[{"name":"R5-180000","title":"RAN5#1-5G-NR Adhoc Agenda","source":"Qualcomm Incorporated","contact":"Pradeep Gowda","contact-id":41384,"tdoctype":"agenda","for":"Presentation","abstract":"","secretary_remarks":"","agenda_item_sort_order":1,"ainumber":"1","ainame":"Opening of the meeting","tdoc_agenda_sort_order":0,"status":"noted","reservation_date":"2017-12-14 09:44:02","uploaded":"2018-01-19 09:17:59","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_AHs\/2018-01-16_5G-NR_Adhoc_1\/Docs\/R5-180000.zip","group":"R5","meeting":"R5-ah-33216","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-180001","title":"LS on UE RF conformance spec for mmWave OTA","source":"TSG WG RAN4","contact":"Ingbert Sigovich","contact-id":28887,"tdoctype":"LS in","for":"Information","abstract":"RAN4 has specified NR core specifications for UE RF mmWave OTA from system point of view. At the same time, RAN4 has also identified some difficulties to verity some core requirements due to low PSD and wide frequency range etc. Identified difficulties an","secretary_remarks":"","agenda_item_sort_order":2,"ainumber":"2","ainame":"Incoming Liaison Statements","tdoc_agenda_sort_order":10,"status":"noted","reservation_date":"2017-12-14 15:37:06","uploaded":"2017-12-14 15:39:43","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"R4-1714550","lsreply":"R5-180110","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/TSGR5_AHs\/2018-01-16_5G-NR_Adhoc_1\/Docs\/R5-180001.zip","group":"R5","meeting":"R5-ah-33216","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-180002","title":"Add references","source":"CATR","contact":"Yufeng Zhang","contact-id":72739,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":12,"ainumber":"4.1.5","ainame":"TS 38.521-2","tdoc_agenda_sort_order":20,"status":"approved","reservation_date":"2018-01-04 06:49:44","uploaded":"2018-01-09 09:45:37","revisionof":"","revisedto":"","release":"Rel-15","crspec":"38.521-2","crspecversion":"0.0.1","workitem":[{"winame":"5GS_NR_LTE-UEConTest"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_AHs\/2018-01-16_5G-NR_Adhoc_1\/Docs\/R5-180002.zip","group":"R5","meeting":"R5-ah-33216","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-180003","title":"Add definitions, symbols and abbreviations","source":"CATR","contact":"Yufeng Zhang","contact-id":72739,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":12,"ainumber":"4.1.5","ainame":"TS 38.521-2","tdoc_agenda_sort_order":30,"status":"revised","reservation_date":"2018-01-04 08:36:58","uploaded":"2018-01-09 09:45:37","revisionof":"","revisedto":"R5-180103","release":"Rel-15","crspec":"38.521-2","crspecversion":"0.0.1","workitem":[{"winame":"5GS_NR_LTE-UEConTest"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_AHs\/2018-01-16_5G-NR_Adhoc_1\/Docs\/R5-180003.zip","group":"R5","meeting":"R5-ah-33216","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-180004","title":"Introduction of Operating bands and Channel arrangement","source":"CATR","contact":"Yufeng Zhang","contact-id":72739,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":12,"ainumber":"4.1.5","ainame":"TS 38.521-2","tdoc_agenda_sort_order":40,"status":"revised","reservation_date":"2018-01-05 08:28:09","uploaded":"2018-01-09 09:45:37","revisionof":"","revisedto":"R5-180104","release":"Rel-15","crspec":"38.521-2","crspecversion":"0.0.1","workitem":[{"winame":"5GS_NR_LTE-UEConTest"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_AHs\/2018-01-16_5G-NR_Adhoc_1\/Docs\/R5-180004.zip","group":"R5","meeting":"R5-ah-33216","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-180005","title":"Definition of downlink physical layer parameters for NR","source":"Ericsson","contact":"Petter Karlsson","contact-id":36047,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":8,"ainumber":"4.1.1","ainame":"TS 38.508-1","tdoc_agenda_sort_order":50,"status":"revised","reservation_date":"2018-01-05 09:07:48","uploaded":"2018-01-08 15:47:07","revisionof":"","revisedto":"R5-180066","release":"Rel-15","crspec":"38.508-1","crspecversion":"0.0.1","workitem":[{"winame":"5GS_NR_LTE-UEConTest"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_AHs\/2018-01-16_5G-NR_Adhoc_1\/Docs\/R5-180005.zip","group":"R5","meeting":"R5-ah-33216","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-180006","title":"Discussion about Test parameters for NR TRx TCs","source":"NTT DOCOMO, INC.","contact":"Takahiro Arai","contact-id":65225,"tdoctype":"discussion","for":"Endorsement","abstract":"5G\/NR core working was completed in last RAN meeting #78 in December 2017, and it is the stage of creating specific Test cases (TCs) in RAN5. And now RAN5 LTE RF specification TS 36.521-1[1] defines Initial condition (test parameters) for each TC. However","secretary_remarks":"","agenda_item_sort_order":15,"ainumber":"4.1.7","ainame":"General Papers \/ Work Plan \/ TC lists","tdoc_agenda_sort_order":60,"status":"revised","reservation_date":"2018-01-05 15:06:13","uploaded":"2018-01-09 06:48:46","revisionof":"","revisedto":"R5-180065","release":"Rel-15","crspec":"","crspecversion":"","workitem":[{"winame":"5GS_NR_LTE-UEConTest"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_AHs\/2018-01-16_5G-NR_Adhoc_1\/Docs\/R5-180006.zip","group":"R5","meeting":"R5-ah-33216","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-180007","title":"Discussion about mmW Test Tolerance for NR TRx TCs","source":"NTT DOCOMO, INC.","contact":"Takahiro Arai","contact-id":65225,"tdoctype":"discussion","for":"Endorsement","abstract":"In the last RAN5#77 meeting, discussion about Test Tolerance (TT) was kicked-off and how to define Sub-6GHz TT was endorsed. Additionally, in the last RAN4#85 meeting, Measurement Uncertainty (MU) for EIRP and TRP (D = 5 cm) were agreed. This document int","secretary_remarks":"","agenda_item_sort_order":15,"ainumber":"4.1.7","ainame":"General Papers \/ Work Plan \/ TC lists","tdoc_agenda_sort_order":70,"status":"revised","reservation_date":"2018-01-05 15:07:52","uploaded":"2018-01-09 06:48:46","revisionof":"","revisedto":"R5-180083","release":"Rel-15","crspec":"","crspecversion":"","workitem":[{"winame":"5GS_NR_LTE-UEConTest"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_AHs\/2018-01-16_5G-NR_Adhoc_1\/Docs\/R5-180007.zip","group":"R5","meeting":"R5-ah-33216","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-180008","title":"Test methodology for mmWave Demod testing","source":"Qualcomm Korea","contact":"Vijay Balasubramanian","contact-id":43758,"tdoctype":"discussion","for":"Endorsement","abstract":"In the context of NR Demodulation testing there has been numerous discussions [1],[2],[3] in RAN4 about the choice of RTS and MPAC with several reasons for & not choosing one over the other. Complexity, Cost, unresolved issues with the test methodology it","secretary_remarks":"","agenda_item_sort_order":15,"ainumber":"4.1.7","ainame":"General Papers \/ Work Plan \/ TC lists","tdoc_agenda_sort_order":80,"status":"revised","reservation_date":"2018-01-06 03:22:12","uploaded":"2018-01-09 06:30:02","revisionof":"","revisedto":"R5-180080","release":"","crspec":"","crspecversion":"","workitem":[{"winame":"5GS_NR_LTE-UEConTest"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_AHs\/2018-01-16_5G-NR_Adhoc_1\/Docs\/R5-180008.zip","group":"R5","meeting":"R5-ah-33216","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-180009","title":"Link budget consideration for mmWave Demod Tests","source":"Qualcomm Korea","contact":"Vijay Balasubramanian","contact-id":43758,"tdoctype":"discussion","for":"Endorsement","abstract":"In the context of 5G-NR Demodulation testing we recommended MP-ROS as choice of test methodology for mmWave Demod testing [1] which is submitted for discussion and endorsement in RAN5 5G-NR Adhoc meeting#1.  This document discusses the link budget conside","secretary_remarks":"","agenda_item_sort_order":15,"ainumber":"4.1.7","ainame":"General Papers \/ Work Plan \/ TC lists","tdoc_agenda_sort_order":90,"status":"revised","reservation_date":"2018-01-06 03:30:59","uploaded":"2018-01-09 06:30:02","revisionof":"","revisedto":"R5-180081","release":"","crspec":"","crspecversion":"","workitem":[{"winame":"5GS_NR_LTE-UEConTest"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_AHs\/2018-01-16_5G-NR_Adhoc_1\/Docs\/R5-180009.zip","group":"R5","meeting":"R5-ah-33216","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-180010","title":"Radiated Emissions Measurement Challenges below 30 MHz","source":"Qualcomm Korea","contact":"Vijay Balasubramanian","contact-id":43758,"tdoctype":"discussion","for":"Endorsement","abstract":"","secretary_remarks":"","agenda_item_sort_order":15,"ainumber":"4.1.7","ainame":"General Papers \/ Work Plan \/ TC lists","tdoc_agenda_sort_order":100,"status":"withdrawn","reservation_date":"2018-01-06 03:32:56","uploaded":null,"revisionof":"","revisedto":"","release":"","crspec":"38.521-2","crspecversion":"","workitem":[{"winame":"5GS_NR_LTE-UEConTest"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"","group":"R5","meeting":"R5-ah-33216","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-180011","title":"TRP\/EIRP Measurement Procedure Alignment with ANSI C63 and ETSI EN 301 908-1","source":"Qualcomm Korea","contact":"Vijay Balasubramanian","contact-id":43758,"tdoctype":"discussion","for":"Endorsement","abstract":"The purpose of this contribution is to highlight that there are currently no TRP measurement procedures existing for 3GPP or regulatory testing for test cases other than for sub6 GHz UL transmitter and receiver OTA performance testing.  The starting point","secretary_remarks":"","agenda_item_sort_order":15,"ainumber":"4.1.7","ainame":"General Papers \/ Work Plan \/ TC lists","tdoc_agenda_sort_order":110,"status":"revised","reservation_date":"2018-01-06 03:34:13","uploaded":"2018-01-09 06:30:02","revisionof":"","revisedto":"R5-180098","release":"","crspec":"38.521-2","crspecversion":"","workitem":[{"winame":"5GS_NR_LTE-UEConTest"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_AHs\/2018-01-16_5G-NR_Adhoc_1\/Docs\/R5-180011.zip","group":"R5","meeting":"R5-ah-33216","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-180012","title":"Discussion on mmWave UE conformance RF testing","source":"Qualcomm Korea","contact":"Vijay Balasubramanian","contact-id":43758,"tdoctype":"discussion","for":"Endorsement","abstract":"The purpose of this contribution is to provide high level recommendations in developing the mmWave UE RF conformance spec 38.521-2 for the 5G NR. This contribution is a response to the R4-1714533: LS on UE RF conformance spec for mmWave OTA.\n2.\tDiscussio","secretary_remarks":"","agenda_item_sort_order":15,"ainumber":"4.1.7","ainame":"General Papers \/ Work Plan \/ TC lists","tdoc_agenda_sort_order":120,"status":"revised","reservation_date":"2018-01-06 03:35:20","uploaded":"2018-01-09 06:30:02","revisionof":"","revisedto":"R5-180090","release":"","crspec":"38.521-2","crspecversion":"","workitem":[{"winame":"5GS_NR_LTE-UEConTest"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_AHs\/2018-01-16_5G-NR_Adhoc_1\/Docs\/R5-180012.zip","group":"R5","meeting":"R5-ah-33216","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-180013","title":"Signalling NR Testcases - OTA chamber requirements","source":"Qualcomm Korea","contact":"Vijay Balasubramanian","contact-id":43758,"tdoctype":"discussion","for":"Endorsement","abstract":"The purpose of this paper is to revisit some previous conclusions in signalling group eliminating the need of far field testing. Near field performance needs to be evaluated for test cases where more than one NR cell, handover procedure, beam management a","secretary_remarks":"","agenda_item_sort_order":15,"ainumber":"4.1.7","ainame":"General Papers \/ Work Plan \/ TC lists","tdoc_agenda_sort_order":130,"status":"noted","reservation_date":"2018-01-06 03:36:16","uploaded":"2018-01-19 09:18:00","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":[{"winame":"5GS_NR_LTE-UEConTest"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_AHs\/2018-01-16_5G-NR_Adhoc_1\/Docs\/R5-180013.zip","group":"R5","meeting":"R5-ah-33216","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-180014","title":"Discussion on test point selection of MOP, MPR and AMPR in FR1","source":"Huawei, CATR","contact":"Chunying Gu","contact-id":65493,"tdoctype":"discussion","for":"Decision","abstract":"In this document, we discussed several points in deciding the test points of MOP, MPR and AMPR in FR1. It is proposed that RAN5 endorse following proposals.