, 5.4.12.2, 5.4.12.3","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251693","title":"Rel-19 CR TS28.552 Add missing  EP_N9 for GTP capacity related measurements","source":"ZTE Corporation","contact":"Bangqiu Ruan","contact-id":96106,"tdoctype":"CR","for":"Approval","abstract":"","secretary_remarks":"Source modified on 3\/28\/2025. Original source : ZTE Corporation","agenda_item_sort_order":41,"ainumber":"6.4.9","ainame":"5G performance measurements and KPIs phase 3","tdoc_agenda_sort_order":16930,"status":"agreed","reservation_date":"2025-03-28 15:13:00","uploaded":"2025-03-28 19:23:07","revisionof":"","revisedto":"","release":"Rel-19","crspec":28.552,"crspecversion":"19.3.0","workitem":[{"winame":"PM_KPI_5G_Ph3"}],"crnumber":693.0,"crrevision":"","crcategory":"A","tsg_crp":"SP-250550","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251693.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"5.1.1.44.1, 5.4.12.1, 5.4.12.2, 5.4.12.3","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251694","title":"Rel-19 pCR TS 28.572 Allow recursive Planned configuration groups","source":"Ericsson India Private Limited","contact":"Balazs Lengyel","contact-id":81420,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":75,"ainumber":"6.19.9.1","ainame":"Management of planned configurations","tdoc_agenda_sort_order":16940,"status":"revised","reservation_date":"2025-03-28 15:13:02","uploaded":"2025-03-28 16:03:21","revisionof":"","revisedto":"S5-251954","release":"Rel-19","crspec":28.572,"crspecversion":"0.3.0","workitem":[{"winame":"PlanM"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251694.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251695","title":"Use case IAB-node connects to management system","source":"Ericsson","contact":"Junfeng Wang","contact-id":91147,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Title modified on 3\/28\/2025. Original title : Rel-19 CR TS 28.314 Use case IAB-node connects to management system<br\/><br\/>Source modified on 3\/28\/2025. Original source : Ericsson Telecomunicazioni SpA<br\/><br\/>Source modified on 28\/03\/2025. Original sour","agenda_item_sort_order":85,"ainumber":"6.19.16.1","ainame":"Management of IAB nodes","tdoc_agenda_sort_order":16950,"status":"agreed","reservation_date":"2025-03-28 15:15:49","uploaded":"2025-03-28 16:11:16","revisionof":"","revisedto":"","release":"Rel-19","crspec":28.314,"crspecversion":"18.0.0","workitem":[{"winame":"NR_MOBILE_IAB_OAM"}],"crnumber":4.0,"crrevision":"","crcategory":"B","tsg_crp":"SP-250543","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251695.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":false,"clauses_affected":"2, 3, 6.1, 6.1.x(new)","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251696","title":"Discussion paper on MSED components, requirements and naming","source":"Nokia Hungary","contact":"Winnie Nakimuli","contact-id":97608,"tdoctype":"discussion","for":"Endorsement","abstract":"Option-1\n3GPP management system shall have the capability to provide the API provider domain functions (i.e., AEF, APF and AMF) as defined by CAPIF.\nOption-2\n3GPP management system shall have the capability to provide the AEF functionality\n3GPP management system shall have the capability to provide the APF functionality\n3GPP management system should have the capability to provide the AMF functionality","secretary_remarks":"","agenda_item_sort_order":95,"ainumber":"6.19.21.1","ainame":"Enhanced OAM for management service exposure to external consumers through CAPIF","tdoc_agenda_sort_order":16960,"status":"revised","reservation_date":"2025-03-28 15:18:48","uploaded":"2025-03-28 15:56:42","revisionof":"","revisedto":"S5-251948","release":"Rel-19","crspec":28.579,"crspecversion":"","workitem":[{"winame":"MExpo"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251696.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251697","title":"Rel-19 pCR TS 28.579 Add use case and requirements for registration of the MSED into the CCF","source":"Nokia Hungary","contact":"Winnie Nakimuli","contact-id":97608,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":95,"ainumber":"6.19.21.1","ainame":"Enhanced OAM for management service exposure to external consumers through CAPIF","tdoc_agenda_sort_order":16970,"status":"revised","reservation_date":"2025-03-28 15:18:59","uploaded":"2025-03-28 15:56:42","revisionof":"","revisedto":"S5-251949","release":"Rel-19","crspec":28.579,"crspecversion":"0.1.0","workitem":[{"winame":"MExpo"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251697.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251698","title":"Rel-19 pCR TS 28.579 Add use case solution for registration of the MSED into the CCF","source":"Nokia Hungary","contact":"Winnie Nakimuli","contact-id":97608,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":95,"ainumber":"6.19.21.1","ainame":"Enhanced OAM for management service exposure to external consumers through CAPIF","tdoc_agenda_sort_order":16980,"status":"revised","reservation_date":"2025-03-28 15:18:59","uploaded":"2025-03-28 15:56:42","revisionof":"","revisedto":"S5-252036","release":"Rel-19","crspec":28.579,"crspecversion":"0.1.0","workitem":[{"winame":"MExpo"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251698.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251699","title":"Rel-19 pCR TS 28.579 Add use case requirements for publishing of management services to the CCF","source":"Nokia Hungary","contact":"Winnie Nakimuli","contact-id":97608,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":95,"ainumber":"6.19.21.1","ainame":"Enhanced OAM for management service exposure to external consumers through CAPIF","tdoc_agenda_sort_order":16990,"status":"revised","reservation_date":"2025-03-28 15:18:59","uploaded":"2025-03-28 15:56:42","revisionof":"","revisedto":"S5-252037","release":"Rel-19","crspec":28.579,"crspecversion":"0.1.0","workitem":[{"winame":"MExpo"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251699.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251700","title":"Rel-19 pCR TS 28.579 Add use case solution to enable the publishing management services to the CCF","source":"Nokia Hungary","contact":"Winnie Nakimuli","contact-id":97608,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":95,"ainumber":"6.19.21.1","ainame":"Enhanced OAM for management service exposure to external consumers through CAPIF","tdoc_agenda_sort_order":17000,"status":"revised","reservation_date":"2025-03-28 15:18:59","uploaded":"2025-03-28 15:56:42","revisionof":"","revisedto":"S5-252038","release":"Rel-19","crspec":28.579,"crspecversion":"0.1.0","workitem":[{"winame":"MExpo"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251700.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251701","title":"Rel-19 pCR TS 28.579 Add use case requirements for logging of management service APIs invocations to the CCF","source":"Nokia Hungary","contact":"Winnie Nakimuli","contact-id":97608,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":95,"ainumber":"6.19.21.1","ainame":"Enhanced OAM for management service exposure to external consumers through CAPIF","tdoc_agenda_sort_order":17010,"status":"revised","reservation_date":"2025-03-28 15:18:59","uploaded":"2025-03-28 15:56:42","revisionof":"","revisedto":"S5-252039","release":"Rel-19","crspec":28.579,"crspecversion":"0.1.0","workitem":[{"winame":"MExpo"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251701.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251702","title":"Rel-19 pCR TS 28.579 Add use case solution for logging the management service API invocations to the CCF","source":"Nokia Hungary","contact":"Winnie Nakimuli","contact-id":97608,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":95,"ainumber":"6.19.21.1","ainame":"Enhanced OAM for management service exposure to external consumers through CAPIF","tdoc_agenda_sort_order":17020,"status":"revised","reservation_date":"2025-03-28 15:18:59","uploaded":"2025-03-28 15:56:42","revisionof":"","revisedto":"S5-252132","release":"Rel-19","crspec":28.579,"crspecversion":"0.1.0","workitem":[{"winame":"MExpo"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251702.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251703","title":"Rel15 CR TS 32.156 Enhancement of the description of the \u201cisNotifyable\u201d attribute property","source":"Nokia","contact":"Winnie Nakimuli","contact-id":97608,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 3\/28\/2025. Original source : Nokia Hungary","agenda_item_sort_order":29,"ainumber":"6.3.11","ainame":"General NRM","tdoc_agenda_sort_order":17030,"status":"not pursued","reservation_date":"2025-03-28 15:18:59","uploaded":"2025-03-28 15:55:57","revisionof":"","revisedto":"","release":"Rel-15","crspec":32.156,"crspecversion":"15.5.0","workitem":[{"winame":"TEI15"}],"crnumber":107.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251703.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"Clause 5.2.1","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251704","title":"Rel16 CR TS 32.156 Enhancement of the description of the \u201cisNotifyable\u201d attribute property and correction of the default value for the \u201cisReadable\u201d attribute property","source":"Nokia","contact":"Winnie Nakimuli","contact-id":97608,"tdoctype":"CR","for":"Approval","abstract":"","secretary_remarks":"Source modified on 3\/28\/2025. Original source : Nokia Hungary","agenda_item_sort_order":29,"ainumber":"6.3.11","ainame":"General NRM","tdoc_agenda_sort_order":17040,"status":"not pursued","reservation_date":"2025-03-28 15:19:00","uploaded":"2025-03-28 15:55:57","revisionof":"","revisedto":"","release":"Rel-16","crspec":32.156,"crspecversion":"16.9.0","workitem":[{"winame":"TEI15"}],"crnumber":108.0,"crrevision":"","crcategory":"A","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251704.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"Clause 5.2.1","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251705","title":"Rel17 CR TS 32.156 Enhancement of the description of the \u201cisNotifyable\u201d attribute property and correction of the default value for the \u201cisReadable\u201d attribute property","source":"Nokia","contact":"Winnie Nakimuli","contact-id":97608,"tdoctype":"CR","for":"Approval","abstract":"","secretary_remarks":"Source modified on 3\/28\/2025. Original source : Nokia Hungary","agenda_item_sort_order":29,"ainumber":"6.3.11","ainame":"General NRM","tdoc_agenda_sort_order":17050,"status":"not pursued","reservation_date":"2025-03-28 15:19:01","uploaded":"2025-03-28 15:55:57","revisionof":"","revisedto":"","release":"Rel-17","crspec":32.156,"crspecversion":"17.7.0","workitem":[{"winame":"TEI15"}],"crnumber":109.0,"crrevision":"","crcategory":"A","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251705.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"Clause 5.2.1","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251706","title":"Rel18 CR TS 32.156 Enhancement of the description of the \u201cisNotifyable\u201d attribute property and correction of the default value for the \u201cisReadable\u201d attribute property","source":"Nokia","contact":"Winnie Nakimuli","contact-id":97608,"tdoctype":"CR","for":"Approval","abstract":"","secretary_remarks":"Source modified on 3\/28\/2025. Original source : Nokia Hungary","agenda_item_sort_order":29,"ainumber":"6.3.11","ainame":"General NRM","tdoc_agenda_sort_order":17060,"status":"not pursued","reservation_date":"2025-03-28 15:19:01","uploaded":"2025-03-28 15:55:57","revisionof":"","revisedto":"","release":"Rel-18","crspec":32.156,"crspecversion":"18.7.0","workitem":[{"winame":"TEI15"}],"crnumber":110.0,"crrevision":"","crcategory":"A","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251706.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"Clause 5.2.1","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251707","title":"Rel19 CR TS 32.156 Enhancement of the description of the \u201cisNotifyable\u201d attribute property and correction of the default value for the \u201cisReadable\u201d attribute property","source":"Nokia","contact":"Winnie Nakimuli","contact-id":97608,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 3\/28\/2025. Original source : Nokia Hungary","agenda_item_sort_order":29,"ainumber":"6.3.11","ainame":"General NRM","tdoc_agenda_sort_order":17070,"status":"revised","reservation_date":"2025-03-28 15:19:02","uploaded":"2025-03-28 15:55:57","revisionof":"","revisedto":"S5-252107","release":"Rel-19","crspec":32.156,"crspecversion":"19.2.0","workitem":[{"winame":"TEI15"}],"crnumber":111.0,"crrevision":"","crcategory":"A","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251707.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"Clause 5.2.1","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251708","title":"Procedure IAB-node connects to management system","source":"Ericsson","contact":"Junfeng Wang","contact-id":91147,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Title modified on 3\/28\/2025. Original title : Rel-19 CR TS 28.315 Procedure of IAB-node connects to management system<br\/><br\/>Source modified on 3\/28\/2025. Original source : Ericsson Telecomunicazioni SpA<br\/><br\/>Source modified on 28\/03\/2025. Original","agenda_item_sort_order":85,"ainumber":"6.19.16.1","ainame":"Management of IAB nodes","tdoc_agenda_sort_order":17080,"status":"revised","reservation_date":"2025-03-28 15:26:57","uploaded":"2025-03-28 16:11:16","revisionof":"","revisedto":"S5-251993","release":"Rel-19","crspec":28.315,"crspecversion":"18.0.0","workitem":[{"winame":"NR_MOBILE_IAB_OAM"}],"crnumber":1.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251708.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":false,"clauses_affected":"5.1, 5.1.x(new), A.1, A.1.x(new)","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251709","title":"Rel-19 CR TS 28.554 add measurement of coverage satisfaction ratio","source":"CMCC, Huawei, ZTE, CATT","contact":"Bin Wang","contact-id":102472,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":79,"ainumber":"6.19.12","ainame":"5G performance measurements and KPIs phase 4","tdoc_agenda_sort_order":17090,"status":"withdrawn","reservation_date":"2025-03-28 15:28:28","uploaded":null,"revisionof":"","revisedto":"","release":"Rel-19","crspec":28.554,"crspecversion":"19.3.0","workitem":[{"winame":"PM_KPI_5G_Ph4"}],"crnumber":218.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251710","title":"Rel-19 CR TS 28.552 add measurement of coverage satisfaction ratio","source":"CMCC, Huawei, ZTE, CATT","contact":"Bin Wang","contact-id":102472,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":79,"ainumber":"6.19.12","ainame":"5G performance measurements and KPIs phase 4","tdoc_agenda_sort_order":17100,"status":"withdrawn","reservation_date":"2025-03-28 15:36:31","uploaded":null,"revisionof":"","revisedto":"","release":"Rel-19","crspec":28.552,"crspecversion":"19.3.0","workitem":[{"winame":"PM_KPI_5G_Ph4"}],"crnumber":694.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251711","title":"Rel-19 CR 28.623 Update sector equipment and antenna function definitions","source":"Ericsson Canada Inc.","contact":"Mark Scott","contact-id":87586,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":80,"ainumber":"6.19.13","ainame":"5G Advanced NRM features phase 3","tdoc_agenda_sort_order":17110,"status":"revised","reservation_date":"2025-03-28 15:42:32","uploaded":"2025-03-28 21:09:07","revisionof":"","revisedto":"S5-251982","release":"Rel-19","crspec":28.623,"crspecversion":"19.3.0","workitem":[{"winame":"SBMA_Ph3"}],"crnumber":529.0,"crrevision":"","crcategory":"C","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251711.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251712","title":"Rel-19 CR TS 28.552 add measurement of coverage ratio","source":"CMCC, Huawei, ZTE, CATT","contact":"Bin Wang","contact-id":102472,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 3\/28\/2025. Original source : CMCC, Huawei, ZTE, CATT<br\/><br\/>Source modified on 28\/03\/2025. Original source : CMCC, Huawei, ZTE, CATT","agenda_item_sort_order":79,"ainumber":"6.19.12","ainame":"5G performance measurements and KPIs phase 4","tdoc_agenda_sort_order":17120,"status":"not pursued","reservation_date":"2025-03-28 15:51:26","uploaded":"2025-03-28 16:01:17","revisionof":"","revisedto":"","release":"Rel-19","crspec":28.552,"crspecversion":"19.3.0","workitem":[{"winame":"PM_KPI_5G_Ph4"}],"crnumber":695.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251712.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":false,"clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251713","title":"Input to DraftCR Rel-19 TS 28.105 Fix wrong reference and add RRC report","source":"Ericsson GmbH, Eurolab","contact":"Jose Antonio Ordo\u00f1ez Lucena","contact-id":105406,"tdoctype":"other","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":61,"ainumber":"6.19.1.1","ainame":"AI\/ML management phase 2","tdoc_agenda_sort_order":17130,"status":"not treated","reservation_date":"2025-03-28 15:53:16","uploaded":"2025-03-28 20:39:35","revisionof":"","revisedto":"","release":"Rel-19","crspec":28.105,"crspecversion":"","workitem":[{"winame":"AIML_MGT_Ph2"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251713.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251714","title":"Rel-19 CR TS 28.554 add measurement of coverage ratio","source":"CMCC, Huawei, ZTE, CATT","contact":"Bin Wang","contact-id":102472,"tdoctype":"CR","for":"Approval","abstract":"","secretary_remarks":"Source modified on 3\/28\/2025. Original source : CMCC, Huawei, ZTE, CATT","agenda_item_sort_order":79,"ainumber":"6.19.12","ainame":"5G performance measurements and KPIs phase 4","tdoc_agenda_sort_order":17140,"status":"not pursued","reservation_date":"2025-03-28 15:54:17","uploaded":"2025-03-28 16:07:11","revisionof":"","revisedto":"","release":"Rel-19","crspec":28.554,"crspecversion":"19.3.0","workitem":[{"winame":"PM_KPI_5G_Ph4"}],"crnumber":219.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251714.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":false,"clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251715","title":"Rel-19 CR TS 28.104 Fix wrong reference and add RRC report","source":"Ericsson GmbH, Eurolab","contact":"Jose Antonio Ordo\u00f1ez Lucena","contact-id":105406,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 3\/28\/2025. Original source : Ericsson GmbH, Eurolab","agenda_item_sort_order":63,"ainumber":"6.19.2.1","ainame":"Management Data Analytics phase 3","tdoc_agenda_sort_order":17150,"status":"revised","reservation_date":"2025-03-28 15:55:18","uploaded":"2025-03-28 20:39:35","revisionof":"","revisedto":"S5-251882","release":"Rel-19","crspec":28.104,"crspecversion":"19.1.0","workitem":[{"winame":"eMDAS_Ph3"}],"crnumber":212.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251715.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"2, 4, 5.1, 8.4.1.1.2","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251716","title":"Rel-18 CR TS 28.318 Fix affectedArea attribute for DSO service outage use case","source":"Ericsson GmbH, Eurolab","contact":"Jose Antonio Ordo\u00f1ez Lucena","contact-id":105406,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Title modified on 3\/28\/2025. Original title :  Rel-18 CR TS 28.318 Fix affectedArea attribute for DSO service outage use case<br\/><br\/>Source modified on 3\/28\/2025. Original source : Ericsson GmbH, Eurolab","agenda_item_sort_order":56,"ainumber":"6.4.24","ainame":"Network and Service Operations for Energy Utilities","tdoc_agenda_sort_order":17160,"status":"agreed","reservation_date":"2025-03-28 15:56:47","uploaded":"2025-03-28 20:39:35","revisionof":"","revisedto":"","release":"Rel-18","crspec":28.318,"crspecversion":"18.1.0","workitem":[{"winame":"NSOEU"}],"crnumber":13.0,"crrevision":"","crcategory":"F","tsg_crp":"SP-250545","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251716.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":false,"clauses_affected":"6.3.2.1, 6.3.2.2, 6.4.1, Forge","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251717","title":"Rel-19 CR TS 28.318 Fix affectedArea attribute for DSO service outage use case","source":"Ericsson GmbH, Eurolab","contact":"Jose Antonio Ordo\u00f1ez Lucena","contact-id":105406,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 3\/28\/2025. Original source : Ericsson GmbH, Eurolab","agenda_item_sort_order":56,"ainumber":"6.4.24","ainame":"Network and Service Operations for Energy Utilities","tdoc_agenda_sort_order":17170,"status":"agreed","reservation_date":"2025-03-28 15:57:41","uploaded":"2025-03-28 20:39:35","revisionof":"","revisedto":"","release":"Rel-19","crspec":28.318,"crspecversion":"19.0.0","workitem":[{"winame":"NSOEU"}],"crnumber":14.0,"crrevision":"","crcategory":"A","tsg_crp":"SP-250545","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251717.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":false,"clauses_affected":"6.3.2.1, 6.3.2.2, 6.4.1, Forge","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251718","title":"pCR TR 28.869 Adopt NF Deployment terminology in scaling use case","source":"Ericsson Telecomunicazioni SpA","contact":"Junfeng Wang","contact-id":91147,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":70,"ainumber":"6.19.6","ainame":"Study on Cloud Aspects of Management and Orchestration","tdoc_agenda_sort_order":17180,"status":"revised","reservation_date":"2025-03-28 15:59:23","uploaded":"2025-03-28 16:09:12","revisionof":"","revisedto":"S5-252012","release":"Rel-19","crspec":28.869,"crspecversion":"1.3.0","workitem":[{"winame":"FS_Cloud_OAM"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251718.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251719","title":"pCR TR 28.869 Detail procedure flow for creation of NF Deployment","source":"Ericsson Telecomunicazioni SpA","contact":"Junfeng Wang","contact-id":91147,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":70,"ainumber":"6.19.6","ainame":"Study on Cloud Aspects of Management and Orchestration","tdoc_agenda_sort_order":17190,"status":"revised","reservation_date":"2025-03-28 16:01:26","uploaded":"2025-03-28 16:09:12","revisionof":"","revisedto":"S5-251888","release":"Rel-19","crspec":28.869,"crspecversion":"1.3.0","workitem":[{"winame":"FS_Cloud_OAM"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251719.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251720","title":"DP on Solution-agnostic request for service provisioning","source":"Ericsson GmbH, Eurolab","contact":"Jose Antonio Ordo\u00f1ez Lucena","contact-id":105406,"tdoctype":"discussion","for":"Endorsement","abstract":"","secretary_remarks":"","agenda_item_sort_order":80,"ainumber":"6.19.13","ainame":"5G Advanced NRM features phase 3","tdoc_agenda_sort_order":17200,"status":"noted","reservation_date":"2025-03-28 16:01:34","uploaded":"2025-03-28 20:39:35","revisionof":"","revisedto":"","release":"Rel-19","crspec":"","crspecversion":"","workitem":[{"winame":"AdNRM_Ph3"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251720.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251721","title":"Rel-19 CR TS 28.541 Enhance network slicing model to support solution-agnostic service provisioning request.","source":"Ericsson GmbH, Eurolab","contact":"Jose Antonio Ordo\u00f1ez Lucena","contact-id":105406,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Title modified on 3\/28\/2025. Original title : Rel-19 CR TS 28.541 Enhance network slicing model to support solution-agnostic service provisioning<br\/><br\/>Source modified on 3\/28\/2025. Original source : Ericsson GmbH, Eurolab","agenda_item_sort_order":80,"ainumber":"6.19.13","ainame":"5G Advanced NRM features phase 3","tdoc_agenda_sort_order":17210,"status":"not pursued","reservation_date":"2025-03-28 16:02:23","uploaded":"2025-03-28 20:39:35","revisionof":"","revisedto":"","release":"Rel-19","crspec":28.541,"crspecversion":"19.3.0","workitem":[{"winame":"AdNRM_Ph3"}],"crnumber":1524.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251721.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"6.3.3.1, 6.3.3.2, 6.3.4.1, 6.4.1, Forge","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251722","title":"pCR TR 28.869 Specification structure for LCM of NF Deployment","source":"Ericsson Telecomunicazioni SpA","contact":"Junfeng Wang","contact-id":91147,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":70,"ainumber":"6.19.6","ainame":"Study on Cloud Aspects of Management and Orchestration","tdoc_agenda_sort_order":17220,"status":"revised","reservation_date":"2025-03-28 16:03:23","uploaded":"2025-03-28 16:09:12","revisionof":"","revisedto":"S5-252016","release":"Rel-19","crspec":28.869,"crspecversion":"1.3.0","workitem":[{"winame":"FS_Cloud_OAM"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251722.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251723","title":"Rel-19 CR TS 28.531 Add requirements to support solution-agnostic request for service provisioning","source":"Ericsson GmbH, Eurolab","contact":"Jose Antonio Ordo\u00f1ez Lucena","contact-id":105406,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 3\/28\/2025. Original source : Ericsson GmbH, Eurolab","agenda_item_sort_order":80,"ainumber":"6.19.13","ainame":"5G Advanced NRM features phase 3","tdoc_agenda_sort_order":17230,"status":"not pursued","reservation_date":"2025-03-28 16:03:59","uploaded":"2025-03-28 20:39:35","revisionof":"","revisedto":"","release":"Rel-19","crspec":28.531,"crspecversion":"19.0.0","workitem":[{"winame":"AdNRM_Ph3"}],"crnumber":244.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251723.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"5.2.1, 5.2.2","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251724","title":"Rel-19 CR TS 28.533 Update Annex E","source":"Ericsson GmbH, Eurolab","contact":"Jose Antonio Ordo\u00f1ez Lucena","contact-id":105406,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 3\/28\/2025. Original source : Ericsson GmbH, Eurolab","agenda_item_sort_order":73,"ainumber":"6.19.8.1","ainame":"Service Based Management Architecture enhancement phase 3","tdoc_agenda_sort_order":17240,"status":"revised","reservation_date":"2025-03-28 16:05:12","uploaded":"2025-03-28 20:39:35","revisionof":"","revisedto":"S5-251937","release":"Rel-19","crspec":28.533,"crspecversion":"19.1.0","workitem":[{"winame":"SBMA_Ph3"}],"crnumber":155.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251724.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"2, Annex E","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251725","title":"pCR TR 28.869 Update Annex D for example scenario for creation of NF Deployment instance","source":"Ericsson Telecomunicazioni SpA","contact":"Junfeng Wang","contact-id":91147,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":70,"ainumber":"6.19.6","ainame":"Study on Cloud Aspects of Management and Orchestration","tdoc_agenda_sort_order":17250,"status":"revised","reservation_date":"2025-03-28 16:05:26","uploaded":"2025-03-28 16:09:12","revisionof":"","revisedto":"S5-251894","release":"Rel-19","crspec":28.869,"crspecversion":"1.3.0","workitem":[{"winame":"FS_Cloud_OAM"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251725.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251726","title":"Rel-19 CR TS 28.622 Correction of Area Scope Parameter","source":"Nokia","contact":"Christiane Allwang","contact-id":90208,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 3\/28\/2025. Original source : Nokia","agenda_item_sort_order":59,"ainumber":"6.4.27","ainame":"OAM Rel-19 small enhancements","tdoc_agenda_sort_order":17260,"status":"agreed","reservation_date":"2025-03-28 16:06:01","uploaded":"2025-03-28 16:12:11","revisionof":"","revisedto":"","release":"Rel-19","crspec":28.622,"crspecversion":"19.3.0","workitem":[{"winame":"TEI19"}],"crnumber":551.0,"crrevision":"","crcategory":"F","tsg_crp":"SP-250559","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251726.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"4.3.38.1","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251727","title":"Rel-19 CR TS 32.422 Correction of Area Scope Parameter","source":"Nokia","contact":"Christiane Allwang","contact-id":90208,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 3\/28\/2025. Original source : Nokia","agenda_item_sort_order":59,"ainumber":"6.4.27","ainame":"OAM Rel-19 small enhancements","tdoc_agenda_sort_order":17270,"status":"agreed","reservation_date":"2025-03-28 16:06:02","uploaded":"2025-03-28 16:12:11","revisionof":"","revisedto":"","release":"Rel-19","crspec":32.422,"crspecversion":"19.2.0","workitem":[{"winame":"TEI19"}],"crnumber":517.0,"crrevision":"","crcategory":"D","tsg_crp":"SP-250559","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251727.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"5.10.2","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251728","title":"Rel-19 CR TS 28.622 Remove stage-3 clarifications for Float datatype","source":"Ericsson GmbH, Eurolab","contact":"Jose Antonio Ordo\u00f1ez Lucena","contact-id":105406,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 3\/28\/2025. Original source : Ericsson GmbH, Eurolab","agenda_item_sort_order":80,"ainumber":"6.19.13","ainame":"5G Advanced NRM features phase 3","tdoc_agenda_sort_order":17280,"status":"revised","reservation_date":"2025-03-28 16:06:43","uploaded":"2025-03-28 20:39:35","revisionof":"","revisedto":"S5-251973","release":"Rel-19","crspec":28.622,"crspecversion":"19.3.0","workitem":[{"winame":"AdNRM_Ph3"}],"crnumber":552.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251728.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"5.2","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251729","title":"Rel-18 CR TS 28.557 Fix wrong references and correct solution for NPN-SC mgmt","source":"Ericsson GmbH, Eurolab","contact":"Jose Antonio Ordo\u00f1ez Lucena","contact-id":105406,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 3\/28\/2025. Original source : Ericsson GmbH, Eurolab","agenda_item_sort_order":55,"ainumber":"6.4.23","ainame":"Management of non-public networks phase 2","tdoc_agenda_sort_order":17290,"status":"revised","reservation_date":"2025-03-28 16:10:23","uploaded":"2025-03-28 20:39:35","revisionof":"","revisedto":"S5-252082","release":"Rel-18","crspec":28.557,"crspecversion":"18.3.0","workitem":[{"winame":"OAM_NPN_Ph2"}],"crnumber":17.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251729.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"2, 6.1.2, 6.1.3, 6.1.5, 6.3.2, B.5","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251730","title":"Rel-19 CR 28.622 Add new generic type KeyValueList","source":"Ericsson India Private Limited","contact":"Balazs Lengyel","contact-id":81420,"tdoctype":"CR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":37,"ainumber":"6.4.5","ainame":"Service based management architecture","tdoc_agenda_sort_order":17300,"status":"revised","reservation_date":"2025-03-28 16:20:42","uploaded":"2025-03-28 16:44:03","revisionof":"","revisedto":"S5-251938","release":"Rel-19","crspec":28.622,"crspecversion":"19.3.0","workitem":[{"winame":"SBMA_Ph3"}],"crnumber":553.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251730.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251731","title":"Rel-19 CR 28.663 Update sector equipment and antenna function definitions","source":"Ericsson Canada Inc.","contact":"Mark Scott","contact-id":87586,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":80,"ainumber":"6.19.13","ainame":"5G Advanced NRM features phase 3","tdoc_agenda_sort_order":17310,"status":"revised","reservation_date":"2025-03-28 16:26:26","uploaded":"2025-03-28 21:08:58","revisionof":"","revisedto":"S5-251983","release":"Rel-19","crspec":28.663,"crspecversion":"18.1.0","workitem":[{"winame":"SBMA_Ph3"}],"crnumber":26.0,"crrevision":"","crcategory":"C","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251731.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251732","title":"Rel-19 CR TS 32.130 Add PLMN granularity performance measurement requirements for Indirect Network Sharing","source":"Esurfing IoT, China Unicom","contact":"Lixin Liang","contact-id":95162,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Title modified on 3\/28\/2025. Original title : Add PLMN granularity performance measurement requirements for Indirect Network Sharing<br\/><br\/>Source modified on 3\/28\/2025. Original source : Esurfing IoT, China Unicom","agenda_item_sort_order":91,"ainumber":"6.19.19.1","ainame":"Management of Network Sharing Phase 3","tdoc_agenda_sort_order":17320,"status":"revised","reservation_date":"2025-03-28 16:41:29","uploaded":"2025-03-28 16:59:28","revisionof":"","revisedto":"S5-252008","release":"Rel-19","crspec":32.13,"crspecversion":"19.0.0","workitem":[{"winame":"NetShare_OAM_Ph3"}],"crnumber":52.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251732.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"5.1.7","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251733","title":"Rel-19 CR 28.532 Add new notifications for reliability","source":"Ericsson India Private Limited","contact":"Balazs Lengyel","contact-id":81420,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":73,"ainumber":"6.19.8.1","ainame":"Service Based Management Architecture enhancement phase 3","tdoc_agenda_sort_order":17330,"status":"revised","reservation_date":"2025-03-28 16:47:28","uploaded":"2025-03-28 21:59:19","revisionof":"","revisedto":"S5-251939, S5-252320","release":"Rel-19","crspec":28.532,"crspecversion":"19.0.0","workitem":[{"winame":"SBMA_Ph3"}],"crnumber":381.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251733.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251734","title":"Correction of the description of the attribute stmTargetUri","source":"Nokia Germany","contact":"J\u00fcrgen Goerge","contact-id":78655,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":96,"ainumber":"6.19.22","ainame":"Management for MonStra (completed)","tdoc_agenda_sort_order":17340,"status":"revised","reservation_date":"2025-03-28 17:23:33","uploaded":"2025-03-28 17:45:30","revisionof":"","revisedto":"S5-252091","release":"Rel-19","crspec":28.56,"crspecversion":"19.1.0","workitem":[{"winame":"Monstra-OAM"}],"crnumber":8.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251734.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251735","title":"Rel-19 CR TS 28.532 PM File extension","source":"Ericsson LM","contact":"Qiang Zu","contact-id":42296,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":79,"ainumber":"6.19.12","ainame":"5G performance measurements and KPIs phase 4","tdoc_agenda_sort_order":17350,"status":"revised","reservation_date":"2025-03-28 17:38:53","uploaded":"2025-03-28 17:40:42","revisionof":"","revisedto":"S5-252023","release":"Rel-19","crspec":28.532,"crspecversion":"19.0.0","workitem":[{"winame":"PM_KPI_5G_Ph4"}],"crnumber":382.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251735.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251736","title":"Rel-19 CR TS 28.104 Multi Domain Resource Optimization","source":"Nokia","contact":"Sreekumar Pothera Kalloor","contact-id":103772,"tdoctype":"CR","for":"Approval","abstract":"","secretary_remarks":"Source modified on 3\/28\/2025. Original source : Nokia","agenda_item_sort_order":63,"ainumber":"6.19.2.1","ainame":"Management Data Analytics phase 3","tdoc_agenda_sort_order":17360,"status":"revised","reservation_date":"2025-03-28 18:10:28","uploaded":"2025-03-28 20:19:20","revisionof":"","revisedto":"S5-251794","release":"Rel-19","crspec":28.104,"crspecversion":"19.1.0","workitem":[{"winame":"eMDAS_Ph3"}],"crnumber":213.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251736.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"3.3, 7.2.x, 8.5.1.2, 8.5.x, ","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251737","title":"Rel-19 CR TS 28.558 Correction on the UE identifer","source":"Nokia","contact":"Sreekumar Pothera Kalloor","contact-id":103772,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Title modified on 3\/28\/2025. Original title : Rel-19 CR TS 28.558 Corrections on the UE identifer<br\/><br\/>Source modified on 3\/28\/2025. Original source : Nokia","agenda_item_sort_order":41,"ainumber":"6.4.9","ainame":"5G performance measurements and KPIs phase 3","tdoc_agenda_sort_order":17370,"status":"revised","reservation_date":"2025-03-28 18:10:29","uploaded":"2025-03-28 18:32:18","revisionof":"","revisedto":"S5-252077","release":"Rel-19","crspec":28.558,"crspecversion":"19.3.0","workitem":[{"winame":"PM_KPI_5G_Ph3"}],"crnumber":34.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251737.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"6.3.1.1.1, 6.3.1.1.2, 6.3.1.1.3, 6.3.1.1.4, 6.3.1.1.5, 6.3.1.1.6, 6.3.1.1.7, 6.3.1.1.8, 6.3.1.2.1, 6.3.1.2.2, 6.3.1.3.1, 6.3.1.3.2, 6.3.1.3.3, 6.3.1.4.1, 6.3.1.4.2","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251738","title":"Rel-19 CR TS 28.552 Corrections on Filter Definition","source":"Nokia","contact":"Sreekumar Pothera Kalloor","contact-id":103772,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Title modified on 3\/28\/2025. Original title : Rel-18 CR TS 28.552 Corrections on Filter Definition<br\/><br\/>Source modified on 3\/28\/2025. Original source : Nokia","agenda_item_sort_order":41,"ainumber":"6.4.9","ainame":"5G performance measurements and KPIs phase 3","tdoc_agenda_sort_order":17380,"status":"not pursued","reservation_date":"2025-03-28 18:10:31","uploaded":"2025-03-28 18:23:12","revisionof":"","revisedto":"","release":"Rel-18","crspec":28.552,"crspecversion":"18.10.0","workitem":[{"winame":"PM_KPI_5G_Ph3"}],"crnumber":696.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251738.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251739","title":"Rel-19 CR TS 28.552 Corrections on Filter Definition","source":"Nokia","contact":"Sreekumar Pothera Kalloor","contact-id":103772,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 3\/28\/2025. Original source : Nokia","agenda_item_sort_order":41,"ainumber":"6.4.9","ainame":"5G performance measurements and KPIs phase 3","tdoc_agenda_sort_order":17390,"status":"not pursued","reservation_date":"2025-03-28 18:10:32","uploaded":"2025-03-28 18:27:34","revisionof":"","revisedto":"","release":"Rel-19","crspec":28.552,"crspecversion":"19.3.0","workitem":[{"winame":"PM_KPI_5G_Ph3"}],"crnumber":697.0,"crrevision":"","crcategory":"A","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251739.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251740","title":"New SID on Study for Data management phase 3","source":"Nokia","contact":"Sreekumar Pothera Kalloor","contact-id":103772,"tdoctype":"SID new","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":12,"ainumber":"5.5","ainame":"Rel-20 topic preparation","tdoc_agenda_sort_order":17400,"status":"revised","reservation_date":"2025-03-28 18:10:33","uploaded":"2025-03-28 18:35:02","revisionof":"","revisedto":"S5-251781","release":"Rel-20","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251740.