\nProposal 1: The test subcarrier spacing shall be 15kHz, 30kHz and 60kHz. \nProposal 2: The test c","secretary_remarks":"","agenda_item_sort_order":15,"ainumber":"4.1.7","ainame":"General Papers \/ Work Plan \/ TC lists","tdoc_agenda_sort_order":140,"status":"revised","reservation_date":"2018-01-08 01:43:20","uploaded":"2018-01-09 01:33:02","revisionof":"","revisedto":"R5-180067","release":"","crspec":"","crspecversion":"","workitem":[{"winame":"5GS_NR_LTE-UEConTest"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_AHs\/2018-01-16_5G-NR_Adhoc_1\/Docs\/R5-180014.zip","group":"R5","meeting":"R5-ah-33216","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-180015","title":"Addition of new FR1 test case 6.2.1.","source":"Huawei","contact":"Chunying Gu","contact-id":65493,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":11,"ainumber":"4.1.4","ainame":"TS 38.521-1","tdoc_agenda_sort_order":150,"status":"revised","reservation_date":"2018-01-08 01:43:23","uploaded":"2018-01-09 01:33:02","revisionof":"","revisedto":"R5-180068","release":"Rel-15","crspec":"38.521-1","crspecversion":"0.0.1","workitem":[{"winame":"5GS_NR_LTE-UEConTest"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_AHs\/2018-01-16_5G-NR_Adhoc_1\/Docs\/R5-180015.zip","group":"R5","meeting":"R5-ah-33216","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-180016","title":"Addition of new FR1 test case 6.3.1.","source":"Huawei","contact":"Chunying Gu","contact-id":65493,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":11,"ainumber":"4.1.4","ainame":"TS 38.521-1","tdoc_agenda_sort_order":160,"status":"revised","reservation_date":"2018-01-08 01:43:23","uploaded":"2018-01-09 01:33:02","revisionof":"","revisedto":"R5-180071","release":"Rel-15","crspec":"38.521-1","crspecversion":"0.0.1","workitem":[{"winame":"5GS_NR_LTE-UEConTest"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_AHs\/2018-01-16_5G-NR_Adhoc_1\/Docs\/R5-180016.zip","group":"R5","meeting":"R5-ah-33216","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-180017","title":"Addition of new FR1 test case 6.3.3.2.","source":"Huawei","contact":"Chunying Gu","contact-id":65493,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":11,"ainumber":"4.1.4","ainame":"TS 38.521-1","tdoc_agenda_sort_order":170,"status":"revised","reservation_date":"2018-01-08 01:43:23","uploaded":"2018-01-09 01:33:02","revisionof":"","revisedto":"R5-180072","release":"Rel-15","crspec":"38.521-1","crspecversion":"0.0.1","workitem":[{"winame":"5GS_NR_LTE-UEConTest"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_AHs\/2018-01-16_5G-NR_Adhoc_1\/Docs\/R5-180017.zip","group":"R5","meeting":"R5-ah-33216","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-180018","title":"Introduction of new test case 6.3.2 Transmit OFF power","source":"CATR","contact":"Yufeng Zhang","contact-id":72739,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":12,"ainumber":"4.1.5","ainame":"TS 38.521-2","tdoc_agenda_sort_order":180,"status":"revised","reservation_date":"2018-01-08 07:28:11","uploaded":"2018-01-09 09:45:37","revisionof":"","revisedto":"R5-180094","release":"Rel-15","crspec":"38.521-2","crspecversion":"0.0.1","workitem":[{"winame":"5GS_NR_LTE-UEConTest"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_AHs\/2018-01-16_5G-NR_Adhoc_1\/Docs\/R5-180018.zip","group":"R5","meeting":"R5-ah-33216","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-180019","title":"Introduction of new test case 6.3.2 Transmit OFF power","source":"CATR","contact":"Yufeng Zhang","contact-id":72739,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":11,"ainumber":"4.1.4","ainame":"TS 38.521-1","tdoc_agenda_sort_order":190,"status":"revised","reservation_date":"2018-01-08 07:39:37","uploaded":"2018-01-09 09:45:37","revisionof":"","revisedto":"R5-180077","release":"Rel-15","crspec":"38.521-1","crspecversion":"0.0.1","workitem":[{"winame":"5GS_NR_LTE-UEConTest"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_AHs\/2018-01-16_5G-NR_Adhoc_1\/Docs\/R5-180019.zip","group":"R5","meeting":"R5-ah-33216","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-180020","title":"Addition of new FR1 test case 6.2.2.","source":"CATR","contact":"Yufeng Zhang","contact-id":72739,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":11,"ainumber":"4.1.4","ainame":"TS 38.521-1","tdoc_agenda_sort_order":200,"status":"revised","reservation_date":"2018-01-08 07:52:00","uploaded":"2018-01-09 09:45:37","revisionof":"","revisedto":"R5-180070","release":"Rel-15","crspec":"38.521-1","crspecversion":"0.0.1","workitem":[{"winame":"5GS_NR_LTE-UEConTest"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_AHs\/2018-01-16_5G-NR_Adhoc_1\/Docs\/R5-180020.zip","group":"R5","meeting":"R5-ah-33216","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-180021","title":"Draft TS 38.521-2 v0.1.0","source":"CATR","contact":"Yufeng Zhang","contact-id":72739,"tdoctype":"draft TS","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":12,"ainumber":"4.1.5","ainame":"TS 38.521-2","tdoc_agenda_sort_order":0,"status":"approved","reservation_date":"2018-01-08 08:07:30","uploaded":"2018-01-29 10:17:36","revisionof":"","revisedto":"","release":"Rel-15","crspec":"38.521-2","crspecversion":"0.1.0","workitem":[{"winame":"5GS_NR_LTE-UEConTest"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_AHs\/2018-01-16_5G-NR_Adhoc_1\/Docs\/R5-180021.zip","group":"R5","meeting":"R5-ah-33216","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-180022","title":"Discussion on test case responsibility split","source":"Ericsson","contact":"Petter Karlsson","contact-id":36047,"tdoctype":"discussion","for":"Endorsement","abstract":"For the NR work, RAN5 has several RF test specifications to add new test cases to, 38.521-1, 38.521-2 and 38.521-3. There are clear dependencies between the test specifications. This discussion paper gives a proposal on how to optimize, working with sever","secretary_remarks":"","agenda_item_sort_order":15,"ainumber":"4.1.7","ainame":"General Papers \/ Work Plan \/ TC lists","tdoc_agenda_sort_order":220,"status":"noted","reservation_date":"2018-01-08 08:39:10","uploaded":"2018-01-08 12:16:29","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":[{"winame":"5GS_NR_LTE-UEConTest"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_AHs\/2018-01-16_5G-NR_Adhoc_1\/Docs\/R5-180022.zip","group":"R5","meeting":"R5-ah-33216","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-180023","title":"Discussion of test channel BW and sub-carrier spacing (SCS) approach for NR TRx test cases","source":"Ericsson","contact":"Petter Karlsson","contact-id":36047,"tdoctype":"discussion","for":"Endorsement","abstract":"As part of the initial condition clause in each NR Tx and Rx test case, the test channel bandwidth(s) needs to be specified in the same way as in legacy LTE test cases.\nAs of today, NR in FR1 is specified with sub-carrier spacing (SCS) of 15 kHz, 30 kHz","secretary_remarks":"","agenda_item_sort_order":15,"ainumber":"4.1.7","ainame":"General Papers \/ Work Plan \/ TC lists","tdoc_agenda_sort_order":230,"status":"revised","reservation_date":"2018-01-08 08:47:40","uploaded":"2018-01-08 15:27:10","revisionof":"","revisedto":"R5-180111","release":"","crspec":"","crspecversion":"","workitem":[{"winame":"5GS_NR_LTE-UEConTest"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_AHs\/2018-01-16_5G-NR_Adhoc_1\/Docs\/R5-180023.zip","group":"R5","meeting":"R5-ah-33216","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-180024","title":"New FR1 test case: 6.3.4.3, Power control relative power tolerance","source":"Ericsson","contact":"Petter Karlsson","contact-id":36047,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":11,"ainumber":"4.1.4","ainame":"TS 38.521-1","tdoc_agenda_sort_order":240,"status":"revised","reservation_date":"2018-01-08 08:56:38","uploaded":"2018-01-08 15:39:36","revisionof":"","revisedto":"R5-180073","release":"Rel-15","crspec":"38.521-1","crspecversion":"0.0.1","workitem":[{"winame":"5GS_NR_LTE-UEConTest"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_AHs\/2018-01-16_5G-NR_Adhoc_1\/Docs\/R5-180024.zip","group":"R5","meeting":"R5-ah-33216","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-180025","title":"WP 38.522 RF RRM Applicability","source":"China Mobile Com. Corporation","contact":"Dan Song","contact-id":75340,"tdoctype":"Work Plan","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":15,"ainumber":"4.1.7","ainame":"General Papers \/ Work Plan \/ TC lists","tdoc_agenda_sort_order":250,"status":"noted","reservation_date":"2018-01-08 10:05:00","uploaded":"2018-01-09 06:13:39","revisionof":"","revisedto":"","release":"Rel-15","crspec":"","crspecversion":"","workitem":[{"winame":"5GS_NR_LTE-UEConTest"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_AHs\/2018-01-16_5G-NR_Adhoc_1\/Docs\/R5-180025.zip","group":"R5","meeting":"R5-ah-33216","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-180026","title":"Draft TS 38.522 v0.1.0 skeleton","source":"China Mobile Com. Corporation","contact":"Dan Song","contact-id":75340,"tdoctype":"draft TS","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":15,"ainumber":"4.1.7","ainame":"General Papers \/ Work Plan \/ TC lists","tdoc_agenda_sort_order":260,"status":"revised","reservation_date":"2018-01-08 10:06:54","uploaded":"2018-01-09 06:13:39","revisionof":"","revisedto":"R5-180107","release":"Rel-15","crspec":"38.522","crspecversion":"0.1.0","workitem":[{"winame":"5GS_NR_LTE-UEConTest"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_AHs\/2018-01-16_5G-NR_Adhoc_1\/Docs\/R5-180026.zip","group":"R5","meeting":"R5-ah-33216","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-180027","title":"Discussion on uncertainty of Sub-6GHz NR TRx tests","source":"Anritsu","contact":"Hiroyuki Baba","contact-id":65585,"tdoctype":"discussion","for":"Endorsement","abstract":"In this document, some Sub6 NR MU elements are analyzed. RAN5 is asked to endorse following:\nProposal 1) Apply Sub-6GHz NR MU specified in Annex \nIf further review or input is required by more TE vendors, then one meeting delay will be possible.","secretary_remarks":"","agenda_item_sort_order":15,"ainumber":"4.1.7","ainame":"General Papers \/ Work Plan \/ TC lists","tdoc_agenda_sort_order":270,"status":"revised","reservation_date":"2018-01-08 10:54:40","uploaded":"2018-01-09 05:07:48","revisionof":"","revisedto":"R5-180084","release":"Rel-15","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_AHs\/2018-01-16_5G-NR_Adhoc_1\/Docs\/R5-180027.zip","group":"R5","meeting":"R5-ah-33216","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-180028","title":"Consideration on the FR2 TRx test procedure","source":"Anritsu","contact":"Hiroyuki Baba","contact-id":65585,"tdoctype":"discussion","for":"Endorsement","abstract":"This paper gives a consideration for the mmWave TRx test procedure.\nRAN5 is asked to endorse followings:\nProposal 1) Specify in the test procedure that the link direction can be determined from the measured EIRP CDF(Maximum Output Power Test) or EIS CDF","secretary_remarks":"","agenda_item_sort_order":15,"ainumber":"4.1.7","ainame":"General Papers \/ Work Plan \/ TC lists","tdoc_agenda_sort_order":280,"status":"revised","reservation_date":"2018-01-08 10:56:54","uploaded":"2018-01-09 05:07:48","revisionof":"","revisedto":"R5-180091","release":"Rel-15","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_AHs\/2018-01-16_5G-NR_Adhoc_1\/Docs\/R5-180028.zip","group":"R5","meeting":"R5-ah-33216","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-180029","title":"Discussion on FR2 Spurious Test","source":"Anritsu","contact":"Hiroyuki Baba","contact-id":65585,"tdoctype":"discussion","for":"Endorsement","abstract":"LS from RAN4 is received and it suggests some recommendation for the tests where the difficulty on the testability is identified. This paper discusses the way forward for the identified solution on the mmWave spurious tests.\n[..]\nWe would have following","secretary_remarks":"","agenda_item_sort_order":15,"ainumber":"4.1.7","ainame":"General Papers \/ Work Plan \/ TC lists","tdoc_agenda_sort_order":290,"status":"revised","reservation_date":"2018-01-08 10:57:47","uploaded":"2018-01-09 05:07:48","revisionof":"","revisedto":"R5-180101","release":"Rel-15","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_AHs\/2018-01-16_5G-NR_Adhoc_1\/Docs\/R5-180029.zip","group":"R5","meeting":"R5-ah-33216","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-180030","title":"LTE Anchor Link Requirements","source":"Anritsu","contact":"Hiroyuki Baba","contact-id":65585,"tdoctype":"discussion","for":"Endorsement","abstract":"In RAN5#77,  power configuration for the LTE anchor link for non-standalone(NSA) mode with LTE and mmWave NR cells tests is proposed and set as baseline assumption. \nIn [1], the some analyses for the LTE-link power is discussed from the perspective of av","secretary_remarks":"","agenda_item_sort_order":15,"ainumber":"4.1.7","ainame":"General Papers \/ Work Plan \/ TC lists","tdoc_agenda_sort_order":300,"status":"revised","reservation_date":"2018-01-08 11:01:34","uploaded":"2018-01-09 05:07:48","revisionof":"","revisedto":"R5-180088","release":"Rel-15","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_AHs\/2018-01-16_5G-NR_Adhoc_1\/Docs\/R5-180030.zip","group":"R5","meeting":"R5-ah-33216","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-180031","title":"Discussion on FR2 uncertainty","source":"Anritsu","contact":"Hiroyuki Baba","contact-id":65585,"tdoctype":"discussion","for":"Endorsement","abstract":"LS from RAN4 is received and it inform the completion of uncertainty for D=5cm, for EIRP and TRP.\nThis document discusses the way forward for the mmWave uncertainty and TT.\nConclusion\nRAN5 is asked to endorse the following proposals:\nProposal 1 : Wait","secretary_remarks":"","agenda_item_sort_order":15,"ainumber":"4.1.7","ainame":"General Papers \/ Work Plan \/ TC lists","tdoc_agenda_sort_order":310,"status":"revised","reservation_date":"2018-01-08 11:02:38","uploaded":"2018-01-09 05:07:48","revisionof":"","revisedto":"R5-180082","release":"Rel-15","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_AHs\/2018-01-16_5G-NR_Adhoc_1\/Docs\/R5-180031.zip","group":"R5","meeting":"R5-ah-33216","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-180032","title":"Discussion paper on 5G NR Connection Diagrams for conducted tests","source":"ROHDE & SCHWARZ","contact":"Adrian Cardalda Garcia","contact-id":66591,"tdoctype":"discussion","for":"Endorsement","abstract":"The connection diagrams Annex is TS 36.508 has become difficult to handle over time. This paper tries to identify the reasons and provide a Way Forward to prevent the same problem in TS 38.501-1.\nThis document has identified the following issues with the","secretary_remarks":"","agenda_item_sort_order":15,"ainumber":"4.1.7","ainame":"General Papers \/ Work Plan \/ TC lists","tdoc_agenda_sort_order":320,"status":"noted","reservation_date":"2018-01-08 11:11:14","uploaded":"2018-01-08 16:18:31","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":[{"winame":"5GS_NR_LTE-UEConTest"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_AHs\/2018-01-16_5G-NR_Adhoc_1\/Docs\/R5-180032.zip","group":"R5","meeting":"R5-ah-33216","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-180033","title":"Discussion on the need for additional UE locking functions in TS 38.509","source":"Fraunhofer HHI, Fraunhofer IIS","contact":"Ramez Askar","contact-id":72551,"tdoctype":"discussion","for":"Endorsement","abstract":"This contribution discusses the need for extensions to the UBF specified in TS 38.509 and describes the following new UE special conformance test functions: POWER-LOCK; DPD-LOCK; AGC-LOCK; MCS-LOCK; and CARRIER-LOCK.\nThis contribution discusses additiona","secretary_remarks":"","agenda_item_sort_order":15,"ainumber":"4.1.7","ainame":"General Papers \/ Work Plan \/ TC lists","tdoc_agenda_sort_order":330,"status":"noted","reservation_date":"2018-01-08 11:19:02","uploaded":"2018-01-08 22:02:38","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_AHs\/2018-01-16_5G-NR_Adhoc_1\/Docs\/R5-180033.zip","group":"R5","meeting":"R5-ah-33216","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-180034","title":"Addition of UE special locking conformance testing functions","source":"Fraunhofer HHI, Fraunhofer IIS","contact":"Ramez Askar","contact-id":72551,"tdoctype":"pCR","for":"Approval","abstract":"As per the discussion paper R5-180033, there is a need to add the following UE special conformance test functions: POWER-LOCK; DPD-LOCK; AGC-LOCK; MCS-LOCK; and CARRIER-LOCK.","secretary_remarks":"","agenda_item_sort_order":10,"ainumber":"4.1.3","ainame":"TS 38.509","tdoc_agenda_sort_order":340,"status":"withdrawn","reservation_date":"2018-01-08 11:24:25","uploaded":"2018-01-08 22:02:38","revisionof":"","revisedto":"","release":"Rel-15","crspec":"38.509","crspecversion":"0.0.1","workitem":[{"winame":"5GS_NR_LTE-UEConTest"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_AHs\/2018-01-16_5G-NR_Adhoc_1\/Docs\/R5-180034.zip","group":"R5","meeting":"R5-ah-33216","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-180035","title":"Addition of a UE POWER-LOCK special conformance testing function","source":"Fraunhofer HHI, Fraunhofer IIS","contact":"Ramez Askar","contact-id":72551,"tdoctype":"pCR","for":"Approval","abstract":"As per the discussion paper R5-180033, there is a need to add a UE POWER-LOCK special conformance testing function.","secretary_remarks":"","agenda_item_sort_order":10,"ainumber":"4.1.3","ainame":"TS 38.509","tdoc_agenda_sort_order":350,"status":"withdrawn","reservation_date":"2018-01-08 11:26:28","uploaded":"2018-01-08 22:02:38","revisionof":"","revisedto":"","release":"Rel-15","crspec":"38.509","crspecversion":"0.0.1","workitem":[{"winame":"5GS_NR_LTE-UEConTest"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_AHs\/2018-01-16_5G-NR_Adhoc_1\/Docs\/R5-180035.zip","group":"R5","meeting":"R5-ah-33216","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-180036","title":"Addition of a UE DPD-LOCK special conformance testing function","source":"Fraunhofer HHI, Fraunhofer IIS","contact":"Ramez Askar","contact-id":72551,"tdoctype":"pCR","for":"Approval","abstract":"As per the discussion paper R5-180033, there is a need to add a UE DPD-LOCK special conformance testing function.","secretary_remarks":"","agenda_item_sort_order":10,"ainumber":"4.1.3","ainame":"TS 38.509","tdoc_agenda_sort_order":360,"status":"withdrawn","reservation_date":"2018-01-08 11:28:15","uploaded":"2018-01-08 22:02:38","revisionof":"","revisedto":"","release":"Rel-15","crspec":"38.509","crspecversion":"0.0.1","workitem":[{"winame":"5GS_NR_LTE-UEConTest"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_AHs\/2018-01-16_5G-NR_Adhoc_1\/Docs\/R5-180036.zip","group":"R5","meeting":"R5-ah-33216","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-180037","title":"Addition of a UE AGC-LOCK special conformance testing function","source":"Fraunhofer HHI, Fraunhofer IIS","contact":"Ramez Askar","contact-id":72551,"tdoctype":"pCR","for":"Approval","abstract":"As per the discussion paper R5-180033, there is a need to add a UE AGC-LOCK special conformance testing function.","secretary_remarks":"","agenda_item_sort_order":10,"ainumber":"4.1.3","ainame":"TS 38.509","tdoc_agenda_sort_order":370,"status":"withdrawn","reservation_date":"2018-01-08 11:29:59","uploaded":"2018-01-08 22:02:38","revisionof":"","revisedto":"","release":"Rel-15","crspec":"38.509","crspecversion":"0.0.1","workitem":[{"winame":"5GS_NR_LTE-UEConTest"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_AHs\/2018-01-16_5G-NR_Adhoc_1\/Docs\/R5-180037.zip","group":"R5","meeting":"R5-ah-33216","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-180038","title":"Addition of a UE MCS-LOCK special conformance testing function","source":"Fraunhofer HHI, Fraunhofer IIS","contact":"Ramez Askar","contact-id":72551,"tdoctype":"pCR","for":"Approval","abstract":"As per the discussion paper R5-180033, there is a need to add a UE MCS-LOCK special conformance testing function.","secretary_remarks":"","agenda_item_sort_order":10,"ainumber":"4.1.3","ainame":"TS 38.509","tdoc_agenda_sort_order":380,"status":"withdrawn","reservation_date":"2018-01-08 11:31:29","uploaded":"2018-01-08 22:02:38","revisionof":"","revisedto":"","release":"Rel-15","crspec":"38.509","crspecversion":"0.0.1","workitem":[{"winame":"5GS_NR_LTE-UEConTest"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_AHs\/2018-01-16_5G-NR_Adhoc_1\/Docs\/R5-180038.zip","group":"R5","meeting":"R5-ah-33216","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-180039","title":"Addition of a UE CARRIER-LOCK special conformance testing function","source":"Fraunhofer HHI, Fraunhofer IIS","contact":"Ramez Askar","contact-id":72551,"tdoctype":"pCR","for":"Approval","abstract":"As per the discussion paper R5-180033, there is a need to add a UE CARRIER-LOCK special conformance testing function.","secretary_remarks":"","agenda_item_sort_order":10,"ainumber":"4.1.3","ainame":"TS 38.509","tdoc_agenda_sort_order":390,"status":"withdrawn","reservation_date":"2018-01-08 11:35:13","uploaded":"2018-01-08 22:02:38","revisionof":"","revisedto":"","release":"Rel-15","crspec":"38.509","crspecversion":"0.0.1","workitem":[{"winame":"5GS_NR_LTE-UEConTest"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_AHs\/2018-01-16_5G-NR_Adhoc_1\/Docs\/R5-180039.zip","group":"R5","meeting":"R5-ah-33216","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-180040","title":"On extensions to the UE beam locking conformance testing function","source":"Fraunhofer HHI, Fraunhofer IIS","contact":"Ramez Askar","contact-id":72551,"tdoctype":"discussion","for":"Endorsement","abstract":"Responding to the LS R5-180001, this contribution discusses beam locking in general and proposes the following: a multi-beam extension of the UBF; a null-locking extension of the UBF; a beam addressing scheme (BAS); and an associated message space (AMS).","secretary_remarks":"","agenda_item_sort_order":15,"ainumber":"4.1.7","ainame":"General Papers \/ Work Plan \/ TC lists","tdoc_agenda_sort_order":400,"status":"noted","reservation_date":"2018-01-08 11:36:59","uploaded":"2018-01-08 22:02:38","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_AHs\/2018-01-16_5G-NR_Adhoc_1\/Docs\/R5-180040.zip","group":"R5","meeting":"R5-ah-33216","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-180041","title":"On a measurement control channel and an associated message space","source":"Fraunhofer HHI, Fraunhofer IIS","contact":"Ramez Askar","contact-id":72551,"tdoctype":"discussion","for":"Decision","abstract":"This contribution identifies the need for RAN5 