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251741","title":"Continuous MDT Discussion","source":"Nokia","contact":"Sreekumar Pothera Kalloor","contact-id":103772,"tdoctype":"discussion","for":"Endorsement","abstract":"","secretary_remarks":"","agenda_item_sort_order":14,"ainumber":"6.1","ainame":"OAM&P Plenary","tdoc_agenda_sort_order":17410,"status":"noted","reservation_date":"2025-03-28 18:10:33","uploaded":"2025-03-28 18:43:40","revisionof":"","revisedto":"","release":"Rel-19","crspec":"","crspecversion":"","workitem":[{"winame":"TraceQoE_OAM"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251741.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251742","title":"Reply LS on Continuous MDT","source":"SA5","contact":"Sreekumar Pothera Kalloor","contact-id":103772,"tdoctype":"LS out","for":"Approval","abstract":"Nokia","secretary_remarks":"","agenda_item_sort_order":14,"ainumber":"6.1","ainame":"OAM&P Plenary","tdoc_agenda_sort_order":17420,"status":"revised","reservation_date":"2025-03-28 18:10:33","uploaded":"2025-03-28 18:50:04","revisionof":"","revisedto":"","release":"Rel-19","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"RAN3","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251742.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251743","title":"Rel-19 CR 28.532 Update notifications with common header","source":"Ericsson India Private Limited","contact":"Balazs Lengyel","contact-id":81420,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":73,"ainumber":"6.19.8.1","ainame":"Service Based Management Architecture enhancement phase 3","tdoc_agenda_sort_order":17430,"status":"agreed","reservation_date":"2025-03-28 18:29:14","uploaded":"2025-03-28 19:51:27","revisionof":"","revisedto":"","release":"Rel-19","crspec":28.532,"crspecversion":"19.0.0","workitem":[{"winame":"SBMA_Ph3"}],"crnumber":383.0,"crrevision":"","crcategory":"B","tsg_crp":"SP-250553","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251743.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251744","title":"DP cloud native NF data streaming - connection based vs pub-sub based","source":"Rakuten Mobile, Inc","contact":"KEXUAN SUN","contact-id":105840,"tdoctype":"discussion","for":"Endorsement","abstract":"","secretary_remarks":"","agenda_item_sort_order":70,"ainumber":"6.19.6","ainame":"Study on Cloud Aspects of Management and Orchestration","tdoc_agenda_sort_order":17440,"status":"revised","reservation_date":"2025-03-28 18:57:09","uploaded":"2025-03-28 19:10:22","revisionof":"","revisedto":"S5-252009","release":"Rel-19","crspec":28.869,"crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251744.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251745","title":"Rel-19 CR TS 28.540 Adding requirement to control RedCap and e-RedCap UEs access based on network conditions","source":"Samsung Electronics GmbH","contact":"Ashutosh Kaushik","contact-id":91962,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Title modified on 3\/28\/2025. Original title : Rel-19 CR TS 28.540 Adding requirements to control RedCap and e-RedCap UEs access<br\/><br\/>Source modified on 3\/28\/2025. Original source : Samsung Electronics GmbH","agenda_item_sort_order":87,"ainumber":"6.19.17.1","ainame":"Management Aspects of RedCap features","tdoc_agenda_sort_order":17450,"status":"revised","reservation_date":"2025-03-28 18:57:59","uploaded":"2025-03-28 19:27:22","revisionof":"","revisedto":"S5-251997","release":"Rel-19","crspec":28.54,"crspecversion":"19.0.0","workitem":[{"winame":"NR_RedCap_OAM"}],"crnumber":39.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251745.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"5.10","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251746","title":"Pseudo-CR on enhance annex examples for data streaming for cloud native network function","source":"Rakuten Mobile, Inc","contact":"KEXUAN SUN","contact-id":105840,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":70,"ainumber":"6.19.6","ainame":"Study on Cloud Aspects of Management and Orchestration","tdoc_agenda_sort_order":17460,"status":"merged","reservation_date":"2025-03-28 18:59:21","uploaded":"2025-03-28 19:10:22","revisionof":"","revisedto":"","release":"Rel-19","crspec":28.869,"crspecversion":"1.3.0","workitem":[{"winame":"FS_Cloud_OAM"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251746.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251747","title":"Pseudo-CR on Add evaluation and conclusion for management data streaming based on message bus","source":"Rakuten Mobile, Inc","contact":"KEXUAN SUN","contact-id":105840,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":70,"ainumber":"6.19.6","ainame":"Study on Cloud Aspects of Management and Orchestration","tdoc_agenda_sort_order":17470,"status":"noted","reservation_date":"2025-03-28 19:00:39","uploaded":"2025-03-28 19:10:22","revisionof":"","revisedto":"","release":"Rel-19","crspec":28.869,"crspecversion":"1.3.0","workitem":[{"winame":"FS_Cloud_OAM"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251747.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251748","title":"Rel-19 CR TS 28.541 Enhancing NR NRM to control RedCap and e-RedCap UEs access","source":"Samsung Electronics GmbH","contact":"Ashutosh Kaushik","contact-id":91962,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":87,"ainumber":"6.19.17.1","ainame":"Management Aspects of RedCap features","tdoc_agenda_sort_order":17480,"status":"revised","reservation_date":"2025-03-28 19:00:52","uploaded":"2025-03-28 19:27:22","revisionof":"","revisedto":"S5-252111","release":"Rel-19","crspec":28.541,"crspecversion":"19.3.0","workitem":[{"winame":"NR_RedCap_OAM"}],"crnumber":1525.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251748.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251749","title":"Rel-19 pCR TS 28.567 Procedure and metrics for CCL performance monitoring","source":"Samsung Electronics GmbH","contact":"Ashutosh Kaushik","contact-id":91962,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":67,"ainumber":"6.19.4.1","ainame":"Closed Control Loop Management","tdoc_agenda_sort_order":17490,"status":"revised","reservation_date":"2025-03-28 19:15:46","uploaded":"2025-03-28 19:27:22","revisionof":"","revisedto":"S5-252033","release":"Rel-19","crspec":28.567,"crspecversion":"0.1.0","workitem":[{"winame":"CCLM"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251749.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251750","title":"Rel-19 CR 28.312 Add generic utility function support (stage 2)","source":"Ericsson Canada Inc.","contact":"Mark Scott","contact-id":87586,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":65,"ainumber":"6.19.3.1","ainame":"Intent driven management services for mobile network phase 3","tdoc_agenda_sort_order":17500,"status":"revised","reservation_date":"2025-03-28 21:16:52","uploaded":"2025-03-28 21:21:28","revisionof":"","revisedto":"S5-251921","release":"Rel-19","crspec":28.312,"crspecversion":"19.1.0","workitem":[{"winame":"IDMS_MN_Ph3"}],"crnumber":337.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251750.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251751","title":"Rel-19 pCR TS 28.572 Plan Configuration Examples","source":"Ericsson India Private Limited","contact":"Balazs Lengyel","contact-id":81420,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":75,"ainumber":"6.19.9.1","ainame":"Management of planned configurations","tdoc_agenda_sort_order":17510,"status":"withdrawn","reservation_date":"2025-03-28 22:02:57","uploaded":"2025-03-28 22:06:59","revisionof":"","revisedto":"","release":"Rel-19","crspec":28.572,"crspecversion":"0.3.0","workitem":[{"winame":"PlanM"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251751.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251752","title":"Rel-19 CR 28.622 Reliable notification transfer","source":"Ericsson Hungary Ltd","contact":"Balazs Lengyel","contact-id":81420,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":73,"ainumber":"6.19.8.1","ainame":"Service Based Management Architecture enhancement phase 3","tdoc_agenda_sort_order":17520,"status":"revised","reservation_date":"2025-03-28 22:22:37","uploaded":"2025-03-28 22:30:49","revisionof":"S5-250888","revisedto":"S5-251940","release":"Rel-19","crspec":28.622,"crspecversion":"19.3.0","workitem":[{"winame":"SBMA_Ph3"}],"crnumber":513.0,"crrevision":2.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251752.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251753","title":"Rel-19 pCR TS 28.572 Plan Activation Results","source":"Ericsson India Private Limited","contact":"Balazs Lengyel","contact-id":81420,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":75,"ainumber":"6.19.9.1","ainame":"Management of planned configurations","tdoc_agenda_sort_order":17530,"status":"withdrawn","reservation_date":"2025-03-28 22:40:22","uploaded":"2025-03-28 22:43:29","revisionof":"","revisedto":"","release":"Rel-19","crspec":28.572,"crspecversion":"0.3.0","workitem":[{"winame":"PlanM"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251753.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251754","title":"Discussion paper on: Long Running Configuration Reads","source":"Ericsson India Private Limited","contact":"Balazs Lengyel","contact-id":81420,"tdoctype":"discussion","for":"Endorsement","abstract":"","secretary_remarks":"","agenda_item_sort_order":75,"ainumber":"6.19.9.1","ainame":"Management of planned configurations","tdoc_agenda_sort_order":17540,"status":"withdrawn","reservation_date":"2025-03-28 22:58:18","uploaded":"2025-03-28 22:59:46","revisionof":"","revisedto":"","release":"Rel-19","crspec":28.572,"crspecversion":"","workitem":[{"winame":"PlanM"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251754.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251755","title":"pCR DraftCR Rel-19 TS 28.105 Editorials corrections to the requirements of Managing ML models in use in a live network","source":"NEC Europe Ltd","contact":"Hassan Al-kanani","contact-id":47274,"tdoctype":"other","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":61,"ainumber":"6.19.1.1","ainame":"AI\/ML management phase 2","tdoc_agenda_sort_order":17550,"status":"merged","reservation_date":"2025-03-28 23:12:51","uploaded":"2025-03-28 23:41:55","revisionof":"","revisedto":"","release":"Rel-19","crspec":28.105,"crspecversion":"","workitem":[{"winame":"AIML_MGT_Ph2"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251755.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251756","title":"Input to Draft CR Rel-19 CR TS 28.105 Pre-specialized training and Fine-tuning","source":"NEC, Intel","contact":"Hassan Al-kanani","contact-id":47274,"tdoctype":"other","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":61,"ainumber":"6.19.1.1","ainame":"AI\/ML management phase 2","tdoc_agenda_sort_order":17560,"status":"revised","reservation_date":"2025-03-28 23:16:20","uploaded":"2025-03-28 23:41:55","revisionof":"","revisedto":"S5-251782","release":"Rel-19","crspec":28.105,"crspecversion":"","workitem":[{"winame":"AIML_MGT_Ph2"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251756.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251757","title":"Input to draft CR TS 28.105 add NRM for ML pre-training and fine-tuning","source":"NEC, Intel","contact":"Hassan Al-kanani","contact-id":47274,"tdoctype":"other","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":61,"ainumber":"6.19.1.1","ainame":"AI\/ML management phase 2","tdoc_agenda_sort_order":17570,"status":"revised","reservation_date":"2025-03-28 23:32:29","uploaded":"2025-03-28 23:41:55","revisionof":"","revisedto":"S5-251783","release":"Rel-19","crspec":28.105,"crspecversion":"","workitem":[{"winame":"AIML_MGT_Ph2"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251757.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251758","title":"Selecting the Release for the SA5 OAM and Charging aspects","source":"SA5 leadership & MCC","contact":"Lan Zou","contact-id":35534,"tdoctype":"other","for":"Agreement","abstract":"This document was triggered by SA5 charging Rel-19 new WID  proposals in SA#107, but the release selection issue may also be applicable to OAM.\nThe following slides was copy and adjusted from SP-250327.\nSA5 leaders ask the group to discuss this issue considering both Charging\/OAM aspects in SA5#160\/#161 and provide way forward to SA#108 for the preparation of Rel-20 release planning.\nAction 1: for each Feature, identify whether Charging\/OAM is required or not\nAction 2: set a default completion time for Charging\/OAM\nAction 3: what to do when Charging\/OAM is required but has not been defined by the deadline ?\n\nWhether each Feature requires Charging\/OAM aspects or not shall be clear\nThis shall be first specified at the Feature\u2019s creation, and this can be revisited at any time. \nContributions are strongly invited at any time, in particular from operators\nIt may be possible that not all the Features require Charging\/OAM aspects specification. \nCurrently, whenever Charging\/OAM aspects have not been specified for a given Feature, it is not clear whether this is:\nIntentional, because no Charging\/OAM is needed, or \nBecause Charging\/OAM aspects are still pending specification\nThe means to identify whether Charging\/OAM aspects are required or not may include:\nA clearer indication in the WID template (e.g. a tick-box stating: \u201cDoes this Feature require the specification of charging aspects?\u201d)\nAnd\/or a table in SA5 Chair\u2019s report to SA, tracking the status of all the \u201cFeatures requiring Charging\/OAM\u201d, for as long as the Charging\/OAM has not been completed in the current release\nSA is asked to endorse the statement in bold, italics\n\nFor those Features that require Charging\/OAM but for which the Charging\/OAM could not be completed on time, exceptions sheets can be used, as for other Stages\nIf, at the Charging\/OAM completion time (potentially extended by the exception sheet), the Charging\/OAM is (still) not completed, then 2 different handlings are possible: \nPostpone the entire Feature (i.e. all its 3 stages) to the next Release\nas done e.g. with Stage 1 when Stages 2\/3 are not completed in the same originally-planed Release in Stage 1\nOR Keep the Feature in its original Release (Release n) and allow the Charging\/OAM aspects to be in the subsequent Release [n+1]\nThis would imply that the Feature in Release n is either not chargeable\/manageable, or it is charged\/managed with a proprietary solution. The proprietary solution may be replaced by 3GPP solution when\/if this solution is specified in release [n+x]\nSA is asked to endorse the statement in the first bullet, and to provide guidance on the second bullet","secretary_remarks":"","agenda_item_sort_order":8,"ainumber":"5.1","ainame":"Administrative issues at SA5 level","tdoc_agenda_sort_order":17580,"status":"revised","reservation_date":"2025-03-31 08:28:45","uploaded":"2025-03-31 14:49:53","revisionof":"","revisedto":"S5-251770","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251758.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251759","title":"Draft TS28.561","source":"China Mobile","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"draft TS","for":"Discussion","abstract":"","secretary_remarks":"","agenda_item_sort_order":69,"ainumber":"6.19.5.1","ainame":"Management aspects of Network Digital Twins","tdoc_agenda_sort_order":175900,"status":"approved","reservation_date":"2025-04-23 08:53:50","uploaded":"2025-04-23 09:01:12","revisionof":"","revisedto":"","release":"Rel-19","crspec":28.561,"crspecversion":"0.2.0","workitem":[{"winame":"NDT"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251759.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251760","title":"Draft TS28.567","source":"Nokia","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"draft TS","for":"Discussion","abstract":"","secretary_remarks":"","agenda_item_sort_order":67,"ainumber":"6.19.4.1","ainame":"Closed Control Loop Management","tdoc_agenda_sort_order":176000,"status":"approved","reservation_date":"2025-04-23 08:53:51","uploaded":"2025-04-23 09:01:12","revisionof":"","revisedto":"","release":"Rel-19","crspec":28.567,"crspecversion":"0.2.0","workitem":[{"winame":"CCLM"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251760.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251761","title":"Draft TS28.572","source":"Nokia","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"draft TS","for":"Discussion","abstract":"","secretary_remarks":"","agenda_item_sort_order":75,"ainumber":"6.19.9.1","ainame":"Management of planned configurations","tdoc_agenda_sort_order":176100,"status":"approved","reservation_date":"2025-04-23 08:53:53","uploaded":null,"revisionof":"","revisedto":"","release":"Rel-19","crspec":28.572,"crspecversion":"0.4.0","workitem":[{"winame":"PlanM"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251762","title":"Draft TS28.579","source":"Nokia","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"draft TS","for":"Discussion","abstract":"","secretary_remarks":"","agenda_item_sort_order":95,"ainumber":"6.19.21.1","ainame":"Enhanced OAM for management service exposure to external consumers through CAPIF","tdoc_agenda_sort_order":176200,"status":"approved","reservation_date":"2025-04-23 08:53:55","uploaded":"2025-04-23 09:01:12","revisionof":"","revisedto":"","release":"Rel-19","crspec":28.579,"crspecversion":"0.2.0","workitem":[{"winame":"MExpo"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251762.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251763","title":"Draft TR28.869","source":"China Mobile","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"draft TR","for":"Discussion","abstract":"","secretary_remarks":"","agenda_item_sort_order":70,"ainumber":"6.19.6","ainame":"Study on Cloud Aspects of Management and Orchestration","tdoc_agenda_sort_order":176300,"status":"approved","reservation_date":"2025-04-23 08:53:56","uploaded":"2025-04-23 09:01:12","revisionof":"","revisedto":"","release":"Rel-19","crspec":28.869,"crspecversion":"1.4.0","workitem":[{"winame":"FS_Cloud_OAM"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251763.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251764","title":"Rel-19 draftCR TS28.105","source":"NEC","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"draftCR","for":"Discussion","abstract":"","secretary_remarks":"","agenda_item_sort_order":61,"ainumber":"6.19.1.1","ainame":"AI\/ML management phase 2","tdoc_agenda_sort_order":176400,"status":"approved","reservation_date":"2025-04-23 08:53:57","uploaded":"2025-04-23 09:01:12","revisionof":"","revisedto":"","release":"Rel-19","crspec":28.105,"crspecversion":"19.2.0","workitem":[{"winame":"AIML_MGT_Ph2"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251764.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251765","title":"Rel-19 draftCR TS28.622","source":"Nokia","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"draftCR","for":"Discussion","abstract":"","secretary_remarks":"","agenda_item_sort_order":76,"ainumber":"6.19.","ainame":"Data management phase 2","tdoc_agenda_sort_order":176500,"status":"approved","reservation_date":"2025-04-23 08:53:57","uploaded":"2025-04-23 09:01:12","revisionof":"","revisedto":"","release":"Rel-19","crspec":28.622,"crspecversion":"19.3.0","workitem":[{"winame":"MADCOL_Ph2"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251765.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251766","title":"Rel-19 SA5 work planning","source":"WG Chair","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"other","for":"Information","abstract":"","secretary_remarks":"","agenda_item_sort_order":8,"ainumber":"5.1","ainame":"Administrative issues at SA5 level","tdoc_agenda_sort_order":12191,"status":"endorsed","reservation_date":"2025-04-23 08:53:57","uploaded":"2025-04-23 09:01:12","revisionof":"S5-251219","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251766.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251767","title":"Rel-20 SA5 work planning","source":"WG Chair","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"other","for":"Information","abstract":"","secretary_remarks":"","agenda_item_sort_order":8,"ainumber":"5.1","ainame":"Administrative issues at SA5 level","tdoc_agenda_sort_order":12201,"status":"endorsed","reservation_date":"2025-04-23 08:53:57","uploaded":"2025-04-23 09:01:12","revisionof":"S5-251220","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251767.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251768","title":"LS to SA for guidance of maintenance of specifications","source":"SA5","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"LS out","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":10,"ainumber":"5.3","ainame":"Liaison statements at SA5 level","tdoc_agenda_sort_order":176800,"status":"revised","reservation_date":"2025-04-23 08:53:57","uploaded":"2025-04-23 09:01:12","revisionof":"","revisedto":"S5-252123","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"TSG SA","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251768.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251769","title":"Maintenance of TSs in SA5","source":"Ericsson","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"discussion","for":"Endorsement","abstract":"","secretary_remarks":"","agenda_item_sort_order":8,"ainumber":"5.1","ainame":"Administrative issues at SA5 level","tdoc_agenda_sort_order":14131,"status":"noted","reservation_date":"2025-04-23 08:53:57","uploaded":"2025-04-23 09:01:12","revisionof":"S5-251413","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251769.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251770","title":"Selecting the Release for the SA5 OAM and Charging aspects","source":"SA5 leadership & MCC","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"other","for":"Information","abstract":"","secretary_remarks":"","agenda_item_sort_order":8,"ainumber":"5.1","ainame":"Administrative issues at SA5 level","tdoc_agenda_sort_order":17581,"status":"noted","reservation_date":"2025-04-23 08:53:57","uploaded":"2025-04-23 09:01:12","revisionof":"S5-251758","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251770.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251771","title":"LS response on Ambient IoT progress of RAN3","source":"SA5","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"LS out","for":"Approval","abstract":"Huawei to draft","secretary_remarks":"","agenda_item_sort_order":10,"ainumber":"5.3","ainame":"Liaison statements at SA5 level","tdoc_agenda_sort_order":13281,"status":"approved","reservation_date":"2025-04-23 08:53:58","uploaded":"2025-04-23 09:01:12","revisionof":"","revisedto":"","release":"Rel-19","crspec":"","crspecversion":"","workitem":[{"winame":"AdNRM_Ph3"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"S5-251328\/R3-250905","lsto":"RAN3, SA2","Cc":"","lsoriginalls":"R3-250905","lsreply":"R3-253181, R3-253803","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251771.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251772","title":"New Study on AI\/ML management enhancements","source":"NEC, Intel","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"SID new","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":12,"ainumber":"5.5","ainame":"Rel-20 topic preparation","tdoc_agenda_sort_order":13161,"status":"noted","reservation_date":"2025-04-23 08:53:58","uploaded":"2025-04-23 09:01:12","revisionof":"S5-251316","revisedto":"","release":"Rel-20","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251772.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251773","title":"New WID on OAM for XR and media services (XRM)","source":"ZTE Corporation","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"WID new","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":12,"ainumber":"5.5","ainame":"Rel-20 topic preparation","tdoc_agenda_sort_order":13661,"status":"noted","reservation_date":"2025-04-23 08:53:58","uploaded":"2025-04-23 09:01:12","revisionof":"S5-251366","revisedto":"","release":"Rel-20","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251773.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251774","title":"New SID on energy efficiency and energy saving aspects of 5G Advanced","source":"Huawei","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"SID new","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":12,"ainumber":"5.5","ainame":"Rel-20 topic preparation","tdoc_agenda_sort_order":13871,"status":"noted","reservation_date":"2025-04-23 08:53:58","uploaded":"2025-04-23 09:01:12","revisionof":"S5-251387","revisedto":"","release":"Rel-20","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251774.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251775","title":"New SID on SBMA enhancement phase 4","source":"Moderator (Huawei)","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"SID new","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":12,"ainumber":"5.5","ainame":"Rel-20 topic preparation","tdoc_agenda_sort_order":14891,"status":"noted","reservation_date":"2025-04-23 08:53:58","uploaded":"2025-04-23 09:01:12","revisionof":"S5-251489","revisedto":"","release":"Rel-20","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251775.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251776","title":"New SID on Management aspect of Network Digital Twins phase 2","source":"China Mobile","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"SID new","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":12,"ainumber":"5.5","ainame":"Rel-20 topic preparation","tdoc_agenda_sort_order":14981,"status":"noted","reservation_date":"2025-04-23 08:53:58","uploaded":"2025-04-23 09:01:12","revisionof":"S5-251498","revisedto":"S5-252421","release":"Rel-20","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251776.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251777","title":"New SID Study on intent driven management services for mobile network phase 4","source":"Moderator (Huawei, Ericsson)","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"SID new","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":12,"ainumber":"5.5","ainame":"Rel-20 topic preparation","tdoc_agenda_sort_order":15581,"status":"noted","reservation_date":"2025-04-23 08:53:58","uploaded":"2025-04-23 09:01:12","revisionof":"S5-251558","revisedto":"S5-252332","release":"Rel-20","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251777.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251778","title":"WID on Study on Management Data Analytics (MDA) \u2013 Phase 4","source":"Huawei Tech. Japan, K.K.","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"SID new","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":12,"ainumber":"5.5","ainame":"Rel-20 topic preparation","tdoc_agenda_sort_order":15931,"status":"noted","reservation_date":"2025-04-23 08:53:58","uploaded":"2025-04-23 09:01:12","revisionof":"S5-251593","revisedto":"","release":"Rel-20","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251778.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251779","title":"New SID on cloud aspects of management and orchestration phase 2","source":"China Mobile","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"SID new","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":12,"ainumber":"5.5","ainame":"Rel-20 topic preparation","tdoc_agenda_sort_order":16341,"status":"noted","reservation_date":"2025-04-23 08:53:58","uploaded":"2025-04-23 09:01:12","revisionof":"S5-251634","revisedto":"","release":"Rel-20","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251779.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251780","title":"New SID on Semantic-based Network Management","source":"Moderator(China Unicom, Samsung)","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"SID new","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":12,"ainumber":"5.5","ainame":"Rel-20 topic preparation","tdoc_agenda_sort_order":16521,"status":"noted","reservation_date":"2025-04-23 08:53:58","uploaded":"2025-04-23 09:01:12","revisionof":"S5-251652","revisedto":"","release":"Rel-20","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251780.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251781","title":"New SID on Study for Data management phase 3","source":"Nokia, Verizon","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"SID new","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":12,"ainumber":"5.5","ainame":"Rel-20 topic preparation","tdoc_agenda_sort_order":17401,"status":"revised","reservation_date":"2025-04-23 08:53:58","uploaded":"2025-04-23 09:01:12","revisionof":"S5-251740","revisedto":"S5-252124","release":"Rel-20","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251781.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251782","title":"Input to Draft CR Rel-19 CR TS 28.105 Pre-specialized training and Fine-tuning","source":"NEC, Intel, China Mobile, ZTE","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"other","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":61,"ainumber":"6.19.1.1","ainame":"AI\/ML management phase 2","tdoc_agenda_sort_order":17561,"status":"noted","reservation_date":"2025-04-23 08:53:58","uploaded":"2025-04-23 09:01:12","revisionof":"S5-251756","revisedto":"","release":"Rel-19","crspec":28.105,"crspecversion":"","workitem":[{"winame":"AIML_MGT_Ph2"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251782.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251783","title":"Input to draft CR TS 28.105 add NRM for ML pre-training and fine-tuning","source":"NEC, Intel, China Mobile, ZTE, Huawei","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"other","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":61,"ainumber":"6.19.1.1","ainame":"AI\/ML management phase 2","tdoc_agenda_sort_order":17571,"status":"noted","reservation_date":"2025-04-23 08:53:59","uploaded":"2025-04-23 09:01:12","revisionof":"S5-251757","revisedto":"","release":"Rel-19","crspec":28.105,"crspecversion":"","workitem":[{"winame":"AIML_MGT_Ph2"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251783.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251784","title":"Input to draftCR TS 28.105 Add NRMs on LCM for Federated Learning","source":"Intel, NEC, ZTE, Samsung, Nokia","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"other","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":61,"ainumber":"6.19.1.1","ainame":"AI\/ML management phase 2","tdoc_agenda_sort_order":14101,"status":"noted","reservation_date":"2025-04-23 08:53:59","uploaded":"2025-04-23 09:01:12","revisionof":"S5-251410","revisedto":"","release":"Rel-19","crspec":28.105,"crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251784.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251785","title":"Input to DraftCR Rel-19 TS 28.105 Add Procedure Diagram for FL Server selection and determination","source":"ZTE Corporation,NEC, Intel","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"other","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":61,"ainumber":"6.19.1.1","ainame":"AI\/ML management phase 2","tdoc_agenda_sort_order":13551,"status":"noted","reservation_date":"2025-04-23 08:53:59","uploaded":"2025-04-23 09:01:12","revisionof":"S5-251355","revisedto":"","release":"Rel-19","crspec":28.105,"crspecversion":"","workitem":[{"winame":"AIML_MGT_Ph2"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251785.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251786","title":"Rel-19 InputToDraftCR TS 28.105 Add use case and requirements for reinforcement learning conflict management","source":"Huawei","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"other","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":61,"ainumber":"6.19.1.1","ainame":"AI\/ML management phase 2","tdoc_agenda_sort_order":15491,"status":"noted","reservation_date":"2025-04-23 08:53:59","uploaded":"2025-04-23 09:01:12","revisionof":"S5-251549","revisedto":"","release":"Rel-19","crspec":28.105,"crspecversion":"","workitem":[{"winame":"AIML_MGT_Ph2"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251786.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251787","title":"Rel-19 InputToDraftCR 28.105 RL UC and Requirements","source":"Samsung R&D Institute UK, Ericsson","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"other","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":61,"ainumber":"6.19.1.1","ainame":"AI\/ML management phase 2","tdoc_agenda_sort_order":15411,"status":"approved","reservation_date":"2025-04-23 08:53:59","uploaded":"2025-04-23 09:01:12","revisionof":"S5-251541","revisedto":"","release":"Rel-19","crspec":28.105,"crspecversion":"","workitem":[{"winame":"AIML_MGT_Ph2"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251787.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251788","title":"Input to DraftCR Rel-19 TS 28.105 Update the UC and Req of Reinforcement Learning","source":"ZTE Corporation, Ericsson","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"other","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":61,"ainumber":"6.19.1.1","ainame":"AI\/ML management phase 2","tdoc_agenda_sort_order":13571,"status":"approved","reservation_date":"2025-04-23 08:53:59","uploaded":"2025-04-23 09:01:12","revisionof":"S5-251357","revisedto":"","release":"Rel-19","crspec":28.105,"crspecversion":"","workitem":[{"winame":"AIML_MGT_Ph2"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251788.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251789","title":"Rel-19 Input to draftCR TS 28.105 Add NRMs on distributed training","source":"CATT, ZTE, Samsung, Ericsson","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"other","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":61,"ainumber":"6.19.1.1","ainame":"AI\/ML management phase 2","tdoc_agenda_sort_order":16331,"status":"approved","reservation_date":"2025-04-23 08:53:59","uploaded":"2025-04-23 09:01:12","revisionof":"S5-251633","revisedto":"","release":"Rel-19","crspec":28.105,"crspecversion":"","workitem":[{"winame":"AIML_MGT_Ph2"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251789.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251790","title":"Add the use case and requirements for edge application deployment location analysis","source":"AsiaInfo, ZTE","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 23\/04\/2025. Original source : AsiaInfo, ZTE","agenda_item_sort_order":63,"ainumber":"6.19.2.1","ainame":"Management Data Analytics phase 3","tdoc_agenda_sort_order":13171,"status":"agreed","reservation_date":"2025-04-23 08:53:59","uploaded":"2025-04-23 09:01:12","revisionof":"S5-251317","revisedto":"","release":"Rel-19","crspec":28.104,"crspecversion":"19.1.0","workitem":[{"winame":"eMDAS_Ph3"}],"crnumber":191.0,"crrevision":1.0,"crcategory":"B","tsg_crp":"SP-250528","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251790.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"7.2.7.Z(new), 7.2.7.Z.1(new) , 7.2.7.Z.2(new) , 7.2.7.Z.3(new)","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251791","title":"Rel-19 CR TS 28.104 add solutions for edge application deployment location analysis","source":"AsiaInfo, ZTE","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Approval","abstract":"","secretary_remarks":"Title modified on 23\/04\/2025. Original title : Rel-19 CR TS 28.104 Add solution for  edge application deployment location analysis<br\/><br\/>Source modified on 23\/04\/2025. Original source : AsiaInfo, ZTE","agenda_item_sort_order":63,"ainumber":"6.19.2.1","ainame":"Management Data Analytics phase 3","tdoc_agenda_sort_order":13201,"status":"agreed","reservation_date":"2025-04-23 08:54:00","uploaded":"2025-04-23 09:01:12","revisionof":"S5-251320","revisedto":"","release":"Rel-19","crspec":28.104,"crspecversion":"19.1.0","workitem":[{"winame":"eMDAS_Ph3"}],"crnumber":194.0,"crrevision":1.0,"crcategory":"B","tsg_crp":"SP-250528","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251791.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":false,"clauses_affected":"2, 8.4.2.Y(New), 8.4.2.Y.1(New), 8.4.2.Y.2(New), 8.4.2.Y.3(New), 8.6.1","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251792","title":"Add the use case and requirements for edge computing performance analysis","source":"AsiaInfo, ZTE","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 23\/04\/2025. Original source : AsiaInfo, ZTE","agenda_item_sort_order":63,"ainumber":"6.19.2.1","ainame":"Management Data Analytics phase 3","tdoc_agenda_sort_order":13181,"status":"agreed","reservation_date":"2025-04-23 08:54:01","uploaded":"2025-04-23 09:01:12","revisionof":"S5-251318","revisedto":"","release":"Rel-19","crspec":28.104,"crspecversion":"19.1.0","workitem":[{"winame":"eMDAS_Ph3"}],"crnumber":192.0,"crrevision":1.0,"crcategory":"B","tsg_crp":"SP-250528","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251792.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"7.2.2, 7.2.2.X(new), 7.2.2.X.1(new) , 7.2.2.X.2(new) , 7.2.2.X.3(new)","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251793","title":"Rel-19 CR TS 28.104 add solutions for edge computing performance analysis","source":"AsiaInfo, ZTE","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Approval","abstract":"","secretary_remarks":"Source modified on 23\/04\/2025. Original source : AsiaInfo, ZTE","agenda_item_sort_order":63,"ainumber":"6.19.2.1","ainame":"Management Data Analytics phase 3","tdoc_agenda_sort_order":13211,"status":"agreed","reservation_date":"2025-04-23 08:54:02","uploaded":"2025-04-23 09:01:12","revisionof":"S5-251321","revisedto":"","release":"Rel-19","crspec":28.104,"crspecversion":"19.1.0","workitem":[{"winame":"eMDAS_Ph3"}],"crnumber":195.0,"crrevision":1.0,"crcategory":"B","tsg_crp":"SP-250528","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251793.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"2, 8.4.2.X(New), 8.4.2.X.1(New), 8.4.2.X.2(New), 8.4.2.X.3(New), 8.6.1","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251794","title":"Rel-19 CR TS 28.104 Multi Domain Resource Optimization","source":"Nokia","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Approval","abstract":"","secretary_remarks":"Source modified on 23\/04\/2025. Original source : Nokia","agenda_item_sort_order":63,"ainumber":"6.19.2.1","ainame":"Management Data Analytics phase 3","tdoc_agenda_sort_order":17361,"status":"not pursued","reservation_date":"2025-04-23 08:54:03","uploaded":"2025-04-23 09:01:12","revisionof":"S5-251736","revisedto":"","release":"Rel-19","crspec":28.104,"crspecversion":"19.1.0","workitem":[{"winame":"eMDAS_Ph3"}],"crnumber":213.0,"crrevision":1.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251794.