to consider the definition of an extended measurement control channel (MCC) together with an associated message space (AMS) and proposes that this item is the subject of further study.","secretary_remarks":"","agenda_item_sort_order":15,"ainumber":"4.1.7","ainame":"General Papers \/ Work Plan \/ TC lists","tdoc_agenda_sort_order":410,"status":"withdrawn","reservation_date":"2018-01-08 11:38:24","uploaded":null,"revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"","group":"R5","meeting":"R5-ah-33216","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-180042","title":"Discussion on synergies between test cases in TS 38.521-1. TS 38.521-2 and TS 38.521-3","source":"Ericsson","contact":"Petter Karlsson","contact-id":36047,"tdoctype":"discussion","for":"Endorsement","abstract":"Since the number of test specifications and test cases has grown dramatically from LTE to NR, it\u2019s desirable to limit the amount of maintenance work in RAN5. This paper addresses the fact that some parts of test cases in 38.521-1\/38.521-2 and 38.521-3 wou","secretary_remarks":"","agenda_item_sort_order":15,"ainumber":"4.1.7","ainame":"General Papers \/ Work Plan \/ TC lists","tdoc_agenda_sort_order":420,"status":"revised","reservation_date":"2018-01-08 11:51:58","uploaded":"2018-01-08 12:32:00","revisionof":"","revisedto":"R5-180106","release":"","crspec":"","crspecversion":"","workitem":[{"winame":"5GS_NR_LTE-UEConTest"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_AHs\/2018-01-16_5G-NR_Adhoc_1\/Docs\/R5-180042.zip","group":"R5","meeting":"R5-ah-33216","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-180043","title":"TP to add clause 6.2.3 UE additional maximum output power reduction (A-MPR) to 38.521-1","source":"Ericsson LM","contact":"Mats Johansson","contact-id":38077,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":11,"ainumber":"4.1.4","ainame":"TS 38.521-1","tdoc_agenda_sort_order":430,"status":"revised","reservation_date":"2018-01-08 14:42:20","uploaded":"2018-01-09 06:56:35","revisionof":"","revisedto":"R5-180069","release":"Rel-15","crspec":"38.521-1","crspecversion":"0.0.1","workitem":[{"winame":"5GS_NR_LTE-UEConTest"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_AHs\/2018-01-16_5G-NR_Adhoc_1\/Docs\/R5-180043.zip","group":"R5","meeting":"R5-ah-33216","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-180044","title":"TP to add clause 6.5.3.3 Additional spurious emissions to 38.521-1","source":"Ericsson LM","contact":"Mats Johansson","contact-id":38077,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":11,"ainumber":"4.1.4","ainame":"TS 38.521-1","tdoc_agenda_sort_order":440,"status":"revised","reservation_date":"2018-01-08 14:43:39","uploaded":"2018-01-09 06:56:35","revisionof":"","revisedto":"R5-180074","release":"Rel-15","crspec":"38.521-1","crspecversion":"0.0.1","workitem":[{"winame":"5GS_NR_LTE-UEConTest"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_AHs\/2018-01-16_5G-NR_Adhoc_1\/Docs\/R5-180044.zip","group":"R5","meeting":"R5-ah-33216","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-180045","title":"TP to add clause 6.2.4.3 UE A-MPR intra-band EN-DC to 38.521-3","source":"Ericsson LM","contact":"Mats Johansson","contact-id":38077,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":13,"ainumber":"4.1.6","ainame":"TS 38.521-3","tdoc_agenda_sort_order":450,"status":"revised","reservation_date":"2018-01-08 14:44:47","uploaded":"2018-01-09 06:56:35","revisionof":"","revisedto":"R5-180086","release":"Rel-15","crspec":"38.521-3","crspecversion":"0.0.1","workitem":[{"winame":"5GS_NR_LTE-UEConTest"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_AHs\/2018-01-16_5G-NR_Adhoc_1\/Docs\/R5-180045.zip","group":"R5","meeting":"R5-ah-33216","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-180046","title":"TP to add clause 6.5.3.2.3 Additional Spectrum emissions mask (contiguous sub-blocks) for intra-band EN-DC to 38.521-3","source":"Ericsson LM","contact":"Mats Johansson","contact-id":38077,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":13,"ainumber":"4.1.6","ainame":"TS 38.521-3","tdoc_agenda_sort_order":460,"status":"revised","reservation_date":"2018-01-08 14:46:03","uploaded":"2018-01-09 06:56:35","revisionof":"","revisedto":"R5-180087","release":"Rel-15","crspec":"38.521-3","crspecversion":"0.0.1","workitem":[{"winame":"5GS_NR_LTE-UEConTest"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_AHs\/2018-01-16_5G-NR_Adhoc_1\/Docs\/R5-180046.zip","group":"R5","meeting":"R5-ah-33216","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-180047","title":"Discussion on Measurement Uncertainty for 5G NR","source":"PCTEST Engineering Lab","contact":"Ronald Borsato","contact-id":66645,"tdoctype":"discussion","for":"Endorsement","abstract":"Conformance testing for New Radio will present many additional test challenges. One area of concern is the additional measurement uncertainty for the test setup for FR2 and its impact on certification testing. The baseline test setup for FR2 relies on an","secretary_remarks":"","agenda_item_sort_order":15,"ainumber":"4.1.7","ainame":"General Papers \/ Work Plan \/ TC lists","tdoc_agenda_sort_order":470,"status":"revised","reservation_date":"2018-01-08 18:28:17","uploaded":"2018-01-09 01:17:00","revisionof":"","revisedto":"R5-180085","release":"","crspec":"","crspecversion":"","workitem":[{"winame":"5GS_NR_LTE-UEConTest"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_AHs\/2018-01-16_5G-NR_Adhoc_1\/Docs\/R5-180047.zip","group":"R5","meeting":"R5-ah-33216","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-180048","title":"Discussion on measurement uncertainty for 5G NR FR1","source":"Keysight Technologies UK Ltd","contact":"Emilio Ruiz","contact-id":62021,"tdoctype":"discussion","for":"Discussion","abstract":"","secretary_remarks":"","agenda_item_sort_order":15,"ainumber":"4.1.7","ainame":"General Papers \/ Work Plan \/ TC lists","tdoc_agenda_sort_order":480,"status":"withdrawn","reservation_date":"2018-01-08 20:17:06","uploaded":null,"revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":[{"winame":"5GS_NR_LTE-UEConTest"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"","group":"R5","meeting":"R5-ah-33216","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-180049","title":"Discussion on connection diagrams for 5G NR","source":"Keysight Technologies UK Ltd","contact":"Emilio Ruiz","contact-id":62021,"tdoctype":"discussion","for":"Discussion","abstract":"LTE devices provides UE antenna connectors to perform conducted measurements and the connection diagrams defined in TS 36.508 [1] informs about the connection between SS elements and UE antenna connectors. Connection diagrams for 5G NR RF1 can follow same","secretary_remarks":"","agenda_item_sort_order":15,"ainumber":"4.1.7","ainame":"General Papers \/ Work Plan \/ TC lists","tdoc_agenda_sort_order":490,"status":"noted","reservation_date":"2018-01-08 20:22:59","uploaded":"2018-01-15 16:43:55","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":[{"winame":"5GS_NR_LTE-UEConTest"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_AHs\/2018-01-16_5G-NR_Adhoc_1\/Docs\/R5-180049.zip","group":"R5","meeting":"R5-ah-33216","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-180050","title":"Discussion on LTE anchor requirements for NSA","source":"Keysight Technologies UK Ltd","contact":"Emilio Ruiz","contact-id":62021,"tdoctype":"discussion","for":"Discussion","abstract":"A default baseline for LTE anchor requirements was considered in [1] at RAN5#77 when NR mmW RF requirements will be tested for NSA. This default baseline assumption disables DL\/UL allocations in the OTA LTE link for RF test cases after establishing the mm","secretary_remarks":"","agenda_item_sort_order":15,"ainumber":"4.1.7","ainame":"General Papers \/ Work Plan \/ TC lists","tdoc_agenda_sort_order":500,"status":"revised","reservation_date":"2018-01-08 20:24:28","uploaded":"2018-01-15 16:43:55","revisionof":"","revisedto":"R5-180089","release":"","crspec":"","crspecversion":"","workitem":[{"winame":"5GS_NR_LTE-UEConTest"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_AHs\/2018-01-16_5G-NR_Adhoc_1\/Docs\/R5-180050.zip","group":"R5","meeting":"R5-ah-33216","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-180051","title":"TP to add 6.5.1 Occupied bandwidth to 38.521-1","source":"Keysight Technologies UK Ltd","contact":"Emilio Ruiz","contact-id":62021,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":11,"ainumber":"4.1.4","ainame":"TS 38.521-1","tdoc_agenda_sort_order":510,"status":"revised","reservation_date":"2018-01-08 20:28:16","uploaded":"2018-01-15 16:43:55","revisionof":"","revisedto":"R5-180075","release":"Rel-15","crspec":"38.521-1","crspecversion":"0.0.1","workitem":[{"winame":"5GS_NR_LTE-UEConTest"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_AHs\/2018-01-16_5G-NR_Adhoc_1\/Docs\/R5-180051.zip","group":"R5","meeting":"R5-ah-33216","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-180052","title":"TP to add 6.5.2.1.1 SEM to 38.521-1","source":"Keysight Technologies UK Ltd","contact":"Emilio Ruiz","contact-id":62021,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":11,"ainumber":"4.1.4","ainame":"TS 38.521-1","tdoc_agenda_sort_order":520,"status":"revised","reservation_date":"2018-01-08 20:31:15","uploaded":"2018-01-15 16:43:55","revisionof":"","revisedto":"R5-180078","release":"Rel-15","crspec":"38.521-1","crspecversion":"0.0.1","workitem":[{"winame":"5GS_NR_LTE-UEConTest"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_AHs\/2018-01-16_5G-NR_Adhoc_1\/Docs\/R5-180052.zip","group":"R5","meeting":"R5-ah-33216","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-180053","title":"TP to add 6.5.2.2.1 NR ACLR to 38.521-1","source":"Keysight Technologies UK Ltd","contact":"Emilio Ruiz","contact-id":62021,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":11,"ainumber":"4.1.4","ainame":"TS 38.521-1","tdoc_agenda_sort_order":530,"status":"revised","reservation_date":"2018-01-08 20:32:32","uploaded":"2018-01-15 16:43:55","revisionof":"","revisedto":"R5-180079","release":"Rel-15","crspec":"38.521-1","crspecversion":"0.0.1","workitem":[{"winame":"5GS_NR_LTE-UEConTest"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_AHs\/2018-01-16_5G-NR_Adhoc_1\/Docs\/R5-180053.zip","group":"R5","meeting":"R5-ah-33216","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-180054","title":"On Measurement Grids for mm-wave NR","source":"ROHDE & SCHWARZ","contact":"Edwin Menzel","contact-id":65839,"tdoctype":"discussion","for":"Endorsement","abstract":"At RAN4 meetings, different measurement grids for TRP and EIRP CDF measurements have been discussed (e.g. in [1], [2], [3], [4]). The choice of measurement grids has a major influence on the accuracy of OTA TRP measurements and on the validity of EIRP CDF","secretary_remarks":"","agenda_item_sort_order":15,"ainumber":"4.1.7","ainame":"General Papers \/ Work Plan \/ TC lists","tdoc_agenda_sort_order":540,"status":"revised","reservation_date":"2018-01-08 20:33:09","uploaded":"2018-01-08 23:38:02","revisionof":"","revisedto":"R5-180093","release":"","crspec":"","crspecversion":"","workitem":[{"winame":"5GS_NR_LTE-UEConTest"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_AHs\/2018-01-16_5G-NR_Adhoc_1\/Docs\/R5-180054.zip","group":"R5","meeting":"R5-ah-33216","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-180055","title":"Tx radiated spurious emissions measurements with dynamic measurement bandwidth","source":"ROHDE & SCHWARZ","contact":"Edwin Menzel","contact-id":65839,"tdoctype":"discussion","for":"Endorsement","abstract":"The OTA spurious emissions limits for UEs are specified by [1]. As TRP is the selected metric for spurious emissions, test time becomes a very critical issue [2] for FR2 transmitters in particular. Furthermore, OTA testing suffers from frequency-dependent","secretary_remarks":"","agenda_item_sort_order":15,"ainumber":"4.1.7","ainame":"General Papers \/ Work Plan \/ TC lists","tdoc_agenda_sort_order":550,"status":"revised","reservation_date":"2018-01-08 20:33:09","uploaded":"2018-01-08 23:38:02","revisionof":"","revisedto":"R5-180102","release":"","crspec":"","crspecversion":"","workitem":[{"winame":"5GS_NR_LTE-UEConTest"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_AHs\/2018-01-16_5G-NR_Adhoc_1\/Docs\/R5-180055.zip","group":"R5","meeting":"R5-ah-33216","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-180056","title":"Discussion on Measurement Uncertainty for FR2","source":"ROHDE & SCHWARZ","contact":"Edwin Menzel","contact-id":65839,"tdoctype":"discussion","for":"Endorsement","abstract":"1.\tBackground: Measurement Uncertainties for LTE OTA Test Cases\nIn the past, Measurement Uncertainties (MUs) for LTE OTA test cases, TRP&TRS for SISO OTA [1] or TRMS for MIMO OTA [2], have been defined in RAN4, while the MU for conformance test cases [3]","secretary_remarks":"","agenda_item_sort_order":15,"ainumber":"4.1.7","ainame":"General Papers \/ Work Plan \/ TC lists","tdoc_agenda_sort_order":560,"status":"noted","reservation_date":"2018-01-08 20:33:09","uploaded":"2018-01-11 10:16:11","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":[{"winame":"5GS_NR_LTE-UEConTest"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_AHs\/2018-01-16_5G-NR_Adhoc_1\/Docs\/R5-180056.zip","group":"R5","meeting":"R5-ah-33216","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-180057","title":"TP to add skeleton of 6.5.1 Occupied bandwidth to 38.521-2","source":"Keysight Technologies UK Ltd","contact":"Emilio Ruiz","contact-id":62021,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":12,"ainumber":"4.1.5","ainame":"TS 38.521-2","tdoc_agenda_sort_order":570,"status":"revised","reservation_date":"2018-01-08 20:35:21","uploaded":"2018-01-15 16:43:55","revisionof":"","revisedto":"R5-180095","release":"Rel-15","crspec":"38.521-2","crspecversion":"0.0.1","workitem":[{"winame":"5GS_NR_LTE-UEConTest"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_AHs\/2018-01-16_5G-NR_Adhoc_1\/Docs\/R5-180057.zip","group":"R5","meeting":"R5-ah-33216","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-180058","title":"TP to add skeleton of 6.5.2.1 SEM to 38.521-2","source":"Keysight Technologies UK Ltd","contact":"Emilio Ruiz","contact-id":62021,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":12,"ainumber":"4.1.5","ainame":"TS 38.521-2","tdoc_agenda_sort_order":580,"status":"revised","reservation_date":"2018-01-08 20:36:43","uploaded":"2018-01-15 16:43:55","revisionof":"","revisedto":"R5-180096","release":"Rel-15","crspec":"38.521-2","crspecversion":"0.0.1","workitem":[{"winame":"5GS_NR_LTE-UEConTest"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_AHs\/2018-01-16_5G-NR_Adhoc_1\/Docs\/R5-180058.zip","group":"R5","meeting":"R5-ah-33216","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-180059","title":"TP to add skeleton of 6.5.2.3 ACLR to 38.521-2","source":"Keysight Technologies UK Ltd","contact":"Emilio Ruiz","contact-id":62021,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":12,"ainumber":"4.1.5","ainame":"TS 38.521-2","tdoc_agenda_sort_order":590,"status":"revised","reservation_date":"2018-01-08 20:38:12","uploaded":"2018-01-15 16:43:55","revisionof":"","revisedto":"R5-180097","release":"Rel-15","crspec":"38.521-2","crspecversion":"0.0.1","workitem":[{"winame":"5GS_NR_LTE-UEConTest"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_AHs\/2018-01-16_5G-NR_Adhoc_1\/Docs\/R5-180059.zip","group":"R5","meeting":"R5-ah-33216","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-180060","title":"On Requirements for the LTE OTA Anchor for NSA","source":"ROHDE & SCHWARZ","contact":"Edwin Menzel","contact-id":65839,"tdoctype":"discussion","for":"Endorsement","abstract":"","secretary_remarks":"","agenda_item_sort_order":15,"ainumber":"4.1.7","ainame":"General Papers \/ Work Plan \/ TC lists","tdoc_agenda_sort_order":600,"status":"withdrawn","reservation_date":"2018-01-08 21:07:12","uploaded":null,"revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":[{"winame":"5GS_NR_LTE-UEConTest"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"","group":"R5","meeting":"R5-ah-33216","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-180061","title":"MU responsibility for OTA tests","source":"Keysight Technologies UK Ltd","contact":"Moray Rumney","contact-id":6630,"tdoctype":"discussion","for":"Endorsement","abstract":"Proposal to shift responsibility for OTA MU definition from RAN4 to RAN5.","secretary_remarks":"","agenda_item_sort_order":4,"ainumber":"3.1","ainame":"General Discussion Papers","tdoc_agenda_sort_order":610,"status":"noted","reservation_date":"2018-01-08 21:31:58","uploaded":"2018-01-09 01:42:46","revisionof":"","revisedto":"","release":"Rel-15","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_AHs\/2018-01-16_5G-NR_Adhoc_1\/Docs\/R5-180061.zip","group":"R5","meeting":"R5-ah-33216","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-180062","title":"TP to add clause 6.5.2.1.2 Additional spectrum emission mask 38.521-1","source":"Ericsson LM","contact":"Mats Johansson","contact-id":38077,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":11,"ainumber":"4.1.4","ainame":"TS 38.521-1","tdoc_agenda_sort_order":620,"status":"revised","reservation_date":"2018-01-08 21:37:30","uploaded":"2018-01-09 06:56:35","revisionof":"","revisedto":"R5-180076","release":"Rel-15","crspec":"38.521-1","crspecversion":"0.0.1","workitem":[{"winame":"5GS_NR_LTE-UEConTest"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_AHs\/2018-01-16_5G-NR_Adhoc_1\/Docs\/R5-180062.zip","group":"R5","meeting":"R5-ah-33216","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-180063","title":"LS on interworking mechanisms between 5G System and legacy RATs","source":"TSG RAN","contact":"Ingbert Sigovich","contact-id":28887,"tdoctype":"LS in","for":"Action","abstract":"RAN plenary has identified that Rel-15 interworking mechanisms between the 5G System and legacy RATs should be clarified.\nTo avoid possible confusion between Working Groups, RAN plenary wishes to repeat its earlier decision that \nno interworking is expe","secretary_remarks":"","agenda_item_sort_order":2,"ainumber":"2","ainame":"Incoming Liaison Statements","tdoc_agenda_sort_order":6300,"status":"noted","reservation_date":"2018-01-10 13:02:05","uploaded":"2018-01-10 13:05:11","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"RP-172823","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_AHs\/2018-01-16_5G-NR_Adhoc_1\/Docs\/R5-180063.zip","group":"R5","meeting":"R5-ah-33216","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-180064","title":"Skeleton for NR Demod spec 38.521-4","source":"Qualcomm Inc.","contact":"Ingbert Sigovich","contact-id":28887,"tdoctype":"draft TS","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":15,"ainumber":"4.1.7","ainame":"General Papers \/ Work Plan \/ TC lists","tdoc_agenda_sort_order":0,"status":"approved","reservation_date":"2018-01-22 11:15:25","uploaded":"2018-01-23 11:03:13","revisionof":"","revisedto":"","release":"Rel-15","crspec":"38.521-4","crspecversion":"0.0.1","workitem":[{"winame":"5GS_NR_LTE-UEConTest"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_AHs\/2018-01-16_5G-NR_Adhoc_1\/Docs\/R5-180064.zip","group":"R5","meeting":"R5-ah-33216","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-180065","title":"Discussion about Test parameters for NR TRx TCs","source":"NTT DOCOMO, INC.","contact":"Ingbert Sigovich","contact-id":28887,"tdoctype":"discussion","for":"Endorsement","abstract":"","secretary_remarks":"","agenda_item_sort_order":15,"ainumber":"4.1.7","ainame":"General Papers \/ Work Plan \/ TC lists","tdoc_agenda_sort_order":61,"status":"noted","reservation_date":"2018-01-22 11:15:27","uploaded":"2018-01-22 11:28:06","revisionof":"R5-180006","revisedto":"","release":"Rel-15","crspec":"","crspecversion":"","workitem":[{"winame":"5GS_NR_LTE-UEConTest"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_AHs\/2018-01-16_5G-NR_Adhoc_1\/Docs\/R5-180065.zip","group":"R5","meeting":"R5-ah-33216","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-180066","title":"Definition of downlink physical layer parameters for NR","source":"Ericsson","contact":"Ingbert Sigovich","contact-id":28887,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":8,"ainumber":"4.1.1","ainame":"TS 38.508-1","tdoc_agenda_sort_order":51,"status":"approved","reservation_date":"2018-01-22 11:15:27","uploaded":"2018-01-22 11:28:06","revisionof":"R5-180005","revisedto":"","release":"Rel-15","crspec":"38.508-1","crspecversion":"0.0.1","workitem":[{"winame":"5GS_NR_LTE-UEConTest"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_AHs\/2018-01-16_5G-NR_Adhoc_1\/Docs\/R5-180066.zip","group":"R5","meeting":"R5-ah-33216","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-180067","title":"Discussion on test point selection of MOP, MPR and AMPR in FR1","source":"Huawei, CATR","contact":"Ingbert Sigovich","contact-id":28887,"tdoctype":"discussion","for":"Decision","abstract":"","secretary_remarks":"","agenda_item_sort_order":15,"ainumber":"4.1.7","ainame":"General Papers \/ Work Plan \/ TC lists","tdoc_agenda_sort_order":141,"status":"noted","reservation_date":"2018-01-22 11:15:27","uploaded":"2018-01-22 11:28:06","revisionof":"R5-180014","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":[{"winame":"5GS_NR_LTE-UEConTest"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_AHs\/2018-01-16_5G-NR_Adhoc_1\/Docs\/R5-180067.zip","group":"R5","meeting":"R5-ah-33216","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-180068","title":"Addition of new FR1 test case 6.2.1.","source":"Huawei","contact":"Ingbert Sigovich","contact-id":28887,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":11,"ainumber":"4.1.4","ainame":"TS 38.521-1","tdoc_agenda_sort_order":151,"status":"approved","reservation_date":"2018-01-22 11:15:27","uploaded":"2018-01-22 11:28:06","revisionof":"R5-180015","revisedto":"","release":"Rel-15","crspec":"38.521-1","crspecversion":"0.0.1","workitem":[{"winame":"5GS_NR_LTE-UEConTest"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_AHs\/2018-01-16_5G-NR_Adhoc_1\/Docs\/R5-180068.zip","group":"R5","meeting":"R5-ah-33216","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-180069","title":"TP to add clause 6.2.3 UE additional maximum output power reduction (A-MPR) to 38.521-1","source":"Ericsson LM","contact":"Ingbert Sigovich","contact-id":28887,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":11,"ainumber":"4.1.4","ainame":"TS 38.521-1","tdoc_agenda_sort_order":431,"status":"approved","reservation_date":"2018-01-22 11:15:28","uploaded":"2018-01-22 11:28:06","revisionof":"R5-180043","revisedto":"","release":"Rel-15","crspec":"38.521-1","crspecversion":"0.0.1","workitem":[{"winame":"5GS_NR_LTE-UEConTest"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_AHs\/2018-01-16_5G-NR_Adhoc_1\/Docs\/R5-180069.zip","group":"R5","meeting":"R5-ah-33216","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-180070","title":"Addition of new FR1 test case 6.2.2.","source":"CATR","contact":"Ingbert Sigovich","contact-id":28887,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":11,"ainumber":"4.1.4","ainame":"TS 38.521-1","tdoc_agenda_sort_order":201,"status":"approved","reservation_date":"2018-01-22 11:15:28","uploaded":"2018-01-22 