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"3.3, 7.2.x, 8.5.1.2, 8.5.x, ","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251795","title":"Rel19 CR TS28.104 add solution on management data correlation analytics","source":"Nokia, Nokia Shanghai Bell, Orange","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":63,"ainumber":"6.19.2.1","ainame":"Management Data Analytics phase 3","tdoc_agenda_sort_order":14401,"status":"agreed","reservation_date":"2025-04-23 08:54:04","uploaded":"2025-04-23 09:01:12","revisionof":"S5-251440","revisedto":"","release":"Rel-19","crspec":28.104,"crspecversion":"19.1.0","workitem":[{"winame":"eMDAS_Ph3"}],"crnumber":197.0,"crrevision":1.0,"crcategory":"B","tsg_crp":"SP-250528","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251795.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251796","title":"Rel19 CR TS28.104 add solution on correlation analytics for NF Scaling and dimensioning","source":"Nokia, Nokia Shanghai Bell, Orange","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":63,"ainumber":"6.19.2.1","ainame":"Management Data Analytics phase 3","tdoc_agenda_sort_order":14411,"status":"agreed","reservation_date":"2025-04-23 08:54:05","uploaded":"2025-04-23 09:01:12","revisionof":"S5-251441","revisedto":"","release":"Rel-19","crspec":28.104,"crspecversion":"19.1.0","workitem":[{"winame":"eMDAS_Ph3"}],"crnumber":198.0,"crrevision":1.0,"crcategory":"B","tsg_crp":"SP-250528","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251796.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251797","title":"Rel19 CR TS28.104 add solution on management data correlation analytics for threshold assessment and adjustment","source":"Nokia, Nokia Shanghai Bell","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":63,"ainumber":"6.19.2.1","ainame":"Management Data Analytics phase 3","tdoc_agenda_sort_order":14421,"status":"agreed","reservation_date":"2025-04-23 08:54:06","uploaded":"2025-04-23 09:01:12","revisionof":"S5-251442","revisedto":"","release":"Rel-19","crspec":28.104,"crspecversion":"19.1.0","workitem":[{"winame":"eMDAS_Ph3"}],"crnumber":199.0,"crrevision":1.0,"crcategory":"B","tsg_crp":"SP-250528","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251797.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251798","title":"Add the use case and requirements for traffic congestion prediction analytics based on UE throughput","source":"AsiaInfo, ZTE, Orange","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 23\/04\/2025. Original source : AsiaInfo, ZTE, Orange","agenda_item_sort_order":63,"ainumber":"6.19.2.1","ainame":"Management Data Analytics phase 3","tdoc_agenda_sort_order":13191,"status":"agreed","reservation_date":"2025-04-23 08:54:07","uploaded":"2025-04-23 09:01:12","revisionof":"S5-251319","revisedto":"","release":"Rel-19","crspec":28.104,"crspecversion":"19.1.0","workitem":[{"winame":"eMDAS_Ph3"}],"crnumber":193.0,"crrevision":1.0,"crcategory":"B","tsg_crp":"SP-250528","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251798.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"7.2, 7.2.2.Y(new), 7.2.2.Y.1(new) , 7.2.2.Y.2(new) , 7.2.2.Y.3(new)","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251799","title":"Rel-19 CR TS 28.104 add solutions for traffic congestion prediction analysis based on UE throughput","source":"AsiaInfo, ZTE","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Approval","abstract":"","secretary_remarks":"Title modified on 23\/04\/2025. Original title : Rel-19 CR TS 28.104 Add solutions for traffic congestion prediction analysis based on UE throughput<br\/><br\/>Source modified on 23\/04\/2025. Original source : AsiaInfo, ZTE","agenda_item_sort_order":63,"ainumber":"6.19.2.1","ainame":"Management Data Analytics phase 3","tdoc_agenda_sort_order":14621,"status":"agreed","reservation_date":"2025-04-23 08:54:08","uploaded":"2025-04-23 09:01:12","revisionof":"S5-251462","revisedto":"","release":"Rel-19","crspec":28.104,"crspecversion":"19.1.0","workitem":[{"winame":"eMDAS_Ph3"}],"crnumber":201.0,"crrevision":1.0,"crcategory":"B","tsg_crp":"SP-250528","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251799.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":false,"clauses_affected":"8.4.2.Z(New), 8.4.2.Z.1(New), 8.4.2.Z.2(New), 8.4.2.Z.3(New), 8.6.1","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251800","title":"agenda_with_Tdocs_sequence_CH","source":"SWG CH Chair (MATRIXX Software)","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"agenda","for":"Information","abstract":"","secretary_remarks":"","agenda_item_sort_order":97,"ainumber":"7.1","ainame":"Charging Plenary","tdoc_agenda_sort_order":12151,"status":"noted","reservation_date":"2025-04-23 08:54:09","uploaded":"2025-04-23 09:01:12","revisionof":"S5-251215","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251800.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251801","title":"Revised WID on Charging for Uncrewed Aerial Systems Phase 3","source":"China Mobile Com. Corporation","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"WID revised","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":98,"ainumber":"7.2","ainame":"New Charging Study\/Work Item proposals","tdoc_agenda_sort_order":15331,"status":"agreed","reservation_date":"2025-04-23 08:54:09","uploaded":"2025-04-23 09:01:12","revisionof":"S5-251533","revisedto":"","release":"Rel-19","crspec":"","crspecversion":"","workitem":[{"winame":"UAS_Ph3-CH"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251801.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251802","title":"Rel-19 CR 32.291 Addition of domain features","source":"Ericsson","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 23\/04\/2025. Original source : Ericsson","agenda_item_sort_order":101,"ainumber":"7.4.1","ainame":"CHF Segmentation","tdoc_agenda_sort_order":15091,"status":"agreed","reservation_date":"2025-04-23 08:54:09","uploaded":"2025-04-23 09:01:12","revisionof":"S5-251509","revisedto":"","release":"Rel-19","crspec":32.291,"crspecversion":"19.2.0","workitem":[{"winame":"CHFSeg"}],"crnumber":619.0,"crrevision":1.0,"crcategory":"B","tsg_crp":"SP-250526","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251802.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"6.1.8","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251803","title":"Re-19 CR 32.274 Addition of charging characteristics","source":"Ericsson","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Title modified on 23\/04\/2025. Original title : Rel-19 CR 32.274 Addition of charging characteristics<br\/><br\/>Source modified on 23\/04\/2025. Original source : Ericsson","agenda_item_sort_order":101,"ainumber":"7.4.1","ainame":"CHF Segmentation","tdoc_agenda_sort_order":15101,"status":"agreed","reservation_date":"2025-04-23 08:54:10","uploaded":"2025-04-23 09:01:12","revisionof":"S5-251510","revisedto":"","release":"Rel-19","crspec":32.274,"crspecversion":"18.1.0","workitem":[{"winame":"CHFSeg"}],"crnumber":91.0,"crrevision":1.0,"crcategory":"B","tsg_crp":"SP-250526","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251803.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"5.4.1.3 and annex x (new)","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251804","title":"Add layer 3 multi-hop ProSe UE-to-Network relay communication related CDR parameters","source":"China Telecom","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 23\/04\/2025. Original source : China Telecom","agenda_item_sort_order":105,"ainumber":"7.4.5","ainame":"Charging Aspects for 5G ProSe Ph3","tdoc_agenda_sort_order":13131,"status":"agreed","reservation_date":"2025-04-23 08:54:11","uploaded":"2025-04-23 09:01:12","revisionof":"S5-251313","revisedto":"","release":"Rel-19","crspec":32.298,"crspecversion":"19.1.0","workitem":[{"winame":"5G_ProSe_Ph3_CH"}],"crnumber":1033.0,"crrevision":1.0,"crcategory":"B","tsg_crp":"SP-250516","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251804.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"5.1.4.7.X(new), 5.1.4.7.Y(new), forge","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251805","title":"Update Charging principles and architecture references for MVNOs charging","source":"CSCN","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":106,"ainumber":"7.4.6","ainame":"Charging aspects of satellite access Phase 3","tdoc_agenda_sort_order":15921,"status":"agreed","reservation_date":"2025-04-23 08:54:12","uploaded":"2025-04-23 09:01:12","revisionof":"S5-251592","revisedto":"","release":"Rel-19","crspec":32.24,"crspecversion":"19.2.0","workitem":[{"winame":"5GSAT_Ph3-CH"}],"crnumber":515.0,"crrevision":1.0,"crcategory":"D","tsg_crp":"SP-250518","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251805.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251806","title":"Introduce the support of store and forward satellite operation and UE-satellite-UE communication","source":"CATT","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Approval","abstract":"","secretary_remarks":"Source modified on 23\/04\/2025. Original source : CATT","agenda_item_sort_order":106,"ainumber":"7.4.6","ainame":"Charging aspects of satellite access Phase 3","tdoc_agenda_sort_order":16401,"status":"agreed","reservation_date":"2025-04-23 08:54:13","uploaded":"2025-04-23 09:01:12","revisionof":"S5-251640","revisedto":"","release":"Rel-19","crspec":32.24,"crspecversion":"19.2.0","workitem":[{"winame":"5GSAT_Ph3-CH"}],"crnumber":516.0,"crrevision":1.0,"crcategory":"B","tsg_crp":"SP-250518","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251806.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"2, 6.5","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251807","title":"Rel-19 CR 32.255 Addition of the Satellite Roaming Charging Principle","source":"Huawei","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 23\/04\/2025. Original source : Huawei","agenda_item_sort_order":106,"ainumber":"7.4.6","ainame":"Charging aspects of satellite access Phase 3","tdoc_agenda_sort_order":14661,"status":"agreed","reservation_date":"2025-04-23 08:54:14","uploaded":"2025-04-23 09:01:12","revisionof":"S5-251466","revisedto":"","release":"Rel-19","crspec":32.255,"crspecversion":"19.1.0","workitem":[{"winame":"5GSAT_Ph3-CH"}],"crnumber":574.0,"crrevision":1.0,"crcategory":"B","tsg_crp":"SP-250518","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251807.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"5.1.9.X (New)","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251808","title":"Add charging principle for store and forward satellite operation","source":"CATT","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Approval","abstract":"","secretary_remarks":"Source modified on 23\/04\/2025. Original source : CATT","agenda_item_sort_order":106,"ainumber":"7.4.6","ainame":"Charging aspects of satellite access Phase 3","tdoc_agenda_sort_order":16411,"status":"agreed","reservation_date":"2025-04-23 08:54:14","uploaded":"2025-04-23 09:01:12","revisionof":"S5-251641","revisedto":"","release":"Rel-19","crspec":32.251,"crspecversion":"18.0.0","workitem":[{"winame":"5GSAT_Ph3-CH"}],"crnumber":520.0,"crrevision":1.0,"crcategory":"B","tsg_crp":"SP-250518","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251808.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"3.3, 5.2.1.x","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251809","title":"Add charging information for store and forward satellite operation of SMS service","source":"CATT","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Approval","abstract":"","secretary_remarks":"Source modified on 23\/04\/2025. Original source : CATT","agenda_item_sort_order":106,"ainumber":"7.4.6","ainame":"Charging aspects of satellite access Phase 3","tdoc_agenda_sort_order":16421,"status":"agreed","reservation_date":"2025-04-23 08:54:15","uploaded":"2025-04-23 09:01:12","revisionof":"S5-251642","revisedto":"","release":"Rel-19","crspec":32.251,"crspecversion":"18.0.0","workitem":[{"winame":"5GSAT_Ph3-CH"}],"crnumber":521.0,"crrevision":1.0,"crcategory":"B","tsg_crp":"SP-250518","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251809.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"6.1.5, 6.1.6, 6.3.2","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251810","title":"Add charging trigger for store and forward satellite operation with UP CIoT","source":"CATT","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Approval","abstract":"","secretary_remarks":"Source modified on 23\/04\/2025. Original source : CATT","agenda_item_sort_order":106,"ainumber":"7.4.6","ainame":"Charging aspects of satellite access Phase 3","tdoc_agenda_sort_order":16431,"status":"agreed","reservation_date":"2025-04-23 08:54:16","uploaded":"2025-04-23 09:01:12","revisionof":"S5-251643","revisedto":"","release":"Rel-19","crspec":32.251,"crspecversion":"18.0.0","workitem":[{"winame":"5GSAT_Ph3-CH"}],"crnumber":522.0,"crrevision":1.0,"crcategory":"B","tsg_crp":"SP-250518","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251810.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"5.2.3.x","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251811","title":"Add charging information for store and forward satellite operation with UP CIoT","source":"CATT","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Approval","abstract":"","secretary_remarks":"Source modified on 23\/04\/2025. Original source : CATT","agenda_item_sort_order":106,"ainumber":"7.4.6","ainame":"Charging aspects of satellite access Phase 3","tdoc_agenda_sort_order":16441,"status":"agreed","reservation_date":"2025-04-23 08:54:17","uploaded":"2025-04-23 09:01:12","revisionof":"S5-251644","revisedto":"","release":"Rel-19","crspec":32.251,"crspecversion":"18.0.0","workitem":[{"winame":"5GSAT_Ph3-CH"}],"crnumber":523.0,"crrevision":1.0,"crcategory":"B","tsg_crp":"SP-250518","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251811.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"6.1.x","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251812","title":"Add charging principle for UE-satellite-UE communication","source":"CATT","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Approval","abstract":"","secretary_remarks":"Source modified on 23\/04\/2025. Original source : CATT","agenda_item_sort_order":106,"ainumber":"7.4.6","ainame":"Charging aspects of satellite access Phase 3","tdoc_agenda_sort_order":16451,"status":"agreed","reservation_date":"2025-04-23 08:54:18","uploaded":"2025-04-23 09:01:12","revisionof":"S5-251645","revisedto":"S5-252707","release":"Rel-19","crspec":32.26,"crspecversion":"18.3.0","workitem":[{"winame":"5GSAT_Ph3-CH"}],"crnumber":443.0,"crrevision":1.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251812.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"5.1.x","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251813","title":"Add charging trigger and charging information for UE-satellite-UE communication","source":"CATT","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Approval","abstract":"","secretary_remarks":"Source modified on 23\/04\/2025. Original source : CATT","agenda_item_sort_order":106,"ainumber":"7.4.6","ainame":"Charging aspects of satellite access Phase 3","tdoc_agenda_sort_order":16461,"status":"agreed","reservation_date":"2025-04-23 08:54:19","uploaded":"2025-04-23 09:01:12","revisionof":"S5-251646","revisedto":"","release":"Rel-19","crspec":32.26,"crspecversion":"18.3.0","workitem":[{"winame":"5GSAT_Ph3-CH"}],"crnumber":444.0,"crrevision":1.0,"crcategory":"B","tsg_crp":"SP-250518","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251813.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"6.4.2.2, 6.4.2.3","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251814","title":"Rel-19 CR 32.240 CAPIF Logical Charging Architecture","source":"Nokia","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":107,"ainumber":"7.4.7","ainame":"Charging aspects of CAPIF","tdoc_agenda_sort_order":14351,"status":"agreed","reservation_date":"2025-04-23 08:54:20","uploaded":"2025-04-23 09:01:12","revisionof":"S5-251435","revisedto":"","release":"Rel-19","crspec":32.24,"crspecversion":"19.2.0","workitem":[{"winame":"CH_CAPIF_EXT"}],"crnumber":511.0,"crrevision":1.0,"crcategory":"B","tsg_crp":"SP-250524","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251814.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251815","title":"Rel-19 CR 32.240 CAPIF Service Charging","source":"Nokia","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":107,"ainumber":"7.4.7","ainame":"Charging aspects of CAPIF","tdoc_agenda_sort_order":14361,"status":"agreed","reservation_date":"2025-04-23 08:54:21","uploaded":"2025-04-23 09:01:12","revisionof":"S5-251436","revisedto":"","release":"Rel-19","crspec":32.24,"crspecversion":"19.2.0","workitem":[{"winame":"CH_CAPIF_EXT"}],"crnumber":512.0,"crrevision":1.0,"crcategory":"B","tsg_crp":"SP-250524","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251815.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251816","title":"Rel-19 CR 32.254 Addition of charging architecture for CAPIF","source":"Ericsson, Nokia, Huawei","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 23\/04\/2025. Original source : Ericsson","agenda_item_sort_order":107,"ainumber":"7.4.7","ainame":"Charging aspects of CAPIF","tdoc_agenda_sort_order":15121,"status":"agreed","reservation_date":"2025-04-23 08:54:21","uploaded":"2025-04-23 09:01:12","revisionof":"S5-251512","revisedto":"","release":"Rel-19","crspec":32.254,"crspecversion":"19.0.0","workitem":[{"winame":"CH_CAPIF_EXT"}],"crnumber":62.0,"crrevision":1.0,"crcategory":"B","tsg_crp":"SP-250524","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251816.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"3.3, 4.1, and 4.4","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251817","title":"Rel-19 CR 32.254 Addition of charging principles for CAPIF","source":"Ericsson, Huawei","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 23\/04\/2025. Original source : Ericsson","agenda_item_sort_order":107,"ainumber":"7.4.7","ainame":"Charging aspects of CAPIF","tdoc_agenda_sort_order":15131,"status":"agreed","reservation_date":"2025-04-23 08:54:22","uploaded":"2025-04-23 09:01:12","revisionof":"S5-251513","revisedto":"","release":"Rel-19","crspec":32.254,"crspecversion":"19.0.0","workitem":[{"winame":"CH_CAPIF_EXT"}],"crnumber":63.0,"crrevision":1.0,"crcategory":"B","tsg_crp":"SP-250524","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251817.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"2, 5.1.0, and 5.1.1","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251818","title":"Rel-19 CR 32.254 Addition of the CAPIF Charging Message Content","source":"Huawei","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Title modified on 23\/04\/2025. Original title : Rel-19 CR 32.254 Addition of CAPIF charging support<br\/><br\/>Source modified on 23\/04\/2025. Original source : Huawei","agenda_item_sort_order":107,"ainumber":"7.4.7","ainame":"Charging aspects of CAPIF","tdoc_agenda_sort_order":14691,"status":"agreed","reservation_date":"2025-04-23 08:54:23","uploaded":"2025-04-23 09:01:12","revisionof":"S5-251469","revisedto":"","release":"Rel-19","crspec":32.254,"crspecversion":"19.0.0","workitem":[{"winame":"CH_CAPIF_EXT"}],"crnumber":60.0,"crrevision":1.0,"crcategory":"B","tsg_crp":"SP-250524","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251818.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"6.x(New)","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251819","title":"Rel-19 CR 32.255 Support volume-based charging for standalone IMS data channel","source":"China Mobile","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Approval","abstract":"","secretary_remarks":"Source modified on 23\/04\/2025. Original source : China Mobile","agenda_item_sort_order":108,"ainumber":"7.4.8","ainame":"Charging aspects of next generation real time communication services phase 2","tdoc_agenda_sort_order":13691,"status":"agreed","reservation_date":"2025-04-23 08:54:24","uploaded":"2025-04-23 09:01:12","revisionof":"S5-251369","revisedto":"","release":"Rel-19","crspec":32.255,"crspecversion":"19.1.0","workitem":[{"winame":"NG_RTC_Ph2-CH"}],"crnumber":573.0,"crrevision":1.0,"crcategory":"B","tsg_crp":"SP-250542","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251819.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"5.1.18","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251820","title":"Rel-19 CR 32.255 Add volume based charging principle for DC application download and usage","source":"Huawei","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 23\/04\/2025. Original source : Huawei","agenda_item_sort_order":108,"ainumber":"7.4.8","ainame":"Charging aspects of next generation real time communication services phase 2","tdoc_agenda_sort_order":14761,"status":"agreed","reservation_date":"2025-04-23 08:54:25","uploaded":"2025-04-23 09:01:12","revisionof":"S5-251476","revisedto":"","release":"Rel-19","crspec":32.255,"crspecversion":"19.1.0","workitem":[{"winame":"NG_RTC_Ph2-CH"}],"crnumber":575.0,"crrevision":1.0,"crcategory":"B","tsg_crp":"SP-250542","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251820.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"5.1.18","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251821","title":"Rel-19 CR 32.255 Add volume based charging principle to support IMS DC as a PS Data Off Exempt Service","source":"Huawei","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 23\/04\/2025. Original source : Huawei","agenda_item_sort_order":108,"ainumber":"7.4.8","ainame":"Charging aspects of next generation real time communication services phase 2","tdoc_agenda_sort_order":14771,"status":"agreed","reservation_date":"2025-04-23 08:54:26","uploaded":"2025-04-23 09:01:12","revisionof":"S5-251477","revisedto":"","release":"Rel-19","crspec":32.255,"crspecversion":"19.1.0","workitem":[{"winame":"NG_RTC_Ph2-CH"}],"crnumber":576.0,"crrevision":1.0,"crcategory":"B","tsg_crp":"SP-250542","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251821.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"6.2.1.2","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251822","title":"Rel-19 CR 32.260 Support duration-based charging for standalone IMS data channel","source":"China Mobile, Huawei","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 23\/04\/2025. Original source : China Mobile","agenda_item_sort_order":108,"ainumber":"7.4.8","ainame":"Charging aspects of next generation real time communication services phase 2","tdoc_agenda_sort_order":13701,"status":"agreed","reservation_date":"2025-04-23 08:54:26","uploaded":"2025-04-23 09:01:12","revisionof":"S5-251370","revisedto":"","release":"Rel-19","crspec":32.26,"crspecversion":"18.3.0","workitem":[{"winame":"NG_RTC_Ph2-CH"}],"crnumber":438.0,"crrevision":1.0,"crcategory":"B","tsg_crp":"SP-250542","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251822.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"5.1.15, 6.4.2.2","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251823","title":"Rel-19 CR 32.260 Charging architecture for IMS DC application download charging charging","source":"Huawei","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 23\/04\/2025. Original source : Huawei","agenda_item_sort_order":108,"ainumber":"7.4.8","ainame":"Charging aspects of next generation real time communication services phase 2","tdoc_agenda_sort_order":14701,"status":"agreed","reservation_date":"2025-04-23 08:54:27","uploaded":"2025-04-23 09:01:12","revisionof":"S5-251470","revisedto":"","release":"Rel-19","crspec":32.26,"crspecversion":"18.3.0","workitem":[{"winame":"NG_RTC_Ph2-CH"}],"crnumber":439.0,"crrevision":1.0,"crcategory":"B","tsg_crp":"SP-250542","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251823.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"3.3, 4.1, 4.4","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251824","title":"Rel-19 CR 32.260 Charging principle for IMS DC application download charging","source":"Huawei","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 23\/04\/2025. Original source : Huawei","agenda_item_sort_order":108,"ainumber":"7.4.8","ainame":"Charging aspects of next generation real time communication services phase 2","tdoc_agenda_sort_order":14711,"status":"agreed","reservation_date":"2025-04-23 08:54:28","uploaded":"2025-04-23 09:01:12","revisionof":"S5-251471","revisedto":"","release":"Rel-19","crspec":32.26,"crspecversion":"18.3.0","workitem":[{"winame":"NG_RTC_Ph2-CH"}],"crnumber":440.0,"crrevision":1.0,"crcategory":"B","tsg_crp":"SP-250542","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251824.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"5.4.3, 5.4.x (new)","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251825","title":"Rel-19 CR 32.260 Charging information for IMS DC application download charging","source":"Huawei","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 23\/04\/2025. Original source : Huawei","agenda_item_sort_order":108,"ainumber":"7.4.8","ainame":"Charging aspects of next generation real time communication services phase 2","tdoc_agenda_sort_order":14721,"status":"agreed","reservation_date":"2025-04-23 08:54:29","uploaded":"2025-04-23 09:01:12","revisionof":"S5-251472","revisedto":"","release":"Rel-19","crspec":32.26,"crspecversion":"18.3.0","workitem":[{"winame":"NG_RTC_Ph2-CH"}],"crnumber":441.0,"crrevision":1.0,"crcategory":"B","tsg_crp":"SP-250542","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251825.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"6.4.1.2.1, 6.4.1b.1, 6.4.1b.2, 6.4.2.2, 6.4.2.3","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251826","title":"Rel-19 CR 32.291 Charging information for IMS DC application download charging","source":"Huawei","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 23\/04\/2025. Original source : Huawei","agenda_item_sort_order":108,"ainumber":"7.4.8","ainame":"Charging aspects of next generation real time communication services phase 2","tdoc_agenda_sort_order":14731,"status":"agreed","reservation_date":"2025-04-23 08:54:30","uploaded":"2025-04-23 09:01:12","revisionof":"S5-251473","revisedto":"","release":"Rel-19","crspec":32.291,"crspecversion":"19.2.0","workitem":[{"winame":"NG_RTC_Ph2-CH"}],"crnumber":618.0,"crrevision":1.0,"crcategory":"B","tsg_crp":"SP-250542","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251826.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"3.3, 6.1.6.1, 6.1.6.2.8.3, 6.1.6.2.8.x (new), 6.1.6.3.4, 6.1.6.3.35, 6.1.8, 7.8, Forge","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251827","title":"Rel-19 CR 32.298 Charging information for IMS DC application download charging","source":"Huawei","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 23\/04\/2025. Original source : Huawei","agenda_item_sort_order":108,"ainumber":"7.4.8","ainame":"Charging aspects of next generation real time communication services phase 2","tdoc_agenda_sort_order":14741,"status":"agreed","reservation_date":"2025-04-23 08:54:31","uploaded":"2025-04-23 09:01:12","revisionof":"S5-251474","revisedto":"","release":"Rel-19","crspec":32.298,"crspecversion":"19.1.0","workitem":[{"winame":"NG_RTC_Ph2-CH"}],"crnumber":1035.0,"crrevision":1.0,"crcategory":"B","tsg_crp":"SP-250542","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251827.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"3.3, Forge","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251828","title":"Rel-19 CR 32.254 Add charging principle for IMS network capabilities exposure","source":"Huawei","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 23\/04\/2025. Original source : Huawei","agenda_item_sort_order":108,"ainumber":"7.4.8","ainame":"Charging aspects of next generation real time communication services phase 2","tdoc_agenda_sort_order":14781,"status":"agreed","reservation_date":"2025-04-23 08:54:31","uploaded":"2025-04-23 09:01:12","revisionof":"S5-251478","revisedto":"","release":"Rel-19","crspec":32.254,"crspecversion":"19.0.0","workitem":[{"winame":"NG_RTC_Ph2-CH"}],"crnumber":61.0,"crrevision":1.0,"crcategory":"B","tsg_crp":"SP-250542","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251828.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"5.1.1, 6.3.1.4.1","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251829","title":"Extend the scope and charging architecture to support 5G LCS converged charging","source":"China Telecom, Ericsson","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 23\/04\/2025. Original source : China Telecom","agenda_item_sort_order":110,"ainumber":"7.4.","ainame":"Charging Aspects of 5GC LoCation Services","tdoc_agenda_sort_order":13411,"status":"agreed","reservation_date":"2025-04-23 08:54:32","uploaded":"2025-04-23 09:01:12","revisionof":"S5-251341","revisedto":"","release":"Rel-19","crspec":32.271,"crspecversion":"19.1.0","workitem":[{"winame":"CH_5G_eLCS_Ph3"}],"crnumber":29.0,"crrevision":1.0,"crcategory":"B","tsg_crp":"SP-250523","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251829.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"1, 4.4","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251830","title":"Extend basic priciples, CDR generation and handling for 5G LCS converged charging","source":"China Telecom, Ericsson","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 23\/04\/2025. Original source : China Telecom","agenda_item_sort_order":110,"ainumber":"7.4.","ainame":"Charging Aspects of 5GC LoCation Services","tdoc_agenda_sort_order":13421,"status":"agreed","reservation_date":"2025-04-23 08:54:33","uploaded":"2025-04-23 09:01:12","revisionof":"S5-251342","revisedto":"","release":"Rel-19","crspec":32.271,"crspecversion":"19.1.0","workitem":[{"winame":"CH_5G_eLCS_Ph3"}],"crnumber":30.0,"crrevision":1.0,"crcategory":"B","tsg_crp":"SP-250523","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251830.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"5.4.1, 5.4.3","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251831","title":"Rel-19 CR 32.271 Addition of LCS architecture","source":"Ericsson","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 23\/04\/2025. Original source : Ericsson","agenda_item_sort_order":110,"ainumber":"7.4.","ainame":"Charging Aspects of 5GC LoCation Services","tdoc_agenda_sort_order":15161,"status":"agreed","reservation_date":"2025-04-23 08:54:34","uploaded":"2025-04-23 09:01:12","revisionof":"S5-251516","revisedto":"","release":"Rel-19","crspec":32.271,"crspecversion":"19.1.0","workitem":[{"winame":"CH_5G_eLCS_Ph3"}],"crnumber":35.0,"crrevision":1.0,"crcategory":"B","tsg_crp":"SP-250523","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251831.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"4.1.2 and 4.1.x (new)","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251832","title":"Add message flow of converged charging for 5GC-MT-LR","source":"China Telecom","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Approval","abstract":"","secretary_remarks":"Source modified on 23\/04\/2025. Original source : China Telecom","agenda_item_sort_order":110,"ainumber":"7.4.","ainame":"Charging Aspects of 5GC LoCation Services","tdoc_agenda_sort_order":13431,"status":"agreed","reservation_date":"2025-04-23 08:54:35","uploaded":"2025-04-23 09:01:12","revisionof":"S5-251343","revisedto":"","release":"Rel-19","crspec":32.271,"crspecversion":"19.1.0","workitem":[{"winame":"CH_5G_eLCS_Ph3"}],"crnumber":31.0,"crrevision":1.0,"crcategory":"B","tsg_crp":"SP-250523","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251832.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"5.4.2.x (new)","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251833","title":"Add message flow of converged charging for 5GC-MO-LR","source":"China Telecom","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Approval","abstract":"","secretary_remarks":"Source modified on 23\/04\/2025. Original source : China Telecom","agenda_item_sort_order":110,"ainumber":"7.4.","ainame":"Charging Aspects of 5GC LoCation Services","tdoc_agenda_sort_order":13441,"status":"agreed","reservation_date":"2025-04-23 08:54:36","uploaded":"2025-04-23 09:01:12","revisionof":"S5-251344","revisedto":"","release":"Rel-19","crspec":32.271,"crspecversion":"19.1.0","workitem":[{"winame":"CH_5G_eLCS_Ph3"}],"crnumber":32.0,"crrevision":1.0,"crcategory":"B","tsg_crp":"SP-250523","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251833.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"5.4.2.y (new)","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251834","title":"Extend data description for 5G LCS converged charging","source":"China Telecom","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 23\/04\/2025. Original source : China Telecom","agenda_item_sort_order":110,"ainumber":"7.4.","ainame":"Charging Aspects of 5GC LoCation Services","tdoc_agenda_sort_order":13451,"status":"agreed","reservation_date":"2025-04-23 08:54:37","uploaded":"2025-04-23 09:01:12","revisionof":"S5-251345","revisedto":"","release":"Rel-19","crspec":32.271,"crspecversion":"19.1.0","workitem":[{"winame":"CH_5G_eLCS_Ph3"}],"crnumber":33.0,"crrevision":1.0,"crcategory":"B","tsg_crp":"SP-250523","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251834.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"6.2a","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251835","title":"Extend charging information and bindings for 5G LCS converged charging","source":"China Telecom","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 23\/04\/2025. Original source : China Telecom","agenda_item_sort_order":110,"ainumber":"7.4.","ainame":"Charging Aspects of 5GC LoCation Services","tdoc_agenda_sort_order":13461,"status":"agreed","reservation_date":"2025-04-23 08:54:38","uploaded":"2025-04-23 09:01:12","revisionof":"S5-251346","revisedto":"","release":"Rel-19","crspec":32.271,"crspecversion":"19.1.0","workitem":[{"winame":"CH_5G_eLCS_Ph3"}],"crnumber":34.0,"crrevision":1.0,"crcategory":"B","tsg_crp":"SP-250523","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251835.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"6.3, 6.4","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251836","title":"Extend Data Type for 5G LCS converged charging","source":"China Telecom","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 23\/04\/2025. Original source : China Telecom","agenda_item_sort_order":110,"ainumber":"7.4.","ainame":"Charging Aspects of 5GC LoCation Services","tdoc_agenda_sort_order":13471,"status":"agreed","reservation_date":"2025-04-23 08:54:39","uploaded":"2025-04-23 09:01:12","revisionof":"S5-251347","revisedto":"","release":"Rel-19","crspec":32.291,"crspecversion":"19.2.0","workitem":[{"winame":"CH_5G_eLCS_Ph3"}],"crnumber":616.0,"crrevision":1.0,"crcategory":"B","tsg_crp":"SP-250523","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251836.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"6.1.6.2.19, 6.1.6.3.4, 6.1.8, 7.17","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251837","title":"Extend CHF-CDR for 5G LCS converged charging","source":"China Telecom","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 23\/04\/2025. Original source : China Telecom","agenda_item_sort_order":110,"ainumber":"7.4.","ainame":"Charging Aspects of 5GC LoCation Services","tdoc_agenda_sort_order":13481,"status":"agreed","reservation_date":"2025-04-23 08:54:39","uploaded":"2025-04-23 09:01:12","revisionof":"S5-251348","revisedto":"","release":"Rel-19","crspec":32.298,"crspecversion":"19.1.0","workitem":[{"winame":"CH_5G_eLCS_Ph3"}],"crnumber":1034.0,"crrevision":1.0,"crcategory":"B","tsg_crp":"SP-250523","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251837.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"5.1.5.0","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251838","title":"Rel-19 CR 32.240 Add charging support to AIoT service","source":"Huawei","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Title modified on 23\/04\/2025. Original title : Rel-19 CR 32.240 Add charging support for AIoT service<br\/><br\/>Source modified on 23\/04\/2025. Original source : Huawei","agenda_item_sort_order":111,"ainumber":"7.4.11","ainame":"Charging for Ambient power-enabled Internet of Things","tdoc_agenda_sort_order":13081,"status":"agreed","reservation_date":"2025-04-23 08:54:40","uploaded":"2025-04-23 09:01:12","revisionof":"S5-251308","revisedto":"","release":"Rel-19","crspec":32.24,"crspecversion":"19.2.0","workitem":[{"winame":"AmbientIoT-CH"}],"crnumber":510.0,"crrevision":1.0,"crcategory":"B","tsg_crp":"SP-250522","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251838.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"2, 6.x (NEW)","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251839","title":"Rel-19 CR 32.254 Add charging support for AIoT service","source":"Huawei","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":111,"ainumber":"7.4.11","ainame":"Charging for Ambient power-enabled Internet of Things","tdoc_agenda_sort_order":13091,"status":"withdrawn","reservation_date":"2025-04-23 08:54:41","uploaded":null,"revisionof":"","revisedto":"","release":"Rel-19","crspec":32.254,"crspecversion":"19.0.0","workitem":[{"winame":"AmbientIoT-CH"}],"crnumber":56.0,"crrevision":1.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251840","title":"Rel-19 CR 32.291 Add charging support to AIoT service","source":"Huawei","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Title modified on 23\/04\/2025. Original title : Rel-19 CR 32.291 Add charging support for AIoT service<br\/><br\/>Source modified on 23\/04\/2025. Original source : Huawei","agenda_item_sort_order":111,"ainumber":"7.4.11","ainame":"Charging for Ambient power-enabled Internet of Things","tdoc_agenda_sort_order":13101,"status":"agreed","reservation_date":"2025-04-23 08:54:42","uploaded":"2025-04-23 09:01:12","revisionof":"S5-251310","revisedto":"","release":"Rel-19","crspec":32.291,"crspecversion":"19.2.0","workitem":[{"winame":"AmbientIoT-CH"}],"crnumber":614.0,"crrevision":1.0,"crcategory":"B","tsg_crp":"SP-250522","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251840.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"3.3., 6.1.6.3.4, 6.1.8, Forge","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251841","title":"Rel-19 CR 32.298 Add charging support to AIoT service","source":"Huawei","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Title modified on 23\/04\/2025. Original title : Rel-19 CR 32.298 Add charging support for AIoT service<br\/><br\/>Source modified on 23\/04\/2025. Original source : Huawei","agenda_item_sort_order":111,"ainumber":"7.4.11","ainame":"Charging for Ambient power-enabled Internet of Things","tdoc_agenda_sort_order":13111,"status":"agreed","reservation_date":"2025-04-23 08:54:43","uploaded":"2025-04-23 09:01:12","revisionof":"S5-251311","revisedto":"","release":"Rel-19","crspec":32.298,"crspecversion":"19.1.0","workitem":[{"winame":"AmbientIoT-CH"}],"crnumber":1032.0,"crrevision":1.0,"crcategory":"B","tsg_crp":"SP-250522","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251841.