11:28:06","revisionof":"R5-180020","revisedto":"","release":"Rel-15","crspec":"38.521-1","crspecversion":"0.0.1","workitem":[{"winame":"5GS_NR_LTE-UEConTest"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_AHs\/2018-01-16_5G-NR_Adhoc_1\/Docs\/R5-180070.zip","group":"R5","meeting":"R5-ah-33216","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-180071","title":"Addition of new FR1 test case 6.3.1.","source":"Huawei","contact":"Ingbert Sigovich","contact-id":28887,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":11,"ainumber":"4.1.4","ainame":"TS 38.521-1","tdoc_agenda_sort_order":161,"status":"approved","reservation_date":"2018-01-22 11:15:28","uploaded":"2018-01-22 11:28:06","revisionof":"R5-180016","revisedto":"","release":"Rel-15","crspec":"38.521-1","crspecversion":"0.0.1","workitem":[{"winame":"5GS_NR_LTE-UEConTest"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_AHs\/2018-01-16_5G-NR_Adhoc_1\/Docs\/R5-180071.zip","group":"R5","meeting":"R5-ah-33216","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-180072","title":"Addition of new FR1 test case 6.3.3.2.","source":"Huawei","contact":"Ingbert Sigovich","contact-id":28887,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":11,"ainumber":"4.1.4","ainame":"TS 38.521-1","tdoc_agenda_sort_order":171,"status":"approved","reservation_date":"2018-01-22 11:15:28","uploaded":"2018-01-22 11:28:06","revisionof":"R5-180017","revisedto":"","release":"Rel-15","crspec":"38.521-1","crspecversion":"0.0.1","workitem":[{"winame":"5GS_NR_LTE-UEConTest"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_AHs\/2018-01-16_5G-NR_Adhoc_1\/Docs\/R5-180072.zip","group":"R5","meeting":"R5-ah-33216","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-180073","title":"New FR1 test case: 6.3.4.3, Power control relative power tolerance","source":"Ericsson","contact":"Ingbert Sigovich","contact-id":28887,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":11,"ainumber":"4.1.4","ainame":"TS 38.521-1","tdoc_agenda_sort_order":241,"status":"approved","reservation_date":"2018-01-22 11:15:28","uploaded":"2018-01-22 11:28:06","revisionof":"R5-180024","revisedto":"","release":"Rel-15","crspec":"38.521-1","crspecversion":"0.0.1","workitem":[{"winame":"5GS_NR_LTE-UEConTest"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_AHs\/2018-01-16_5G-NR_Adhoc_1\/Docs\/R5-180073.zip","group":"R5","meeting":"R5-ah-33216","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-180074","title":"TP to add clause 6.5.3.3 Additional spurious emissions to 38.521-1","source":"Ericsson LM","contact":"Ingbert Sigovich","contact-id":28887,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":11,"ainumber":"4.1.4","ainame":"TS 38.521-1","tdoc_agenda_sort_order":441,"status":"withdrawn","reservation_date":"2018-01-22 11:15:28","uploaded":null,"revisionof":"R5-180044","revisedto":"","release":"Rel-15","crspec":"38.521-1","crspecversion":"0.0.1","workitem":[{"winame":"5GS_NR_LTE-UEConTest"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"","group":"R5","meeting":"R5-ah-33216","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-180075","title":"TP to add 6.5.1 Occupied bandwidth to 38.521-1","source":"Keysight Technologies UK Ltd","contact":"Ingbert Sigovich","contact-id":28887,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":11,"ainumber":"4.1.4","ainame":"TS 38.521-1","tdoc_agenda_sort_order":511,"status":"approved","reservation_date":"2018-01-22 11:15:28","uploaded":"2018-01-22 11:28:06","revisionof":"R5-180051","revisedto":"","release":"Rel-15","crspec":"38.521-1","crspecversion":"0.0.1","workitem":[{"winame":"5GS_NR_LTE-UEConTest"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_AHs\/2018-01-16_5G-NR_Adhoc_1\/Docs\/R5-180075.zip","group":"R5","meeting":"R5-ah-33216","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-180076","title":"TP to add clause 6.5.2.1.2 Additional spectrum emission mask 38.521-1","source":"Ericsson LM","contact":"Ingbert Sigovich","contact-id":28887,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":11,"ainumber":"4.1.4","ainame":"TS 38.521-1","tdoc_agenda_sort_order":621,"status":"approved","reservation_date":"2018-01-22 11:15:28","uploaded":"2018-01-22 11:28:06","revisionof":"R5-180062","revisedto":"","release":"Rel-15","crspec":"38.521-1","crspecversion":"0.0.1","workitem":[{"winame":"5GS_NR_LTE-UEConTest"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_AHs\/2018-01-16_5G-NR_Adhoc_1\/Docs\/R5-180076.zip","group":"R5","meeting":"R5-ah-33216","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-180077","title":"Introduction of new test case 6.3.2 Transmit OFF power","source":"CATR","contact":"Ingbert Sigovich","contact-id":28887,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":11,"ainumber":"4.1.4","ainame":"TS 38.521-1","tdoc_agenda_sort_order":191,"status":"approved","reservation_date":"2018-01-22 11:15:28","uploaded":"2018-01-22 11:28:06","revisionof":"R5-180019","revisedto":"","release":"Rel-15","crspec":"38.521-1","crspecversion":"0.0.1","workitem":[{"winame":"5GS_NR_LTE-UEConTest"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_AHs\/2018-01-16_5G-NR_Adhoc_1\/Docs\/R5-180077.zip","group":"R5","meeting":"R5-ah-33216","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-180078","title":"TP to add 6.5.2.1.1 SEM to 38.521-1","source":"Keysight Technologies UK Ltd","contact":"Ingbert Sigovich","contact-id":28887,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":11,"ainumber":"4.1.4","ainame":"TS 38.521-1","tdoc_agenda_sort_order":521,"status":"approved","reservation_date":"2018-01-22 11:15:28","uploaded":"2018-01-22 11:28:06","revisionof":"R5-180052","revisedto":"","release":"Rel-15","crspec":"38.521-1","crspecversion":"0.0.1","workitem":[{"winame":"5GS_NR_LTE-UEConTest"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_AHs\/2018-01-16_5G-NR_Adhoc_1\/Docs\/R5-180078.zip","group":"R5","meeting":"R5-ah-33216","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-180079","title":"TP to add 6.5.2.2.1 NR ACLR to 38.521-1","source":"Keysight Technologies UK Ltd","contact":"Ingbert Sigovich","contact-id":28887,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":11,"ainumber":"4.1.4","ainame":"TS 38.521-1","tdoc_agenda_sort_order":531,"status":"approved","reservation_date":"2018-01-22 11:15:28","uploaded":"2018-01-22 11:28:06","revisionof":"R5-180053","revisedto":"","release":"Rel-15","crspec":"38.521-1","crspecversion":"0.0.1","workitem":[{"winame":"5GS_NR_LTE-UEConTest"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_AHs\/2018-01-16_5G-NR_Adhoc_1\/Docs\/R5-180079.zip","group":"R5","meeting":"R5-ah-33216","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-180080","title":"Test methodology for mmWave Demod testing","source":"Qualcomm Korea","contact":"Ingbert Sigovich","contact-id":28887,"tdoctype":"discussion","for":"Endorsement","abstract":"","secretary_remarks":"","agenda_item_sort_order":15,"ainumber":"4.1.7","ainame":"General Papers \/ Work Plan \/ TC lists","tdoc_agenda_sort_order":81,"status":"noted","reservation_date":"2018-01-22 11:15:28","uploaded":"2018-01-22 11:18:07","revisionof":"R5-180008","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":[{"winame":"5GS_NR_LTE-UEConTest"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_AHs\/2018-01-16_5G-NR_Adhoc_1\/Docs\/R5-180080.zip","group":"R5","meeting":"R5-ah-33216","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-180081","title":"Link budget consideration for mmWave Demod Tests","source":"Qualcomm Korea","contact":"Ingbert Sigovich","contact-id":28887,"tdoctype":"discussion","for":"Endorsement","abstract":"","secretary_remarks":"","agenda_item_sort_order":15,"ainumber":"4.1.7","ainame":"General Papers \/ Work Plan \/ TC lists","tdoc_agenda_sort_order":91,"status":"noted","reservation_date":"2018-01-22 11:15:28","uploaded":"2018-01-22 11:28:06","revisionof":"R5-180009","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":[{"winame":"5GS_NR_LTE-UEConTest"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_AHs\/2018-01-16_5G-NR_Adhoc_1\/Docs\/R5-180081.zip","group":"R5","meeting":"R5-ah-33216","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-180082","title":"Discussion on FR2 uncertainty","source":"Anritsu","contact":"Ingbert Sigovich","contact-id":28887,"tdoctype":"discussion","for":"Endorsement","abstract":"","secretary_remarks":"","agenda_item_sort_order":15,"ainumber":"4.1.7","ainame":"General Papers \/ Work Plan \/ TC lists","tdoc_agenda_sort_order":311,"status":"noted","reservation_date":"2018-01-22 11:15:28","uploaded":"2018-01-22 11:18:07","revisionof":"R5-180031","revisedto":"","release":"Rel-15","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_AHs\/2018-01-16_5G-NR_Adhoc_1\/Docs\/R5-180082.zip","group":"R5","meeting":"R5-ah-33216","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-180083","title":"Discussion about mmW Test Tolerance for NR TRx TCs","source":"NTT DOCOMO, INC.","contact":"Ingbert Sigovich","contact-id":28887,"tdoctype":"discussion","for":"Endorsement","abstract":"","secretary_remarks":"","agenda_item_sort_order":15,"ainumber":"4.1.7","ainame":"General Papers \/ Work Plan \/ TC lists","tdoc_agenda_sort_order":71,"status":"noted","reservation_date":"2018-01-22 11:15:28","uploaded":"2018-01-22 11:28:06","revisionof":"R5-180007","revisedto":"","release":"Rel-15","crspec":"","crspecversion":"","workitem":[{"winame":"5GS_NR_LTE-UEConTest"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_AHs\/2018-01-16_5G-NR_Adhoc_1\/Docs\/R5-180083.zip","group":"R5","meeting":"R5-ah-33216","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-180084","title":"Discussion on uncertainty of Sub-6GHz NR TRx tests","source":"Anritsu","contact":"Ingbert Sigovich","contact-id":28887,"tdoctype":"discussion","for":"Endorsement","abstract":"","secretary_remarks":"","agenda_item_sort_order":15,"ainumber":"4.1.7","ainame":"General Papers \/ Work Plan \/ TC lists","tdoc_agenda_sort_order":271,"status":"noted","reservation_date":"2018-01-22 11:15:28","uploaded":"2018-01-22 11:28:06","revisionof":"R5-180027","revisedto":"","release":"Rel-15","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_AHs\/2018-01-16_5G-NR_Adhoc_1\/Docs\/R5-180084.zip","group":"R5","meeting":"R5-ah-33216","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-180085","title":"Discussion on Measurement Uncertainty for 5G NR","source":"PCTEST Engineering Lab","contact":"Ingbert Sigovich","contact-id":28887,"tdoctype":"discussion","for":"Endorsement","abstract":"","secretary_remarks":"","agenda_item_sort_order":15,"ainumber":"4.1.7","ainame":"General Papers \/ Work Plan \/ TC lists","tdoc_agenda_sort_order":471,"status":"noted","reservation_date":"2018-01-22 11:15:28","uploaded":"2018-01-22 11:18:07","revisionof":"R5-180047","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":[{"winame":"5GS_NR_LTE-UEConTest"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_AHs\/2018-01-16_5G-NR_Adhoc_1\/Docs\/R5-180085.zip","group":"R5","meeting":"R5-ah-33216","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-180086","title":"TP to add clause 6.2.4.3 UE A-MPR intra-band EN-DC to 38.521-3","source":"Ericsson LM","contact":"Ingbert Sigovich","contact-id":28887,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":13,"ainumber":"4.1.6","ainame":"TS 38.521-3","tdoc_agenda_sort_order":451,"status":"approved","reservation_date":"2018-01-22 11:15:28","uploaded":"2018-01-22 11:28:06","revisionof":"R5-180045","revisedto":"","release":"Rel-15","crspec":"38.521-3","crspecversion":"0.0.1","workitem":[{"winame":"5GS_NR_LTE-UEConTest"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_AHs\/2018-01-16_5G-NR_Adhoc_1\/Docs\/R5-180086.zip","group":"R5","meeting":"R5-ah-33216","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-180087","title":"TP to add clause 6.5.3.2.3 Additional Spectrum emissions mask (contiguous sub-blocks) for intra-band EN-DC to 38.521-3","source":"Ericsson LM","contact":"Ingbert Sigovich","contact-id":28887,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":13,"ainumber":"4.1.6","ainame":"TS 38.521-3","tdoc_agenda_sort_order":461,"status":"approved","reservation_date":"2018-01-22 11:15:28","uploaded":"2018-01-22 11:28:06","revisionof":"R5-180046","revisedto":"","release":"Rel-15","crspec":"38.521-3","crspecversion":"0.0.1","workitem":[{"winame":"5GS_NR_LTE-UEConTest"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_AHs\/2018-01-16_5G-NR_Adhoc_1\/Docs\/R5-180087.zip","group":"R5","meeting":"R5-ah-33216","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-180088","title":"LTE Anchor Link Requirements","source":"Anritsu","contact":"Ingbert Sigovich","contact-id":28887,"tdoctype":"discussion","for":"Endorsement","abstract":"","secretary_remarks":"","agenda_item_sort_order":15,"ainumber":"4.1.7","ainame":"General Papers \/ Work Plan \/ TC lists","tdoc_agenda_sort_order":301,"status":"noted","reservation_date":"2018-01-22 11:15:29","uploaded":"2018-01-22 11:28:06","revisionof":"R5-180030","revisedto":"","release":"Rel-15","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_AHs\/2018-01-16_5G-NR_Adhoc_1\/Docs\/R5-180088.zip","group":"R5","meeting":"R5-ah-33216","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-180089","title":"Discussion on LTE anchor requirements for NSA","source":"Keysight Technologies UK Ltd","contact":"Ingbert Sigovich","contact-id":28887,"tdoctype":"discussion","for":"Discussion","abstract":"","secretary_remarks":"","agenda_item_sort_order":15,"ainumber":"4.1.7","ainame":"General Papers \/ Work Plan \/ TC lists","tdoc_agenda_sort_order":501,"status":"noted","reservation_date":"2018-01-22 11:15:29","uploaded":"2018-01-22 11:28:06","revisionof":"R5-180050","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":[{"winame":"5GS_NR_LTE-UEConTest"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_AHs\/2018-01-16_5G-NR_Adhoc_1\/Docs\/R5-180089.zip","group":"R5","meeting":"R5-ah-33216","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-180090","title":"Discussion on mmWave UE conformance RF testing","source":"Qualcomm Korea","contact":"Ingbert Sigovich","contact-id":28887,"tdoctype":"discussion","for":"Endorsement","abstract":"","secretary_remarks":"","agenda_item_sort_order":15,"ainumber":"4.1.7","ainame":"General Papers \/ Work Plan \/ TC lists","tdoc_agenda_sort_order":121,"status":"noted","reservation_date":"2018-01-22 11:15:29","uploaded":"2018-01-22 11:18:07","revisionof":"R5-180012","revisedto":"","release":"","crspec":"38.521-2","crspecversion":"","workitem":[{"winame":"5GS_NR_LTE-UEConTest"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_AHs\/2018-01-16_5G-NR_Adhoc_1\/Docs\/R5-180090.zip","group":"R5","meeting":"R5-ah-33216","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-180091","title":"Consideration on the FR2 TRx test procedure","source":"Anritsu","contact":"Ingbert Sigovich","contact-id":28887,"tdoctype":"discussion","for":"Endorsement","abstract":"","secretary_remarks":"","agenda_item_sort_order":15,"ainumber":"4.1.7","ainame":"General Papers \/ Work Plan \/ TC lists","tdoc_agenda_sort_order":281,"status":"noted","reservation_date":"2018-01-22 11:15:29","uploaded":"2018-01-22 11:18:07","revisionof":"R5-180028","revisedto":"","release":"Rel-15","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_AHs\/2018-01-16_5G-NR_Adhoc_1\/Docs\/R5-180091.zip","group":"R5","meeting":"R5-ah-33216","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-180092","title":"Draft LS on Measurement Uncertainty Definition Responsibilities","source":"TSG WG RAN5","contact":"Ingbert Sigovich","contact-id":28887,"tdoctype":"LS out","for":"Approval","abstract":"Release:\tRelease 15\nWork Item:\t5GS_NR_LTE-UEConTest\nRAN5 has reviewed three contributions [1-3] discussing the responsibilities to define measurement uncertainties (MUs) for NR OTA testing. Given RAN5\u2019s experience defining MUs and test tolerances (TTs)","secretary_remarks":"","agenda_item_sort_order":18,"ainumber":"5.2","ainame":"Outgoing LS (Post meeting approval on RAN5 reflector)","tdoc_agenda_sort_order":9200,"status":"approved","reservation_date":"2018-01-22 11:15:29","uploaded":"2018-01-22 11:28:06","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"TSG WG RAN4","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_AHs\/2018-01-16_5G-NR_Adhoc_1\/Docs\/R5-180092.zip","group":"R5","meeting":"R5-ah-33216","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-180093","title":"On Measurement Grids for mm-wave NR","source":"ROHDE & SCHWARZ","contact":"Ingbert Sigovich","contact-id":28887,"tdoctype":"discussion","for":"Endorsement","abstract":"","secretary_remarks":"","agenda_item_sort_order":15,"ainumber":"4.1.7","ainame":"General Papers \/ Work Plan \/ TC lists","tdoc_agenda_sort_order":541,"status":"noted","reservation_date":"2018-01-22 11:15:29","uploaded":"2018-01-22 11:28:06","revisionof":"R5-180054","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":[{"winame":"5GS_NR_LTE-UEConTest"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_AHs\/2018-01-16_5G-NR_Adhoc_1\/Docs\/R5-180093.zip","group":"R5","meeting":"R5-ah-33216","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-180094","title":"Introduction of new test case 6.3.2 Transmit OFF power","source":"CATR","contact":"Ingbert Sigovich","contact-id":28887,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":12,"ainumber":"4.1.5","ainame":"TS 38.521-2","tdoc_agenda_sort_order":181,"status":"approved","reservation_date":"2018-01-22 11:15:29","uploaded":"2018-01-22 11:28:06","revisionof":"R5-180018","revisedto":"","release":"Rel-15","crspec":"38.521-2","crspecversion":"0.0.1","workitem":[{"winame":"5GS_NR_LTE-UEConTest"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_AHs\/2018-01-16_5G-NR_Adhoc_1\/Docs\/R5-180094.zip","group":"R5","meeting":"R5-ah-33216","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-180095","title":"TP to add skeleton of 6.5.1 Occupied bandwidth to 38.521-2","source":"Keysight Technologies UK Ltd","contact":"Ingbert Sigovich","contact-id":28887,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":12,"ainumber":"4.1.5","ainame":"TS 38.521-2","tdoc_agenda_sort_order":571,"status":"approved","reservation_date":"2018-01-22 11:15:29","uploaded":"2018-01-22 11:28:06","revisionof":"R5-180057","revisedto":"","release":"Rel-15","crspec":"38.521-2","crspecversion":"0.0.1","workitem":[{"winame":"5GS_NR_LTE-UEConTest"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_AHs\/2018-01-16_5G-NR_Adhoc_1\/Docs\/R5-180095.zip","group":"R5","meeting":"R5-ah-33216","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-180096","title":"TP to add skeleton of 6.5.2.1 SEM to 38.521-2","source":"Keysight Technologies UK Ltd","contact":"Ingbert Sigovich","contact-id":28887,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":12,"ainumber":"4.1.5","ainame":"TS 38.521-2","tdoc_agenda_sort_order":581,"status":"approved","reservation_date":"2018-01-22 11:15:29","uploaded":"2018-01-22 11:28:06","revisionof":"R5-180058","revisedto":"","release":"Rel-15","crspec":"38.521-2","crspecversion":"0.0.1","workitem":[{"winame":"5GS_NR_LTE-UEConTest"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_AHs\/2018-01-16_5G-NR_Adhoc_1\/Docs\/R5-180096.zip","group":"R5","meeting":"R5-ah-33216","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-180097","title":"TP to add skeleton of 6.5.2.3 ACLR to 38.521-2","source":"Keysight Technologies UK Ltd","contact":"Ingbert Sigovich","contact-id":28887,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":12,"ainumber":"4.1.5","ainame":"TS 38.521-2","tdoc_agenda_sort_order":591,"status":"approved","reservation_date":"2018-01-22 11:15:29","uploaded":"2018-01-22 11:28:06","revisionof":"R5-180059","revisedto":"","release":"Rel-15","crspec":"38.521-2","crspecversion":"0.0.1","workitem":[{"winame":"5GS_NR_LTE-UEConTest"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_AHs\/2018-01-16_5G-NR_Adhoc_1\/Docs\/R5-180097.zip","group":"R5","meeting":"R5-ah-33216","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-180098","title":"TRP\/EIRP Measurement Procedure Alignment with ANSI C63 and ETSI EN 301 908-1","source":"Qualcomm Korea","contact":"Ingbert Sigovich","contact-id":28887,"tdoctype":"discussion","for":"Endorsement","abstract":"","secretary_remarks":"","agenda_item_sort_order":15,"ainumber":"4.1.7","ainame":"General Papers \/ Work Plan \/ TC lists","tdoc_agenda_sort_order":111,"status":"withdrawn","reservation_date":"2018-01-22 11:15:29","uploaded":null,"revisionof":"R5-180011","revisedto":"","release":"","crspec":"38.521-2","crspecversion":"","workitem":[{"winame":"5GS_NR_LTE-UEConTest"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"","group":"R5","meeting":"R5-ah-33216","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-180099","title":"TRP and EIRP Spurious Emission Measurement Procedure Baselines","source":"Qualcomm Korea","contact":"Ingbert Sigovich","contact-id":28887,"tdoctype":"discussion","for":"Endorsement","abstract":"reissued from R5-180098 because of title change.","secretary_remarks":"","agenda_item_sort_order":15,"ainumber":"4.1.7","ainame":"General Papers \/ Work Plan \/ TC lists","tdoc_agenda_sort_order":112,"status":"noted","reservation_date":"2018-01-22 11:15:29","uploaded":"2018-01-22 11:18:07","revisionof":"","revisedto":"","release":"","crspec":"38.521-2","crspecversion":"","workitem":[{"winame":"5GS_NR_LTE-UEConTest"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_AHs\/2018-01-16_5G-NR_Adhoc_1\/Docs\/R5-180099.zip","group":"R5","meeting":"R5-ah-33216","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-180100","title":"LS on LTE requirements for EN-DC with NR in FR2","source":"TSG WG RAN5","contact":"Ingbert Sigovich","contact-id":28887,"tdoctype":"LS out","for":"Approval","abstract":"RAN5 has discussed at RAN5#1 5G-NR Adhoc meeting the need to clarify with RAN4 E-UTRA requirements for EN-DC scenario with NR in FR2. The rationale behind this need is the way that some EN-DC requirements are defined in TS 38.101-3 [3], where there is not","secretary_remarks":"","agenda_item_sort_order":18,"ainumber":"5.2","ainame":"Outgoing LS (Post meeting approval on RAN5 reflector)","tdoc_agenda_sort_order":10000,"status":"approved","reservation_date":"2018-01-22 11:15:29","uploaded":"2018-01-22 11:28:06","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"TSG WG RAN4","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_AHs\/2018-01-16_5G-NR_Adhoc_1\/Docs\/R5-180100.zip","group":"R5","meeting":"R5-ah-33216","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-180101","title":"Discussion on FR2 Spurious Test","source":"Anritsu","contact":"Ingbert Sigovich","contact-id":28887,"tdoctype":"discussion","for":"Endorsement","abstract":"","secretary_remarks":"","agenda_item_sort_order":15,"ainumber":"4.1.7","ainame":"General Papers \/ Work Plan \/ TC lists","tdoc_agenda_sort_order":291,"status":"noted","reservation_date":"2018-01-22 11:15:29","uploaded":"2018-01-22 11:18:08","revisionof":"R5-180029","revisedto":"","release":"Rel-15","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_AHs\/2018-01-16_5G-NR_Adhoc_1\/Docs\/R5-180101.zip","group":"R5","meeting":"R5-ah-33216","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-180102","title":"Tx radiated spurious emissions measurements with dynamic measurement bandwidth","source":"ROHDE & SCHWARZ","contact":"Ingbert Sigovich","contact-id":28887,"tdoctype":"discussion","for":"Endorsement","abstract":"","secretary_remarks":"","agenda_item_sort_order":15,"ainumber":"4.1.7","ainame":"General Papers \/ Work Plan \/ TC lists","tdoc_agenda_sort_order":551,"status":"noted","reservation_date":"2018-01-22 11:15:29","uploaded":"2018-01-22 