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"Forge","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251842","title":"Rel-19 CR 32.240 Addition of MOCN network sharing","source":"Ericsson","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 23\/04\/2025. Original source : Ericsson","agenda_item_sort_order":112,"ainumber":"7.4.12","ainame":"Charging aspects for Multi-Operator Core Network (MOCN) network sharing","tdoc_agenda_sort_order":15191,"status":"agreed","reservation_date":"2025-04-23 08:54:44","uploaded":"2025-04-23 09:01:12","revisionof":"S5-251519","revisedto":"","release":"Rel-19","crspec":32.24,"crspecversion":"19.2.0","workitem":[{"winame":"CH_MOCN_NetShare"}],"crnumber":514.0,"crrevision":1.0,"crcategory":"B","tsg_crp":"SP-250525","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251842.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"2 and 6.7.1","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251843","title":"Rel-19 CR 32.255 Addition of architecture for MOCN","source":"Ericsson","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 23\/04\/2025. Original source : Ericsson","agenda_item_sort_order":112,"ainumber":"7.4.12","ainame":"Charging aspects for Multi-Operator Core Network (MOCN) network sharing","tdoc_agenda_sort_order":15201,"status":"agreed","reservation_date":"2025-04-23 08:54:57","uploaded":"2025-04-23 09:01:12","revisionof":"S5-251520","revisedto":"","release":"Rel-19","crspec":32.255,"crspecversion":"19.1.0","workitem":[{"winame":"CH_MOCN_NetShare"},{"winame":" NetShare_CH"}],"crnumber":578.0,"crrevision":1.0,"crcategory":"B","tsg_crp":"SP-250525","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251843.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"2 and 4.1.x","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251844","title":"Rel-19 CR 32.255 Addition of charging architecture for MOCN","source":"Ericsson","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 23\/04\/2025. Original source : Ericsson","agenda_item_sort_order":112,"ainumber":"7.4.12","ainame":"Charging aspects for Multi-Operator Core Network (MOCN) network sharing","tdoc_agenda_sort_order":0,"status":"not pursued","reservation_date":"2025-04-23 08:54:57","uploaded":"2025-04-23 09:01:12","revisionof":"S5-251522","revisedto":"","release":"Rel-19","crspec":32.255,"crspecversion":"19.1.0","workitem":[{"winame":"CH_MOCN_NetShare"}],"crnumber":579.0,"crrevision":1.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251844.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"4.x (new)","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251845","title":"Rel-19 CR 32.255 Addition of charging requirements for MOCN","source":"Ericsson","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 23\/04\/2025. Original source : Ericsson","agenda_item_sort_order":112,"ainumber":"7.4.12","ainame":"Charging aspects for Multi-Operator Core Network (MOCN) network sharing","tdoc_agenda_sort_order":0,"status":"not pursued","reservation_date":"2025-04-23 08:54:58","uploaded":"2025-04-23 09:01:12","revisionof":"S5-251523","revisedto":"S5-252773","release":"Rel-19","crspec":32.255,"crspecversion":"19.1.0","workitem":[{"winame":"CH_MOCN_NetShare"}],"crnumber":580.0,"crrevision":1.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251845.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"2, 5.1.1, and 5.1.2","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251846","title":"Rel-19 CR 32.256 Addition of architecture for network sharing","source":"Ericsson","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":112,"ainumber":"7.4.12","ainame":"Charging aspects for Multi-Operator Core Network (MOCN) network sharing","tdoc_agenda_sort_order":15211,"status":"agreed","reservation_date":"2025-04-23 08:54:59","uploaded":"2025-04-23 09:01:12","revisionof":"S5-251521","revisedto":"","release":"Rel-19","crspec":32.256,"crspecversion":"19.1.0","workitem":[{"winame":"NetShare_CH"}],"crnumber":48.0,"crrevision":1.0,"crcategory":"F","tsg_crp":"SP-250540","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251846.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251847","title":"Correct bindings information for 5G ProSe Charging","source":"China Telecom","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":99,"ainumber":"7.3","ainame":"Charging Maintenance and Rel-19 Charging small enhancements","tdoc_agenda_sort_order":12911,"status":"agreed","reservation_date":"2025-04-23 08:55:00","uploaded":"2025-04-23 09:01:12","revisionof":"S5-251291","revisedto":"","release":"Rel-17","crspec":32.291,"crspecversion":"17.12.0","workitem":[{"winame":"5G_ProSe"}],"crnumber":609.0,"crrevision":1.0,"crcategory":"F","tsg_crp":"SP-250515","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251847.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251848","title":"Correct bindings information for 5G ProSe Charging","source":"China Telecom","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":105,"ainumber":"7.4.5","ainame":"Charging Aspects for 5G ProSe Ph3","tdoc_agenda_sort_order":12991,"status":"agreed","reservation_date":"2025-04-23 08:55:01","uploaded":"2025-04-23 09:01:12","revisionof":"S5-251299","revisedto":"","release":"Rel-18","crspec":32.291,"crspecversion":"18.9.0","workitem":[{"winame":"5G_ProSe"}],"crnumber":610.0,"crrevision":1.0,"crcategory":"A","tsg_crp":"SP-250515","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251848.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251849","title":"Correct bindings information for 5G ProSe Charging","source":"China Telecom","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":105,"ainumber":"7.4.5","ainame":"Charging Aspects for 5G ProSe Ph3","tdoc_agenda_sort_order":13001,"status":"agreed","reservation_date":"2025-04-23 08:55:01","uploaded":"2025-04-23 09:01:12","revisionof":"S5-251300","revisedto":"","release":"Rel-19","crspec":32.291,"crspecversion":"19.2.0","workitem":[{"winame":"5G_ProSe"}],"crnumber":611.0,"crrevision":1.0,"crcategory":"A","tsg_crp":"SP-250515","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251849.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251850","title":"Rel-19 CR 28.849 EditHelp Editorial Changes","source":"Nokia","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":99,"ainumber":"7.3","ainame":"Charging Maintenance and Rel-19 Charging small enhancements","tdoc_agenda_sort_order":14341,"status":"agreed","reservation_date":"2025-04-23 08:55:02","uploaded":"2025-04-23 09:01:12","revisionof":"S5-251434","revisedto":"","release":"Rel-19","crspec":28.849,"crspecversion":"19.0.0","workitem":[{"winame":"FS_CAPIF_Ph2_CH"}],"crnumber":1.0,"crrevision":1.0,"crcategory":"D","tsg_crp":"SP-250532","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251850.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251851","title":"Rel-19 CR 28.851 Addressing editHelp comments","source":"China Mobile","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":99,"ainumber":"7.3","ainame":"Charging Maintenance and Rel-19 Charging small enhancements","tdoc_agenda_sort_order":15261,"status":"agreed","reservation_date":"2025-04-23 08:55:03","uploaded":"2025-04-23 09:01:12","revisionof":"S5-251526","revisedto":"","release":"Rel-19","crspec":28.851,"crspecversion":"19.0.0","workitem":[{"winame":"FS_NG_RTC_Ph2_CH"}],"crnumber":2.0,"crrevision":1.0,"crcategory":"D","tsg_crp":"SP-250533","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251851.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251852","title":"Correction of reference","source":"China Mobile Com. Corporation","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":99,"ainumber":"7.3","ainame":"Charging Maintenance and Rel-19 Charging small enhancements","tdoc_agenda_sort_order":15311,"status":"agreed","reservation_date":"2025-04-23 08:55:04","uploaded":"2025-04-23 09:01:12","revisionof":"S5-251531","revisedto":"","release":"Rel-19","crspec":28.853,"crspecversion":"19.0.0","workitem":[{"winame":"FS_UAS_CH"}],"crnumber":1.0,"crrevision":1.0,"crcategory":"D","tsg_crp":"SP-250534","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251852.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251853","title":"Rel-18 CR 32.298 Correction of API Information","source":"Amdocs","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":99,"ainumber":"7.3","ainame":"Charging Maintenance and Rel-19 Charging small enhancements","tdoc_agenda_sort_order":16041,"status":"agreed","reservation_date":"2025-04-23 08:55:04","uploaded":"2025-04-23 09:01:12","revisionof":"S5-251604","revisedto":"S5-252537","release":"Rel-18","crspec":32.298,"crspecversion":"18.8.0","workitem":[{"winame":"TEI18"}],"crnumber":1036.0,"crrevision":1.0,"crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251853.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251854","title":"Rel-19 CR 32.298 Correction of API Information","source":"Amdocs Software Systems Ltd","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":99,"ainumber":"7.3","ainame":"Charging Maintenance and Rel-19 Charging small enhancements","tdoc_agenda_sort_order":16051,"status":"agreed","reservation_date":"2025-04-23 08:55:05","uploaded":"2025-04-23 09:01:12","revisionof":"S5-251605","revisedto":"S5-252538","release":"Rel-19","crspec":32.298,"crspecversion":"19.1.0","workitem":[{"winame":"TEI18"}],"crnumber":1037.0,"crrevision":1.0,"crcategory":"A","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251854.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251855","title":"Update reference for the TR","source":"CATT","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":106,"ainumber":"7.4.6","ainame":"Charging aspects of satellite access Phase 3","tdoc_agenda_sort_order":16471,"status":"agreed","reservation_date":"2025-04-23 08:55:06","uploaded":"2025-04-23 09:01:12","revisionof":"S5-251647","revisedto":"","release":"Rel-19","crspec":28.846,"crspecversion":"19.0.0","workitem":[{"winame":"5GSAT_Ph3-CH"}],"crnumber":1.0,"crrevision":1.0,"crcategory":"D","tsg_crp":"SP-250518","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251855.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251856","title":"Add layer 3 multi-hop ProSe UE-to-Network relay communication related attributes","source":"China Telecom","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 23\/04\/2025. Original source : China Telecom","agenda_item_sort_order":105,"ainumber":"7.4.5","ainame":"Charging Aspects for 5G ProSe Ph3","tdoc_agenda_sort_order":13121,"status":"agreed","reservation_date":"2025-04-23 08:55:07","uploaded":"2025-04-23 09:01:12","revisionof":"S5-251312","revisedto":"","release":"Rel-19","crspec":32.291,"crspecversion":"19.2.0","workitem":[{"winame":"5G_ProSe_Ph3_CH"}],"crnumber":615.0,"crrevision":1.0,"crcategory":"B","tsg_crp":"SP-250516","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251856.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"6.1.6.2.11.8, 6.1.6.2.11.X(new), 7.9, forge","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251857","title":"Revised WID on on Charging aspects of next generation real time communication services phase 2","source":"China Mobile","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"WID revised","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":98,"ainumber":"7.2","ainame":"New Charging Study\/Work Item proposals","tdoc_agenda_sort_order":13681,"status":"agreed","reservation_date":"2025-04-23 08:55:08","uploaded":"2025-04-23 09:01:12","revisionof":"S5-251368","revisedto":"","release":"Rel-19","crspec":"","crspecversion":"","workitem":[{"winame":"NG_RTC_Ph2-CH"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251857.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251880","title":"Rel-19 CR TS 28.104 update MDA type for UE throughput analysis","source":"Huawei","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Approval","abstract":"","secretary_remarks":"Title modified on 23\/04\/2025. Original title : Rel-19 CR TS 28.104 update MDA type for UE throughput anlaysis<br\/><br\/>Source modified on 23\/04\/2025. Original source : Huawei","agenda_item_sort_order":63,"ainumber":"6.19.2.1","ainame":"Management Data Analytics phase 3","tdoc_agenda_sort_order":15541,"status":"agreed","reservation_date":"2025-04-23 08:55:08","uploaded":"2025-04-23 09:01:12","revisionof":"S5-251554","revisedto":"","release":"Rel-19","crspec":28.104,"crspecversion":"19.1.0","workitem":[{"winame":"eMDAS_Ph3"}],"crnumber":203.0,"crrevision":1.0,"crcategory":"F","tsg_crp":"SP-250528","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251880.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":false,"clauses_affected":"8.4.2.6.1, 8.6.1","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251881","title":"Rel19 CR TS28.104 add solution on management data collection recommendation for predicted failures","source":"Nokia, Nokia Shanghai Bell, Orange","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":63,"ainumber":"6.19.2.1","ainame":"Management Data Analytics phase 3","tdoc_agenda_sort_order":14431,"status":"agreed","reservation_date":"2025-04-23 08:55:09","uploaded":"2025-04-23 09:01:12","revisionof":"S5-251443","revisedto":"","release":"Rel-19","crspec":28.104,"crspecversion":"19.1.0","workitem":[{"winame":"eMDAS_Ph3"}],"crnumber":200.0,"crrevision":1.0,"crcategory":"B","tsg_crp":"SP-250528","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251881.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251882","title":"Rel-19 CR TS 28.104 Fix wrong reference and add RRC report","source":"Ericsson GmbH, Eurolab, Nokia, Nokia Shanghai Bell","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 23\/04\/2025. Original source : Ericsson GmbH, Eurolab, Nokia, Nokia Shanghai Bell","agenda_item_sort_order":63,"ainumber":"6.19.2.1","ainame":"Management Data Analytics phase 3","tdoc_agenda_sort_order":17151,"status":"agreed","reservation_date":"2025-04-23 08:55:10","uploaded":"2025-04-23 09:01:12","revisionof":"S5-251715","revisedto":"","release":"Rel-19","crspec":28.104,"crspecversion":"19.1.0","workitem":[{"winame":"eMDAS_Ph3"}],"crnumber":212.0,"crrevision":1.0,"crcategory":"F","tsg_crp":"SP-250528","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251882.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"2, 4, 5.1, 8.4.1.1.2, 8.4.3.1.2, 8.4.3.1.3, 8.4.7.1.3.2","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251883","title":"Rel-19 CR 28.104 adding statistics information in failure prediction output","source":"Huawei","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Title modified on 23\/04\/2025. Original title : Rel-19 CR 28.104 adding statics information in failure prediction output<br\/><br\/>Source modified on 23\/04\/2025. Original source : Huawei","agenda_item_sort_order":63,"ainumber":"6.19.2.1","ainame":"Management Data Analytics phase 3","tdoc_agenda_sort_order":16181,"status":"agreed","reservation_date":"2025-04-23 08:55:11","uploaded":"2025-04-23 09:01:14","revisionof":"S5-251618","revisedto":"","release":"Rel-19","crspec":28.104,"crspecversion":"19.1.0","workitem":[{"winame":"eMDAS_Ph3"}],"crnumber":206.0,"crrevision":1.0,"crcategory":"B","tsg_crp":"SP-250528","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251883.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"8.4.3.1.3","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251884","title":"Rel-19 CR 28.104 topology information as enabling data is missing","source":"Huawei","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 23\/04\/2025. Original source : Huawei","agenda_item_sort_order":63,"ainumber":"6.19.2.1","ainame":"Management Data Analytics phase 3","tdoc_agenda_sort_order":16201,"status":"agreed","reservation_date":"2025-04-23 08:55:12","uploaded":"2025-04-23 09:01:14","revisionof":"S5-251620","revisedto":"","release":"Rel-19","crspec":28.104,"crspecversion":"19.1.0","workitem":[{"winame":"eMDAS_Ph3"}],"crnumber":208.0,"crrevision":1.0,"crcategory":"F","tsg_crp":"SP-250528","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251884.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"8.4.3.1.2","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251885","title":"Rel-19 CR 28.104 software upgrade validation","source":"Samsung R&D Institute UK, Orange","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 23\/04\/2025. Original source : Samsung R&D Institute UK, Orange","agenda_item_sort_order":63,"ainumber":"6.19.2.1","ainame":"Management Data Analytics phase 3","tdoc_agenda_sort_order":15391,"status":"revised","reservation_date":"2025-04-23 08:55:13","uploaded":"2025-04-23 09:01:14","revisionof":"S5-251539","revisedto":"S5-252116","release":"Rel-19","crspec":28.104,"crspecversion":"19.1.0","workitem":[{"winame":"eMDAS_Ph3"}],"crnumber":202.0,"crrevision":1.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251885.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":false,"clauses_affected":"8.4.6.x (new)","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251886","title":"Rel 19 CR TS 28.104 Clarify definition of confidenceDegree attribute","source":"Ericsson","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 23\/04\/2025. Original source : Ericsson","agenda_item_sort_order":63,"ainumber":"6.19.2.1","ainame":"Management Data Analytics phase 3","tdoc_agenda_sort_order":16261,"status":"agreed","reservation_date":"2025-04-23 08:55:14","uploaded":"2025-04-23 09:01:14","revisionof":"S5-251626","revisedto":"","release":"Rel-19","crspec":28.104,"crspecversion":"19.1.0","workitem":[{"winame":"eMDAS_Ph3"}],"crnumber":211.0,"crrevision":1.0,"crcategory":"F","tsg_crp":"SP-250528","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251886.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"9.5.1","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251887","title":"pCR TR 28.869 LCM changes for declarative descriptor","source":"Rakuten Mobile, Inc, Orange","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":70,"ainumber":"6.19.6","ainame":"Study on Cloud Aspects of Management and Orchestration","tdoc_agenda_sort_order":12631,"status":"noted","reservation_date":"2025-04-23 08:55:15","uploaded":"2025-04-23 09:01:14","revisionof":"S5-251263","revisedto":"","release":"Rel-19","crspec":28.869,"crspecversion":"1.3.0","workitem":[{"winame":"FS_Cloud_OAM"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251887.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251888","title":"pCR TR 28.869 Detail procedure flow for creation of NF Deployment","source":"Ericsson Telecomunicazioni SpA","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":70,"ainumber":"6.19.6","ainame":"Study on Cloud Aspects of Management and Orchestration","tdoc_agenda_sort_order":17191,"status":"noted","reservation_date":"2025-04-23 08:55:15","uploaded":"2025-04-23 09:01:14","revisionof":"S5-251719","revisedto":"","release":"Rel-19","crspec":28.869,"crspecversion":"1.3.0","workitem":[{"winame":"FS_Cloud_OAM"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251888.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251889","title":"pCR TR 28.869 Add potential solution for VNF configuration management","source":"Huawei, Deutsche Telekom, Ericsson, Nokia, Samsung","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":70,"ainumber":"6.19.6","ainame":"Study on Cloud Aspects of Management and Orchestration","tdoc_agenda_sort_order":15371,"status":"noted","reservation_date":"2025-04-23 08:55:15","uploaded":"2025-04-23 09:01:14","revisionof":"S5-251537","revisedto":"S5-252321","release":"Rel-19","crspec":28.869,"crspecversion":"1.3.0","workitem":[{"winame":"FS_Cloud_OAM"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251889.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251890","title":"pCR TR 28.869 Cloud-native VNF policy management evaluation","source":"NTT DOCOMO","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":70,"ainumber":"6.19.6","ainame":"Study on Cloud Aspects of Management and Orchestration","tdoc_agenda_sort_order":15831,"status":"noted","reservation_date":"2025-04-23 08:55:15","uploaded":"2025-04-23 09:01:14","revisionof":"S5-251583","revisedto":"","release":"Rel-19","crspec":28.869,"crspecversion":"1.3.0","workitem":[{"winame":"FS_Cloud_OAM"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251890.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251891","title":"R19 pCR TR 28.869 enhance observability requirements (Use case 7)","source":"Orange, AT&T","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":70,"ainumber":"6.19.6","ainame":"Study on Cloud Aspects of Management and Orchestration","tdoc_agenda_sort_order":15601,"status":"approved","reservation_date":"2025-04-23 08:55:15","uploaded":"2025-04-23 09:01:14","revisionof":"S5-251560","revisedto":"","release":"Rel-19","crspec":28.869,"crspecversion":"1.3.0","workitem":[{"winame":"FS_Cloud_OAM"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251891.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251892","title":"pCR Add evaluation for solutions in clause 5.2.1.3","source":"China Mobile,NTT DOCOMO","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":70,"ainumber":"6.19.6","ainame":"Study on Cloud Aspects of Management and Orchestration","tdoc_agenda_sort_order":15781,"status":"approved","reservation_date":"2025-04-23 08:55:16","uploaded":"2025-04-23 09:01:14","revisionof":"S5-251578","revisedto":"","release":"Rel-19","crspec":28.869,"crspecversion":"1.3.0","workitem":[{"winame":"FS_Cloud_OAM"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251892.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251893","title":"pCR TR 28.869 Annex example for CRD based deployment","source":"Rakuten Mobile, Inc, Orange","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":70,"ainumber":"6.19.6","ainame":"Study on Cloud Aspects of Management and Orchestration","tdoc_agenda_sort_order":12621,"status":"approved","reservation_date":"2025-04-23 08:55:16","uploaded":"2025-04-23 09:01:14","revisionof":"S5-251262","revisedto":"","release":"Rel-19","crspec":28.869,"crspecversion":"1.3.0","workitem":[{"winame":"FS_Cloud_OAM"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251893.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251894","title":"pCR TR 28.869 Update Annex D for example scenario for creation of NF Deployment instance","source":"Ericsson Telecomunicazioni SpA","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":70,"ainumber":"6.19.6","ainame":"Study on Cloud Aspects of Management and Orchestration","tdoc_agenda_sort_order":17251,"status":"noted","reservation_date":"2025-04-23 08:55:16","uploaded":"2025-04-23 09:01:14","revisionof":"S5-251725","revisedto":"","release":"Rel-19","crspec":28.869,"crspecversion":"1.3.0","workitem":[{"winame":"FS_Cloud_OAM"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251894.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251895","title":"pCR TR 28.869  3GPP management architecture evolution based on PaaS","source":"NTT DOCOMO, China Mobile","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":70,"ainumber":"6.19.6","ainame":"Study on Cloud Aspects of Management and Orchestration","tdoc_agenda_sort_order":15841,"status":"noted","reservation_date":"2025-04-23 08:55:16","uploaded":"2025-04-23 09:01:14","revisionof":"S5-251584","revisedto":"","release":"Rel-19","crspec":28.869,"crspecversion":"1.3.0","workitem":[{"winame":"FS_Cloud_OAM"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251895.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251896","title":"NDT concept and scope","source":"Nokia, Ericsson","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":69,"ainumber":"6.19.5.1","ainame":"Management aspects of Network Digital Twins","tdoc_agenda_sort_order":12531,"status":"noted","reservation_date":"2025-04-23 08:55:16","uploaded":"2025-04-23 09:01:14","revisionof":"S5-251253","revisedto":"","release":"Rel-19","crspec":28.561,"crspecversion":"0.1.0","workitem":[{"winame":"NDT"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251896.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251897","title":"TS28.561 Add the NDT concept and scope","source":"China Mobile, FiberCop, Orange, Nokia, Huawei, NTT DOCOMO, SK Telecom, Ericsson","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":69,"ainumber":"6.19.5.1","ainame":"Management aspects of Network Digital Twins","tdoc_agenda_sort_order":16011,"status":"approved","reservation_date":"2025-04-23 08:55:16","uploaded":"2025-04-23 09:01:14","revisionof":"S5-251601","revisedto":"","release":"Rel-19","crspec":28.561,"crspecversion":"0.1.0","workitem":[{"winame":"NDT"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251897.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251898","title":"NDT relation to automation","source":"Nokia, Ericsson","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":69,"ainumber":"6.19.5.1","ainame":"Management aspects of Network Digital Twins","tdoc_agenda_sort_order":12541,"status":"noted","reservation_date":"2025-04-23 08:55:17","uploaded":"2025-04-23 09:01:14","revisionof":"S5-251254","revisedto":"","release":"Rel-19","crspec":28.561,"crspecversion":"0.1.0","workitem":[{"winame":"NDT"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251898.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251899","title":"TS28.561 NDT support for network automation","source":"China Mobile, Huawei, FiberCop, Nokia, Ericsson, ZTE, Huawei, NTT DOCOMO, SK Telecom, Samsung","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":69,"ainumber":"6.19.5.1","ainame":"Management aspects of Network Digital Twins","tdoc_agenda_sort_order":16021,"status":"approved","reservation_date":"2025-04-23 08:55:17","uploaded":"2025-04-23 09:01:14","revisionof":"S5-251602","revisedto":"","release":"Rel-19","crspec":28.561,"crspecversion":"0.1.0","workitem":[{"winame":"NDT"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251899.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251900","title":"NDT support to Automation","source":"Nokia, Ericsson","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":69,"ainumber":"6.19.5.1","ainame":"Management aspects of Network Digital Twins","tdoc_agenda_sort_order":12561,"status":"withdrawn","reservation_date":"2025-04-23 08:55:17","uploaded":null,"revisionof":"","revisedto":"","release":"Rel-19","crspec":28.561,"crspecversion":"0.1.0","workitem":[{"winame":"NDT"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251901","title":"NDTs for verification","source":"Nokia, Ericsson, Huawei","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":69,"ainumber":"6.19.5.1","ainame":"Management aspects of Network Digital Twins","tdoc_agenda_sort_order":12551,"status":"approved","reservation_date":"2025-04-23 08:55:17","uploaded":"2025-04-23 09:01:14","revisionof":"S5-251255","revisedto":"","release":"Rel-19","crspec":28.561,"crspecversion":"0.1.0","workitem":[{"winame":"NDT"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251901.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251902","title":"Pseudo-CR on TS 28.561 Use case of RAN energy saving policy verification","source":"Huawei","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":69,"ainumber":"6.19.5.1","ainame":"Management aspects of Network Digital Twins","tdoc_agenda_sort_order":15661,"status":"withdrawn","reservation_date":"2025-04-23 08:55:17","uploaded":null,"revisionof":"","revisedto":"","release":"Rel-19","crspec":28.561,"crspecversion":"0.1.0","workitem":[{"winame":"NDT"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251903","title":"Pseudo-CR on TS 28.561 Add requirements for NDT supporting data generation","source":"Huawei, Nokia, Ericsson, China Mobile","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":69,"ainumber":"6.19.5.1","ainame":"Management aspects of Network Digital Twins","tdoc_agenda_sort_order":15691,"status":"approved","reservation_date":"2025-04-23 08:55:17","uploaded":"2025-04-23 09:01:14","revisionof":"S5-251569","revisedto":"","release":"Rel-19","crspec":28.561,"crspecversion":"0.1.0","workitem":[{"winame":"NDT"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251903.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251904","title":"Rel-19 pCR 28.567 Triggered CCL UC and Requirements","source":"Samsung R&D Institute UK, Nokia, Deutsche Telekom, China Unicom","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"pCR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":67,"ainumber":"6.19.4.1","ainame":"Closed Control Loop Management","tdoc_agenda_sort_order":15271,"status":"approved","reservation_date":"2025-04-23 08:55:18","uploaded":"2025-04-23 09:01:14","revisionof":"S5-251527","revisedto":"","release":"Rel-19","crspec":28.567,"crspecversion":"0.1.0","workitem":[{"winame":"CCLM"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251904.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251905","title":"CCL Trigger conflicts","source":"Nokia, Samsung","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":67,"ainumber":"6.19.4.1","ainame":"Closed Control Loop Management","tdoc_agenda_sort_order":12441,"status":"approved","reservation_date":"2025-04-23 08:55:18","uploaded":"2025-04-23 09:01:14","revisionof":"S5-251244","revisedto":"","release":"Rel-19","crspec":28.567,"crspecversion":"0.1.0","workitem":[{"winame":"CCLM"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251905.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251906","title":"CCL Goal-targets and actions conflicts","source":"Nokia, Samsung","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":67,"ainumber":"6.19.4.1","ainame":"Closed Control Loop Management","tdoc_agenda_sort_order":12421,"status":"approved","reservation_date":"2025-04-23 08:55:18","uploaded":"2025-04-23 09:01:14","revisionof":"S5-251242","revisedto":"","release":"Rel-19","crspec":28.567,"crspecversion":"0.1.0","workitem":[{"winame":"CCLM"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251906.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251907","title":"CCL Indirect target conflicts","source":"Nokia","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":67,"ainumber":"6.19.4.1","ainame":"Closed Control Loop Management","tdoc_agenda_sort_order":12451,"status":"approved","reservation_date":"2025-04-23 08:55:18","uploaded":"2025-04-23 09:01:14","revisionof":"S5-251245","revisedto":"","release":"Rel-19","crspec":28.567,"crspecversion":"0.1.0","workitem":[{"winame":"CCLM"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251907.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251908","title":"CCL network & time scope conflicts","source":"Nokia","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":67,"ainumber":"6.19.4.1","ainame":"Closed Control Loop Management","tdoc_agenda_sort_order":12431,"status":"noted","reservation_date":"2025-04-23 08:55:18","uploaded":"2025-04-23 09:01:14","revisionof":"S5-251243","revisedto":"","release":"Rel-19","crspec":28.567,"crspecversion":"0.1.0","workitem":[{"winame":"CCLM"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251908.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251909","title":"Informative Annex on conflict handling approach","source":"Nokia","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":67,"ainumber":"6.19.4.1","ainame":"Closed Control Loop Management","tdoc_agenda_sort_order":12521,"status":"approved","reservation_date":"2025-04-23 08:55:18","uploaded":"2025-04-23 09:01:14","revisionof":"S5-251252","revisedto":"","release":"Rel-19","crspec":28.567,"crspecversion":"0.1.0","workitem":[{"winame":"CCLM"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251909.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251910","title":"CCL-impact assessment and resolution","source":"Nokia, Samsung","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":67,"ainumber":"6.19.4.1","ainame":"Closed Control Loop Management","tdoc_agenda_sort_order":12461,"status":"noted","reservation_date":"2025-04-23 08:55:18","uploaded":"2025-04-23 09:01:14","revisionof":"S5-251246","revisedto":"","release":"Rel-19","crspec":28.567,"crspecversion":"0.1.0","workitem":[{"winame":"CCLM"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251910.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251911","title":"CCL decision escalation","source":"Nokia","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":67,"ainumber":"6.19.4.1","ainame":"Closed Control Loop Management","tdoc_agenda_sort_order":12471,"status":"approved","reservation_date":"2025-04-23 08:55:18","uploaded":"2025-04-23 09:01:14","revisionof":"S5-251247","revisedto":"","release":"Rel-19","crspec":28.567,"crspecversion":"0.1.0","workitem":[{"winame":"CCLM"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251911.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251912","title":"pCR TS 28.567 Add use case and requirements for network performance problem recovery","source":"Huawei, Deutsche Telekom, Nokia","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":67,"ainumber":"6.19.4.1","ainame":"Closed Control Loop Management","tdoc_agenda_sort_order":15361,"status":"approved","reservation_date":"2025-04-23 08:55:18","uploaded":"2025-04-23 09:01:14","revisionof":"S5-251536","revisedto":"","release":"Rel-19","crspec":28.567,"crspecversion":"0.1.0","workitem":[{"winame":"CCLM"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251912.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251913","title":"Rel-19 CR TS 28.312 Enhance the use case and solution to support radio network support for UAV pre-flight preparation","source":"Huawei, Deutsche Telekom","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":65,"ainumber":"6.19.3.1","ainame":"Intent driven management services for mobile network phase 3","tdoc_agenda_sort_order":12741,"status":"agreed","reservation_date":"2025-04-23 08:55:38","uploaded":"2025-04-23 09:01:14","revisionof":"S5-251274","revisedto":"","release":"Rel-19","crspec":28.312,"crspecversion":"19.1.0","workitem":[{"winame":"IDMS_MN_Ph3"}],"crnumber":288.0,"crrevision":3.0,"crcategory":"B","tsg_crp":"SP-250536","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251913.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251914","title":"Rel-19 CR TS 28.312 Enhance the use case and solution to support MOCN undifferentiated radio service in a specified area","source":"China Unicom","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":65,"ainumber":"6.19.3.1","ainame":"Intent driven management services for mobile network phase 3","tdoc_agenda_sort_order":13671,"status":"agreed","reservation_date":"2025-04-23 08:55:39","uploaded":"2025-04-23 09:01:14","revisionof":"S5-251367","revisedto":"","release":"Rel-19","crspec":28.312,"crspecversion":"19.1.0","workitem":[{"winame":"IDMS_MN_Ph3"}],"crnumber":316.0,"crrevision":1.0,"crcategory":"B","tsg_crp":"SP-250536","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251914.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251915","title":"Rel-19 CR 28.312 Clarifications on negotiation of intent fulfillment","source":"Ericsson Canada Inc., ZTE","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":65,"ainumber":"6.19.3.1","ainame":"Intent driven management services for mobile network phase 3","tdoc_agenda_sort_order":16031,"status":"agreed","reservation_date":"2025-04-23 08:55:40","uploaded":"2025-04-23 09:01:14","revisionof":"S5-251603","revisedto":"","release":"Rel-19","crspec":28.312,"crspecversion":"19.1.0","workitem":[{"winame":"IDMS_MN_Ph3"}],"crnumber":332.0,"crrevision":1.0,"crcategory":"C","tsg_crp":"SP-250536","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251915.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251916","title":"Rel-19 CR TS 28.312 Update the solution for intent negotiation report","source":"Huawei,China Mobile, ZTE","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 23\/04\/2025. Original source : Huawei, China Mobile, ZTE","agenda_item_sort_order":65,"ainumber":"6.19.3.1","ainame":"Intent driven management services for mobile network phase 3","tdoc_agenda_sort_order":12731,"status":"agreed","reservation_date":"2025-04-23 08:55:41","uploaded":"2025-04-23 09:01:14","revisionof":"S5-251273","revisedto":"","release":"Rel-19","crspec":28.312,"crspecversion":"19.1.0","workitem":[{"winame":"IDMS_MN_Ph3"}],"crnumber":308.0,"crrevision":1.0,"crcategory":"F","tsg_crp":"SP-250536","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251916.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"6.2.1.2.2.1, 6.2.1.2.2.2, 6.2.1.2.2.3, 6.2.1.3.22, 6.2.1.3.22.1, 6.2.1.3.22.2, 6.2.1.3.23, 6.2.1.3.23.1, 6.2.1.3.23.2, 6.2.1.3.24, 6.2.1.3.24.1, 6.2.1.3.24.2, 6.2.1.3.25.2, 6.2.1.4","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251917","title":"Rel-19 CR TS 28.312 Add procedure for intent exploration","source":"Huawei, Deutsche Telekom, ZTE","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":65,"ainumber":"6.19.3.1","ainame":"Intent driven management services for mobile network phase 3","tdoc_agenda_sort_order":12751,"status":"agreed","reservation_date":"2025-04-23 08:56:04","uploaded":"2025-04-23 09:01:14","revisionof":"S5-251275","revisedto":"S5-252402","release":"Rel-19","crspec":28.312,"crspecversion":"19.1.0","workitem":[{"winame":"IDMS_MN_Ph3"}],"crnumber":309.0,"crrevision":1.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251917.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251918","title":"Rel-19 CR TS 28.312 Enhance the definition for intentMgmtPurpose","source":"Huawei, Deutsche Telekom, ZTE","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":65,"ainumber":"6.19.3.1","ainame":"Intent driven management services for mobile network phase 3","tdoc_agenda_sort_order":12791,"status":"agreed","reservation_date":"2025-04-23 08:56:05","uploaded":"2025-04-23 09:01:14","revisionof":"S5-251279","revisedto":"S5-252403","release":"Rel-19","crspec":28.312,"crspecversion":"19.1.0","workitem":[{"winame":"IDMS_MN_Ph3"}],"crnumber":313.0,"crrevision":1.0,"crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251918.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251919","title":"Rel-19 CR TS 28.312 Update clause 6.1 and 7.1 to support intent negotiation","source":"Huawei, Deutsche Telekom, ZTE","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":65,"ainumber":"6.19.3.1","ainame":"Intent driven management services for mobile network phase 3","tdoc_agenda_sort_order":13921,"status":"agreed","reservation_date":"2025-04-23 08:56:06","uploaded":"2025-04-23 09:01:14","revisionof":"S5-251392","revisedto":"","release":"Rel-19","crspec":28.312,"crspecversion":"19.1.0","workitem":[{"winame":"IDMS_MN_Ph3"}],"crnumber":317.0,"crrevision":1.0,"crcategory":"B","tsg_crp":"SP-250536","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251919.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251920","title":"Rel-19 CR TS 28.312 Correction on introduction for intent fulfilment feasibility check","source":"NTT DOCOMO","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 23\/04\/2025. Original source : NTT DOCOMO","agenda_item_sort_order":65,"ainumber":"6.19.3.1","ainame":"Intent driven management services for mobile network phase 3","tdoc_agenda_sort_order":15771,"status":"agreed","reservation_date":"2025-04-23 08:56:07","uploaded":"2025-04-23 09:01:14","revisionof":"S5-251577","revisedto":"","release":"Rel-19","crspec":28.312,"crspecversion":"19.1.0","workitem":[{"winame":"IDMS_MN_Ph3"}],"crnumber":331.0,"crrevision":1.0,"crcategory":"F","tsg_crp":"SP-250536","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251920.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"5.3.3.1","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251921","title":"Rel-19 CR 28.312 Add generic utility function support (stage 2)","source":"Ericsson Canada Inc.","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":65,"ainumber":"6.19.3.1","ainame":"Intent driven management services for mobile network phase 3","tdoc_agenda_sort_order":17501,"status":"agreed","reservation_date":"2025-04-23 08:56:08","uploaded":"2025-04-23 09:01:14","revisionof":"S5-251750","revisedto":"","release":"Rel-19","crspec":28.312,"crspecversion":"19.1.0","workitem":[{"winame":"IDMS_MN_Ph3"}],"crnumber":337.0,"crrevision":1.0,"crcategory":"B","tsg_crp":"SP-250536","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251921.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":false,"clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251922","title":"Rel-19 CR TS 28.312 Update procedures for intent report management to support implicit intent report subscription","source":"Huawei, ZTE, Deutsche Telekom","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":65,"ainumber":"6.19.3.1","ainame":"Intent driven management services for mobile network phase 3","tdoc_agenda_sort_order":12761,"status":"agreed","reservation_date":"2025-04-23 08:56:10","uploaded":"2025-04-23 09:01:14","revisionof":"S5-251276","revisedto":"","release":"Rel-19","crspec":28.312,"crspecversion":"19.1.0","workitem":[{"winame":"IDMS_MN_Ph3"}],"crnumber":310.0,"crrevision":1.0,"crcategory":"B","tsg_crp":"SP-250536","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251922.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251923","title":"Rel-19 CR TS 28.312 Add an example to support intent report based on condition","source":"Huawei","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 23\/04\/2025. Original source : Huawei","agenda_item_sort_order":65,"ainumber":"6.19.3.1","ainame":"Intent driven management services for mobile network phase 3","tdoc_agenda_sort_order":15341,"status":"agreed","reservation_date":"2025-04-23 08:56:11","uploaded":"2025-04-23 09:01:14","revisionof":"S5-251534","revisedto":"","release":"Rel-19","crspec":28.312,"crspecversion":"19.1.0","workitem":[{"winame":"IDMS_MN_Ph3"}],"crnumber":329.0,"crrevision":1.0,"crcategory":"F","tsg_crp":"SP-250536","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251923.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"5.3.2.1","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251924","title":"Rel-19 CR TS 28.312 Update the solution for Intent capability exposure","source":"Huawei, Deutsche Telekom,Nokia","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 23\/04\/2025. Original source : Huawei, Deutsche Telekom, Nokia","agenda_item_sort_order":65,"ainumber":"6.19.3.1","ainame":"Intent driven management services for mobile network phase 3","tdoc_agenda_sort_order":12721,"status":"agreed","reservation_date":"2025-04-23 08:56:12","uploaded":"2025-04-23 09:01:14","revisionof":"S5-251272","revisedto":"","release":"Rel-19","crspec":28.312,"crspecversion":"19.1.0","workitem":[{"winame":"IDMS_MN_Ph3"}],"crnumber":307.0,"crrevision":1.0,"crcategory":"F","tsg_crp":"SP-250536","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251924.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"6.2.1.2.3.1, 6.2.1.2.3.2, 6.2.1.3.11.1, 6.2.1.3.11.2, 6.2.1.3.26.26.2.1.3.26.2, 6.2.1.4,Following YAML files normatively defined in the forge are updated: - OpenAPI\/TS28312_IntentNrm.yaml","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251925","title":"Rel-19 CR TS 28.312 Update 5.3.1 Intent handling capability obtaining","source":"Huawei","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":65,"ainumber":"6.19.3.1","ainame":"Intent driven management services for mobile network phase 3","tdoc_agenda_sort_order":12771,"status":"agreed","reservation_date":"2025-04-23 08:56:13","uploaded":"2025-04-23 09:01:14","revisionof":"S5-251277","revisedto":"","release":"Rel-19","crspec":28.312,"crspecversion":"19.1.0","workitem":[{"winame":"IDMS_MN_Ph3"}],"crnumber":311.0,"crrevision":1.0,"crcategory":"F","tsg_crp":"SP-250536","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251925.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251926","title":"Rel-19 CR TS 28.312 Add missing abbreviation and definition","source":"Huawei, Deutsche Telekom","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":65,"ainumber":"6.19.3.1","ainame":"Intent driven management services for mobile network phase 3","tdoc_agenda_sort_order":12781,"status":"agreed","reservation_date":"2025-04-23 08:56:14","uploaded":"2025-04-23 09:01:14","revisionof":"S5-251278","revisedto":"","release":"Rel-19","crspec":28.312,"crspecversion":"19.1.0","workitem":[{"winame":"IDMS_MN_Ph3"}],"crnumber":312.0,"crrevision":1.0,"crcategory":"B","tsg_crp":"SP-250536","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251926.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251927","title":"CR TS 28.312 introduce mapping table","source":"Ericsson, Deutsche Telekom","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Title modified on 23\/04\/2025. Original title : Rel-19 CR TS 28.312 Introduce mapping table<br\/><br\/>Source modified on 23\/04\/2025. Original source : Ericsson, Deutsche Telekom","agenda_item_sort_order":65,"ainumber":"6.19.3.1","ainame":"Intent driven management services for mobile network phase 3","tdoc_agenda_sort_order":16601,"status":"revised","reservation_date":"2025-04-23 08:56:15","uploaded":"2025-04-23 09:01:14","revisionof":"S5-251660","revisedto":"S5-252117","release":"Rel-19","crspec":28.312,"crspecversion":"19.1.0","workitem":[{"winame":"IDMS_MN_Ph3"}],"crnumber":333.0,"crrevision":1.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251927.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"2, New Annex","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251928","title":"Rel-19 CR TS 28537 Add requirements for discovering management capabilities of MnS instances based on area of interest","source":"Huawei, Deutsche Telekom","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":73,"ainumber":"6.19.8.1","ainame":"Service Based Management Architecture enhancement phase 3","tdoc_agenda_sort_order":13931,"status":"agreed","reservation_date":"2025-04-23 08:56:16","uploaded":"2025-04-23 09:01:14","revisionof":"S5-251393","revisedto":"","release":"Rel-19","crspec":28.537,"crspecversion":"19.1.0","workitem":[{"winame":"SBMA_Ph3"}],"crnumber":31.0,"crrevision":3.0,"crcategory":"B","tsg_crp":"SP-250553","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251928.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251929","title":"Rel-19 CR TS 28.622 Extend the MnsScope to support area of interest (Stage2)","source":"Huawei, Deutsche Telekom","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 23\/04\/2025. Original source : Huawei, Deutsche Telekom","agenda_item_sort_order":73,"ainumber":"6.19.8.1","ainame":"Service Based Management Architecture enhancement phase 3","tdoc_agenda_sort_order":13941,"status":"agreed","reservation_date":"2025-04-23 08:56:17","uploaded":"2025-04-23 09:01:14","revisionof":"S5-251394","revisedto":"","release":"Rel-19","crspec":28.622,"crspecversion":"19.3.0","workitem":[{"winame":"SBMA_Ph3"}],"crnumber":514.0,"crrevision":3.0,"crcategory":"B","tsg_crp":"SP-250553","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251929.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"4.3.42.1, 4.3.X(new), 4.4.1","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251930","title":"Rel-19 CR TS 28.623 Extend the MnsScope to support area of interest (Stage3)","source":"Huawei, Deutsche Telekom","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 23\/04\/2025. Original source : Huawei, Deutsche Telekom","agenda_item_sort_order":73,"ainumber":"6.19.8.1","ainame":"Service Based Management Architecture enhancement phase 3","tdoc_agenda_sort_order":13951,"status":"agreed","reservation_date":"2025-04-23 08:56:18","uploaded":"2025-04-23 09:01:14","revisionof":"S5-251395","revisedto":"","release":"Rel-19","crspec":28.623,"crspecversion":"19.3.0","workitem":[{"winame":"SBMA_Ph3"}],"crnumber":494.0,"crrevision":3.0,"crcategory":"B","tsg_crp":"SP-250553","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251930.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"Following YAML files normatively defined in the forge are updated: - OpenAPI\/TS28623_MnSRegistryNrm.yaml","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251931","title":"Rel-19 CR TS 28.622 Enhance the MnSInfo to support discovery of management capabilities of MnS supported by a MnS Producer (Stage2)","source":"Huawei, Deutsche Telekom,Nokia","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 23\/04\/2025. Original source : Huawei, Deutsche Telekom, Nokia","agenda_item_sort_order":73,"ainumber":"6.19.8.1","ainame":"Service Based Management Architecture enhancement phase 3","tdoc_agenda_sort_order":13961,"status":"agreed","reservation_date":"2025-04-23 08:56:19","uploaded":"2025-04-23 09:01:14","revisionof":"S5-251396","revisedto":"","release":"Rel-19","crspec":28.622,"crspecversion":"19.3.0","workitem":[{"winame":"SBMA_Ph3"}],"crnumber":541.0,"crrevision":1.0,"crcategory":"B","tsg_crp":"SP-250553","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251931.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"4.3.42.2, 4.4.1","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251932","title":"Rel-19 CR TS 28.623 Enhance the MnSInfo to support discovery of management capabilities of MnS supported by a MnS Producer (Stage3)","source":"Huawei, Deutsche Telekom, Nokia","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":73,"ainumber":"6.19.8.1","ainame":"Service Based Management Architecture enhancement phase 3","tdoc_agenda_sort_order":13971,"status":"agreed","reservation_date":"2025-04-23 08:56:20","uploaded":"2025-04-23 09:01:14","revisionof":"S5-251397","revisedto":"","release":"Rel-19","crspec":28.623,"crspecversion":"19.3.0","workitem":[{"winame":"SBMA_Ph3"}],"crnumber":520.0,"crrevision":1.0,"crcategory":"B","tsg_crp":"SP-250553","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251932.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251933","title":"Rel-19 CR TS 28.111 Update concepts and overview","source":"Huawei","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Title modified on 23\/04\/2025. Original title : Rel-19 CR TS 28.111 Update terms and concepts overview<br\/><br\/>Source modified on 23\/04\/2025. Original source : Huawei","agenda_item_sort_order":73,"ainumber":"6.19.8.1","ainame":"Service Based Management Architecture enhancement phase 3","tdoc_agenda_sort_order":14861,"status":"not pursued","reservation_date":"2025-04-23 08:56:21","uploaded":"2025-04-23 09:01:14","revisionof":"S5-251486","revisedto":"","release":"Rel-19","crspec":28.111,"crspecversion":"19.1.0","workitem":[{"winame":"SBMA_Ph3"}],"crnumber":35.0,"crrevision":1.0,"crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251933.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"4","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251934","title":"Rel-19 CR 32.158 Add details for MnS API versioning","source":"Ericsson Canada Inc.","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":73,"ainumber":"6.19.8.1","ainame":"Service Based Management Architecture enhancement phase 3","tdoc_agenda_sort_order":15811,"status":"withdrawn","reservation_date":"2025-04-23 08:56:22","uploaded":null,"revisionof":"","revisedto":"","release":"Rel-19","crspec":32.158,"crspecversion":"18.2.0","workitem":[{"winame":"eSBMA"}],"crnumber":145.0,"crrevision":1.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251935","title":"Rel-19 CR 28.537 Add details for MnS API versioning","source":"Ericsson Canada Inc.","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":73,"ainumber":"6.19.8.1","ainame":"Service Based Management Architecture enhancement phase 3","tdoc_agenda_sort_order":15821,"status":"withdrawn","reservation_date":"2025-04-23 08:56:23","uploaded":null,"revisionof":"","revisedto":"","release":"Rel-19","crspec":28.537,"crspecversion":"19.1.0","workitem":[{"winame":"eSBMA"}],"crnumber":36.0,"crrevision":1.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251936","title":"Rel-19 CR 28.537 Add details for MnS API versioning","source":"Ericsson Canada Inc.","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":73,"ainumber":"6.19.8.1","ainame":"Service Based Management Architecture enhancement phase 3","tdoc_agenda_sort_order":15822,"status":"withdrawn","reservation_date":"2025-04-23 08:56:24","uploaded":null,"revisionof":"","revisedto":"","release":"Rel-19","crspec":28.533,"crspecversion":"19.1.0","workitem":[{"winame":"eSBMA"}],"crnumber":156.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251937","title":"Rel-19 CR TS 28.533 Update Annex E","source":"Ericsson GmbH, Eurolab, Deutsche Telekom, Huawei, Orange","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":73,"ainumber":"6.19.8.1","ainame":"Service Based Management Architecture enhancement phase 3","tdoc_agenda_sort_order":17241,"status":"agreed","reservation_date":"2025-04-23 08:56:26","uploaded":"2025-04-23 09:01:14","revisionof":"S5-251724","revisedto":"S5-252535","release":"Rel-19","crspec":28.533,"crspecversion":"19.1.0","workitem":[{"winame":"SBMA_Ph3"}],"crnumber":155.0,"crrevision":1.0,"crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251937.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251938","title":"Rel-19 CR 28.622 Add new generic type KeyValueList","source":"Ericsson India Private Limited","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":37,"ainumber":"6.4.5","ainame":"Service based management architecture","tdoc_agenda_sort_order":17301,"status":"withdrawn","reservation_date":"2025-04-23 08:56:27","uploaded":null,"revisionof":"S5-251730","revisedto":"","release":"Rel-19","crspec":28.622,"crspecversion":"19.3.0","workitem":[{"winame":"SBMA_Ph3"}],"crnumber":553.0,"crrevision":1.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251939","title":"Rel-19 CR 28.532 Add new notifications for reliability","source":"Ericsson India Private Limited","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":73,"ainumber":"6.19.8.1","ainame":"Service Based Management Architecture enhancement phase 3","tdoc_agenda_sort_order":17331,"status":"not pursued","reservation_date":"2025-04-23 08:56:28","uploaded":"2025-04-23 09:01:14","revisionof":"S5-251733","revisedto":"","release":"Rel-19","crspec":28.532,"crspecversion":"19.0.0","workitem":[{"winame":"SBMA_Ph3"}],"crnumber":381.0,"crrevision":1.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251939.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251940","title":"Rel-19 CR 28.622 Reliable notification transfer","source":"Ericsson Hungary Ltd","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":73,"ainumber":"6.19.8.1","ainame":"Service Based Management Architecture enhancement phase 3","tdoc_agenda_sort_order":17521,"status":"not pursued","reservation_date":"2025-04-23 08:56:29","uploaded":"2025-04-23 09:01:14","revisionof":"S5-251752","revisedto":"S5-252374","release":"Rel-19","crspec":28.622,"crspecversion":"19.3.0","workitem":[{"winame":"SBMA_Ph3"}],"crnumber":513.0,"crrevision":3.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251940.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251941","title":"Rel-19 CR TS 28.310 Introduce energy supply, carbon emission and renewable energy information elements","source":"Nokia, Huawei, Orange, AT&T","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":93,"ainumber":"6.19.20.1","ainame":"Energy efficiency and energy saving aspects of 5G networks and services","tdoc_agenda_sort_order":12641,"status":"not pursued","reservation_date":"2025-04-23 08:56:29","uploaded":"2025-04-23 09:01:14","revisionof":"S5-251264","revisedto":"","release":"Rel-19","crspec":28.31,"crspecversion":"19.0.0","workitem":[{"winame":"Energy_OAM_Ph3"}],"crnumber":70.0,"crrevision":1.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251941.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251942","title":"Rel-19 CR TS 28.623 Add GenericCollection to support grouping of objects for energy related information - Stage 3","source":"Nokia","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":93,"ainumber":"6.19.20.1","ainame":"Energy efficiency and energy saving aspects of 5G networks and services","tdoc_agenda_sort_order":12661,"status":"revised","reservation_date":"2025-04-23 08:56:30","uploaded":"2025-04-23 09:01:14","revisionof":"S5-251266","revisedto":"","release":"Rel-19","crspec":28.623,"crspecversion":"19.3.0","workitem":[{"winame":"Energy_OAM_Ph3"}],"crnumber":515.0,"crrevision":1.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251942.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251943","title":"Incorporation of conclusions from TR 28.880","source":"Vodafone","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":93,"ainumber":"6.19.20.1","ainame":"Energy efficiency and energy saving aspects of 5G networks and services","tdoc_agenda_sort_order":13351,"status":"withdrawn","reservation_date":"2025-04-23 08:56:31","uploaded":null,"revisionof":"","revisedto":"","release":"Rel-19","crspec":28.541,"crspecversion":"19.3.0","workitem":[{"winame":"Energy_OAM_Ph3"}],"crnumber":1496.0,"crrevision":1.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251944","title":"Rel-19 CR TS 28.104 Enhance the MDA assisted Energy Saving use case for handling of power shortages","source":"Nokia","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":93,"ainumber":"6.19.20.1","ainame":"Energy efficiency and energy saving aspects of 5G networks and services","tdoc_agenda_sort_order":12691,"status":"not pursued","reservation_date":"2025-04-23 08:56:32","uploaded":"2025-04-23 09:01:15","revisionof":"S5-251269","revisedto":"","release":"Rel-19","crspec":28.104,"crspecversion":"19.1.0","workitem":[{"winame":"Energy_OAM_Ph3"}],"crnumber":190.0,"crrevision":1.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251944.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251945","title":"Rel-19 CR TS 28.310 Multi-carrier RAN energy saving optimization","source":"Nokia","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":93,"ainumber":"6.19.20.1","ainame":"Energy efficiency and energy saving aspects of 5G networks and services","tdoc_agenda_sort_order":12681,"status":"agreed","reservation_date":"2025-04-23 08:56:33","uploaded":"2025-04-23 09:01:15","revisionof":"S5-251268","revisedto":"","release":"Rel-19","crspec":28.31,"crspecversion":"19.0.0","workitem":[{"winame":"Energy_OAM_Ph3"}],"crnumber":71.0,"crrevision":1.0,"crcategory":"B","tsg_crp":"SP-250530","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251945.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251946","title":"Rel-19 pCR TS 28.579 Introduce definition of External MnS consumer","source":"Huawei","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":95,"ainumber":"6.19.21.1","ainame":"Enhanced OAM for management service exposure to external consumers through CAPIF","tdoc_agenda_sort_order":13731,"status":"revised","reservation_date":"2025-04-23 08:56:34","uploaded":"2025-04-23 09:01:15","revisionof":"S5-251373","revisedto":"S5-252126","release":"Rel-19","crspec":28.579,"crspecversion":"0.1.0","workitem":[{"winame":"MExpo"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251946.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251947","title":"pCR TS 28.579 Add concepts content","source":"Huawei, Nokia, Samsung, AT&T, Ericsson","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":95,"ainumber":"6.19.21.1","ainame":"Enhanced OAM for management service exposure to external consumers through CAPIF","tdoc_agenda_sort_order":14831,"status":"approved","reservation_date":"2025-04-23 08:56:34","uploaded":"2025-04-23 09:01:15","revisionof":"S5-251483","revisedto":"","release":"Rel-19","crspec":28.579,"crspecversion":"0.1.0","workitem":[{"winame":"MExpo"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251947.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251948","title":"Discussion paper on MSED components, requirements and naming","source":"Nokia, Huawei, AT&T, Ericsson","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"discussion","for":"Endorsement","abstract":"","secretary_remarks":"","agenda_item_sort_order":95,"ainumber":"6.19.21.1","ainame":"Enhanced OAM for management service exposure to external consumers through CAPIF","tdoc_agenda_sort_order":16961,"status":"endorsed","reservation_date":"2025-04-23 08:56:34","uploaded":"2025-04-23 09:01:15","revisionof":"S5-251696","revisedto":"","release":"Rel-19","crspec":28.579,"crspecversion":"","workitem":[{"winame":"MExpo"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251948.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251949","title":"Rel-19 pCR TS 28.579 Add use case and requirements for registration of the MSED into the CCF","source":"Nokia Hungary","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":95,"ainumber":"6.19.21.1","ainame":"Enhanced OAM for management service exposure to external consumers through CAPIF","tdoc_agenda_sort_order":16971,"status":"revised","reservation_date":"2025-04-23 08:56:34","uploaded":"2025-04-23 09:01:15","revisionof":"S5-251697","revisedto":"S5-252127","release":"Rel-19","crspec":28.579,"crspecversion":"0.1.0","workitem":[{"winame":"MExpo"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251949.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251950","title":"Rel-19 pCR TS 28.572 Improve clauses on Planned configuration concepts","source":"Nokia","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":75,"ainumber":"6.19.9.1","ainame":"Management of planned configurations","tdoc_agenda_sort_order":16351,"status":"approved","reservation_date":"2025-04-23 08:56:34","uploaded":"2025-04-23 09:01:15","revisionof":"S5-251635","revisedto":"","release":"Rel-19","crspec":28.572,"crspecversion":"0.3.0","workitem":[{"winame":"PlanM"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251950.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251951","title":"Rel-19 pCR TS 28.572 Improve clauses on Managing planned configurations","source":"Nokia","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":75,"ainumber":"6.19.9.1","ainame":"Management of planned configurations","tdoc_agenda_sort_order":16361,"status":"approved","reservation_date":"2025-04-23 08:56:34","uploaded":"2025-04-23 09:01:15","revisionof":"S5-251636","revisedto":"","release":"Rel-19","crspec":28.572,"crspecversion":"0.3.0","workitem":[{"winame":"PlanM"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251951.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251952","title":"Rel-19 pCR TS 28.572 Improve clause Information model","source":"Nokia","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":75,"ainumber":"6.19.9.1","ainame":"Management of planned configurations","tdoc_agenda_sort_order":16371,"status":"approved","reservation_date":"2025-04-23 08:56:34","uploaded":"2025-04-23 09:01:15","revisionof":"S5-251637","revisedto":"","release":"Rel-19","crspec":28.572,"crspecversion":"0.3.0","workitem":[{"winame":"PlanM"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251952.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251953","title":"Rel-19 pCR TS 28.572 Improve clause RESTful HTTP-based solution set","source":"Nokia","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":75,"ainumber":"6.19.9.1","ainame":"Management of planned configurations","tdoc_agenda_sort_order":16381,"status":"approved","reservation_date":"2025-04-23 08:56:34","uploaded":"2025-04-23 09:01:15","revisionof":"S5-251638","revisedto":"","release":"Rel-19","crspec":28.572,"crspecversion":"0.3.0","workitem":[{"winame":"PlanM"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251953.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251954","title":"Rel-19 pCR TS 28.572 Allow recursive Planned configuration groups","source":"Ericsson India Private Limited","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":75,"ainumber":"6.19.9.1","ainame":"Management of planned configurations","tdoc_agenda_sort_order":16941,"status":"approved","reservation_date":"2025-04-23 08:56:34","uploaded":"2025-04-23 09:01:15","revisionof":"S5-251694","revisedto":"","release":"Rel-19","crspec":28.572,"crspecversion":"0.3.0","workitem":[{"winame":"PlanM"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251954.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251955","title":"Input to Draft CR 28.622 External Management Data","source":"Nokia, Deutsche Telekom, \tEricsson, Huawei","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"other","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":76,"ainumber":"6.19.","ainame":"Data management phase 2","tdoc_agenda_sort_order":14991,"status":"approved","reservation_date":"2025-04-23 08:56:35","uploaded":"2025-04-23 09:01:15","revisionof":"S5-251499","revisedto":"","release":"Rel-19","crspec":28.622,"crspecversion":"","workitem":[{"winame":"MADCOL_Ph2"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251955.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251956","title":"Draft CR MADCOL TS 28.622","source":"Nokia","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"draftCR","for":"Approval","abstract":"baseline before SA#160","secretary_remarks":"","agenda_item_sort_order":76,"ainumber":"6.19.","ainame":"Data management phase 2","tdoc_agenda_sort_order":14992,"status":"revised","reservation_date":"2025-04-23 08:56:35","uploaded":"2025-04-23 09:01:15","revisionof":"","revisedto":"S5-252125","release":"Rel-19","crspec":28.622,"crspecversion":"19.3.0","workitem":[{"winame":"MADCOL_Ph2"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251956.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251957","title":"Draft CR MADCOL TS 28.622","source":"Nokia","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"draftCR","for":"Approval","abstract":"baseline after SA#160","secretary_remarks":"","agenda_item_sort_order":76,"ainumber":"6.19.","ainame":"Data management phase 2","tdoc_agenda_sort_order":14993,"status":"withdrawn","reservation_date":"2025-04-23 08:56:35","uploaded":null,"revisionof":"","revisedto":"","release":"Rel-19","crspec":28.622,"crspecversion":"19.3.0","workitem":[{"winame":"MADCOL_Ph2"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251958","title":"Rel-19 CR TS 28.405 QoE Reference Uniqueness","source":"Ericsson, CATT","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 23\/04\/2025. Original source : Ericsson, CATT","agenda_item_sort_order":78,"ainumber":"6.19.11.1","ainame":"Data management regarding subscriptions and reporting","tdoc_agenda_sort_order":12311,"status":"not pursued","reservation_date":"2025-04-23 08:56:35","uploaded":"2025-04-23 09:01:15","revisionof":"S5-251231","revisedto":"S5-252260","release":"Rel-19","crspec":28.405,"crspecversion":"19.2.0","workitem":[{"winame":"Data_SREP"}],"crnumber":40.0,"crrevision":1.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251958.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"5.2","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251959","title":"Rel-19 CR TS 32.422 Trace Reference Uniqueness","source":"Ericsson, CATT","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 23\/04\/2025. Original source : Ericsson, CATT","agenda_item_sort_order":78,"ainumber":"6.19.11.1","ainame":"Data management regarding subscriptions and reporting","tdoc_agenda_sort_order":12321,"status":"not pursued","reservation_date":"2025-04-23 08:56:36","uploaded":"2025-04-23 09:01:15","revisionof":"S5-251232","revisedto":"S5-252259","release":"Rel-19","crspec":32.422,"crspecversion":"19.2.0","workitem":[{"winame":"Data_SREP"}],"crnumber":511.0,"crrevision":1.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251959.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"5.6","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251960","title":"Rel-19 CR 28.558 misaligned 5GC UE level measurement procedure","source":"Ericsson","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 23\/04\/2025. Original source : Ericsson","agenda_item_sort_order":79,"ainumber":"6.19.12","ainame":"5G performance measurements and KPIs phase 4","tdoc_agenda_sort_order":12251,"status":"agreed","reservation_date":"2025-04-23 08:56:37","uploaded":"2025-04-23 09:01:15","revisionof":"S5-251225","revisedto":"","release":"Rel-19","crspec":28.558,"crspecversion":"19.3.0","workitem":[{"winame":"PM_KPI_5G_Ph4"}],"crnumber":33.0,"crrevision":1.0,"crcategory":"F","tsg_crp":"SP-250551","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251960.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"2, 6.2.2.1.6.1","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251961","title":"Rel-19 CR TS 28.552 Cell Unavailable Time performance measurement","source":"Ericsson, AT&T, Samsung","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 23\/04\/2025. Original source : Ericsson, AT&T, Samsung","agenda_item_sort_order":79,"ainumber":"6.19.12","ainame":"5G performance measurements and KPIs phase 4","tdoc_agenda_sort_order":12271,"status":"agreed","reservation_date":"2025-04-23 08:56:37","uploaded":"2025-04-23 09:01:15","revisionof":"S5-251227","revisedto":"","release":"Rel-19","crspec":28.552,"crspecversion":"19.3.0","workitem":[{"winame":"PM_KPI_5G_Ph4"}],"crnumber":674.0,"crrevision":1.0,"crcategory":"B","tsg_crp":"SP-250551","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251961.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":false,"clauses_affected":"5.1.4.1.x (new)","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251962","title":"Rel-19 CR TS 32.401 PM Counter Metadata","source":"Ericsson","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 23\/04\/2025. Original source : Ericsson","agenda_item_sort_order":79,"ainumber":"6.19.12","ainame":"5G performance measurements and KPIs phase 4","tdoc_agenda_sort_order":12281,"status":"not pursued","reservation_date":"2025-04-23 08:56:38","uploaded":"2025-04-23 09:01:15","revisionof":"S5-251228","revisedto":"","release":"Rel-19","crspec":32.401,"crspecversion":"19.0.0","workitem":[{"winame":"PM_KPI_5G_Ph4"}],"crnumber":44.0,"crrevision":1.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251962.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"4.2.2","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251963","title":"Rel-19 CR TS 32.404 PM Counter Metadata","source":"Ericsson","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 23\/04\/2025. Original source : Ericsson","agenda_item_sort_order":79,"ainumber":"6.19.12","ainame":"5G performance measurements and KPIs phase 4","tdoc_agenda_sort_order":12291,"status":"not pursued","reservation_date":"2025-04-23 08:56:39","uploaded":"2025-04-23 09:01:15","revisionof":"S5-251229","revisedto":"S5-252270","release":"Rel-19","crspec":32.404,"crspecversion":"18.2.0","workitem":[{"winame":"PM_KPI_5G_Ph4"}],"crnumber":22.0,"crrevision":1.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251963.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"3.3","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251964","title":"Rel-19 CR TS 28.552 Correction of Distribution of time interval","source":"Esurfing IoT","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 23\/04\/2025. Original source : Esurfing IoT","agenda_item_sort_order":79,"ainumber":"6.19.12","ainame":"5G performance measurements and KPIs phase 4","tdoc_agenda_sort_order":16531,"status":"agreed","reservation_date":"2025-04-23 08:56:40","uploaded":"2025-04-23 09:01:15","revisionof":"S5-251653","revisedto":"","release":"Rel-19","crspec":28.552,"crspecversion":"19.3.0","workitem":[{"winame":"PM_KPI_5G_Ph4"}],"crnumber":689.0,"crrevision":1.0,"crcategory":"F","tsg_crp":"SP-250551","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251964.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":false,"clauses_affected":"5.1.1.6.12","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251965","title":"Rel-19 CR TS 28.552 Add Multicast Group Paging records for MBS measurement","source":"Esurfing IoT","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 23\/04\/2025. Original source : Esurfing IoT","agenda_item_sort_order":79,"ainumber":"6.19.12","ainame":"5G performance measurements and KPIs phase 4","tdoc_agenda_sort_order":16541,"status":"agreed","reservation_date":"2025-04-23 08:56:50","uploaded":"2025-04-23 09:01:15","revisionof":"S5-251654","revisedto":"","release":"Rel-19","crspec":28.552,"crspecversion":"19.3.0","workitem":[{"winame":"PM_KPI_5G_Ph4"}],"crnumber":690.0,"crrevision":1.0,"crcategory":"B","tsg_crp":"SP-250551","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251965.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":false,"clauses_affected":"5.1.1.27.x(new), A.X(new)","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251966","title":"Rel-19 CR TS 28.552 add measurement of coverage ratio","source":"CMCC, Huawei, ZTE, CATT","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":79,"ainumber":"6.19.12","ainame":"5G performance measurements and KPIs phase 4","tdoc_agenda_sort_order":17121,"status":"withdrawn","reservation_date":"2025-04-23 08:56:51","uploaded":null,"revisionof":"","revisedto":"","release":"Rel-19","crspec":28.552,"crspecversion":"19.3.0","workitem":[{"winame":"PM_KPI_5G_Ph4"}],"crnumber":695.0,"crrevision":1.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251967","title":"Rel19 CR TS28.541 NRM enhancements to ManagedNFProfile","source":"Nokia, Nokia Shanghai Bell, ZTE Corporation, Orange","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":80,"ainumber":"6.19.13","ainame":"5G Advanced NRM features phase 3","tdoc_agenda_sort_order":12921,"status":"agreed","reservation_date":"2025-04-23 08:56:52","uploaded":"2025-04-23 09:01:15","revisionof":"S5-251292","revisedto":"","release":"Rel-19","crspec":28.541,"crspecversion":"19.3.0","workitem":[{"winame":"AdNRM_Ph3"}],"crnumber":1490.0,"crrevision":1.0,"crcategory":"B","tsg_crp":"SP-250520","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251967.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251968","title":"Rel-19 CR TS 28.538 Update the procedure 5GC NF Provisioning","source":"Huawei","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 23\/04\/2025. Original source : Huawei","agenda_item_sort_order":80,"ainumber":"6.19.13","ainame":"5G Advanced NRM features phase 3","tdoc_agenda_sort_order":15751,"status":"agreed","reservation_date":"2025-04-23 08:56:53","uploaded":"2025-04-23 09:01:15","revisionof":"S5-251575","revisedto":"","release":"Rel-19","crspec":28.538,"crspecversion":"19.3.0","workitem":[{"winame":"AdNRM_Ph3"}],"crnumber":109.0,"crrevision":1.0,"crcategory":"F","tsg_crp":"SP-250520","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251968.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"7.4.3, 7.4.4","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251969","title":"Rel-19 CR TS 28.540 Enhance the requirement description","source":"Huawei","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 23\/04\/2025. Original source : Huawei","agenda_item_sort_order":80,"ainumber":"6.19.13","ainame":"5G Advanced NRM features phase 3","tdoc_agenda_sort_order":14041,"status":"agreed","reservation_date":"2025-04-23 08:56:54","uploaded":"2025-04-23 09:01:15","revisionof":"S5-251404","revisedto":"","release":"Rel-19","crspec":28.54,"crspecversion":"19.0.0","workitem":[{"winame":"AdNRM_Ph3"}],"crnumber":33.0,"crrevision":1.0,"crcategory":"F","tsg_crp":"SP-250520","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251969.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"5.9.1.1, 5.9.1.2, 8.9.2, 5.9.3, 5.9.4, 5.10, 5.11","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251970","title":"Rel-19 CR TS 28.540 Add requirements for management of Ambient IoT","source":"Huawei, China Unicom","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 23\/04\/2025. Original source : Huawei, China Unicom","agenda_item_sort_order":80,"ainumber":"6.19.13","ainame":"5G Advanced NRM features phase 3","tdoc_agenda_sort_order":15731,"status":"agreed","reservation_date":"2025-04-23 08:56:54","uploaded":"2025-04-23 09:01:15","revisionof":"S5-251573","revisedto":"","release":"Rel-19","crspec":28.54,"crspecversion":"19.0.0","workitem":[{"winame":"AdNRM_Ph3"}],"crnumber":35.0,"crrevision":1.0,"crcategory":"B","tsg_crp":"SP-250520","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251970.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"2, 3.1, 3.2, 5.X (new)","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251971","title":"Rel-19 CR TS 28.541 Add AIOTF and ADM IOC to support management of Ambient IoT","source":"Huawei, China Unicom","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 23\/04\/2025. Original source : Huawei, China Unicom","agenda_item_sort_order":80,"ainumber":"6.19.13","ainame":"5G Advanced NRM features phase 3","tdoc_agenda_sort_order":15741,"status":"agreed","reservation_date":"2025-04-23 08:56:55","uploaded":"2025-04-23 09:01:15","revisionof":"S5-251574","revisedto":"S5-252486","release":"Rel-19","crspec":28.541,"crspecversion":"19.3.0","workitem":[{"winame":"AdNRM_Ph3"}],"crnumber":1510.0,"crrevision":1.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251971.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"2, 5.2.1.1, 5.2.1.2, 5.3.a (new), 5.3.b (new), Q.1.1, Q.2.1, stage 3 in Forge.","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251972","title":"Rel-19 CR TS 28.541 update the naming convention in TS28541_NrNrm.yaml to align with stage 2 definition","source":"Huawei, Nokia","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":80,"ainumber":"6.19.13","ainame":"5G Advanced NRM features phase 3","tdoc_agenda_sort_order":13981,"status":"agreed","reservation_date":"2025-04-23 08:56:56","uploaded":"2025-04-23 09:01:15","revisionof":"S5-251398","revisedto":"","release":"Rel-19","crspec":28.541,"crspecversion":"19.3.0","workitem":[{"winame":"AdNRM_Ph3"}],"crnumber":1500.0,"crrevision":1.0,"crcategory":"F","tsg_crp":"SP-250520","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251972.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251973","title":"Rel-19 CR TS 28.622 Remove stage-3 clarifications for Float datatype","source":"Ericsson GmbH, Eurolab, Nokia","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 23\/04\/2025. Original source : Ericsson GmbH, Eurolab, Nokia","agenda_item_sort_order":80,"ainumber":"6.19.13","ainame":"5G Advanced NRM features phase 3","tdoc_agenda_sort_order":17281,"status":"agreed","reservation_date":"2025-04-23 08:56:57","uploaded":"2025-04-23 09:01:15","revisionof":"S5-251728","revisedto":"","release":"Rel-19","crspec":28.622,"crspecversion":"19.3.0","workitem":[{"winame":"AdNRM_Ph3"}],"crnumber":552.0,"crrevision":1.0,"crcategory":"F","tsg_crp":"SP-250520","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251973.