11:28:06","revisionof":"R5-180055","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":[{"winame":"5GS_NR_LTE-UEConTest"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_AHs\/2018-01-16_5G-NR_Adhoc_1\/Docs\/R5-180102.zip","group":"R5","meeting":"R5-ah-33216","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-180103","title":"Add definitions, symbols and abbreviations","source":"CATR","contact":"Ingbert Sigovich","contact-id":28887,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":12,"ainumber":"4.1.5","ainame":"TS 38.521-2","tdoc_agenda_sort_order":31,"status":"approved","reservation_date":"2018-01-22 11:15:29","uploaded":"2018-01-22 11:28:06","revisionof":"R5-180003","revisedto":"","release":"Rel-15","crspec":"38.521-2","crspecversion":"0.0.1","workitem":[{"winame":"5GS_NR_LTE-UEConTest"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_AHs\/2018-01-16_5G-NR_Adhoc_1\/Docs\/R5-180103.zip","group":"R5","meeting":"R5-ah-33216","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-180104","title":"Introduction of Operating bands and Channel arrangement","source":"CATR","contact":"Ingbert Sigovich","contact-id":28887,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":12,"ainumber":"4.1.5","ainame":"TS 38.521-2","tdoc_agenda_sort_order":41,"status":"approved","reservation_date":"2018-01-22 11:15:29","uploaded":"2018-01-22 11:28:06","revisionof":"R5-180004","revisedto":"","release":"Rel-15","crspec":"38.521-2","crspecversion":"0.0.1","workitem":[{"winame":"5GS_NR_LTE-UEConTest"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_AHs\/2018-01-16_5G-NR_Adhoc_1\/Docs\/R5-180104.zip","group":"R5","meeting":"R5-ah-33216","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-180105","title":"Way Forward on NR connection diagrams","source":"Rohde&Schwarz, Keysight Technologies","contact":"Ingbert Sigovich","contact-id":28887,"tdoctype":"discussion","for":"Decision","abstract":"In this meeting, two discussion papers ([1], [2]) were presented analysing the current LTE connection diagrams and how to improve the process in NR.\nThis contribution collects the inputs from these two discussion papers and proposes a way forward.\n2.\tDi","secretary_remarks":"","agenda_item_sort_order":15,"ainumber":"4.1.7","ainame":"General Papers \/ Work Plan \/ TC lists","tdoc_agenda_sort_order":10500,"status":"noted","reservation_date":"2018-01-22 11:15:29","uploaded":"2018-01-22 11:18:08","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_AHs\/2018-01-16_5G-NR_Adhoc_1\/Docs\/R5-180105.zip","group":"R5","meeting":"R5-ah-33216","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-180106","title":"Discussion on synergies between test cases in TS 38.521-1. TS 38.521-2 and TS 38.521-3","source":"Ericsson","contact":"Ingbert Sigovich","contact-id":28887,"tdoctype":"discussion","for":"Endorsement","abstract":"","secretary_remarks":"","agenda_item_sort_order":15,"ainumber":"4.1.7","ainame":"General Papers \/ Work Plan \/ TC lists","tdoc_agenda_sort_order":421,"status":"noted","reservation_date":"2018-01-22 11:15:29","uploaded":"2018-01-22 11:28:06","revisionof":"R5-180042","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":[{"winame":"5GS_NR_LTE-UEConTest"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_AHs\/2018-01-16_5G-NR_Adhoc_1\/Docs\/R5-180106.zip","group":"R5","meeting":"R5-ah-33216","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-180107","title":"Draft TS 38.522 v0.1.0 skeleton","source":"China Mobile Com. Corporation","contact":"Ingbert Sigovich","contact-id":28887,"tdoctype":"draft TS","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":15,"ainumber":"4.1.7","ainame":"General Papers \/ Work Plan \/ TC lists","tdoc_agenda_sort_order":261,"status":"approved","reservation_date":"2018-01-22 11:15:29","uploaded":"2018-01-22 11:28:06","revisionof":"R5-180026","revisedto":"","release":"Rel-15","crspec":"38.522","crspecversion":"0.1.0","workitem":[{"winame":"5GS_NR_LTE-UEConTest"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_AHs\/2018-01-16_5G-NR_Adhoc_1\/Docs\/R5-180107.zip","group":"R5","meeting":"R5-ah-33216","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-180108","title":"LS to RAN4 on mmWave Demod test methodology","source":"TSG WG RAN5","contact":"Ingbert Sigovich","contact-id":28887,"tdoctype":"LS out","for":"Approval","abstract":"As part of discussion paper (R5-180080), RAN5 group discussed the proposed test methodology to be used as baseline test method for mmWave demod testing. The RAN5 RF sub-group sees significant value in using this simplified test approach which supports bot","secretary_remarks":"","agenda_item_sort_order":18,"ainumber":"5.2","ainame":"Outgoing LS (Post meeting approval on RAN5 reflector)","tdoc_agenda_sort_order":10800,"status":"approved","reservation_date":"2018-01-22 11:15:30","uploaded":"2018-01-22 11:28:06","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"TSG WG RAN4","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_AHs\/2018-01-16_5G-NR_Adhoc_1\/Docs\/R5-180108.zip","group":"R5","meeting":"R5-ah-33216","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-180109","title":"LS to RAN WG4 on OTA test coverage for multi-panel Ues at FR2","source":"TSG WG RAN5","contact":"Ingbert Sigovich","contact-id":28887,"tdoctype":"LS out","for":"Approval","abstract":"At RAN5 5G-NR Adhoc Meeting #1 during discussion of R5-180094 it was noted that the conducted tests at FR1 are carried out on all the TRx ports of the UE. For radiated tests, to cover the equivalent coverage as FR1\/LTE, FR2 test will be necessary to ensur","secretary_remarks":"","agenda_item_sort_order":18,"ainumber":"5.2","ainame":"Outgoing LS (Post meeting approval on RAN5 reflector)","tdoc_agenda_sort_order":10900,"status":"approved","reservation_date":"2018-01-22 11:15:31","uploaded":"2018-01-22 11:18:08","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":[{"winame":"5GS_NR_LTE-UEConTest"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"TSG WG RAN4","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_AHs\/2018-01-16_5G-NR_Adhoc_1\/Docs\/R5-180109.zip","group":"R5","meeting":"R5-ah-33216","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-180110","title":"LS to RAN4 on TRP measurement challenges","source":"TSG WG RAN5","contact":"Ingbert Sigovich","contact-id":28887,"tdoctype":"LS out","for":"Approval","abstract":"Response to:\tR4-1714533 LS on conformance spec for mmWave OTA_Anritsu","secretary_remarks":"","agenda_item_sort_order":18,"ainumber":"5.2","ainame":"Outgoing LS (Post meeting approval on RAN5 reflector)","tdoc_agenda_sort_order":11000,"status":"approved","reservation_date":"2018-01-22 11:15:31","uploaded":"2018-01-22 11:18:08","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":[{"winame":"5GS_NR_LTE-UEConTest"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"R5-180001","lsto":"TSG WG RAN4","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_AHs\/2018-01-16_5G-NR_Adhoc_1\/Docs\/R5-180110.zip","group":"R5","meeting":"R5-ah-33216","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-180111","title":"Discussion of test channel BW and sub-carrier spacing (SCS) approach for NR TRx test cases","source":"Ericsson","contact":"Ingbert Sigovich","contact-id":28887,"tdoctype":"discussion","for":"Endorsement","abstract":"","secretary_remarks":"","agenda_item_sort_order":15,"ainumber":"4.1.7","ainame":"General Papers \/ Work Plan \/ TC lists","tdoc_agenda_sort_order":231,"status":"noted","reservation_date":"2018-01-22 11:15:31","uploaded":"2018-01-22 11:28:06","revisionof":"R5-180023","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":[{"winame":"5GS_NR_LTE-UEConTest"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_AHs\/2018-01-16_5G-NR_Adhoc_1\/Docs\/R5-180111.zip","group":"R5","meeting":"R5-ah-33216","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-180112","title":"Draft LS on Measurement Grids for mm-wave NR","source":"TSG WG RAN5","contact":"Ingbert Sigovich","contact-id":28887,"tdoctype":"LS out","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":18,"ainumber":"5.2","ainame":"Outgoing LS (Post meeting approval on RAN5 reflector)","tdoc_agenda_sort_order":11200,"status":"withdrawn","reservation_date":"2018-01-22 11:15:31","uploaded":null,"revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"TSG WG RAN4","Cc":"","lsoriginalls":"","lsreply":"","link":"","group":"R5","meeting":"R5-ah-33216","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-180113","title":"Draft TS 38.521-3 v0.1.0","source":"Qualcomm","contact":"Ingbert Sigovich","contact-id":28887,"tdoctype":"draft TS","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":13,"ainumber":"4.1.6","ainame":"TS 38.521-3","tdoc_agenda_sort_order":0,"status":"approved","reservation_date":"2018-01-22 11:15:31","uploaded":"2018-01-23 11:03:14","revisionof":"","revisedto":"","release":"Rel-15","crspec":"38.521-3","crspecversion":"0.1.0","workitem":[{"winame":"5GS_NR_LTE-UEConTest"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_AHs\/2018-01-16_5G-NR_Adhoc_1\/Docs\/R5-180113.zip","group":"R5","meeting":"R5-ah-33216","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-180114","title":"Draft TS 38.508-1 v0.2.0","source":"Ericsson","contact":"Ingbert Sigovich","contact-id":28887,"tdoctype":"draft TS","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":15,"ainumber":"4.1.7","ainame":"General Papers \/ Work Plan \/ TC lists","tdoc_agenda_sort_order":0,"status":"approved","reservation_date":"2018-01-22 11:15:35","uploaded":"2018-01-29 11:15:44","revisionof":"","revisedto":"","release":"Rel-15","crspec":"38.508-1","crspecversion":"0.2.0","workitem":[{"winame":"5GS_NR_LTE-UEConTest"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_AHs\/2018-01-16_5G-NR_Adhoc_1\/Docs\/R5-180114.zip","group":"R5","meeting":"R5-ah-33216","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-180115","title":"Draft TS 38.521-1 v0.1.0","source":"China Unicom","contact":"Ingbert Sigovich","contact-id":28887,"tdoctype":"draft TS","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":15,"ainumber":"4.1.7","ainame":"General Papers \/ Work Plan \/ TC lists","tdoc_agenda_sort_order":0,"status":"approved","reservation_date":"2018-01-22 11:15:38","uploaded":"2018-01-26 18:22:00","revisionof":"","revisedto":"","release":"Rel-15","crspec":"38.521-1","crspecversion":"0.1.0","workitem":[{"winame":"5GS_NR_LTE-UEConTest"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_AHs\/2018-01-16_5G-NR_Adhoc_1\/Docs\/R5-180115.zip","group":"R5","meeting":"R5-ah-33216","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-180116","title":"draft RAN5#1 5G-NR Adhoc meeting report","source":"ETSI Secretariat","contact":"Ingbert Sigovich","contact-id":28887,"tdoctype":"report","for":"Information","abstract":"","secretary_remarks":"","agenda_item_sort_order":19,"ainumber":"5.4","ainame":"Draft Meeting Minutes RAN5#1-5G-NR Adhoc (Sec)","tdoc_agenda_sort_order":11600,"status":"noted","reservation_date":"2018-01-22 11:15:41","uploaded":null,"revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"","group":"R5","meeting":"R5-ah-33216","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-180117","title":"LS announcing Publication of  TSG IoTSDL TS.41 IoT Standard Diagnostic Logging V1.0","source":"GSMA IoTSDL","contact":"Ingbert Sigovich","contact-id":28887,"tdoctype":"LS in","for":"Action","abstract":"","secretary_remarks":"","agenda_item_sort_order":3,"ainumber":"3","ainame":"RAN5 RF General Issues","tdoc_agenda_sort_order":0,"status":"reserved","reservation_date":"2018-02-08 13:25:42","uploaded":null,"revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"TSG30_055","lsreply":"","link":"","group":"R5","meeting":"R5-ah-33216","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0}]