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"5.2","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251974","title":"Rel-19 CR TS 28.622 Enhance the definition for schedulerStatus and conditionStatus with default values (stage2)","source":"Huawei","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":80,"ainumber":"6.19.13","ainame":"5G Advanced NRM features phase 3","tdoc_agenda_sort_order":14021,"status":"not pursued","reservation_date":"2025-04-23 08:56:58","uploaded":"2025-04-23 09:01:15","revisionof":"S5-251402","revisedto":"","release":"Rel-19","crspec":28.622,"crspecversion":"19.3.0","workitem":[{"winame":"AdNRM_Ph3"}],"crnumber":543.0,"crrevision":1.0,"crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251974.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251975","title":"Rel-19 CR TS 28.623 Enhance the definition for schedulerStatus and conditionStatus with default values (stage3)","source":"Huawei","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 23\/04\/2025. Original source : Huawei","agenda_item_sort_order":80,"ainumber":"6.19.13","ainame":"5G Advanced NRM features phase 3","tdoc_agenda_sort_order":14031,"status":"not pursued","reservation_date":"2025-04-23 08:56:58","uploaded":"2025-04-23 09:01:15","revisionof":"S5-251403","revisedto":"","release":"Rel-19","crspec":28.623,"crspecversion":"19.3.0","workitem":[{"winame":"AdNRM_Ph3"}],"crnumber":522.0,"crrevision":1.0,"crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251975.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"Following YAML files normatively defined in the forge are updated: - OpenAPI\/TS28623_GenericNrm.yaml","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251976","title":"Rel-19 CR TS 28.622 Address the misalignment issues for vnfParametersList and peeParametersList (stage2)","source":"Huawei","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 23\/04\/2025. Original source : Huawei","agenda_item_sort_order":80,"ainumber":"6.19.13","ainame":"5G Advanced NRM features phase 3","tdoc_agenda_sort_order":13991,"status":"agreed","reservation_date":"2025-04-23 08:56:59","uploaded":"2025-04-23 09:01:15","revisionof":"S5-251399","revisedto":"","release":"Rel-19","crspec":28.622,"crspecversion":"19.3.0","workitem":[{"winame":"AdNRM_Ph3"}],"crnumber":542.0,"crrevision":1.0,"crcategory":"C","tsg_crp":"SP-250520","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251976.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"4.3.X(new), 4.3.Y(new), 4.4.1","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251977","title":"Rel-19 CR TS 28.623 Address the misalignment issues for vnfParametersList and peeParametersList (stage3)","source":"Huawei","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":80,"ainumber":"6.19.13","ainame":"5G Advanced NRM features phase 3","tdoc_agenda_sort_order":14001,"status":"agreed","reservation_date":"2025-04-23 08:57:00","uploaded":"2025-04-23 09:01:15","revisionof":"S5-251400","revisedto":"","release":"Rel-19","crspec":28.623,"crspecversion":"19.3.0","workitem":[{"winame":"AdNRM_Ph3"}],"crnumber":521.0,"crrevision":1.0,"crcategory":"C","tsg_crp":"SP-250520","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251977.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251978","title":"Rel19 CR TS28.541 change the dataType concerning HostAddr","source":"Nokia, Nokia Shanghai Bell","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":80,"ainumber":"6.19.13","ainame":"5G Advanced NRM features phase 3","tdoc_agenda_sort_order":12931,"status":"agreed","reservation_date":"2025-04-23 08:57:01","uploaded":"2025-04-23 09:01:15","revisionof":"S5-251293","revisedto":"","release":"Rel-19","crspec":28.541,"crspecversion":"19.3.0","workitem":[{"winame":"AdNRM_Ph3"}],"crnumber":1491.0,"crrevision":1.0,"crcategory":"C","tsg_crp":"SP-250520","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251978.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251979","title":"Rel19 CR TS28.538 change the dataType concerning HostAddr","source":"Nokia, Nokia Shanghai Bell","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":80,"ainumber":"6.19.13","ainame":"5G Advanced NRM features phase 3","tdoc_agenda_sort_order":12941,"status":"agreed","reservation_date":"2025-04-23 08:57:02","uploaded":"2025-04-23 09:01:15","revisionof":"S5-251294","revisedto":"","release":"Rel-19","crspec":28.538,"crspecversion":"19.3.0","workitem":[{"winame":"AdNRM_Ph3"}],"crnumber":108.0,"crrevision":1.0,"crcategory":"C","tsg_crp":"SP-250520","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251979.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251980","title":"Rel-19 CR 28.662 Update sector equipment and antenna function definitions","source":"Ericsson Canada Inc.","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":80,"ainumber":"6.19.13","ainame":"5G Advanced NRM features phase 3","tdoc_agenda_sort_order":15891,"status":"not pursued","reservation_date":"2025-04-23 08:57:03","uploaded":"2025-04-23 09:01:15","revisionof":"S5-251589","revisedto":"","release":"Rel-19","crspec":28.662,"crspecversion":"18.0.0","workitem":[{"winame":"AdNRM_Ph3"}],"crnumber":15.0,"crrevision":1.0,"crcategory":"C","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251980.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251981","title":"Rel-19 CR 28.541 Update sector equipment and antenna function definitions","source":"Ericsson Canada Inc.","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":80,"ainumber":"6.19.13","ainame":"5G Advanced NRM features phase 3","tdoc_agenda_sort_order":15901,"status":"not pursued","reservation_date":"2025-04-23 08:57:04","uploaded":"2025-04-23 09:01:15","revisionof":"S5-251590","revisedto":"","release":"Rel-19","crspec":28.541,"crspecversion":"19.3.0","workitem":[{"winame":"AdNRM_Ph3"}],"crnumber":1513.0,"crrevision":1.0,"crcategory":"C","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251981.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251982","title":"Rel-19 CR 28.623 Update sector equipment and antenna function definitions","source":"Ericsson Canada Inc.","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":80,"ainumber":"6.19.13","ainame":"5G Advanced NRM features phase 3","tdoc_agenda_sort_order":17111,"status":"not pursued","reservation_date":"2025-04-23 08:57:05","uploaded":"2025-04-23 09:01:15","revisionof":"S5-251711","revisedto":"","release":"Rel-19","crspec":28.623,"crspecversion":"19.3.0","workitem":[{"winame":"SBMA_Ph3"}],"crnumber":529.0,"crrevision":1.0,"crcategory":"C","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251982.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251983","title":"Rel-19 CR 28.663 Update sector equipment and antenna function definitions (stage3, yang)","source":"Ericsson Canada Inc.","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Title modified on 23\/04\/2025. Original title : Rel-19 CR 28.663 Update sector equipment and antenna function definitions<br\/><br\/>Source modified on 23\/04\/2025. Original source : Ericsson Canada Inc.","agenda_item_sort_order":80,"ainumber":"6.19.13","ainame":"5G Advanced NRM features phase 3","tdoc_agenda_sort_order":17311,"status":"not pursued","reservation_date":"2025-04-23 08:57:05","uploaded":"2025-04-23 09:01:15","revisionof":"S5-251731","revisedto":"","release":"Rel-19","crspec":28.663,"crspecversion":"18.1.0","workitem":[{"winame":"AdNRM_Ph3"}],"crnumber":26.0,"crrevision":1.0,"crcategory":"C","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251983.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":false,"clauses_affected":"1, 2, A.2.2.1, A.2.2.2, Annex X (new), X.1 (new)","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251984","title":"Rel-19 CR TS 32.423 Corrections on Trace Record Format","source":"Ericsson, AT&T","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 23\/04\/2025. Original source : Ericsson, AT&T","agenda_item_sort_order":81,"ainumber":"6.19.14","ainame":"Subscriber and Equipment Trace and QoE collection management","tdoc_agenda_sort_order":12381,"status":"not pursued","reservation_date":"2025-04-23 08:57:07","uploaded":"2025-04-23 09:01:15","revisionof":"S5-251238","revisedto":"S5-252230","release":"Rel-19","crspec":32.423,"crspecversion":"19.2.0","workitem":[{"winame":"TraceQoE_OAM"}],"crnumber":198.0,"crrevision":1.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251984.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"5.2.1, 5.2.2, 5.2.6, 5.2.x (new), G.1, Annex X (new)","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251985","title":"Rel-19 CR TS 28.541 Add attributes to support MEC deployment on board the NTN","source":"ZTE Corporation","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 23\/04\/2025. Original source : ZTE Corporation","agenda_item_sort_order":83,"ainumber":"6.19.15.1","ainame":"Management Aspects of NTN Phase 2","tdoc_agenda_sort_order":14541,"status":"agreed","reservation_date":"2025-04-23 08:57:08","uploaded":"2025-04-23 09:01:15","revisionof":"S5-251454","revisedto":"","release":"Rel-19","crspec":28.541,"crspecversion":"19.3.0","workitem":[{"winame":"NTN_OAM_Ph2"}],"crnumber":1506.0,"crrevision":1.0,"crcategory":"B","tsg_crp":"SP-250546","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251985.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"5.3.113.2","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251986","title":"CR 28.657 Add requirements for SnF support","source":"Samsung R&D Institute UK","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 23\/04\/2025. Original source : Samsung R&D Institute UK","agenda_item_sort_order":83,"ainumber":"6.19.15.1","ainame":"Management Aspects of NTN Phase 2","tdoc_agenda_sort_order":15281,"status":"agreed","reservation_date":"2025-04-23 08:57:09","uploaded":"2025-04-23 09:01:15","revisionof":"S5-251528","revisedto":"","release":"Rel-19","crspec":28.657,"crspecversion":"18.0.0","workitem":[{"winame":"NTN_OAM_Ph2"}],"crnumber":10.0,"crrevision":1.0,"crcategory":"B","tsg_crp":"SP-250546","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251986.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"4.2","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251987","title":"Rel-19 CR 28.540 Add secure backhaul requirements for NTN","source":"Ericsson Canada Inc.","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 23\/04\/2025. Original source : Ericsson Canada Inc.","agenda_item_sort_order":83,"ainumber":"6.19.15.1","ainame":"Management Aspects of NTN Phase 2","tdoc_agenda_sort_order":15851,"status":"revised","reservation_date":"2025-04-23 08:57:10","uploaded":"2025-04-23 09:01:15","revisionof":"S5-251585","revisedto":"","release":"Rel-19","crspec":28.54,"crspecversion":"19.0.0","workitem":[{"winame":"NTN_OAM_Ph2"}],"crnumber":36.0,"crrevision":1.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251987.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"2, 3.1, 3.2, 4.10.2.x (new), 5.9.2.x (new)","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251988","title":"Rel-19 CR 28.314 Add secure backhaul requirements for NTN","source":"Ericsson Canada Inc.","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":83,"ainumber":"6.19.15.1","ainame":"Management Aspects of NTN Phase 2","tdoc_agenda_sort_order":15852,"status":"revised","reservation_date":"2025-04-23 08:57:12","uploaded":"2025-04-23 09:01:15","revisionof":"","revisedto":"","release":"Rel-19","crspec":28.314,"crspecversion":"18.0.0","workitem":[{"winame":"NTN_OAM_Ph2"}],"crnumber":5.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251988.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251989","title":"Rel-19 CR 28.315 Add secure backhaul requirements for NTN","source":"Ericsson Canada Inc.","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":83,"ainumber":"6.19.15.1","ainame":"Management Aspects of NTN Phase 2","tdoc_agenda_sort_order":15853,"status":"agreed","reservation_date":"2025-04-23 08:57:12","uploaded":"2025-04-23 09:01:15","revisionof":"","revisedto":"","release":"Rel-19","crspec":28.315,"crspecversion":"18.0.0","workitem":[{"winame":"NTN_OAM_Ph2"}],"crnumber":2.0,"crrevision":"","crcategory":"B","tsg_crp":"SP-250546","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251989.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251990","title":"LS to SA3 on management of secure backhaul for NTN","source":"SA5","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"LS out","for":"Approval","abstract":"Ericsson","secretary_remarks":"","agenda_item_sort_order":14,"ainumber":"6.1","ainame":"OAM&P Plenary","tdoc_agenda_sort_order":199000,"status":"approved","reservation_date":"2025-04-23 08:57:14","uploaded":"2025-04-23 09:01:15","revisionof":"","revisedto":"","release":"Rel-19","crspec":"","crspecversion":"","workitem":[{"winame":"NTN_OAM_Ph2"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"SA3","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251990.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251991","title":"Rel-19 CR 28.541 Add solution for NTN time-based IP configuration","source":"Ericsson Canada Inc.","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 23\/04\/2025. Original source : Ericsson Canada Inc.","agenda_item_sort_order":83,"ainumber":"6.19.15.1","ainame":"Management Aspects of NTN Phase 2","tdoc_agenda_sort_order":15861,"status":"agreed","reservation_date":"2025-04-23 08:57:14","uploaded":"2025-04-23 09:01:15","revisionof":"S5-251586","revisedto":"","release":"Rel-19","crspec":28.541,"crspecversion":"19.3.0","workitem":[{"winame":"NTN_OAM_Ph2"}],"crnumber":1512.0,"crrevision":1.0,"crcategory":"B","tsg_crp":"SP-250546","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251991.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"2, 4.3.77, 4.3.95, 4.4.1, 5.2.1, 5.3.1.1, Annex Q.1.x (new) ","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251992","title":"Requirements for IAB-node connects to management system","source":"Ericsson","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 23\/04\/2025. Original source : Ericsson","agenda_item_sort_order":85,"ainumber":"6.19.16.1","ainame":"Management of IAB nodes","tdoc_agenda_sort_order":16561,"status":"agreed","reservation_date":"2025-04-23 08:57:15","uploaded":"2025-04-23 09:01:15","revisionof":"S5-251656","revisedto":"","release":"Rel-19","crspec":28.314,"crspecversion":"18.0.0","workitem":[{"winame":"NR_MOBILE_IAB_OAM"}],"crnumber":2.0,"crrevision":1.0,"crcategory":"B","tsg_crp":"SP-250543","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251992.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":false,"clauses_affected":"6.2, 6.2.x(new)","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251993","title":"Procedure IAB-node connects to management system","source":"Ericsson","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 23\/04\/2025. Original source : Ericsson","agenda_item_sort_order":85,"ainumber":"6.19.16.1","ainame":"Management of IAB nodes","tdoc_agenda_sort_order":17081,"status":"agreed","reservation_date":"2025-04-23 08:57:16","uploaded":"2025-04-23 09:01:15","revisionof":"S5-251708","revisedto":"","release":"Rel-19","crspec":28.315,"crspecversion":"18.0.0","workitem":[{"winame":"NR_MOBILE_IAB_OAM"}],"crnumber":1.0,"crrevision":1.0,"crcategory":"B","tsg_crp":"SP-250543","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251993.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":false,"clauses_affected":"2, 5.1, 5.1.x(new), A.1, A.1.x(new)","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251994","title":"Rel-19 CR TS28.552 Enhance RRC connection resuming related measurements for RedCap UEs","source":"ZTE Corporation, China Unicom, Ericsson","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 23\/04\/2025. Original source : ZTE Corporation, China Unicom, Ericsson","agenda_item_sort_order":87,"ainumber":"6.19.17.1","ainame":"Management Aspects of RedCap features","tdoc_agenda_sort_order":14551,"status":"agreed","reservation_date":"2025-04-23 08:57:17","uploaded":"2025-04-23 09:01:15","revisionof":"S5-251455","revisedto":"","release":"Rel-19","crspec":28.552,"crspecversion":"19.3.0","workitem":[{"winame":"NR_RedCap_OAM"}],"crnumber":684.0,"crrevision":1.0,"crcategory":"B","tsg_crp":"SP-250544","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251994.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":false,"clauses_affected":"5.1.1.18.1, 5.1.1.18.2","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251995","title":"Rel-19 CR TS28.552 Enhance PRB Usage related measurements for RedCap UEs","source":"ZTE Corporation, China Unicom, Ericsson","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 23\/04\/2025. Original source : ZTE Corporation, China Unicom, Ericsson","agenda_item_sort_order":87,"ainumber":"6.19.17.1","ainame":"Management Aspects of RedCap features","tdoc_agenda_sort_order":14561,"status":"agreed","reservation_date":"2025-04-23 08:57:18","uploaded":"2025-04-23 09:01:15","revisionof":"S5-251456","revisedto":"","release":"Rel-19","crspec":28.552,"crspecversion":"19.3.0","workitem":[{"winame":"NR_RedCap_OAM"}],"crnumber":685.0,"crrevision":1.0,"crcategory":"B","tsg_crp":"SP-250544","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251995.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":false,"clauses_affected":"5.1.1.2.1,5.1.1.2.2, 5.1.1.2.15,5.1.1.2.16","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251996","title":"Rel-19 CR TS28.552 Enhance Number of Active UEs related measurements for RedCap UEs","source":"ZTE Corporation, China Unicom, Ericsson","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":87,"ainumber":"6.19.17.1","ainame":"Management Aspects of RedCap features","tdoc_agenda_sort_order":14571,"status":"agreed","reservation_date":"2025-04-23 08:57:18","uploaded":"2025-04-23 09:01:15","revisionof":"S5-251457","revisedto":"","release":"Rel-19","crspec":28.552,"crspecversion":"19.3.0","workitem":[{"winame":"NR_RedCap_OAM"}],"crnumber":686.0,"crrevision":1.0,"crcategory":"B","tsg_crp":"SP-250544","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251996.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251997","title":"Rel-19 CR TS 28.540 Adding requirement to control RedCap and e-RedCap UEs access based on network conditions","source":"Samsung Electronics GmbH","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":87,"ainumber":"6.19.17.1","ainame":"Management Aspects of RedCap features","tdoc_agenda_sort_order":17451,"status":"not pursued","reservation_date":"2025-04-23 08:57:19","uploaded":"2025-04-23 09:01:15","revisionof":"S5-251745","revisedto":"","release":"Rel-19","crspec":28.54,"crspecversion":"19.0.0","workitem":[{"winame":"NR_RedCap_OAM"}],"crnumber":39.0,"crrevision":1.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251997.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251998","title":"Rel-19 CR 28.552 Add a new measurement related to efficiency of data collection from NFs performed by NWDAF","source":"China Telecom, Ericsson","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 23\/04\/2025. Original source : China Telecom, Ericsson","agenda_item_sort_order":89,"ainumber":"6.19.18.1","ainame":"Enhancement of Management Aspects related to NWDAF Phase 2","tdoc_agenda_sort_order":13361,"status":"agreed","reservation_date":"2025-04-23 08:57:20","uploaded":"2025-04-23 09:01:15","revisionof":"S5-251336","revisedto":"","release":"Rel-19","crspec":28.552,"crspecversion":"19.3.0","workitem":[{"winame":"NWDAF_OAM_Ph2"}],"crnumber":679.0,"crrevision":1.0,"crcategory":"B","tsg_crp":"SP-250547","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251998.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"5.18.5.x (new)","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-251999","title":"Rel-19 CR 28.552 Add a new measurement related to efficiency of data collection from DCCF or NWDAF hosting DCCF performed by NWDAF","source":"China Telecom","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":89,"ainumber":"6.19.18.1","ainame":"Enhancement of Management Aspects related to NWDAF Phase 2","tdoc_agenda_sort_order":13371,"status":"merged","reservation_date":"2025-04-23 08:57:21","uploaded":"2025-04-23 09:01:15","revisionof":"S5-251337","revisedto":"","release":"Rel-19","crspec":28.552,"crspecversion":"19.3.0","workitem":[{"winame":"NWDAF_OAM_Ph2"}],"crnumber":680.0,"crrevision":1.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-251999.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-252000","title":"Rel-19 CR 28.552 Add a new measurement related to transmission rate related to the data collection from NFs performed by NWDAF","source":"China Telecom, Ericsson","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 23\/04\/2025. Original source : China Telecom, Ericsson","agenda_item_sort_order":89,"ainumber":"6.19.18.1","ainame":"Enhancement of Management Aspects related to NWDAF Phase 2","tdoc_agenda_sort_order":13381,"status":"agreed","reservation_date":"2025-04-23 08:57:22","uploaded":"2025-04-23 09:01:15","revisionof":"S5-251338","revisedto":"","release":"Rel-19","crspec":28.552,"crspecversion":"19.3.0","workitem":[{"winame":"NWDAF_OAM_Ph2"}],"crnumber":681.0,"crrevision":1.0,"crcategory":"B","tsg_crp":"SP-250547","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-252000.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"5.18.5.x (new)","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-252001","title":"Rel-19 CR 28.552 Add a new measurement related to transmission rate related to the data collection from DCCF or NWDAF hosting DCCF performed by NWDAF","source":"China Telecom","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":89,"ainumber":"6.19.18.1","ainame":"Enhancement of Management Aspects related to NWDAF Phase 2","tdoc_agenda_sort_order":13391,"status":"merged","reservation_date":"2025-04-23 08:57:23","uploaded":"2025-04-23 09:01:15","revisionof":"S5-251339","revisedto":"","release":"Rel-19","crspec":28.552,"crspecversion":"19.3.0","workitem":[{"winame":"NWDAF_OAM_Ph2"}],"crnumber":682.0,"crrevision":1.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-252001.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-252002","title":"Rel-19 CR 28.552 Add use case descriptions on monitoring of NWDAF data collection","source":"China Telecom, Ericsson","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 23\/04\/2025. Original source : China Telecom, Ericsson","agenda_item_sort_order":89,"ainumber":"6.19.18.1","ainame":"Enhancement of Management Aspects related to NWDAF Phase 2","tdoc_agenda_sort_order":13401,"status":"agreed","reservation_date":"2025-04-23 08:57:24","uploaded":"2025-04-23 09:01:15","revisionof":"S5-251340","revisedto":"","release":"Rel-19","crspec":28.552,"crspecversion":"19.3.0","workitem":[{"winame":"NWDAF_OAM_Ph2"}],"crnumber":683.0,"crrevision":1.0,"crcategory":"B","tsg_crp":"SP-250547","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-252002.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"Annex A","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-252003","title":"Rel-19 CR TS 32.130 Enhance the service-based management architecture for MOCN","source":"Huawei, China Unicom","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 23\/04\/2025. Original source : Huawei, China Unicom","agenda_item_sort_order":91,"ainumber":"6.19.19.1","ainame":"Management of Network Sharing Phase 3","tdoc_agenda_sort_order":13741,"status":"agreed","reservation_date":"2025-04-23 08:57:25","uploaded":"2025-04-23 09:01:15","revisionof":"S5-251374","revisedto":"","release":"Rel-19","crspec":32.13,"crspecversion":"19.0.0","workitem":[{"winame":"NetShare_OAM_Ph3"}],"crnumber":44.0,"crrevision":1.0,"crcategory":"F","tsg_crp":"SP-250541","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-252003.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":false,"clauses_affected":"B.2","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-252004","title":"Rel-19 CR TS 32.130 Enhance Indirect Network Sharing scenario description","source":"Huawei, China Unicom","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 23\/04\/2025. Original source : Huawei, China Unicom","agenda_item_sort_order":91,"ainumber":"6.19.19.1","ainame":"Management of Network Sharing Phase 3","tdoc_agenda_sort_order":13761,"status":"agreed","reservation_date":"2025-04-23 08:57:26","uploaded":"2025-04-23 09:01:15","revisionof":"S5-251376","revisedto":"","release":"Rel-19","crspec":32.13,"crspecversion":"19.0.0","workitem":[{"winame":"NetShare_OAM_Ph3"}],"crnumber":45.0,"crrevision":1.0,"crcategory":"D","tsg_crp":"SP-250541","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-252004.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"4.1","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-252005","title":"Rel-19 CR TS 32.130 Clarify MOCN and GWCN scenarios description","source":"Huawei, China Unicom","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":91,"ainumber":"6.19.19.1","ainame":"Management of Network Sharing Phase 3","tdoc_agenda_sort_order":13771,"status":"agreed","reservation_date":"2025-04-23 08:57:28","uploaded":"2025-04-23 09:01:15","revisionof":"S5-251377","revisedto":"","release":"Rel-19","crspec":32.13,"crspecversion":"19.0.0","workitem":[{"winame":"NetShare_OAM_Ph3"}],"crnumber":46.0,"crrevision":1.0,"crcategory":"D","tsg_crp":"SP-250541","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-252005.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-252006","title":"Rel-19 CR TS 32.130 Categorize requirements for the management support for Indirect Network Sharing scenario","source":"Huawei, China Unicom","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":91,"ainumber":"6.19.19.1","ainame":"Management of Network Sharing Phase 3","tdoc_agenda_sort_order":13791,"status":"agreed","reservation_date":"2025-04-23 08:57:29","uploaded":"2025-04-23 09:01:15","revisionof":"S5-251379","revisedto":"","release":"Rel-19","crspec":32.13,"crspecversion":"19.0.0","workitem":[{"winame":"NetShare_OAM_Ph3"}],"crnumber":47.0,"crrevision":1.0,"crcategory":"D","tsg_crp":"SP-250541","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-252006.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-252007","title":"Rel-19 CR TS 32.130 Update abbreviations for Indirect Network Sharing","source":"China Unicom, China Telecom","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":91,"ainumber":"6.19.19.1","ainame":"Management of Network Sharing Phase 3","tdoc_agenda_sort_order":16511,"status":"agreed","reservation_date":"2025-04-23 08:57:30","uploaded":"2025-04-23 09:01:15","revisionof":"S5-251651","revisedto":"","release":"Rel-19","crspec":32.13,"crspecversion":"19.0.0","workitem":[{"winame":"NetShare_OAM_Ph3"}],"crnumber":50.0,"crrevision":1.0,"crcategory":"F","tsg_crp":"SP-250541","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-252007.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-252008","title":"Rel-19 CR TS 32.130 Add PLMN granularity performance measurement requirements for Indirect Network Sharing","source":"Esurfing IoT, China Unicom","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 23\/04\/2025. Original source : Esurfing IoT, China Unicom","agenda_item_sort_order":91,"ainumber":"6.19.19.1","ainame":"Management of Network Sharing Phase 3","tdoc_agenda_sort_order":17321,"status":"agreed","reservation_date":"2025-04-23 08:57:30","uploaded":"2025-04-23 09:01:15","revisionof":"S5-251732","revisedto":"","release":"Rel-19","crspec":32.13,"crspecversion":"19.0.0","workitem":[{"winame":"NetShare_OAM_Ph3"}],"crnumber":52.0,"crrevision":1.0,"crcategory":"B","tsg_crp":"SP-250541","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-252008.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"5.1.7","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-252009","title":"DP cloud native NF data streaming - connection based vs pub-sub based","source":"Rakuten Mobile, Inc, AT&T, \tOrange, NTT DOCOMO, \tChina Mobile, China Unicom, \tFiberCop","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"discussion","for":"Endorsement","abstract":"","secretary_remarks":"","agenda_item_sort_order":70,"ainumber":"6.19.6","ainame":"Study on Cloud Aspects of Management and Orchestration","tdoc_agenda_sort_order":17441,"status":"noted","reservation_date":"2025-04-23 08:57:31","uploaded":"2025-04-23 09:01:15","revisionof":"S5-251744","revisedto":"","release":"Rel-19","crspec":28.869,"crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-252009.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-252010","title":"Pseudo-CR on TR 28.869 Add an example in Annex B","source":"Huawei, Rakuten Mobile, Inc.","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":70,"ainumber":"6.19.6","ainame":"Study on Cloud Aspects of Management and Orchestration","tdoc_agenda_sort_order":15711,"status":"approved","reservation_date":"2025-04-23 08:57:31","uploaded":"2025-04-23 09:01:15","revisionof":"S5-251571","revisedto":"","release":"Rel-19","crspec":28.869,"crspecversion":"1.3.0","workitem":[{"winame":"FS_Cloud_OAM"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-252010.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-252011","title":"pCR Add evaluation for some LCM solutions and update the clause 5.2.6","source":"China Mobile","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":70,"ainumber":"6.19.6","ainame":"Study on Cloud Aspects of Management and Orchestration","tdoc_agenda_sort_order":15941,"status":"noted","reservation_date":"2025-04-23 08:57:31","uploaded":"2025-04-23 09:01:15","revisionof":"S5-251594","revisedto":"","release":"Rel-19","crspec":28.869,"crspecversion":"1.3.0","workitem":[{"winame":"FS_Cloud_OAM"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-252011.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-252012","title":"pCR TR 28.869 Adopt NF Deployment terminology in scaling use case","source":"Ericsson Telecomunicazioni SpA","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":70,"ainumber":"6.19.6","ainame":"Study on Cloud Aspects of Management and Orchestration","tdoc_agenda_sort_order":17181,"status":"approved","reservation_date":"2025-04-23 08:57:31","uploaded":"2025-04-23 09:01:15","revisionof":"S5-251718","revisedto":"","release":"Rel-19","crspec":28.869,"crspecversion":"1.3.0","workitem":[{"winame":"FS_Cloud_OAM"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-252012.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-252013","title":"Pseudo-CR on TR 28.869 Add conclusion for management data streaming solution based on message bus","source":"Huawei","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":70,"ainumber":"6.19.6","ainame":"Study on Cloud Aspects of Management and Orchestration","tdoc_agenda_sort_order":15721,"status":"revised","reservation_date":"2025-04-23 08:57:32","uploaded":"2025-04-23 09:01:15","revisionof":"S5-251572","revisedto":"S5-252121","release":"Rel-19","crspec":28.869,"crspecversion":"1.3.0","workitem":[{"winame":"FS_Cloud_OAM"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-252013.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-252014","title":"pCR Add general conclusion and some recommendations","source":"China Mobile","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":70,"ainumber":"6.19.6","ainame":"Study on Cloud Aspects of Management and Orchestration","tdoc_agenda_sort_order":16001,"status":"approved","reservation_date":"2025-04-23 08:57:32","uploaded":"2025-04-23 09:01:15","revisionof":"S5-251600","revisedto":"","release":"Rel-19","crspec":28.869,"crspecversion":"1.3.0","workitem":[{"winame":"FS_Cloud_OAM"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-252014.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-252015","title":"pCR Add terminology","source":"China Mobile","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":70,"ainumber":"6.19.6","ainame":"Study on Cloud Aspects of Management and Orchestration","tdoc_agenda_sort_order":16391,"status":"noted","reservation_date":"2025-04-23 08:57:32","uploaded":"2025-04-23 09:01:15","revisionof":"S5-251639","revisedto":"","release":"Rel-19","crspec":28.869,"crspecversion":"1.3.0","workitem":[{"winame":"FS_Cloud_OAM"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-252015.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-252016","title":"pCR TR 28.869 Specification structure for LCM of NF Deployment","source":"Ericsson Telecomunicazioni SpA","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":70,"ainumber":"6.19.6","ainame":"Study on Cloud Aspects of Management and Orchestration","tdoc_agenda_sort_order":17221,"status":"noted","reservation_date":"2025-04-23 08:57:32","uploaded":"2025-04-23 09:01:15","revisionof":"S5-251722","revisedto":"","release":"Rel-19","crspec":28.869,"crspecversion":"1.3.0","workitem":[{"winame":"FS_Cloud_OAM"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-252016.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-252017","title":"Pseudo-CR on TS 28.561 Nested NDT Definition","source":"FiberCop, Deutsche Telekom, Telecom Italia, Orange, NTT Docomo , Nokia , China Mobile, Ericsson","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":69,"ainumber":"6.19.5.1","ainame":"Management aspects of Network Digital Twins","tdoc_agenda_sort_order":16571,"status":"revised","reservation_date":"2025-04-23 08:57:32","uploaded":"2025-04-23 09:01:15","revisionof":"S5-251657","revisedto":"S5-252120","release":"Rel-19","crspec":28.561,"crspecversion":"0.1.0","workitem":[{"winame":"NDT"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-252017.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-252018","title":"Discussion Paper Justification for the Inclusion of Nested NDT Definition in the TS 28.561","source":"FiberCop, Deutsche Telekom, Telecom Italia","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"discussion","for":"Endorsement","abstract":"","secretary_remarks":"","agenda_item_sort_order":69,"ainumber":"6.19.5.1","ainame":"Management aspects of Network Digital Twins","tdoc_agenda_sort_order":14231,"status":"noted","reservation_date":"2025-04-23 08:57:32","uploaded":"2025-04-23 09:01:15","revisionof":"S5-251423","revisedto":"","release":"Rel-19","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-252018.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-252019","title":"Rel-19 pCR TS 28.561 General improvements to use cases and requirements","source":"Huawei Tech. Japan, K.K., Ericsson","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":69,"ainumber":"6.19.5.1","ainame":"Management aspects of Network Digital Twins","tdoc_agenda_sort_order":15991,"status":"approved","reservation_date":"2025-04-23 08:57:32","uploaded":"2025-04-23 09:01:15","revisionof":"S5-251599","revisedto":"","release":"Rel-19","crspec":28.561,"crspecversion":"0.1.0","workitem":[{"winame":"NDT"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-252019.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-252020","title":"Pseudo-CR on TS 28.561 NDT NRMs","source":"Huawei","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":69,"ainumber":"6.19.5.1","ainame":"Management aspects of Network Digital Twins","tdoc_agenda_sort_order":15671,"status":"revised","reservation_date":"2025-04-23 08:57:32","uploaded":"2025-04-23 09:01:15","revisionof":"S5-251567","revisedto":"S5-252118","release":"Rel-19","crspec":28.561,"crspecversion":"0.1.0","workitem":[{"winame":"NDT"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-252020.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-252021","title":"Pseudo-CR on TS 28.561 Procedure for consuming NDT capability","source":"Huawei","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":69,"ainumber":"6.19.5.1","ainame":"Management aspects of Network Digital Twins","tdoc_agenda_sort_order":15701,"status":"revised","reservation_date":"2025-04-23 08:57:32","uploaded":"2025-04-23 09:01:15","revisionof":"S5-251570","revisedto":"S5-252119","release":"Rel-19","crspec":28.561,"crspecversion":"0.1.0","workitem":[{"winame":"NDT"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-252021.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-252022","title":"Rel-19 Revised WID on Management Aspects of NTN Phase 2","source":"CATT, China Unicom","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"WID revised","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":17,"ainumber":"6.2.2","ainame":"Management Architecture and Mechanisms","tdoc_agenda_sort_order":16271,"status":"agreed","reservation_date":"2025-04-23 08:57:32","uploaded":"2025-04-23 09:01:15","revisionof":"S5-251627","revisedto":"","release":"Rel-19","crspec":"","crspecversion":"","workitem":[{"winame":"NTN_OAM_Ph2"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-252022.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-252023","title":"Rel-19 CR TS 28.532 PM File extension","source":"Ericsson LM","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":79,"ainumber":"6.19.12","ainame":"5G performance measurements and KPIs phase 4","tdoc_agenda_sort_order":17351,"status":"agreed","reservation_date":"2025-04-23 08:57:33","uploaded":"2025-04-23 09:01:15","revisionof":"S5-251735","revisedto":"","release":"Rel-19","crspec":28.532,"crspecversion":"19.0.0","workitem":[{"winame":"PM_KPI_5G_Ph4"}],"crnumber":382.0,"crrevision":1.0,"crcategory":"B","tsg_crp":"SP-250551","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-252023.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-252024","title":"Rel-19 CR 28540 Add NTN regenerative concepts and requirements","source":"Ericsson","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Title modified on 23\/04\/2025. Original title : Rel-19 CR 28.540 Add NTN regenerative concepts and requirements<br\/><br\/>Source modified on 23\/04\/2025. Original source : Ericsson","agenda_item_sort_order":83,"ainumber":"6.19.15.1","ainame":"Management Aspects of NTN Phase 2","tdoc_agenda_sort_order":15881,"status":"agreed","reservation_date":"2025-04-23 08:57:34","uploaded":"2025-04-23 09:01:15","revisionof":"S5-251588","revisedto":"","release":"Rel-19","crspec":28.54,"crspecversion":"19.0.0","workitem":[{"winame":"NTN_OAM_Ph2"}],"crnumber":37.0,"crrevision":1.0,"crcategory":"B","tsg_crp":"SP-250546","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-252024.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"4.10.X (new), 5.9.4","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-252025","title":"Rel-19 CR TS 28.658 Add attributes to support Store and Forward Satellite operation for eNB","source":"CATT","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 23\/04\/2025. Original source : CATT, Samsung","agenda_item_sort_order":83,"ainumber":"6.19.15.1","ainame":"Management Aspects of NTN Phase 2","tdoc_agenda_sort_order":16291,"status":"agreed","reservation_date":"2025-04-23 08:57:35","uploaded":"2025-04-23 09:01:15","revisionof":"S5-251629","revisedto":"","release":"Rel-19","crspec":28.658,"crspecversion":"18.1.0","workitem":[{"winame":"NTN_OAM_Ph2"}],"crnumber":68.0,"crrevision":1.0,"crcategory":"B","tsg_crp":"SP-250546","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-252025.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"4.1.1, 4.3.1.2","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-252026","title":"Rel-19 CR TS 28.659 Add attributes to support Store and Forward Satellite operation for eNB stage3","source":"CATT","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 23\/04\/2025. Original source : CATT, Samsung","agenda_item_sort_order":83,"ainumber":"6.19.15.1","ainame":"Management Aspects of NTN Phase 2","tdoc_agenda_sort_order":16301,"status":"agreed","reservation_date":"2025-04-23 08:57:36","uploaded":"2025-04-23 09:01:15","revisionof":"","revisedto":"","release":"Rel-19","crspec":28.659,"crspecversion":"18.1.0","workitem":[{"winame":"NTN_OAM_Ph2"}],"crnumber":45.0,"crrevision":"","crcategory":"B","tsg_crp":"SP-250546","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-252026.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"A.2.2.1, A.3.2","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-252027","title":"Rel-19 CR TS 28.708 Add attributes to support Store and Forward Satellite operation for EPC","source":"CATT, Samsung","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 23\/04\/2025. Original source : CATT, Samsung","agenda_item_sort_order":83,"ainumber":"6.19.15.1","ainame":"Management Aspects of NTN Phase 2","tdoc_agenda_sort_order":16311,"status":"agreed","reservation_date":"2025-04-23 08:57:37","uploaded":"2025-04-23 09:01:15","revisionof":"S5-251631","revisedto":"S5-252391","release":"Rel-19","crspec":28.708,"crspecversion":"18.1.0","workitem":[{"winame":"NTN_OAM_Ph2"}],"crnumber":11.0,"crrevision":1.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-252027.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"4.3.2.2, 4.3.22.2, 4.3.y(new), 4.4.1","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-252028","title":"Rel-19 CR TS 28.709 Add attributes to support Store and Forward Satellite operation for EPC stage 3","source":"CATT","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Title modified on 23\/04\/2025. Original title : Rel-19 CR TS 28.709 Add attributes to support Store and Forward Satellite operation for EPC stage3<br\/><br\/>Source modified on 23\/04\/2025. Original source : CATT, Samsung","agenda_item_sort_order":83,"ainumber":"6.19.15.1","ainame":"Management Aspects of NTN Phase 2","tdoc_agenda_sort_order":16321,"status":"agreed","reservation_date":"2025-04-23 08:57:38","uploaded":"2025-04-23 09:01:15","revisionof":"S5-251632","revisedto":"S5-252393","release":"Rel-19","crspec":28.709,"crspecversion":"18.1.0","workitem":[{"winame":"NTN_OAM_Ph2"}],"crnumber":16.0,"crrevision":1.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-252028.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"A.2.2.1, A.2.2.5, A.3.2, B.3.2","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-252029","title":"DP on CCL and ACCL modelling relationship","source":"Nokia, Samsung","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"discussion","for":"Endorsement","abstract":"","secretary_remarks":"","agenda_item_sort_order":67,"ainumber":"6.19.4.1","ainame":"Closed Control Loop Management","tdoc_agenda_sort_order":12501,"status":"endorsed","reservation_date":"2025-04-23 08:57:39","uploaded":"2025-04-23 09:01:15","revisionof":"S5-251250","revisedto":"","release":"Rel-19","crspec":28.567,"crspecversion":"","workitem":[{"winame":"CCLM"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-252029.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-252030","title":"CCL General NRM","source":"Nokia, Samsung","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":67,"ainumber":"6.19.4.1","ainame":"Closed Control Loop Management","tdoc_agenda_sort_order":12491,"status":"approved","reservation_date":"2025-04-23 08:57:39","uploaded":"2025-04-23 09:01:15","revisionof":"S5-251249","revisedto":"","release":"Rel-19","crspec":28.567,"crspecversion":"0.1.0","workitem":[{"winame":"CCLM"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-252030.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-252031","title":"Rel-19 CR TS 28.536 Clarify generic use of closed control loop","source":"Ericsson, Deutsche Telekom","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":67,"ainumber":"6.19.4.1","ainame":"Closed Control Loop Management","tdoc_agenda_sort_order":16621,"status":"withdrawn","reservation_date":"2025-04-23 08:57:39","uploaded":null,"revisionof":"","revisedto":"","release":"Rel-19","crspec":28.536,"crspecversion":"19.1.0","workitem":[{"winame":"CCLM"}],"crnumber":124.0,"crrevision":1.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-252032","title":"pCR on TS 28.567 introduce imported information elements","source":"Ericsson, Deutsche Telekom","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":67,"ainumber":"6.19.4.1","ainame":"Closed Control Loop Management","tdoc_agenda_sort_order":16631,"status":"withdrawn","reservation_date":"2025-04-23 08:57:40","uploaded":null,"revisionof":"","revisedto":"","release":"Rel-19","crspec":28.567,"crspecversion":"0.1.0","workitem":[{"winame":"CCLM"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-252033","title":"Rel-19 pCR TS 28.567 Procedure and metrics for CCL performance monitoring","source":"Samsung Electronics GmbH","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":67,"ainumber":"6.19.4.1","ainame":"Closed Control Loop Management","tdoc_agenda_sort_order":17491,"status":"approved","reservation_date":"2025-04-23 08:57:40","uploaded":"2025-04-23 09:01:15","revisionof":"S5-251749","revisedto":"","release":"Rel-19","crspec":28.567,"crspecversion":"0.1.0","workitem":[{"winame":"CCLM"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-252033.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-252034","title":"Coordinating CCLs with other functions","source":"Nokia","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":67,"ainumber":"6.19.4.1","ainame":"Closed Control Loop Management","tdoc_agenda_sort_order":12481,"status":"approved","reservation_date":"2025-04-23 08:57:40","uploaded":"2025-04-23 09:01:15","revisionof":"S5-251248","revisedto":"","release":"Rel-19","crspec":28.567,"crspecversion":"0.1.0","workitem":[{"winame":"CCLM"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-252034.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-252035","title":"CCL coordination NRM","source":"Nokia","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":67,"ainumber":"6.19.4.1","ainame":"Closed Control Loop Management","tdoc_agenda_sort_order":12511,"status":"noted","reservation_date":"2025-04-23 08:57:40","uploaded":"2025-04-23 09:01:15","revisionof":"S5-251251","revisedto":"","release":"Rel-19","crspec":28.567,"crspecversion":"0.1.0","workitem":[{"winame":"CCLM"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-252035.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-252036","title":"Rel-19 pCR TS 28.579 Add use case solution for registration of the MSED into the CCF","source":"Nokia Hungary","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":95,"ainumber":"6.19.21.1","ainame":"Enhanced OAM for management service exposure to external consumers through CAPIF","tdoc_agenda_sort_order":16981,"status":"revised","reservation_date":"2025-04-23 08:57:40","uploaded":"2025-04-23 09:01:15","revisionof":"S5-251698","revisedto":"S5-252128","release":"Rel-19","crspec":28.579,"crspecversion":"0.1.0","workitem":[{"winame":"MExpo"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-252036.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-252037","title":"Rel-19 pCR TS 28.579 Add use case requirements for publishing of management services to the CCF","source":"Nokia Hungary","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":95,"ainumber":"6.19.21.1","ainame":"Enhanced OAM for management service exposure to external consumers through CAPIF","tdoc_agenda_sort_order":16991,"status":"revised","reservation_date":"2025-04-23 08:57:41","uploaded":"2025-04-23 09:01:15","revisionof":"S5-251699","revisedto":"S5-252129","release":"Rel-19","crspec":28.579,"crspecversion":"0.1.0","workitem":[{"winame":"MExpo"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-252037.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-252038","title":"Rel-19 pCR TS 28.579 Add use case solution to enable the publishing management services to the CCF","source":"Nokia Hungary","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":95,"ainumber":"6.19.21.1","ainame":"Enhanced OAM for management service exposure to external consumers through CAPIF","tdoc_agenda_sort_order":17001,"status":"revised","reservation_date":"2025-04-23 08:57:41","uploaded":"2025-04-23 09:01:15","revisionof":"S5-251700","revisedto":"S5-252130","release":"Rel-19","crspec":28.579,"crspecversion":"0.1.0","workitem":[{"winame":"MExpo"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-252038.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-252039","title":"Rel-19 pCR TS 28.579 Add use case requirements for logging of management service APIs invocations to the CCF","source":"Nokia Hungary","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":95,"ainumber":"6.19.21.1","ainame":"Enhanced OAM for management service exposure to external consumers through CAPIF","tdoc_agenda_sort_order":17011,"status":"revised","reservation_date":"2025-04-23 08:57:41","uploaded":"2025-04-23 09:01:15","revisionof":"S5-251701","revisedto":"S5-252131","release":"Rel-19","crspec":28.579,"crspecversion":"0.1.0","workitem":[{"winame":"MExpo"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-252039.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-252040","title":"Rel-19 InputToDraftCR TS 28.105 add solution for exploration in reinforcement learning","source":"Huawei, Samsung, Nokia, Intel, NEC, ZTE","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"other","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":61,"ainumber":"6.19.1.1","ainame":"AI\/ML management phase 2","tdoc_agenda_sort_order":15481,"status":"noted","reservation_date":"2025-04-23 08:57:41","uploaded":"2025-04-23 09:01:15","revisionof":"S5-251548","revisedto":"","release":"Rel-19","crspec":28.105,"crspecversion":"","workitem":[{"winame":"AIML_MGT_Ph2"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-252040.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-252041","title":"Input to draftCR TS28.105 NRM for ML-Knowledge-based TL","source":"Nokia","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"other","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":61,"ainumber":"6.19.1.1","ainame":"AI\/ML management phase 2","tdoc_agenda_sort_order":12611,"status":"revised","reservation_date":"2025-04-23 08:57:41","uploaded":"2025-04-23 09:01:15","revisionof":"S5-251261","revisedto":"S5-252133","release":"Rel-19","crspec":28.105,"crspecversion":"","workitem":[{"winame":"AIML_MGT_Ph2"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-252041.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-252042","title":"Input to draftCR Rel-19 TS 28.105 Use case on model confidence requirement","source":"Nokia, Nokia Shanghai Bell","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"other","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":61,"ainumber":"6.19.1.1","ainame":"AI\/ML management phase 2","tdoc_agenda_sort_order":16121,"status":"noted","reservation_date":"2025-04-23 08:57:41","uploaded":"2025-04-23 09:01:15","revisionof":"S5-251612","revisedto":"","release":"Rel-19","crspec":28.105,"crspecversion":"","workitem":[{"winame":"AIML_MGT_Ph2"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-252042.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-252043","title":"Input to draftCR Rel-19 TS 28.105 Solution on sustainable AIML training","source":"Nokia, Nokia Shanghai Bell","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"other","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":61,"ainumber":"6.19.1.1","ainame":"AI\/ML management phase 2","tdoc_agenda_sort_order":16111,"status":"withdrawn","reservation_date":"2025-04-23 08:57:41","uploaded":null,"revisionof":"","revisedto":"","release":"Rel-19","crspec":28.105,"crspecversion":"","workitem":[{"winame":"AIML_MGT_Ph2"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-252044","title":"Input to DraftCR Rel-19 TS 28.105 Add New Use Case and Requirements of Sustainable AIML for ML training","source":"ZTE Corporation","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"other","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":61,"ainumber":"6.19.1.1","ainame":"AI\/ML management phase 2","tdoc_agenda_sort_order":13581,"status":"noted","reservation_date":"2025-04-23 08:57:41","uploaded":"2025-04-23 09:01:15","revisionof":"S5-251358","revisedto":"","release":"Rel-19","crspec":28.105,"crspecversion":"","workitem":[{"winame":"AIML_MGT_Ph2"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-252044.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-252045","title":"Input to draftCR Rel-19 TS 28.105 Use case on AIML prediction latency in training","source":"Nokia, Nokia Shanghai Bell","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"other","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":61,"ainumber":"6.19.1.1","ainame":"AI\/ML management phase 2","tdoc_agenda_sort_order":16071,"status":"withdrawn","reservation_date":"2025-04-23 08:57:42","uploaded":null,"revisionof":"","revisedto":"","release":"Rel-19","crspec":28.105,"crspecversion":"","workitem":[{"winame":"AIML_MGT_Ph2"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-252046","title":"Rel-19 InputToDraftCR TS 28.105 Update the description for managing ML models in use in a live network","source":"Huawei, NEC, Ericsson","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"other","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":61,"ainumber":"6.19.1.1","ainame":"AI\/ML management phase 2","tdoc_agenda_sort_order":15471,"status":"approved","reservation_date":"2025-04-23 08:57:42","uploaded":"2025-04-23 09:01:15","revisionof":"S5-251547","revisedto":"","release":"Rel-19","crspec":28.105,"crspecversion":"","workitem":[{"winame":"AIML_MGT_Ph2"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-252046.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-252047","title":"Rel-19 InputToDraftCR TS 28.105 add use case for Management of Local explanation in AIML inference","source":"HUAWEI, Orange, CMCC, Nokia, Verizon,NTT DOCOMO","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"other","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":61,"ainumber":"6.19.1.1","ainame":"AI\/ML management phase 2","tdoc_agenda_sort_order":15511,"status":"noted","reservation_date":"2025-04-23 08:57:42","uploaded":"2025-04-23 09:01:15","revisionof":"S5-251551","revisedto":"","release":"Rel-19","crspec":28.105,"crspecversion":"","workitem":[{"winame":"AIML_MGT_Ph2"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-252047.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-252048","title":"Input to DraftCR Rel-19 TS 28.105 Add New AI\/ML functionalities management scenario for LMF","source":"ZTE Corporation, Ericsson","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"other","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":61,"ainumber":"6.19.1.1","ainame":"AI\/ML management phase 2","tdoc_agenda_sort_order":13621,"status":"approved","reservation_date":"2025-04-23 08:57:42","uploaded":"2025-04-23 09:01:15","revisionof":"S5-251362","revisedto":"","release":"Rel-19","crspec":28.105,"crspecversion":"","workitem":[{"winame":"AIML_MGT_Ph2"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-252048.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-252049","title":"LS reply to ETSI NFV for the publication of NFV-IFA054","source":"SA5","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"LS out","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":10,"ainumber":"5.3","ainame":"Liaison statements at SA5 level","tdoc_agenda_sort_order":13301,"status":"withdrawn","reservation_date":"2025-04-23 08:57:42","uploaded":null,"revisionof":"","revisedto":"","release":"Rel-19","crspec":"","crspecversion":"","workitem":[{"winame":"FS_Cloud_OAM"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"S5-251330","lsto":"ETSI ISG NFV","Cc":"SA2","lsoriginalls":"","lsreply":"","link":"","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-252050","title":"Support Continuous MDT on reply to RAN3 incoming LS (R3-250788)","source":"Ericsson, AT&T, CMCC, Deutsche Telekom, ZTE","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"discussion","for":"Endorsement","abstract":"","secretary_remarks":"","agenda_item_sort_order":14,"ainumber":"6.1","ainame":"OAM&P Plenary","tdoc_agenda_sort_order":12221,"status":"not pursued","reservation_date":"2025-04-23 08:57:42","uploaded":"2025-04-23 09:01:15","revisionof":"S5-251222","revisedto":"","release":"Rel-19","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-252050.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-252051","title":"Reply LS to LS on Continuous MDT","source":"SA5","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"LS out","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":14,"ainumber":"6.1","ainame":"OAM&P Plenary","tdoc_agenda_sort_order":12231,"status":"withdrawn","reservation_date":"2025-04-23 08:57:42","uploaded":null,"revisionof":"","revisedto":"","release":"Rel-19","crspec":"","crspecversion":"","workitem":[{"winame":"NR_AIML_NGRAN_enh-Core"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"R3-250788","lsto":"RAN3","Cc":"","lsoriginalls":"R3-250788","lsreply":"","link":"","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-252052","title":"Continuous MDT Discussion","source":"Nokia","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"discussion","for":"Endorsement","abstract":"","secretary_remarks":"","agenda_item_sort_order":14,"ainumber":"6.1","ainame":"OAM&P Plenary","tdoc_agenda_sort_order":17411,"status":"withdrawn","reservation_date":"2025-04-23 08:57:42","uploaded":null,"revisionof":"","revisedto":"","release":"Rel-19","crspec":"","crspecversion":"","workitem":[{"winame":"TraceQoE_OAM"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-252053","title":"Reply LS to RAN3 LS on Continuous MDT","source":"SA5","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"LS out","for":"Approval","abstract":"Huawei","secretary_remarks":"","agenda_item_sort_order":14,"ainumber":"6.1","ainame":"OAM&P Plenary","tdoc_agenda_sort_order":13261,"status":"revised","reservation_date":"2025-04-23 08:57:42","uploaded":"2025-04-23 09:01:15","revisionof":"","revisedto":"S5-252114","release":"Rel-19","crspec":"","crspecversion":"","workitem":[{"winame":"NR_AIML_NGRAN_enh-Core"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"S5-251326\/R3-250891","lsto":"RAN3","Cc":"","lsoriginalls":"R3-250891","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-252053.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-252054","title":"Rel-19 CR TS 28.312 Add description of excavating of implicit intent","source":"China Mobile Com. Corporation","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 23\/04\/2025. Original source : China Mobile Com. Corporation","agenda_item_sort_order":65,"ainumber":"6.19.3.1","ainame":"Intent driven management services for mobile network phase 3","tdoc_agenda_sort_order":14601,"status":"not pursued","reservation_date":"2025-04-23 08:57:43","uploaded":"2025-04-23 09:01:15","revisionof":"S5-251460","revisedto":"","release":"Rel-19","crspec":28.312,"crspecversion":"19.1.0","workitem":[{"winame":"IDMS_MN_Ph3"}],"crnumber":325.0,"crrevision":1.0,"crcategory":"C","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-252054.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"5.3.9, 6.2.1.2","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-252055","title":"LS reply to LS on 5G Trace to support UE level measurement","source":"SA5","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"LS out","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":14,"ainumber":"6.1","ainame":"OAM&P Plenary","tdoc_agenda_sort_order":16151,"status":"revised","reservation_date":"2025-04-23 08:57:43","uploaded":"2025-04-23 09:01:15","revisionof":"S5-251615","revisedto":"S5-252113","release":"Rel-18","crspec":"","crspecversion":"","workitem":[{"winame":"TEI18"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"SA5-250280","lsto":"3GPP CT4","Cc":"3GPP CT3","lsoriginalls":"C4-245536","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-252055.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-252056","title":"Reply LS on per-UE UE performance metrics","source":"SA5","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"LS out","for":"Approval","abstract":"NEC, Ericsson","secretary_remarks":"","agenda_item_sort_order":10,"ainumber":"5.3","ainame":"Liaison statements at SA5 level","tdoc_agenda_sort_order":14091,"status":"approved","reservation_date":"2025-04-23 08:57:44","uploaded":"2025-04-23 09:01:15","revisionof":"S5-251409","revisedto":"","release":"Rel-19","crspec":"","crspecversion":"","workitem":[{"winame":"AIML_MGT_Ph2"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"S5-251324\/R3-247775","lsto":"RAN3","Cc":"RAN2","lsoriginalls":"R3-247775","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-252056.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-252057","title":"Rel 19 CR TS 28.104 Correct References for MDA reporting","source":"Ericsson","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 23\/04\/2025. Original source : Ericsson","agenda_item_sort_order":34,"ainumber":"6.4.2","ainame":"Management Data Analytics phase 2","tdoc_agenda_sort_order":16251,"status":"agreed","reservation_date":"2025-04-23 08:57:44","uploaded":"2025-04-23 09:01:15","revisionof":"S5-251625","revisedto":"","release":"Rel-19","crspec":28.104,"crspecversion":"19.1.0","workitem":[{"winame":"eMDAS_Ph3"}],"crnumber":210.0,"crrevision":1.0,"crcategory":"F","tsg_crp":"SP-250528","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-252057.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"10.1.3.1","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-252058","title":"Rel-18 CR TS 28.312 Correct import table","source":"Ericsson, Deutsche Telekom","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 23\/04\/2025. Original source : Ericsson, Deutsche Telekom","agenda_item_sort_order":36,"ainumber":"6.4.4","ainame":"Intent driven Management Service for mobile network phase 2","tdoc_agenda_sort_order":16711,"status":"agreed","reservation_date":"2025-04-23 08:57:44","uploaded":"2025-04-23 09:01:15","revisionof":"S5-251671","revisedto":"","release":"Rel-18","crspec":28.312,"crspecversion":"18.7.0","workitem":[{"winame":"IDMS_MN_ph2"}],"crnumber":335.0,"crrevision":1.0,"crcategory":"F","tsg_crp":"SP-250535","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-252058.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"6.2.1.0","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-252059","title":"Rel-18 CR TS 28.312 Correct import table","source":"Ericsson, Deutsche Telekom","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Title modified on 23\/04\/2025. Original title : Rel-19 CR TS 28.312 Correct import table<br\/><br\/>Source modified on 23\/04\/2025. Original source : Ericsson, Deutsche Telekom","agenda_item_sort_order":36,"ainumber":"6.4.4","ainame":"Intent driven Management Service for mobile network phase 2","tdoc_agenda_sort_order":16721,"status":"agreed","reservation_date":"2025-04-23 08:57:46","uploaded":"2025-04-23 09:01:15","revisionof":"S5-251672","revisedto":"","release":"Rel-19","crspec":28.312,"crspecversion":"19.1.0","workitem":[{"winame":"IDMS_MN_ph2"}],"crnumber":336.0,"crrevision":1.0,"crcategory":"A","tsg_crp":"SP-250535","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-252059.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"6.2.1.0","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-252060","title":"Rel-18 CR 28.111 How to use notifyPotentialFaultyAlarmList","source":"Ericsson India Private Limited","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":37,"ainumber":"6.4.5","ainame":"Service based management architecture","tdoc_agenda_sort_order":14161,"status":"agreed","reservation_date":"2025-04-23 08:57:47","uploaded":"2025-04-23 09:01:15","revisionof":"S5-251416","revisedto":"","release":"Rel-18","crspec":28.111,"crspecversion":"18.4.0","workitem":[{"winame":"eSBMA"}],"crnumber":29.0,"crrevision":1.0,"crcategory":"F","tsg_crp":"SP-250531","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-252060.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-252061","title":"Rel-19 CR 28.111 How to use notifyPotentialFaultyAlarmList","source":"Ericsson India Private Limited","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":37,"ainumber":"6.4.5","ainame":"Service based management architecture","tdoc_agenda_sort_order":14171,"status":"agreed","reservation_date":"2025-04-23 08:57:48","uploaded":"2025-04-23 09:01:15","revisionof":"S5-251417","revisedto":"","release":"Rel-19","crspec":28.111,"crspecversion":"19.1.0","workitem":[{"winame":"eSBMA"}],"crnumber":30.0,"crrevision":1.0,"crcategory":"A","tsg_crp":"SP-250531","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-252061.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-252062","title":"Rel-19 CR 28.622 Remove deprecated notification","source":"Ericsson India Private Limited","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":37,"ainumber":"6.4.5","ainame":"Service based management architecture","tdoc_agenda_sort_order":14381,"status":"agreed","reservation_date":"2025-04-23 08:57:50","uploaded":"2025-04-23 09:01:15","revisionof":"S5-251438","revisedto":"","release":"Rel-19","crspec":28.622,"crspecversion":"19.3.0","workitem":[{"winame":"TEI19"}],"crnumber":547.0,"crrevision":1.0,"crcategory":"C","tsg_crp":"SP-250559","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-252062.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-252063","title":"Rel-19 CR 28.541 Remove deprecated notification","source":"Ericsson India Private Limited","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":37,"ainumber":"6.4.5","ainame":"Service based management architecture","tdoc_agenda_sort_order":14391,"status":"agreed","reservation_date":"2025-04-23 08:57:50","uploaded":"2025-04-23 09:01:15","revisionof":"S5-251439","revisedto":"","release":"Rel-19","crspec":28.541,"crspecversion":"19.3.0","workitem":[{"winame":"TEI19"}],"crnumber":1505.0,"crrevision":1.0,"crcategory":"C","tsg_crp":"SP-250558","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-252063.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-252064","title":"Rel-18 CR TS 28.111 Correction on reliability of alarm lists","source":"Huawei","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":37,"ainumber":"6.4.5","ainame":"Service based management architecture","tdoc_agenda_sort_order":14811,"status":"withdrawn","reservation_date":"2025-04-23 08:57:52","uploaded":null,"revisionof":"","revisedto":"","release":"Rel-18","crspec":28.111,"crspecversion":"18.4.0","workitem":[{"winame":"eSBMA"}],"crnumber":33.0,"crrevision":1.0,"crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-252065","title":"Rel-19 CR TS 28.111 Correction on reliability of alarm lists","source":"Huawei","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":37,"ainumber":"6.4.5","ainame":"Service based management architecture","tdoc_agenda_sort_order":14821,"status":"withdrawn","reservation_date":"2025-04-23 08:57:52","uploaded":null,"revisionof":"","revisedto":"","release":"Rel-19","crspec":28.111,"crspecversion":"19.1.0","workitem":[{"winame":"eSBMA"}],"crnumber":34.0,"crrevision":1.0,"crcategory":"A","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-252066","title":"Rel 18 CR TS 28.532 correct the format of scope parameter to align with stage3","source":"HUAWEI","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":37,"ainumber":"6.4.5","ainame":"Service based management architecture","tdoc_agenda_sort_order":15431,"status":"not pursued","reservation_date":"2025-04-23 08:57:53","uploaded":"2025-04-23 09:01:15","revisionof":"S5-251543","revisedto":"","release":"Rel-18","crspec":28.532,"crspecversion":"18.6.0","workitem":[{"winame":"eSBMA"}],"crnumber":377.0,"crrevision":1.0,"crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-252066.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-252067","title":"Rel 19 CR TS 28.532 correct the scope operation parameter in stage 3","source":"Huawei","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":37,"ainumber":"6.4.5","ainame":"Service based management architecture","tdoc_agenda_sort_order":15441,"status":"not pursued","reservation_date":"2025-04-23 08:57:54","uploaded":"2025-04-23 09:01:15","revisionof":"S5-251544","revisedto":"","release":"Rel-19","crspec":28.532,"crspecversion":"19.0.0","workitem":[{"winame":"eSBMA"}],"crnumber":378.0,"crrevision":1.0,"crcategory":"A","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-252067.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-252068","title":"Rel-18 CR TS 28.111 Add missing ThresholdInfo dataType and related definition","source":"Huawei, Ericsson, Nokia","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 23\/04\/2025. Original source : Huawei, Nokia, Ericsson","agenda_item_sort_order":37,"ainumber":"6.4.5","ainame":"Service based management architecture","tdoc_agenda_sort_order":15641,"status":"agreed","reservation_date":"2025-04-23 08:57:55","uploaded":"2025-04-23 09:01:15","revisionof":"S5-251564","revisedto":"","release":"Rel-18","crspec":28.111,"crspecversion":"18.4.0","workitem":[{"winame":"eSBMA"}],"crnumber":40.0,"crrevision":1.0,"crcategory":"F","tsg_crp":"SP-250531","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-252068.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"7.1, 7.3.X(new), 7.3.Y(new), 7.3.Z(new), 7.4.1","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-252069","title":"Rel-19 CR TS 28.111 Add missing ThresholdInfo dataType and related definition","source":"Huawei, Ericsson, Nokia","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 23\/04\/2025. Original source : Huawei, Nokia","agenda_item_sort_order":37,"ainumber":"6.4.5","ainame":"Service based management architecture","tdoc_agenda_sort_order":15651,"status":"agreed","reservation_date":"2025-04-23 08:57:55","uploaded":"2025-04-23 09:01:15","revisionof":"S5-251565","revisedto":"","release":"Rel-19","crspec":28.111,"crspecversion":"19.1.0","workitem":[{"winame":"eSBMA"}],"crnumber":41.0,"crrevision":1.0,"crcategory":"A","tsg_crp":"SP-250531","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-252069.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"7.1, 7.3.X(new), 7.3.Y(new), 7.3.Z(new), 7.4.1","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-252070","title":"Rel-18 CR 32.422 Clarification on SMF obtaining Trace control and measurement parameters from UDM","source":"Huawei, Ericsson","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Title modified on 23\/04\/2025. Original title : Rel-19 CR 32.422 Clarification on SMF obtaining Trace control and measurement parameters from UDM<br\/><br\/>Source modified on 23\/04\/2025. Original source : Huawei, Ericsson","agenda_item_sort_order":40,"ainumber":"6.4.8","ainame":"Management of Trace\/MDT phase 2","tdoc_agenda_sort_order":16161,"status":"agreed","reservation_date":"2025-04-23 08:57:56","uploaded":"2025-04-23 09:01:15","revisionof":"S5-251616","revisedto":"","release":"Rel-18","crspec":32.422,"crspecversion":"18.5.0","workitem":[{"winame":"5GMDT_Ph2"}],"crnumber":515.0,"crrevision":1.0,"crcategory":"F","tsg_crp":"SP-250517","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-252070.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"2, 4.1.2.15.1 and 4.1.2.18.2","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-252071","title":"Rel-19 CR 32.422 Clarification on SMF obtaining trace control and configuration parameters from UDM","source":"Huawei, Ericsson","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 23\/04\/2025. Original source : Huawei, Ericsson","agenda_item_sort_order":40,"ainumber":"6.4.8","ainame":"Management of Trace\/MDT phase 2","tdoc_agenda_sort_order":16171,"status":"agreed","reservation_date":"2025-04-23 08:57:57","uploaded":"2025-04-23 09:01:15","revisionof":"S5-251617","revisedto":"","release":"Rel-19","crspec":32.422,"crspecversion":"19.2.0","workitem":[{"winame":"5GMDT_Ph2"}],"crnumber":516.0,"crrevision":1.0,"crcategory":"A","tsg_crp":"SP-250517","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-252071.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"2, 4.1.2.15.1 and 4.1.2.18.2","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-252072","title":"Rel-18 CR TS 28.552 Corrections of subcounters and filters","source":"Ericsson, Rakuten Mobile, Samsung, Nokia","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 23\/04\/2025. Original source : Ericsson, Rakuten Mobile, Samsung, Nokia","agenda_item_sort_order":41,"ainumber":"6.4.9","ainame":"5G performance measurements and KPIs phase 3","tdoc_agenda_sort_order":12341,"status":"agreed","reservation_date":"2025-04-23 08:57:58","uploaded":"2025-04-23 09:01:15","revisionof":"S5-251234","revisedto":"","release":"Rel-18","crspec":28.552,"crspecversion":"18.10.0","workitem":[{"winame":"PM_KPI_5G_Ph3"}],"crnumber":675.0,"crrevision":1.0,"crcategory":"F","tsg_crp":"SP-250550","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-252072.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"4.1, 4.1a (new), 4.2","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-252073","title":"Rel-19 CR TS 28.552 Corrections of subcounters and filters","source":"Ericsson, Rakuten Mobile, Samsung, Nokia","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 23\/04\/2025. Original source : Ericsson, Rakuten Mobile, Samsung, Nokia","agenda_item_sort_order":41,"ainumber":"6.4.9","ainame":"5G performance measurements and KPIs phase 3","tdoc_agenda_sort_order":12351,"status":"agreed","reservation_date":"2025-04-23 08:57:59","uploaded":"2025-04-23 09:01:15","revisionof":"S5-251235","revisedto":"","release":"Rel-19","crspec":28.552,"crspecversion":"19.3.0","workitem":[{"winame":"PM_KPI_5G_Ph3"}],"crnumber":676.0,"crrevision":1.0,"crcategory":"A","tsg_crp":"SP-250550","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-252073.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"4.1, 4.1a (new), 4.2","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-252074","title":"Rel-19 CR 28.532 Enhance notifyFilePreparationError definition","source":"Ericsson Canada Inc.","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 23\/04\/2025. Original source : Ericsson Canada Inc.","agenda_item_sort_order":41,"ainumber":"6.4.9","ainame":"5G performance measurements and KPIs phase 3","tdoc_agenda_sort_order":15871,"status":"agreed","reservation_date":"2025-04-23 08:58:00","uploaded":"2025-04-23 09:01:15","revisionof":"S5-251587","revisedto":"","release":"Rel-19","crspec":28.532,"crspecversion":"19.0.0","workitem":[{"winame":"PM_KPI_5G_Ph3"}],"crnumber":379.0,"crrevision":1.0,"crcategory":"C","tsg_crp":"SP-250550","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-252074.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"11.6.1.2.1, 11.6.1.2.2 ","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-252075","title":"Rel-18 CR TS 28.552 PLMN name inconsistency","source":"Ericsson","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 23\/04\/2025. Original source : Ericsson","agenda_item_sort_order":41,"ainumber":"6.4.9","ainame":"5G performance measurements and KPIs phase 3","tdoc_agenda_sort_order":15971,"status":"agreed","reservation_date":"2025-04-23 08:58:01","uploaded":"2025-04-23 09:01:15","revisionof":"S5-251597","revisedto":"","release":"Rel-18","crspec":28.552,"crspecversion":"18.10.0","workitem":[{"winame":"PM_KPI_5G_Ph3"}],"crnumber":687.0,"crrevision":1.0,"crcategory":"F","tsg_crp":"SP-250550","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-252075.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":false,"clauses_affected":"5.1.1.23, 5.1.2.1, 5.1.3.3, 5.1.3.6.2","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-252076","title":"Rel-19 CR TS 28.552 PLMN name inconsistency","source":"Ericsson","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 23\/04\/2025. Original source : Ericsson","agenda_item_sort_order":41,"ainumber":"6.4.9","ainame":"5G performance measurements and KPIs phase 3","tdoc_agenda_sort_order":15981,"status":"agreed","reservation_date":"2025-04-23 08:58:02","uploaded":"2025-04-23 09:01:15","revisionof":"S5-251598","revisedto":"","release":"Rel-19","crspec":28.552,"crspecversion":"19.3.0","workitem":[{"winame":"PM_KPI_5G_Ph3"}],"crnumber":688.0,"crrevision":1.0,"crcategory":"A","tsg_crp":"SP-250550","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-252076.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":false,"clauses_affected":"5.1.2.1, 5.1.3.3, 5.1.3.6.2","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-252077","title":"Rel-19 CR TS 28.558 Correction on the UE identifer","source":"Nokia, Ericsson","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 23\/04\/2025. Original source : Nokia, Ericsson","agenda_item_sort_order":41,"ainumber":"6.4.9","ainame":"5G performance measurements and KPIs phase 3","tdoc_agenda_sort_order":17371,"status":"agreed","reservation_date":"2025-04-23 08:58:03","uploaded":"2025-04-23 09:01:15","revisionof":"S5-251737","revisedto":"","release":"Rel-19","crspec":28.558,"crspecversion":"19.3.0","workitem":[{"winame":"PM_KPI_5G_Ph3"}],"crnumber":34.0,"crrevision":1.0,"crcategory":"F","tsg_crp":"SP-250550","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-252077.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"6.3.1.1.1, 6.3.1.1.2, 6.3.1.1.3, 6.3.1.1.4, 6.3.1.1.5, 6.3.1.1.6, 6.3.1.1.7, 6.3.1.1.8, 6.3.1.2.1, 6.3.1.2.2, 6.3.1.3.1, 6.3.1.3.2, 6.3.1.3.3, 6.3.1.4.1, 6.3.1.4.2","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-252078","title":"Rel-18 CR TS 28.541 Typo corrections and missing definitions","source":"ZTE Corporation, Orange, Nokia, Nokia Shanghai Bell","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 23\/04\/2025. Original source : ZTE Corporation, Orange, Nokia","agenda_item_sort_order":43,"ainumber":"6.4.11","ainame":"Additional NRM features phase 2","tdoc_agenda_sort_order":13501,"status":"agreed","reservation_date":"2025-04-23 08:58:04","uploaded":"2025-04-23 09:01:15","revisionof":"S5-251350","revisedto":"","release":"Rel-18","crspec":28.541,"crspecversion":"18.11.0","workitem":[{"winame":"AdNRM_ph2"}],"crnumber":1497.0,"crrevision":1.0,"crcategory":"F","tsg_crp":"SP-250519","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-252078.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"5.3.140, 5.4.1","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-252079","title":"Rel-19 CR TS 28.541 Typo corrections and missing definitions","source":"ZTE Corporation, Orange","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 23\/04\/2025. Original source : ZTE Corporation, Orange, Nokia","agenda_item_sort_order":43,"ainumber":"6.4.11","ainame":"Additional NRM features phase 2","tdoc_agenda_sort_order":13511,"status":"agreed","reservation_date":"2025-04-23 08:58:05","uploaded":"2025-04-23 09:01:15","revisionof":"S5-251351","revisedto":"","release":"Rel-19","crspec":28.541,"crspecversion":"19.3.0","workitem":[{"winame":"AdNRM_ph2"}],"crnumber":1498.0,"crrevision":1.0,"crcategory":"A","tsg_crp":"SP-250519","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-252079.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"5.3.140, 5.4.1","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-252080","title":"Rel-19 CR 28.541 Align predefinedPccRuleSet attributes with the definitions in TS 29.512","source":"Ericsson, Deutsche Telekom","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":43,"ainumber":"6.4.11","ainame":"Additional NRM features phase 2","tdoc_agenda_sort_order":16591,"status":"agreed","reservation_date":"2025-04-23 08:58:05","uploaded":"2025-04-23 09:01:15","revisionof":"S5-251659","revisedto":"S5-252533","release":"Rel-19","crspec":28.541,"crspecversion":"19.3.0","workitem":[{"winame":"TEI19"}],"crnumber":1520.0,"crrevision":1.0,"crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-252080.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-252081","title":"Rel-18 CR TS 28.557 Update procedure of management of tenant to align with access control solution","source":"Huawei, Ericsson","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 23\/04\/2025. Original source : Huawei, Ericsson","agenda_item_sort_order":55,"ainumber":"6.4.23","ainame":"Management of non-public networks phase 2","tdoc_agenda_sort_order":15611,"status":"agreed","reservation_date":"2025-04-23 08:58:06","uploaded":"2025-04-23 09:01:15","revisionof":"S5-251561","revisedto":"","release":"Rel-18","crspec":28.557,"crspecversion":"18.3.0","workitem":[{"winame":"OAM_NPN_Ph2"}],"crnumber":16.0,"crrevision":1.0,"crcategory":"F","tsg_crp":"SP-250548","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-252081.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"2, 6.1.3, B.5","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-252082","title":"Rel-18 CR TS 28.557 Fix wrong references and correct solution for NPN-SC mgmt","source":"Ericsson GmbH, Eurolab","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 23\/04\/2025. Original source : Ericsson GmbH, Eurolab","agenda_item_sort_order":55,"ainumber":"6.4.23","ainame":"Management of non-public networks phase 2","tdoc_agenda_sort_order":17291,"status":"agreed","reservation_date":"2025-04-23 08:58:07","uploaded":"2025-04-23 09:01:15","revisionof":"S5-251729","revisedto":"","release":"Rel-18","crspec":28.557,"crspecversion":"18.3.0","workitem":[{"winame":"OAM_NPN_Ph2"}],"crnumber":17.0,"crrevision":1.0,"crcategory":"F","tsg_crp":"SP-250548","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-252082.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"2, 6.1.2, 6.3.2","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-252083","title":"Rel-18 CR 28.111 YANG stage-3 corrections","source":"Ericsson India Private Limited","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":58,"ainumber":"6.4.26","ainame":"Rel-18 CAT B\/C SA5 internal alignment and other CAT F CR(s)","tdoc_agenda_sort_order":12821,"status":"agreed","reservation_date":"2025-04-23 08:58:08","uploaded":"2025-04-23 09:01:15","revisionof":"S5-251282","revisedto":"","release":"Rel-18","crspec":28.111,"crspecversion":"18.4.0","workitem":[{"winame":"TEI18"}],"crnumber":25.0,"crrevision":1.0,"crcategory":"F","tsg_crp":"SP-250557","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-252083.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-252084","title":"Rel-19 CR 28.111 YANG stage-3 corrections","source":"Ericsson India Private Limited","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":58,"ainumber":"6.4.26","ainame":"Rel-18 CAT B\/C SA5 internal alignment and other CAT F CR(s)","tdoc_agenda_sort_order":12831,"status":"agreed","reservation_date":"2025-04-23 08:58:09","uploaded":"2025-04-23 09:01:15","revisionof":"S5-251283","revisedto":"","release":"Rel-19","crspec":28.111,"crspecversion":"19.1.0","workitem":[{"winame":"TEI19"}],"crnumber":26.0,"crrevision":1.0,"crcategory":"F","tsg_crp":"SP-250558","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-252084.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-252085","title":"Rel-19 CR TS 28.560 Corrections on networkInterfaceTypeList","source":"Ericsson, Vodafone","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 23\/04\/2025. Original source : Ericsson, Vodafone","agenda_item_sort_order":59,"ainumber":"6.4.27","ainame":"OAM Rel-19 small enhancements","tdoc_agenda_sort_order":0,"status":"not pursued","reservation_date":"2025-04-23 08:58:10","uploaded":"2025-04-23 09:01:15","revisionof":"S5-251239","revisedto":"","release":"Rel-19","crspec":28.56,"crspecversion":"19.1.0","workitem":[{"winame":"TEI19"}],"crnumber":2.0,"crrevision":1.0,"crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-252085.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"6.3.1","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-252086","title":"Rel-19 CR TS 28.560 Corrections on PCAPNG header","source":"Ericsson, Vodafone","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 23\/04\/2025. Original source : Ericsson, Vodafone","agenda_item_sort_order":59,"ainumber":"6.4.27","ainame":"OAM Rel-19 small enhancements","tdoc_agenda_sort_order":12401,"status":"agreed","reservation_date":"2025-04-23 08:58:11","uploaded":"2025-04-23 09:01:15","revisionof":"S5-251240","revisedto":"","release":"Rel-19","crspec":28.56,"crspecversion":"19.1.0","workitem":[{"winame":"TEI19"}],"crnumber":3.0,"crrevision":1.0,"crcategory":"F","tsg_crp":"SP-250559","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-252086.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"2, 7.1.2.1","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-252087","title":"Addressing ENs in TS 28.560","source":"Vodafone, Ericsson, Nokia, Deutsche Telekom","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":59,"ainumber":"6.4.27","ainame":"OAM Rel-19 small enhancements","tdoc_agenda_sort_order":0,"status":"not pursued","reservation_date":"2025-04-23 08:58:11","uploaded":"2025-04-23 09:01:15","revisionof":"S5-251287","revisedto":"","release":"Rel-19","crspec":28.56,"crspecversion":"19.1.0","workitem":[{"winame":"Monstra-OAM"}],"crnumber":4.0,"crrevision":1.0,"crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-252087.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-252088","title":"Removal of already addressed Editor's Note","source":"Vodafone, Nokia, Ericsson, Deutsche Telekom","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":59,"ainumber":"6.4.27","ainame":"OAM Rel-19 small enhancements","tdoc_agenda_sort_order":12881,"status":"agreed","reservation_date":"2025-04-23 08:58:12","uploaded":"2025-04-23 09:01:15","revisionof":"S5-251288","revisedto":"","release":"Rel-19","crspec":28.56,"crspecversion":"19.1.0","workitem":[{"winame":"Monstra-OAM"}],"crnumber":5.0,"crrevision":1.0,"crcategory":"D","tsg_crp":"SP-250539","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-252088.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-252089","title":"Addressing EN for supporting type of signalling","source":"Vodafone, Samsung, Ericsson","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":59,"ainumber":"6.4.27","ainame":"OAM Rel-19 small enhancements","tdoc_agenda_sort_order":0,"status":"not pursued","reservation_date":"2025-04-23 08:58:13","uploaded":"2025-04-23 09:01:15","revisionof":"S5-251414","revisedto":"","release":"Rel-19","crspec":28.56,"crspecversion":"19.1.0","workitem":[{"winame":"Monstra-OAM"}],"crnumber":6.0,"crrevision":1.0,"crcategory":"C","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-252089.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-252090","title":"Removal of Editor's Note on encoding","source":"Vodafone","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":59,"ainumber":"6.4.27","ainame":"OAM Rel-19 small enhancements","tdoc_agenda_sort_order":14151,"status":"agreed","reservation_date":"2025-04-23 08:58:14","uploaded":"2025-04-23 09:01:15","revisionof":"S5-251415","revisedto":"","release":"Rel-19","crspec":28.56,"crspecversion":"19.1.0","workitem":[{"winame":"Monstra-OAM"}],"crnumber":7.0,"crrevision":1.0,"crcategory":"C","tsg_crp":"SP-250539","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-252090.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-252091","title":"Correction of the description of the attribute stmTargetUri","source":"Nokia, Ericsson","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 23\/04\/2025. Original source : Nokia Germany, Ericsson","agenda_item_sort_order":96,"ainumber":"6.19.22","ainame":"Management for MonStra (completed)","tdoc_agenda_sort_order":17341,"status":"agreed","reservation_date":"2025-04-23 08:58:15","uploaded":"2025-04-23 09:01:15","revisionof":"S5-251734","revisedto":"","release":"Rel-19","crspec":28.56,"crspecversion":"19.1.0","workitem":[{"winame":"Monstra-OAM"}],"crnumber":8.0,"crrevision":1.0,"crcategory":"F","tsg_crp":"SP-250539","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-252091.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"2, 6.3.1","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-252092","title":"Rel-19 CR TS 28.623 Update the YANG definition for notificationTypes to align with stage 2 definition","source":"Huawei","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":59,"ainumber":"6.4.27","ainame":"OAM Rel-19 small enhancements","tdoc_agenda_sort_order":13821,"status":"revised","reservation_date":"2025-04-23 08:58:16","uploaded":"2025-04-23 09:01:15","revisionof":"S5-251382","revisedto":"S5-252115","release":"Rel-19","crspec":28.623,"crspecversion":"19.3.0","workitem":[{"winame":"TEI19"}],"crnumber":518.0,"crrevision":1.0,"crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-252092.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-252093","title":"Rel-19 CR TS 28.533 Corrections","source":"Huawei","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":59,"ainumber":"6.4.27","ainame":"OAM Rel-19 small enhancements","tdoc_agenda_sort_order":13831,"status":"agreed","reservation_date":"2025-04-23 08:58:17","uploaded":"2025-04-23 09:01:15","revisionof":"","revisedto":"","release":"Rel-19","crspec":28.533,"crspecversion":"19.1.0","workitem":[{"winame":"TEI19"}],"crnumber":157.0,"crrevision":"","crcategory":"D","tsg_crp":"SP-250558","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-252093.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-252094","title":"Rel-19 CR TS 28.622 Update Attribute constraints for TimeWindow","source":"Huawei","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 23\/04\/2025. Original source : Huawei","agenda_item_sort_order":59,"ainumber":"6.4.27","ainame":"OAM Rel-19 small enhancements","tdoc_agenda_sort_order":13901,"status":"not pursued","reservation_date":"2025-04-23 08:58:18","uploaded":"2025-04-23 09:01:15","revisionof":"S5-251390","revisedto":"S5-252300","release":"Rel-19","crspec":28.622,"crspecversion":"19.3.0","workitem":[{"winame":"TEI19"}],"crnumber":540.0,"crrevision":1.0,"crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-252094.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"4.3.47.1, 4.3.48.3","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-252095","title":"Rel-19 CR 28.541 Add control attribute for LTM cell switch","source":"Ericsson","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 23\/04\/2025. Original source : Ericsson","agenda_item_sort_order":59,"ainumber":"6.4.27","ainame":"OAM Rel-19 small enhancements","tdoc_agenda_sort_order":15571,"status":"agreed","reservation_date":"2025-04-23 08:58:19","uploaded":"2025-04-23 09:01:15","revisionof":"S5-251557","revisedto":"","release":"Rel-19","crspec":28.541,"crspecversion":"19.3.0","workitem":[{"winame":"TEI19"}],"crnumber":1509.0,"crrevision":1.0,"crcategory":"B","tsg_crp":"SP-250558","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-252095.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":false,"clauses_affected":"3.3, 4.3.2.2, 4.3.2.3, 4.4.1, Forge","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-252096","title":"Rel-19 CR TS 28.541 Fix invalid reference","source":"Huawei","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 23\/04\/2025. Original source : Huawei","agenda_item_sort_order":29,"ainumber":"6.3.11","ainame":"General NRM","tdoc_agenda_sort_order":15951,"status":"agreed","reservation_date":"2025-04-23 08:58:21","uploaded":"2025-04-23 09:01:15","revisionof":"S5-251595","revisedto":"","release":"Rel-19","crspec":28.541,"crspecversion":"19.3.0","workitem":[{"winame":"TEI19"}],"crnumber":1515.0,"crrevision":1.0,"crcategory":"F","tsg_crp":"SP-250558","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-252096.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"5.1","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-252097","title":"Rel 19 CR TS 28.541 Remove support qualifier from attribute constraints for NR NRM","source":"Ericsson","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":59,"ainumber":"6.4.27","ainame":"OAM Rel-19 small enhancements","tdoc_agenda_sort_order":16211,"status":"agreed","reservation_date":"2025-04-23 08:58:22","uploaded":"2025-04-23 09:01:15","revisionof":"S5-251621","revisedto":"","release":"Rel-19","crspec":28.541,"crspecversion":"19.3.0","workitem":[{"winame":"TEI19"}],"crnumber":1516.0,"crrevision":1.0,"crcategory":"C","tsg_crp":"SP-250558","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-252097.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-252098","title":"Rel 19 CR TS 28.541 Remove support qualifier from attribute constraints for Network Slice NRM","source":"Ericsson","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 23\/04\/2025. Original source : Ericsson","agenda_item_sort_order":59,"ainumber":"6.4.27","ainame":"OAM Rel-19 small enhancements","tdoc_agenda_sort_order":16221,"status":"agreed","reservation_date":"2025-04-23 08:58:23","uploaded":"2025-04-23 09:01:15","revisionof":"S5-251622","revisedto":"","release":"Rel-19","crspec":28.541,"crspecversion":"19.3.0","workitem":[{"winame":"TEI19"}],"crnumber":1517.0,"crrevision":1.0,"crcategory":"C","tsg_crp":"SP-250558","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-252098.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":false,"clauses_affected":"6.3.1.3, 6.3.2.3, 6.3.4.3, 6.3.6.3, 6.3.7.3, 6.3.8.3, 6.3.9.3, 6.3.11.3, 6.3.12.3, 6.3.14.3, 6.3.15.3, 6.3.16.3, 6.3.17.3, 6.3.20.3, 6.3.26.3, 6.3.27.3, 6.3.30.3, 6.3.31.3, 6.3.32.2, 6.3.34.3, 6.3.37.3, 6.3.38.3, 6.3.42.3, 6.3.43.3, 6.3.45.3, 6.3.46.3","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-252099","title":"Rel 19 CR TS 28.541 Remove support qualifier from attribute constraints for 5GC NRM","source":"Ericsson","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":59,"ainumber":"6.4.27","ainame":"OAM Rel-19 small enhancements","tdoc_agenda_sort_order":16231,"status":"agreed","reservation_date":"2025-04-23 08:58:25","uploaded":"2025-04-23 09:01:15","revisionof":"S5-251623","revisedto":"","release":"Rel-19","crspec":28.541,"crspecversion":"19.3.0","workitem":[{"winame":"TEI19"}],"crnumber":1518.0,"crrevision":1.0,"crcategory":"C","tsg_crp":"SP-250558","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-252099.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-252100","title":"Rel-19 CR TS 28.541 Correction on wrong attribute property definition.docx","source":"CATT","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":59,"ainumber":"6.4.27","ainame":"OAM Rel-19 small enhancements","tdoc_agenda_sort_order":0,"status":"not pursued","reservation_date":"2025-04-23 08:58:26","uploaded":"2025-04-23 09:01:15","revisionof":"S5-251628","revisedto":"","release":"Rel-19","crspec":28.541,"crspecversion":"19.3.0","workitem":[{"winame":"TEI19"}],"crnumber":1470.0,"crrevision":3.0,"crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-252100.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-252101","title":"Correct the description of maximum number of PDU sessions of network slice","source":"Huawei","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 23\/04\/2025. Original source : Huawei","agenda_item_sort_order":59,"ainumber":"6.4.27","ainame":"OAM Rel-19 small enhancements","tdoc_agenda_sort_order":16491,"status":"agreed","reservation_date":"2025-04-23 08:58:28","uploaded":"2025-04-23 09:01:16","revisionof":"S5-251649","revisedto":"","release":"Rel-19","crspec":28.554,"crspecversion":"19.3.0","workitem":[{"winame":"TEI19"}],"crnumber":217.0,"crrevision":1.0,"crcategory":"F","tsg_crp":"SP-250559","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-252101.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"6.4.5","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-252102","title":"Rel-17 CR TS 28.310 Clarify information of service","source":"Ericsson, Deutsche Telekom","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":23,"ainumber":"6.3.5","ainame":"Energy efficiency","tdoc_agenda_sort_order":16641,"status":"withdrawn","reservation_date":"2025-04-23 08:58:29","uploaded":null,"revisionof":"","revisedto":"","release":"Rel-17","crspec":28.31,"crspecversion":"17.10.0","workitem":[{"winame":"TEI17"}],"crnumber":73.0,"crrevision":1.0,"crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-252103","title":"Rel-17 CR 28.541 Update for allowed value ueAccProbabilityDist (stage3, yang)","source":"Ericsson Canada Inc.","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 23\/04\/2025. Original source : Ericsson Canada Inc.","agenda_item_sort_order":25,"ainumber":"6.3.7","ainame":"SON","tdoc_agenda_sort_order":14301,"status":"agreed","reservation_date":"2025-04-23 08:58:30","uploaded":"2025-04-23 09:01:16","revisionof":"S5-251430","revisedto":"","release":"Rel-17","crspec":28.541,"crspecversion":"17.18.0","workitem":[{"winame":"TEI16"}],"crnumber":1502.0,"crrevision":1.0,"crcategory":"A","tsg_crp":"SP-250555","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-252103.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":false,"clauses_affected":"E.5.30","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-252104","title":"Rel-19 CR 28.541 Update for allowed value ueAccProbabilityDist (stage3, yang)","source":"Ericsson Canada Inc.","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 23\/04\/2025. Original source : Ericsson Canada Inc.","agenda_item_sort_order":25,"ainumber":"6.3.7","ainame":"SON","tdoc_agenda_sort_order":14321,"status":"agreed","reservation_date":"2025-04-23 08:58:31","uploaded":"2025-04-23 09:01:16","revisionof":"S5-251432","revisedto":"","release":"Rel-19","crspec":28.541,"crspecversion":"19.3.0","workitem":[{"winame":"TEI16"}],"crnumber":1504.0,"crrevision":1.0,"crcategory":"A","tsg_crp":"SP-250555","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-252104.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":false,"clauses_affected":"Forge only","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-252105","title":"Rel19 CR TS28.541 correction to inconsistency between stage 2 and stage 3 concerning SubNetwork and ManagedElement containment","source":"Nokia, Nokia Shanghai Bell","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":29,"ainumber":"6.3.11","ainame":"General NRM","tdoc_agenda_sort_order":12951,"status":"agreed","reservation_date":"2025-04-23 08:58:33","uploaded":"2025-04-23 09:01:16","revisionof":"S5-251295","revisedto":"","release":"Rel-19","crspec":28.541,"crspecversion":"19.3.0","workitem":[{"winame":"TEI18"}],"crnumber":1492.0,"crrevision":1.0,"crcategory":"A","tsg_crp":"SP-250557","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-252105.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-252106","title":"Rel19 CR TS28.541 correction to stage 3 of SatelliteBackhaulInfo","source":"Nokia, Nokia Shanghai Bell","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":29,"ainumber":"6.3.11","ainame":"General NRM","tdoc_agenda_sort_order":12981,"status":"agreed","reservation_date":"2025-04-23 08:58:34","uploaded":"2025-04-23 09:01:16","revisionof":"S5-251298","revisedto":"","release":"Rel-19","crspec":28.541,"crspecversion":"19.3.0","workitem":[{"winame":"TEI18"}],"crnumber":1495.0,"crrevision":1.0,"crcategory":"A","tsg_crp":"SP-250557","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-252106.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-252107","title":"Rel19 CR TS 32.156 Enhancement of the description of the \u201cisNotifyable\u201d attribute property and correction of the default value for the \u201cisReadable\u201d attribute property","source":"Nokia","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":29,"ainumber":"6.3.11","ainame":"General NRM","tdoc_agenda_sort_order":17071,"status":"agreed","reservation_date":"2025-04-23 08:58:35","uploaded":"2025-04-23 09:01:16","revisionof":"S5-251707","revisedto":"","release":"Rel-19","crspec":32.156,"crspecversion":"19.2.0","workitem":[{"winame":"TEI19"}],"crnumber":111.0,"crrevision":1.0,"crcategory":"F","tsg_crp":"SP-250559","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-252107.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-252108","title":"Rel-19 InputToDraftCR 28.105 solution for Impact management","source":"Samsung R&D Institute UK, ZTE, Ericsson","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"other","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":61,"ainumber":"6.19.1.1","ainame":"AI\/ML management phase 2","tdoc_agenda_sort_order":15301,"status":"approved","reservation_date":"2025-04-23 08:58:36","uploaded":"2025-04-23 09:01:16","revisionof":"S5-251530","revisedto":"","release":"Rel-19","crspec":28.105,"crspecversion":"","workitem":[{"winame":"AIML_MGT_Ph2"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-252108.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-252109","title":"Rel-19 CR TS 28.623 Update stage 3 to support energy information NRM","source":"Nokia, Huawei, Orange, AT&T","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"reissued from S5-251942 because of title and contents change","secretary_remarks":"","agenda_item_sort_order":93,"ainumber":"6.19.20.1","ainame":"Energy efficiency and energy saving aspects of 5G networks and services","tdoc_agenda_sort_order":12662,"status":"not pursued","reservation_date":"2025-04-23 08:58:36","uploaded":"2025-04-23 09:01:16","revisionof":"","revisedto":"","release":"Rel-19","crspec":28.623,"crspecversion":"19.3.0","workitem":[{"winame":"Energy_OAM_Ph3"}],"crnumber":530.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-252109.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-252110","title":"Rel-19 CR TS 28.541 add YAML stage 3 for NTN time based solution","source":"Huawei","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 23\/04\/2025. Original source : Huawei","agenda_item_sort_order":83,"ainumber":"6.19.15.1","ainame":"Management Aspects of NTN Phase 2","tdoc_agenda_sort_order":15761,"status":"agreed","reservation_date":"2025-04-23 08:58:37","uploaded":"2025-04-23 09:01:16","revisionof":"S5-251576","revisedto":"","release":"Rel-19","crspec":28.541,"crspecversion":"19.3.0","workitem":[{"winame":"NTN_OAM_Ph2"}],"crnumber":1511.0,"crrevision":1.0,"crcategory":"B","tsg_crp":"SP-250546","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-252110.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":false,"clauses_affected":"4.3.94, 4.3.95Following YAML file normatively defined in the forge are updated- \/OpenAPI\/TS28541_NrNrm.yaml","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-252111","title":"Rel-19 CR TS 28.541 Enhancing NR NRM to control RedCap and e-RedCap UEs access","source":"Samsung Electronics GmbH","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":87,"ainumber":"6.19.17.1","ainame":"Management Aspects of RedCap features","tdoc_agenda_sort_order":17481,"status":"not pursued","reservation_date":"2025-04-23 08:58:38","uploaded":"2025-04-23 09:01:16","revisionof":"S5-251748","revisedto":"","release":"Rel-19","crspec":28.541,"crspecversion":"19.3.0","workitem":[{"winame":"NR_RedCap_OAM"}],"crnumber":1525.0,"crrevision":1.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-252111.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-252112","title":"SA5 working procedures","source":"WG Chair","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"other","for":"Information","abstract":"","secretary_remarks":"","agenda_item_sort_order":8,"ainumber":"5.1","ainame":"Administrative issues at SA5 level","tdoc_agenda_sort_order":12051,"status":"endorsed","reservation_date":"2025-04-23 08:58:39","uploaded":"2025-04-23 09:01:16","revisionof":"S5-251205","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-252112.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-252113","title":"LS reply to LS on 5G Trace to support UE level measurement","source":"SA5","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"LS out","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":14,"ainumber":"6.1","ainame":"OAM&P Plenary","tdoc_agenda_sort_order":16152,"status":"approved","reservation_date":"2025-04-23 08:58:39","uploaded":"2025-04-23 09:01:16","revisionof":"S5-252055","revisedto":"","release":"Rel-18","crspec":"","crspecversion":"","workitem":[{"winame":"TEI18"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"SA5-250280","lsto":"3GPP CT4","Cc":"3GPP CT3","lsoriginalls":"C4-245536","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-252113.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-252114","title":"Reply LS to RAN3 LS on Continuous MDT","source":"SA5","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"LS out","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":14,"ainumber":"6.1","ainame":"OAM&P Plenary","tdoc_agenda_sort_order":13262,"status":"approved","reservation_date":"2025-04-23 08:58:39","uploaded":"2025-04-23 09:01:16","revisionof":"S5-252053","revisedto":"","release":"Rel-19","crspec":"","crspecversion":"","workitem":[{"winame":"NR_AIML_NGRAN_enh-Core"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"S5-251326\/R3-250891","lsto":"RAN3","Cc":"","lsoriginalls":"R3-250891","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-252114.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-252115","title":"Rel-19 CR TS 28.623 Update the YANG definition for notificationTypes to align with stage 2 definition","source":"Huawei","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 23\/04\/2025. Original source : Huawei","agenda_item_sort_order":59,"ainumber":"6.4.27","ainame":"OAM Rel-19 small enhancements","tdoc_agenda_sort_order":13822,"status":"agreed","reservation_date":"2025-04-23 08:58:39","uploaded":"2025-04-23 09:01:16","revisionof":"S5-252092","revisedto":"","release":"Rel-19","crspec":28.623,"crspecversion":"19.3.0","workitem":[{"winame":"TEI19"}],"crnumber":518.0,"crrevision":2.0,"crcategory":"F","tsg_crp":"SP-250559","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-252115.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"Following YANG files normatively defined in the forge are updated: - yang-models\/_3gpp-common-subscription-control.yang","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-252116","title":"Rel-19 CR 28.104 software upgrade validation","source":"Samsung R&D Institute UK, Orange","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":63,"ainumber":"6.19.2.1","ainame":"Management Data Analytics phase 3","tdoc_agenda_sort_order":15392,"status":"agreed","reservation_date":"2025-04-23 08:58:41","uploaded":"2025-04-23 09:01:16","revisionof":"S5-251885","revisedto":"","release":"Rel-19","crspec":28.104,"crspecversion":"19.1.0","workitem":[{"winame":"eMDAS_Ph3"}],"crnumber":202.0,"crrevision":2.0,"crcategory":"B","tsg_crp":"SP-250528","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-252116.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-252117","title":"CR TS 28.312 introduce mapping table","source":"Ericsson, Deutsche Telekom","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Title modified on 23\/04\/2025. Original title : Rel-19 CR TS 28.312 Introduce mapping table<br\/><br\/>Source modified on 23\/04\/2025. Original source : Ericsson, Deutsche Telekom","agenda_item_sort_order":65,"ainumber":"6.19.3.1","ainame":"Intent driven management services for mobile network phase 3","tdoc_agenda_sort_order":16602,"status":"agreed","reservation_date":"2025-04-23 08:58:42","uploaded":"2025-04-23 09:01:16","revisionof":"S5-251927","revisedto":"","release":"Rel-19","crspec":28.312,"crspecversion":"19.1.0","workitem":[{"winame":"IDMS_MN_Ph3"}],"crnumber":333.0,"crrevision":2.0,"crcategory":"B","tsg_crp":"SP-250536","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-252117.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"2, New Annex","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-252118","title":"Pseudo-CR on TS 28.561 NDT NRMs","source":"Huawei, Nokia, CMCC, ZTE, Orange, Ericsson","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":69,"ainumber":"6.19.5.1","ainame":"Management aspects of Network Digital Twins","tdoc_agenda_sort_order":15672,"status":"approved","reservation_date":"2025-04-23 08:58:43","uploaded":"2025-04-23 09:01:16","revisionof":"S5-252020","revisedto":"","release":"Rel-19","crspec":28.561,"crspecversion":"0.1.0","workitem":[{"winame":"NDT"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-252118.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-252119","title":"Pseudo-CR on TS 28.561 Procedure for consuming NDT capability","source":"Huawei","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":69,"ainumber":"6.19.5.1","ainame":"Management aspects of Network Digital Twins","tdoc_agenda_sort_order":15702,"status":"approved","reservation_date":"2025-04-23 08:58:43","uploaded":"2025-04-23 09:01:16","revisionof":"S5-252021","revisedto":"","release":"Rel-19","crspec":28.561,"crspecversion":"0.1.0","workitem":[{"winame":"NDT"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-252119.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-252120","title":"Pseudo-CR on TS 28.561 Nested NDT Definition","source":"FiberCop, Deutsche Telekom, Telecom Italia, Orange, NTT Docomo , Nokia , China Mobile, Ericsson","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":69,"ainumber":"6.19.5.1","ainame":"Management aspects of Network Digital Twins","tdoc_agenda_sort_order":16572,"status":"approved","reservation_date":"2025-04-23 08:58:43","uploaded":"2025-04-23 09:01:16","revisionof":"S5-252017","revisedto":"","release":"Rel-19","crspec":28.561,"crspecversion":"0.1.0","workitem":[{"winame":"NDT"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-252120.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-252121","title":"Pseudo-CR on TR 28.869 Add conclusion for management data streaming solution based on message bus","source":"Huawei","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":70,"ainumber":"6.19.6","ainame":"Study on Cloud Aspects of Management and Orchestration","tdoc_agenda_sort_order":15722,"status":"noted","reservation_date":"2025-04-23 08:58:43","uploaded":"2025-04-23 09:01:16","revisionof":"S5-252013","revisedto":"S5-252490","release":"Rel-19","crspec":28.869,"crspecversion":"1.3.0","workitem":[{"winame":"FS_Cloud_OAM"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-252121.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-252122","title":"Rel-19 SA5 work plan TU table","source":"WG Chair","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"other","for":"Information","abstract":"","secretary_remarks":"","agenda_item_sort_order":8,"ainumber":"5.1","ainame":"Administrative issues at SA5 level","tdoc_agenda_sort_order":12141,"status":"noted","reservation_date":"2025-04-23 08:58:43","uploaded":"2025-04-23 09:01:16","revisionof":"S5-251214","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-252122.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-252123","title":"LS to SA for guidance of maintenance of specifications","source":"SA5","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"LS out","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":10,"ainumber":"5.3","ainame":"Liaison statements at SA5 level","tdoc_agenda_sort_order":176801,"status":"approved","reservation_date":"2025-04-23 08:58:43","uploaded":"2025-04-23 09:01:16","revisionof":"S5-251768","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"TSG SA","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-252123.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-252124","title":"New SID on Study for Data management phase 3","source":"Nokia, Verizon","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"SID new","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":12,"ainumber":"5.5","ainame":"Rel-20 topic preparation","tdoc_agenda_sort_order":17402,"status":"noted","reservation_date":"2025-04-23 08:58:43","uploaded":"2025-04-23 09:01:16","revisionof":"S5-251781","revisedto":"","release":"Rel-20","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-252124.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-252125","title":"Draft CR MADCOL TS 28.622","source":"Nokia","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"draftCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":76,"ainumber":"6.19.","ainame":"Data management phase 2","tdoc_agenda_sort_order":14993,"status":"approved","reservation_date":"2025-04-23 08:58:44","uploaded":"2025-04-23 09:01:16","revisionof":"S5-251956","revisedto":"","release":"Rel-19","crspec":28.622,"crspecversion":"19.3.0","workitem":[{"winame":"MADCOL_Ph2"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-252125.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-252126","title":"Rel-19 pCR TS 28.579 Introduce definition of External MnS consumer","source":"Huawei, Ericsson, Nokia, Deutsche Telekom","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":95,"ainumber":"6.19.21.1","ainame":"Enhanced OAM for management service exposure to external consumers through CAPIF","tdoc_agenda_sort_order":13732,"status":"approved","reservation_date":"2025-04-23 08:58:44","uploaded":"2025-04-23 09:01:16","revisionof":"S5-251946","revisedto":"","release":"Rel-19","crspec":28.579,"crspecversion":"0.1.0","workitem":[{"winame":"MExpo"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-252126.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-252127","title":"Rel-19 pCR TS 28.579 Add use case and requirements for registration of the MSED into the CCF","source":"Nokia Hungary, AT&T","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":95,"ainumber":"6.19.21.1","ainame":"Enhanced OAM for management service exposure to external consumers through CAPIF","tdoc_agenda_sort_order":16972,"status":"approved","reservation_date":"2025-04-23 08:58:44","uploaded":"2025-04-23 09:01:16","revisionof":"S5-251949","revisedto":"","release":"Rel-19","crspec":28.579,"crspecversion":"0.1.0","workitem":[{"winame":"MExpo"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-252127.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-252128","title":"Rel-19 pCR TS 28.579 Add use case solution for registration of the MSED into the CCF","source":"Nokia Hungary, AT&T","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":95,"ainumber":"6.19.21.1","ainame":"Enhanced OAM for management service exposure to external consumers through CAPIF","tdoc_agenda_sort_order":16982,"status":"approved","reservation_date":"2025-04-23 08:58:44","uploaded":"2025-04-23 09:01:16","revisionof":"S5-252036","revisedto":"","release":"Rel-19","crspec":28.579,"crspecversion":"0.1.0","workitem":[{"winame":"MExpo"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-252128.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-252129","title":"Rel-19 pCR TS 28.579 Add use case requirements for publishing of management services to the CCF","source":"Nokia Hungary, AT&T","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":95,"ainumber":"6.19.21.1","ainame":"Enhanced OAM for management service exposure to external consumers through CAPIF","tdoc_agenda_sort_order":16992,"status":"approved","reservation_date":"2025-04-23 08:58:44","uploaded":"2025-04-23 09:01:16","revisionof":"S5-252037","revisedto":"","release":"Rel-19","crspec":28.579,"crspecversion":"0.1.0","workitem":[{"winame":"MExpo"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-252129.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-252130","title":"Rel-19 pCR TS 28.579 Add use case solution to enable the publishing management services to the CCF","source":"Nokia Hungary, AT&T","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":95,"ainumber":"6.19.21.1","ainame":"Enhanced OAM for management service exposure to external consumers through CAPIF","tdoc_agenda_sort_order":17002,"status":"approved","reservation_date":"2025-04-23 08:58:44","uploaded":"2025-04-23 09:01:16","revisionof":"S5-252038","revisedto":"","release":"Rel-19","crspec":28.579,"crspecversion":"0.1.0","workitem":[{"winame":"MExpo"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-252130.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-252131","title":"Rel-19 pCR TS 28.579 Add use case requirements for logging of management service APIs invocations to the CCF","source":"Nokia Hungary, AT&T","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":95,"ainumber":"6.19.21.1","ainame":"Enhanced OAM for management service exposure to external consumers through CAPIF","tdoc_agenda_sort_order":17012,"status":"approved","reservation_date":"2025-04-23 08:58:44","uploaded":"2025-04-23 09:01:16","revisionof":"S5-252039","revisedto":"","release":"Rel-19","crspec":28.579,"crspecversion":"0.1.0","workitem":[{"winame":"MExpo"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-252131.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-252132","title":"Rel-19 pCR TS 28.579 Add use case solution for logging the management service API invocations to the CCF","source":"Nokia Hungary, AT&T","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":95,"ainumber":"6.19.21.1","ainame":"Enhanced OAM for management service exposure to external consumers through CAPIF","tdoc_agenda_sort_order":17021,"status":"approved","reservation_date":"2025-04-23 08:58:45","uploaded":"2025-04-23 09:01:16","revisionof":"S5-251702","revisedto":"","release":"Rel-19","crspec":28.579,"crspecversion":"0.1.0","workitem":[{"winame":"MExpo"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-252132.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-252133","title":"Input to draftCR TS28.105 NRM for ML-Knowledge-based TL","source":"Nokia","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"other","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":61,"ainumber":"6.19.1.1","ainame":"AI\/ML management phase 2","tdoc_agenda_sort_order":12612,"status":"approved","reservation_date":"2025-04-23 08:58:45","uploaded":"2025-04-23 09:01:16","revisionof":"S5-252041","revisedto":"","release":"Rel-19","crspec":28.105,"crspecversion":"","workitem":[{"winame":"AIML_MGT_Ph2"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_160\/Docs\/S5-252133.zip","group":"S5","meeting":"S5-160","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0}]